R-01-12-06-13D4 - 12/6/2001RESOLUTION NO. R- 01- 12- 06 -13D4 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with ECO Resources, Inc. for the Chisholm Valley and Westwind neighborhoods Waterline Replacement Program, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with ECO Resources, Inc. for the Chisholm Valley and Westwind neighborhoods Waterline Replacement Program, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. : ODMA\ WORLDO%\ O : \NDO% \RBSOL"TI \R11206D6.WPD /ec ATTEST: RESOLVED this 6th day of December, 2001. CHRISTINE R. MARTINEZ, City Secre 2 RO = A. STLUKA, J . , Mayor City of Round Rock, Texas CITY OF ROUND CONSTRUCTION CHANGE DEPARTMENT: Public Works ROCK DATA ORDER PAGE 1 OF 1 11/6/01 NO: 2 adjustments. PROJECT: Waterline Replacement Project DATE: ORIGINAL Bid Package A CHANGE ORDER CONTRACT PRICE $534,193.00 JUSTIFICATION: Final PREVIOUS CHANGE ORDERS: $41,450.00 quantity THIS CHANGE ORDER: ($39,752.00) ICI-IANGE ORDERS TO DATE: $1,698.00 CHANGE ITEM # DESCRIPTION OF CHANGES UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS cALENOARI WORKING 5 Remove and replace concrete curb and putter LF -941 $10.00 ($9,410.00) n/a 6 Remove and replace concrete sidewalk SF - 6850 $4.00 ($27,400.00) n/a 7 Remove and replace concrete driveway SF - 588 $5.00 ($2,940.00) n/a Deduct $2.00 that was incorrectly added by change order No. 1 due to math error ($2.00) n/a TOTAL: PREPARED BY: Alysha Girard 11/6/01 PERCENT OF ORIGINAL (539,752.00) n/a CONTRACT PRICE ENGINEERING ASSISTANT DATE 1 CONT CTOR: ECO Resources, InC. THIS CHANGE ORDER: -7.44% PREVIOUS CHANGE ORDER: 7.76% TOTAL % CHANGE: 0.32% BY: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $535,89t00 TITLE: A 4,,, _ APPROVED: BT$.113Termoaaea,-, CITY OF RCILIND ROCK 11/07/2001 18:37 FAX 5122185583 CORR PUBLIC WORKS 12002 EXHIBIT "Au SID PACKAGES M1: CREEN5EN0 HERMATIGE SAM 5055 TRAILS SOMERSET MO TOWN MEADOWS PEACH TREE VALLEY A-2: CIMARRON SHAOOWSROOK CREEKMONT B: CHISHOLM VALLEY WEST WINO C: MEADOW LAKE SETTLEMENT EAGLE RIDGE 0: GREENHILL CHAPEL HILL NORTH WILLOW:ENO SUNRISE VISTA SETTLEMENT EGGER ACRES MESA PARK MESA RIDGE E: KENNSINGTON PLACE GREENLAWN PLACE WINDY TERRACE F: WINDY PARK 0: ROUND ROCK RANCH H: HIGH COUNTRY I: OAK BLUFF O ROUND ROCK WEST LEGEND _ COMPLETE I I IN PROGRESS _ TO BE DONE BLUE TUBING SCHEDULE BID PACKAGES A-1: CREEKBEND HERMATIOE SAM BASS TRAILS SOMERSET OLD TOWN MEADOWS PEACH TREE VALLEY M2: CIMARRON SNADOWBROOK CREEKMONT B: CHISHOLM VALLEY WEST WIND C: MEADOW LAKE SETTLEMENT EAGLE RIDGE D: GREENHILL CHAPEL HILL NORTH WILLOWBEND SUNRISE VISTA SETTLEMENT EDGER ACRES MESA PARK MESA RIDGE E KENNSINGTON PLACE GREENLAW N PLACE WINDY TERRACE F: WINDY PARK 0: ROUND ROCK RANCH H: HIGH COUNTRY I: OAK BLUFF K ROUND ROCK WEST LEGEND - COMPLETE n IN PROGRESS _ TO BE DONE BLUE TUBING SCHEDULE DATE: November 30, 2001 SUBJECT: City Council Meeting - December 6, 2001 ITEM: * 13.D.4. Consider a resolution authorizing the Mayor to execute Change Order No. 2 with ECO Resources for the Chisholm Valley and Westwind neighborhoods Waterline Replacement Program. The change order is for $39,752.00. This change order will reduce the quantities of concrete related items bringing the fmal contract amount to $535,891. Resource: Jim Nuse, Public Works Director History: The original contract for replacement of the polybutylene water services in the Chisholm Valley and Westwind neighborhoods was approved at the March 9, 2000 council meeting by resolution #R- 00- 03- 09 -10B2 in the amount of $534,193. A change order for an additional $41,450 worth of services was approved at the March 22, 2001 council meeting. This change order would reduce the quantities of concrete related items bringing the final contract amount to $535,891. Funding: Cost: ($39,752) Source of funds: Blue Tubing Settlement Funds Outside Resources: ECO Resources, Inc. Impact/ Benefit: This will allow for final payment of the already completed project. Public Comment: N/A Sponsor: N/A CITY OF ROUND CONSTRUCTION CHANGE DEPARTMENT: Public Works ROCK DATA ORDER PAGE 1 OF 1 11/6/01 Na 2 adjustments. PROJECT: Waterline Replacement Project DATE: ORIGINAL Bid Package B CHANGE ORDER CONTRACT PRICE: $534,193.00 JUSTIFICATION: Final quantity PREVIOUS CHANGE ORDERS: $41,450.00 THIS CHANGE ORDER: ($39.752.00) _ CHANGE ORDERS TO DATE: $1,698.00 CHANGE ITEM # F4u,ev DESCRIPTION OF CHANGES I ... o.. r.. UNIT QTY. UNIT PRICE AMOUNT ADDED DAYS CALENDAR/ WORKING 5 .. ... Remove and replace concrete curb and gutter WiLYY: d/. WW0.. 1AWaLL 'M LF .YSJpL4AUGNIZ°- -941 'S:.._:_ .W._- _.......,..,Plwaoluirn $10.00 i.. ($9,410.00) .... n/a 6 Remove and replace concrete sidewalk SF -6850 $4.00 (527,400.00) n/a 7 Remove and replace concrete driveway SF -588 $5.00 ($2,940.00) n/a Deduct $2.00 that was incorrectly added by change order No. 1 due to math error (52.00) n/a TOTAL: PREPARED BY: Alysha Girard 11/6/01 PERCENT OF ORIGINAL ($39,752.00) n/a CONTRACT PRICE ENGINEERING ASSISI ANT DATE CONT' • CTOR: ECO Resources, Inc. THIS CHANGE ORDER: -7.44% PREVIOUS CHANGE ORDER: 7.76% TOTAL % CHANGE: 0.32% BY: , TITLE: j(�I'r ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: $535,891.00 v,[/X1p APPROVED A 1 i/i ilk /'/_//Lim/ ST-13 co/STBIroniect specs rHr OF ROUND RO • ' 11/07/2001 18 :37 FAX 5122185583 CORR PUBLIC WORKS U002 Mayor Robert A. Stluka, Jr Mayor Pro-tem Tom Nielson Council Members Alan McGraw Carrie Pitt Earl Palmer Isabel Callahan Gary Coe City Manager Robert L. Bennett, Jr City Attorney Stephan L Sheets CITY OF ROUND ROCK February 20, 2002 Mr. Stephen C. Held Regional Vice President ECO Resources, Inc. 9511 Ranch Road 620 N. Austin, TX 78726 Dear Mr. Held: 1 -800- 735 -2989 TDD 1 -800- 735 -2988 Voice www.ci.round-rocktx.us 221 East Main Sheet Round Rock, Texas 78664 512 -218 -5400 The Round Rock City Council approved Resolution No. R- 01- 12- 06 -13D4 at their regularly scheduled meeting on December 6, 2001. This resolution approves the Contract Change Order No. 2 for the Chisholm Valley and Westwind neighborhoods Waterline Replacement Program. Enclosed is a copy of the resolution and change order no. 2 for your files. If you have any questions, please do not hesitate to contact Alysha Girard at 218 -6646. Sincerely, l Christine R. Martinez City Secretary Enclosure Fax: 512 -218 -7097