R-01-12-06-13D7 - 12/6/2001RESOLUTION NO. R- 01- 12- 06 -13D7 WHEREAS, §S.610(4) Code of Ordinances (1995 Edition) provides for the reimbursement for the oversizing of water mains, and WHEREAS, Parker- Kerby, Ltd. has submitted a reimbursement request for the oversizing of water mains associated with the Forest Ridge, Phase 7 -C development, and WHEREAS, the City Council wishes to approve said reimbursement, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the City Council hereby approves of the reimbursement to Parker - Kerby, Ltd. of $7,550.40, which is the cost of oversizing water mains associated with the Forest Ridge, Phase 7 -C development. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this the 6th day o ST: I d/I,6 a�r , CHRISTINE R. MARTINEZ, City Sectary ::ODMA \WORLDOX \O: \WDOX \RESOLUTI \R11206D7 .WPD /sc Decemb ROB A. STLUKA, J + Mayor City of Round Rock, Texas 08/08/2001 11:25 FAX 512 338 5754 WHITTENTUj a: A UK1 W ittenton Hurst, L.L.P. AUSTIN OFFICE: 12416 Hymeadom De.. Suite 101 Auet;n. Tuee 78750 -1868 Tel.: (512) 336-5747 Fa= (512) 3365754 SHfjb 100464 wv.vl.ateoeon6urrc.rom August 7, 2001 Danny Haiden, Chief Engineer City of Round Rock Public Works 2008 Enterprise Round Rock, TX 78664 RE: Parke r -Serby Development, Inc. — Reimbursements >ra Facsimile (218 -5563) ATTORNEYS AT LAW BURNET OFFICE: 109 N. Water St. (livy. 281) Burnet, Tour 78611 -24x4 T.1.: (512) 71518600 Few (512) 715 -8644 Dear Mr. Halden: 1 am writing this letter on behalf of my client, Parker -Kerby Development, Inc., to formally request and present on behalf of Parker -Kerby Development, Inc. their rights, claims and entitlements for reimbursement for the cost of construction of the oversized portion of the Double Creek waterline in the Forest Ridge subdivision to which they are entitled. Parker -Kerby Development, Inc. is fully entitled to all rights of reimbursements for the oversizing of the water improvements. There has been no pledge or assignment of any right, entitlement or claim to the reimbursements by Parker -Kerby Development, Inc. No other individual or entity has a superior right, entitlement or claim to the reimbursements. If you have any questions concerning this matter or require any additional information to process this claim, please do not hesitate to contact me. Sincerely, WHITTENTON & HURST By: Steve Hurst 08/08/2001 WED 11:21 [TX /RX NO 84931 Wi] 002 ■ww wow rawww_ ::: .0 1111 NMI = 41 ' • L,s 4 41 1 . 'ii � ;. � 1m I -n-tw Inevisol 40 • •• toi i Amu Li VE yV iii iit 1 mtirlmi 1 14 1 1 Water Main Oversize Reimbursement For Forest Ridge, Phase 7 -C DATE: November 15, 2001 SUBJECT: City Council Meeting - December 6, 2001 ITEM: * 13.D.7. Consider a resolution approving the reimbursement to Parker - Kerby, Ltd. of $7,550.40, for the cost of oversizing water mains associated with the Forest Ridge, Phase 7 -C development. Forest Ridge, Phase 7 -C consists of approximately 380' of Forest Creek Drive from Forest Ridge Blvd. up to the Lake Forest development. This piece of Forest Creek Drive was actually constructed during the construction of Lake Forest, Section One and a 16" water main was constructed along the south side of the roadway at the same time. The water main provides redundancy of service to Forest Ridge development and was oversized from 8" to a 16" for the benefit of other developments in the area. Resource: Jim Nuse, Director of Public Works Danny Halden, Chief Engineer History: Forest Ridge, Phase 7 -C consists of approximately 380' of Forest Creek Drive from Forest Ridge Blvd. up to the Lake Forest development. This piece of Forest Creek Drive was actually constructed during the construction of Lake Forest, Section One and a 16" water main was constructed along the south side of the roadway at the same time. The water main provides redundancy of service to Forest Ridge development and was oversized from 8" to a 16" for the benefit of other developments in the area. Funding: Cost: $7,550.40 Source of funds: Oversize Account Outside Resources: Parker -Kerby Development, Inc. Impact: Minimal. the Forest Ridge development contributed approximately $120,000 to the oversize account. With this reimbursement included the total reimbursement to the Forest Ridge development to date is approximately, $65,000. Benefit: Provides greater reliability of service to the general area and reduces the possibility of a need for future parallel main. Public Comment: N/A Sponsor: N/A