Loading...
R-01-10-11-12F3 - 10/11/2001RESOLUTION NO. R- 01- 10- 11 -12F3 WHEREAS, the City of Round Rock has previously entered into an agreement for engineering services ( "Agreement ") with Baker - Aicklen & Associates, Inc. for the reconstruction of Chisholm Trail from Chisholm Trail Hotel Centre to Wolle Lane, and WHEREAS, Baker - Aicklen & Associates, Inc. has submitted an Additional Services Authorization for a change in the scope of services, and WHEREAS, the City Council desires to enter into said Additional Services Authorization with Baker - Aicklen & Associates, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City an Additional Services Authorization for a change in the scope of services, a copy of said authorization being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. .ODMA \WORLDOX \0: \WDOX \RESOLUTI \R11011P1.WPD /ec RESOLVED this 11th day of October, 2001. LAND, City Secretary 2 _ l ROB 'T A. STLUKA, J ., Mayor City of Round Rock, Texas Client CITY OF ROUND ROCK Project No. 601 -559 Project PROPOSED IMPROVEMENTS TO CHISHOLM TRAIL Contract Date 01/12/99 Subject of Additional Services EASEMENT EVALUATION Additional Services Project No. 601 -759 -10 1. Evaluate existing easements within new right -of -way for eight (8) parcels. Tech RPLS Clerical Deed Research 8 3 Prepare Sketches 16 4 Easement Evaluation 16 4 2 Total 40 11 2 Technician Hours: 40 x $ 55.00 /hr = 52200.00 RPLS Hours: 11 x 5110.00/hr = 51,210.00 Clerical Hours: 2 x $ 45.00 /hr = $ 90.00 Total $3,500.00 Reason For Change Client Request 14\ Baker -Aicklen & Associates, Inc. Engineers /Surveyors ADDITIONAL SERVICES AUTHORIZATION 1 EXHIBIT nAn Date 09/14/01 Proposal No.01 -7135R Compensation: X Hourly charge plus reimbursable expense basis, as defined in the PROFESSIONAL SERVICES AGREEMENT, and in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are estimated to be approximately $ 3.500.00 Lump sum charge basis plus reimbursable expenses, as defined In the PROFESSIONAL SERVICES AGREEMENT, and In addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are to be Estimated Date of Completion: BAKER - AICKLEN & ASSOCIATES, INC. PREPARED BY: Donald J. Kirby, R.P.L.S. OFFERED BY: G� i lliam Waeltz, P.E., h Manager APPROVED BY: Client: Title: i N l 1� (Sign, keep Client's copy & return all others.) 9.7 - o/ Date Date STANDARD RATE SCHEDULE (Labor Rate Table 35) Effective September, 2000, the following rates are recommended for work performed on an hourly - charge basis. Rates include company overhead and profit for services accomplished during regular working hours. DIRECT LABOR OFFICE PERSONNEL SERVICES Classification Rates Project Engineer /Surveyor/Planner $110.00 per hour Staff Engineer /Surveyor/Planner $95.00 per hour Project Designer /Coordinator $85.00 per hour Engineering Assistant/Surveying Assistant/GPS Processor $70.00 per hour Senior Engineering/Surveying CAD Technician $60.00 per hour Engineering/Surveying CAD Technician/Field Representative $55.00 per hour CAD Draftsman $45.00 per hour Secretary $45.00 per hour Expert Witness/Testimony /Deposition Services Two Times Rates Principal (as appropriate) $120.00 per hour FIELD PARTY SERVICES Rates 1 -Man Field Party ,. $70.00 per hour 2 -Man Field Party $95.00 per hour 3 -Man Field Party $120.00 per hour 4 -Man Field Party $145.00 per hour GPS Field Unit with Operator (Note 5) - $100.00 per hour GPS Field Unit without Operator (Note 5) $60.00 per hour DIRECT EXPENSES Transportation: By Firm's Passenger Vehicles (Note 1) $ 0.35 per mile By Firm's Survey Trucks (Notes 1, 2, 3 & 4) $ 0.35 per mile Subsistence of out- of-city work $100.00 per day Reproduction & Printing by Firm, Prevailing Com- Survey Stakes, Lathes, Iron Rods mercial Rates Or and other Direct Expense Cost, Plus 10% Notes: 1. A mileage charge will be billed for projects exceeding a 50 -mile radius of the base office only. 2. Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of stakes, lathes, etc., used such as during the construction phase of a project will be charged as indicated. 3. A minimum of two (2) hours field party time charge will be made for show -up time and retum to office, resulting from inclement weather conditions, etc. - ' 4. Field Party stand -by time will be charged for at the above -shown appropriate rates. 5. Rates apply to actual time GPS units are in use. All other time will be charged as appropriate normal field party rates.. 6. The firm's professional liability is limited to the total amount of compensation associated with a specific project up to a maximum of $50,000. Baker-Alcklen & Associates, Inc. Engineers /Surveyors 1/,■ , E Chisholm Trail from Chisholm Trail Hotel Centre to Wolle Lane Nw 5 ca.o iu1wr DATE: October 5, 2001 SUBJECT: City Council Meeting — October 11, 2001 ITEM: *12.F.3. Consider a resolution authorizing the Mayor to execute an Additional Services Authorization with Baker Aicklen & Associates, Inc. for the reconstruction of Chisholm Trail from Chisholm Trail Hotel Centre to Wolfe Lane. This authorization is to evaluate the existing easements within the new right -of -way for eight parcels. The cost of this authorization is $3,500 and brings the total project cost to $114,320.00. Resource: Jim Nuse, Public Works Director Tom Word, Chief Traffic Engineer History: Chisholm Trail is a roadway that was not built to handle the traffic volumes that it now carries. Therefore this roadway is in need of reconstruction. This easement review is one of the preliminary steps in the design process. Funding: Cost: $3,500 Source of funds: Self - Financed Utility Construction Fund Outside Resources: Texas Department of Transportation Impact: This supplemental agreement will enable Backer - Aicklen to continue to design Chisholm Trail. Benefit: The ultimate benefit will be the newly constructed Chisholm Trail Roadway. Public Comment: N/A Sponsor: N/A Client CITY OF ROUND ROCK Project No. 601 -559 Project PROPOSED IMPROVEMENTS TO CHISHOLM TRAIL Contract Date 01/12/99 Subject of Additional Services EASEMENT EVALUATION Additional Services Project No. 601- 759 -10 1. Evaluate existing easements within new right -of -way for eight (8) parcels. Tech RPLS Clerical Deed Research 8 3 Prepare Sketches 16 4 Easement Evaluation 16 4 2 Total 40 11 2 Technician Hours: 40 x $ 55.00 /hr = $2,200.00 RPLS Hours: 11 x $110.00 /hr = $1,210.00 Clerical Hours: 2 x $ 45.00 /hr = $ 90.00 Total $3,500.00 ' Reason For Change Client Request Baker-Aicklen & Associates, Inc. Engineers /Surveyors ORIGINAL ADDITIONAL SERVICES AUTHORIZATION Date 09/14/01 Proposal No 01 - 7135R Compensation: X Hourly charge plus reimbursable expense basis, as defined In the PROFESSIONAL SERVICES AGREEMENT, and in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are estimated to be approximately $ 3.500.00 . Lump sum charge basis plus reimbursable expenses, as defined In the PROFESSIONAL SERVICES AGREEMENT, and In addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are to be i Estimated Date of Completion: BAKER - AICKLEN & ASSOCIATES, INC. PREPARED BY: Donald J. Kirby, R.P.L.S. OFFERED BY: :I i d/" �hMa ae i APPROVED BY: �14 `Y:.d �. Cliental rn Lyoe,, orry oFFouuij 40 Title: (Sign, keep Client's copy & return all others.) 9 / 7 - 4/ Date /0 - 11 - 0/ Date OFFICE PERSONNEL SERVICES � M-47Y STANDARD RATE SCHEDULE (Labor Rate Table 35) Effective September, 2000, the following rates are recommended for work performed on an hourly- charge basis. Rates include company overhead and profit for services accomplished during regular working hours. DIRECT LABOR Classification Rates Project Engineer /Surveyor/Planner $110.00 per hour Staff Engineer /Surveyor/Planner 595.00 per hour Project Designer /Coordinator $85.00 per hour Engineering Assistant/Surveying Assistant/GPS Processor $70.00 per hour Senior Engineering/Surveying CAD Technician 560.00 per hour Engineering/Surveying CAD Technician/Field Representative $55.00 per hour CAD Draftsman $45.00 per hour Secretary $45.00 per hour Expert Witness/Testimony/Deposition Services Two Times Rates Principal (as appropriate) $120.00 per hour FIELD PARTY SERVICES Rates 1 -Man Field Party $70.00 per hour 2 -Man Field Party $95.00 per hour 3 -Man Field Party $120.00 per hour 4 -Man Field Party $145.00 per hour GPS Field Unit with Operator (Note 5) $100.00 per hour GPS Field Unit without Operator (Note 5) $60.00 per hour DIRECT EXPENSES Transportation: By Firm's Passenger Vehicles (Note 1) $ 0.35 per mile By Firm's Survey Trucks (Notes 1, 2, 3 & 4) $ 0.35 per mile Subsistence of out -of -city work $100.00 per day Reproduction & Printing by Firm, Prevailing Com- Survey Stakes, Lathes, Iron Rods mercial Rates Or and other Direct Expense Cost, Plus 10% Notes: 1. A mileage charge will be billed for projects exceeding a 50 -mile radius of the base office only. 2. Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of stakes, lathes, etc., used such as during the construction phase of a project will be charged as indicated. 3. A minimum of two (2) hours field party time charge will be made for show =u "time and return to office, resulting Trom inclement weather conditions, etc. 4. Field Party stand -by time will be charged for at the above -shown appropriate rates. 5. Rates' apply to actual time GPS units are in use. All other time will be charged as appropriate normal field party rates. ' 6. The firm's professional liability is limited to the total amount of compensation associated with a specific project up to a maximum of $50,000. Baker- Aicklen & Associates, Inc. Engineers /Surveyors t R " y 0 CITY OF ROUND ROCK P ..:udd Mayor Robert A. StIuka, Jr. Mayor Pro-tem Tom Nielson Council Members Alan McGraw Carrie Pitt Earl Palmer Isabel Callahan Gary Coe City Manager Robert L Bennett, Jr. City Attorney Stephan L Sheets February 27, 2002 Mr. Bill Waeltz, P.E. Baker - Aicklen & Associates, Inc. 203 E. Main St., Suite 201 Round Rock, TX 78664 Dear Mr. Waeltz: 221 East Main Street Round Rock, Texas 78664 512 - 218 -5400 After reviewing our files, we found that your organization may not have received the following documents. The Round Rock City Council approved Resolution No. R- 01- 10- 11 -12F3 at their regularly scheduled meeting on October 11, 2001. This resolution approves the change in the scope of services for the reconstruction of Chisholm Trial from Chisholm Trail Hotel Centre to Wolle Lane. Enclosed is a copy of the resolution and original contract for your files. If you have any questions, please do not hesitate to contact Tom Word at 218 -5562. Christine R. Martin ez City Secretary Enclosures Fax: 512 -218 -7097 1-800-735-2989 TDD 1-800-735-2988 Voice www.ci.round- rock.tx.us