R-01-12-06-13D7 - 12/6/2001RESOLUTION NO. R- 01- 12- 06 -13D7
WHEREAS, §S.610(4) Code of Ordinances (1995 Edition) provides
for the reimbursement for the oversizing of water mains, and
WHEREAS, Parker- Kerby, Ltd. has submitted a reimbursement
request for the oversizing of water mains associated with the Forest
Ridge, Phase 7 -C development, and
WHEREAS, the City Council wishes to approve said reimbursement,
Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the City Council hereby approves of the reimbursement to
Parker - Kerby, Ltd. of $7,550.40, which is the cost of oversizing water
mains associated with the Forest Ridge, Phase 7 -C development.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended.
RESOLVED this the 6th day o
ST:
I d/I,6 a�r ,
CHRISTINE R. MARTINEZ, City Sectary
::ODMA \WORLDOX \O: \WDOX \RESOLUTI \R11206D7 .WPD /sc
Decemb
ROB A. STLUKA, J + Mayor
City of Round Rock, Texas
08/08/2001 11:25 FAX 512 338 5754 WHITTENTUj a: A UK1
W ittenton
Hurst, L.L.P.
AUSTIN OFFICE:
12416 Hymeadom De.. Suite 101
Auet;n. Tuee 78750 -1868
Tel.: (512) 336-5747
Fa= (512) 3365754
SHfjb
100464
wv.vl.ateoeon6urrc.rom
August 7, 2001
Danny Haiden, Chief Engineer
City of Round Rock Public Works
2008 Enterprise
Round Rock, TX 78664
RE: Parke r -Serby Development, Inc. — Reimbursements
>ra Facsimile (218 -5563)
ATTORNEYS AT LAW
BURNET OFFICE:
109 N. Water St. (livy. 281)
Burnet, Tour 78611 -24x4
T.1.: (512) 71518600
Few (512) 715 -8644
Dear Mr. Halden:
1 am writing this letter on behalf of my client, Parker -Kerby Development, Inc., to
formally request and present on behalf of Parker -Kerby Development, Inc. their rights, claims
and entitlements for reimbursement for the cost of construction of the oversized portion of the
Double Creek waterline in the Forest Ridge subdivision to which they are entitled.
Parker -Kerby Development, Inc. is fully entitled to all rights of reimbursements for the
oversizing of the water improvements.
There has been no pledge or assignment of any right, entitlement or claim to the
reimbursements by Parker -Kerby Development, Inc. No other individual or entity has a superior
right, entitlement or claim to the reimbursements.
If you have any questions concerning this matter or require any additional information to
process this claim, please do not hesitate to contact me.
Sincerely,
WHITTENTON & HURST
By:
Steve Hurst
08/08/2001 WED 11:21 [TX /RX NO 84931 Wi] 002
■ww wow rawww_ :::
.0 1111 NMI =
41 ' • L,s
4 41 1 .
'ii � ;. �
1m I -n-tw Inevisol
40
• •• toi i
Amu Li VE
yV iii iit 1
mtirlmi 1
14 1
1
Water Main Oversize Reimbursement
For Forest Ridge, Phase 7 -C
DATE: November 15, 2001
SUBJECT: City Council Meeting - December 6, 2001
ITEM: * 13.D.7. Consider a resolution approving the reimbursement to Parker -
Kerby, Ltd. of $7,550.40, for the cost of oversizing water mains
associated with the Forest Ridge, Phase 7 -C development. Forest
Ridge, Phase 7 -C consists of approximately 380' of Forest Creek
Drive from Forest Ridge Blvd. up to the Lake Forest development.
This piece of Forest Creek Drive was actually constructed during the
construction of Lake Forest, Section One and a 16" water main was
constructed along the south side of the roadway at the same time.
The water main provides redundancy of service to Forest Ridge
development and was oversized from 8" to a 16" for the benefit of
other developments in the area.
Resource: Jim Nuse, Director of Public Works
Danny Halden, Chief Engineer
History: Forest Ridge, Phase 7 -C consists of approximately 380' of Forest Creek Drive
from Forest Ridge Blvd. up to the Lake Forest development. This piece of Forest
Creek Drive was actually constructed during the construction of Lake Forest,
Section One and a 16" water main was constructed along the south side of the
roadway at the same time. The water main provides redundancy of service to
Forest Ridge development and was oversized from 8" to a 16" for the benefit of
other developments in the area.
Funding:
Cost: $7,550.40
Source of funds: Oversize Account
Outside Resources: Parker -Kerby Development, Inc.
Impact: Minimal. the Forest Ridge development contributed approximately $120,000 to the
oversize account. With this reimbursement included the total reimbursement to the
Forest Ridge development to date is approximately, $65,000.
Benefit: Provides greater reliability of service to the general area and reduces the possibility of
a need for future parallel main.
Public Comment: N/A
Sponsor: N/A