Loading...
R-01-12-20-10D1 - 12/20/2001ROM X Description of Changes Ii1 Original + Previously Revised Qty. OHIO.' Item Price New Unit Price new Quantity Revised Item Price Inverse / Revers. Contra:I Price REMOV CONC (smug $8.00 $2,016.00 $2,824.00 REMOV CONC (CURB 8 GUTTER) $4.00 $1,812.00 $2,548.00 BARB WIRE FENCE $0.00 $3.15 $15,750.00 GATES $0.00 $500.00 $1,000.00 EECAVATION(RDWY) $2.50 $104,495.00 $2.84 $35,235.84 EXCAVATION (CHAN) $5.00 $51,760.00 67.00 $740.00 REMOV CONC (INLET) 60.00 $1,200.00 61,200.00 EXCAVATION (SPECIAL) (PED TUNNEL) $0.00 $13.00 $24,180.00 EMBANK (ORD COMP)(IY B)(CL 3) $2.75 $180,614.50 $5.50 $176,291.50 FURN AND PLAC TPSL (CL 255') $0.50 8 $32,527.00 8 CNt ($6,071.00) BLOCK SOD (BERMUDA 42" X 100 ROLL) $2.60 *59,040.80 ($6,221.80) CELL FIB SEED (TEMP)(WARM) $0.19 $6,370.13 ($1,343.49) CELL FIB SEED (TEMP)(COOL) $0.19 $6,370.13 ($1,343.49) HAY OR STRAW SEED (P ERMXRURALXCLA1') $0.25 $11,086.50 ($2,303.50) VEGETATIVE WATERING $11.00 621,472.00 $1,342.00 SOIL RET BLNKT (CL 1)(TY A) $1.05 $7,499.10 $27,577.20 IRRIGATION ECASEMENT INC (00163) (40) (4") $5.50 $12,276.00 $12,276.00 FL BS (COMPL IN RAC5 TY D GR6 CL 4) $16.00 $478,672.00 $16.45 $37,430.30 LIME TOT SUBGR (00) (6") $2.25 $242,327.25 *16,992.00 CHANGE ORDER NO: DIVISION: Public Works A.W.GRIMES BLVD. See last page for new unit price justification 284 0534 LIME (TY A SLURRY OR TY C SLURRY) CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER Arlf Earthwork and paving changes due to ent of quantities. $84.00 SEE page (2) CHANGE DATA 2,456.00 *206,304.00 4149.00 1 of 3 10/11/01 348516 $142,212.00 Man OaaiPBOn etChanges 340 503 PRIME COAT (AE -P) 340 0529 ASPH CONC (TY C)(LEVEL UP)(PG 64-22) 340 0552 HOT MIX ASPHALTIC cry B) (PG 6422) 340 0680 HOT MIX ASPHALTIC (TY C) (PG 70-22) 340 0681 HOT MIX ASPHALTIC (TV C PV 32 SURF) (PG 76-2 354 0629 PLANE ASPH CONC PAV (0" TO 2") 400 0504 STRUCT EXCAVATION (CULV LARGE) 529 0521 CONCRETE VALLEY GUTTER 529 0532 CONC CURB & GUTTER (TV II) 5005 0501 ROCK FILTER DAMS (TY 1) 5005 0502 ROCK FILTER DAMS (REMOV & REPLAC)(TY 1) 5005 0503 ROCK FILTER DAMS (REMOV)(TY 1) 5249 0501 TEMP SEDMT CONT FENCE 5249 0503 TEMP SEDMT CONT FENCE ( REMOV) AI 0632 WHEELCHAIR RAMP (TY 1) Al 0545 CONCRETE SIDEWALK (5 IN) 556 0:08 FIFE UNDDR (TV 6)(6 ") CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER Unit Price 1.14 $48.00 $33.75 $35.75 $37.75 $38.00 011.75 66.25 510.50 68.00 65.25 01.05 60.52 0600.00 $23.50 $40.00 CHANGE DATA Original + Previously Revsed ,y . 16,966.00 200.00 10,431.00 10,431.00 10,431.00 225.00 2,041.00 38,258.00 910.00 910.00 910.00 15,000.00 15,000.00 64.00 11,041.00 500.00 Original Men Price $21,621.24 $9,600.00 $352,046.25 $372,908.25 $393,770.25 $8,550.00 $23,981.75 $239,112.50 $9,555.00 $ $4,777.50 $15,750.00 $7,800.00 $38,400.00 $259,463.50 $20,000.00 New Unit Price $15.00 PG 2 OF 3 Revised In0eaee / Hero Decrease Price contract Prise 21,934.00 25005 $3,383.52 40.00 1920 ($7,680.00) 11256.00 379890 $27,843.75 11157.00 398863 $25,954.50 11252.00 424763 $30,992.75 350.00 13300 $4,750.00 1333.00 19995 $19,995.00 2,124.00 24957 $975.25 37,294.00 233088 ($6,025.00) 159.00 1670 ($7,885.50) 159.00 1272 ($6,008.00) 159.00 835 ($3,942.75) 14,526.00 15252 ($497.70) 14,526.00 7554 ($246.48) 1.00 600 ($37,800.00) 500.00 11750 ($247,713.50) 1081.00 43240 $23,240.00 TOTAL: $299,651.40 CHANGE ORDER NO: DIVISION: Public Works PROJECT: A.W.GRIMES BLVD. Original Contract Price: Amount of Previous Change Orders: Amount the Contract will Decease/Increase with this change order: Total Change Orders to Date: (1 - 41r•u. K > Contract Total including this Change Order will be: PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: PREVIOUS CHANGE ORDER: TOTAL % CHANGE: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: PREPARED BY: Engineer: neer: Contractor: Contractor: APPROVED: CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER .^s PAGE: 3 OF 3 4 A/ e / IA;/ A✓6. S Print Print Name °SERI 6, Au.t y . e t n NB 4/ d // d •�"'of Rou Rod (Owner Signature $8,421,209.70 y18 94t7 1137o,463.31 $299,651.40 r 3 / 1, b70, 114 9 4s,458;340:84-. ` 9, "R I, x'73.01 3.56% ✓ i:60% 16.27 r0 BT6% 1 9.8 3 %, $+- 4 9 :pi 673 .01 ` D1Q -16.t, �Z \ YAr..+ r'TI►"Re..� CD.V . Signature O � Co mpany Name R4rh Cavt'a..escns L,p Company Name Title tea 0/ Title DATE: 10/11/01 /o -/8 -a/ Da Revised: 9/01 1o/ / Date In /ISJo, Date g1- '0-0 Date • CITY OF ROUND ROCK NSA Mayor Robert A. Stluka, 1r Mayor Pro -tem Tom Nielson Council Members Alan McGraw Carrie Pitt Earl Palmer Isabel Callahan Gary Coe City Manager Robert L Bennett, Jr City Attorney Stephan L Sheets February 5, 2002 RGM Constructors, L.P. Attn.: President 15603NII - I35 Pflugerville, TX 78660 Dear Sir: Sincerely, Christine R. Martinez City Secretary Enclosure Fax: 512- 218 -7097 . 1-800-735-2989 TDD 1- 800-735 -2988 Voice www.ci.round- rock.tx.us 221 East Main Stmxt Round Rock, Texas 78664 512218 -5400 The Round Rock City Council approved Resolution No's. R- 01- 12- 20 -10D1 and R -01- 12-20-10D3 at their regularly scheduled meeting on December 20, 2001. The resolutions approve Contract Change Orders No. 5 and No. 8 for the A.W. Grimes, Phase I Construction Project. Enclosed is a copy of the resolution and change orders for your files. If you have any questions, please do not hesitate to contact Bill Stablein at 218 -3237. Mayor Robert A. Stluka, Jr Mayor Pro -tem Tom Nielson Council Members Alan McGraw Carrie Pirt Earl Palmer Isabel Callahan Gary Coe City Manager Robert 4 Bennett, Jr City Attorney Stephan G Sheets CITY OF ROUND ROCK February 5, 2002 Hank Hampton Rodriguez & Huggins Inc. 11211 Taylor Draper Lane, Suite 100 Austin, TX 78759 Dear Mr. Hampton: The Round Rock City Council approved Resolution No's. R- 01- 12- 20 -10D1 and R -01- 12-20-10D3 at their regularly scheduled meeting on December 20, 2001. The resolutions approve Contract Change Orders No. 5 and No. 8 to the Contract with RGM Constructors, L.P. for the A.W. Grimes, Phase I Construction Project. Enclosed is a copy of the resolution and change orders for your files. If you have any questions, please do not hesitate to contact Bill Stablein at 218 -3237. Sincerely, V�" Christine R. Martinez City Secretary Enclosure Fax: 512- 218 -7097 1.800- 735 -2989 TDD - 1- 800 -735 -2988 Voice www.ci.round -rook tx.us 221 East Main Street Round Rock, Texas 78664 512- 218 -5400 RESOLUTION NO. R- 01- 12- 20 -10D1 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with RGM Constructors, L.P. for the A.W. Grimes, Phase I Construction Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 5, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 5 to the Contract with RGM Constructors, L.P. for the A.W. Grimes, Phase I Construction Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. ::OO"v \WORL \ O . \WDOX \RESOLUTI \R11aa001.UPO /rM AT EST: RESOLVED this 20th day of December, 2001. ,L1. A1. , 1111 . CHRISTINE R. MARTINEZ, City Secre 2 RO- ' A. STLUKA, JR., Mayor City of Round Rock, Texas Item A Desalptbe or Changes Original + Previously Revised Qty. Original Item Price New Unit Price New Quantity Revised Item Price Increase 7 Deaease Cordrert Price v i REMOVCONC(SDWU0 $8.00 252.00 $2,016.00 605.00 4840 $2,824.00 REMOVCONC (CURB & GUTTER) $4.00 453.00 61,812.00 1090.00 4360 $2,548.00 BARB WIRE FENCE $0.00 $3.15 5000.00 15750 $15,750.00 GATES $0.00 $500.00 2.00 1000 $1,000.00 EXCAVATION(RDWY) $2.50 41,798.00 $104,495.00 $2.84 49201.00 139731 $35,235.84 EXCAVA11ON(CHAN) $5.00 10,352.00 $51,760.00 67.00 7500.00 52500 6740.00 REMOV CONC (INLET) 60.00 61,200.00 1.00 1200 61,200.00 EXCAVATION (SPECIAL) ('ED TUNNEL) 60.00 $13.00 1860.00 24180 624,180.00 EMBANK (ORD COMP)(IY B)(CL 3) $2.75 65,678.00 $180,614.50 65.50 64892.00 356906 $176,291.50 8 FURN AND PLAC TPSL (CL 2)(5') $0.50 65,054.00 632,527.00 52912.00 26456 ($6,071.00) BLOCK SOD (BERMUDA 4r X 103' ROLL) $2.60 22,708.00 659,040.80 20315.00 52819 ($6,221.80) CELL FIB SEED (TEMPXWARM) $0.19 33,527.00 $6,370.13 26456.00 5027 ($1,343.49) CELL FIB SEED (TEMPXCOOL) $0.19 33,527.00 96,370.13 26456.00 5027 ($1,343.49) HAY OR STRAW SEED (PERMXRURALXCLAY) $0.25 44,346.00 611,086.50 35132.00 8783 ($2,303.50) VEGETATIVE WATERING $11.00 1,952.00 $21,472.00 2074.00 22814 $1,342.00 SOIL RET BLNKT (CL 1)(TY A) $1.05 7,142.00 $7,499.I0 - 33406.00 35076 $27,577.20 IRRIGATION ECASEMENT PVC (SCHD) (40) (4') $5.50 2,232.00 $12,276.00 4464.00 24552 $12,276.00 FL BS (COMPL IN PLAC)(TY D GR6 CL 4) $16.00 29,917.00 $478,672.00 $16.45 31374.00 516102 $37,430.30 LIME TRT SUBGR (0C) (8') $2.25 107,701.00 $242,327.25 115253.00 259319 $16,992.00 CHANGE ORDER NO: DIVISION: Public Works A.W.GRIMES BLVD. nc Earthwork and paving changes due to adjustment of quantities. See last page for new unit price Justification 264 0534 LIME (TY A SLURRY OR TY C SLURRY) CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER $84.00 SEE page (2) CHANGE DATA 2,456.00 $206,304.00 EXHIBIT " 4149.00 PAGE: 1 of 3 DATE: 10/11/01 348516 $142,212.00 340 503 340 0529 340 0552 340 0680 340 0681 354 0529 400 0504 529 0521 529 0532 5005 0501 5005 0502 5005 0503 5249 0501 5249 0503 531 0532 531 0545 556 0508 PRIME COAT (AE-P) ASPH CONC (TY CXLEVEL OP)(PG 84-22) HOT MIX ASPHALTIC (TY 8) (PG 64-22) HOT MIX ASPHALTIC (TY C) (PG 70-22) HOT MLX ASPHALTIC (TY C P/32 SURF) (FG 78-2 PLANE ASPH CONC PAV (0 TO 2') STRUCT EXCAVATION (CULV LARGE) CONCRETE VALLEY GUTTER CONC CURB 8 GUTTER (TY 11) ROCK FILTER DAMS (TY 1) ROCK FILTER DAMS (REMOV 8 REFTAC)(TY 1) ROCK FILTER DAMS (REMOV)(TY 1) TEMP SEDMT CONT FENCE TEMP SEDMT CONT FENCE (REMOV) WHEELCHAIR RAMP (TY 1) CONCRETE SIDEWALK (5114 PIPE UNDDR (TY 8)(6') CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER CHANGE DATA 1.14 18,966.00 $21,621.24 $48.00 200.00 $9,600.00 $33.75 10,431.00 $35Z046.25 $35.75 10,431.00 $372,908.25 $37.75 10,431.00 $393,770.25 $38.00 225.00 $8,550.00 511.75 2,041.00 $23,981.75 56.25 38,258.00 $239,112.50 510.50 910.00 $9,555.00 96.00 910.00 $7,280.00 55.25 910.00 $4,777.50 51.05 15,000.00 $15,750.00 50.52 15,000.00 $7,800.00 5600.00 64.00 $38,400.00 523.50 11,041.00 9259,463.50 $40.00 500.00 $20,000.00 $15.00 PG2 OF 3 21,934.00 25005 $3,383.52 40.00 1920 ($7,680.00) 11256.00 379890 $27,843.75 11157.00 398863 $25,954.50 11252.00 424763 $30,992.75 350.00 13300 $4,750.00 1333.00 19995 $19,995.00 2,124.00 24957 $975.25 37,294.00 233088 ($6,025.00) 159.00 1670 ($7,885.50) 159.00 1272 (56,008.00) 159.00 835 ($3,942.75) 14,526.00 15252 ($497.70) 14,52000 7554 ($246.48) 1.00 600 (937,800.00) 500.00 11750 (5247,713.50) 1081.00 43240 $23,240.00 TOTAL: $299,651.40 CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER CHANGE ORDER NO: PAGE: 3 OF 3 DIVISION: Public Works DATE: PROJECT: A.W.GRIMES BLVD. 10/11/01 Original Contract Price: $8,421,209.70 Amount of Previous Change Orders: ..1.2-1-8914:1-7— 4 1,370,46a , 3 1 Amount he Contract will Decease/Incmac with this change order: $299,651.40 ..., Total Change Orders to Date: (1 4-Vieu. 5•) v-,18,V.S.57 Contract Total including this Change Order will be: PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: PREVIOUS CHANGE ORDER: TOTAL % CHANGE: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: PREPARED BY: En. ineer: Engineer: Contractor: Contractor: APPROVED: gnature .mpany Name / Pdnt Name Print Name Print Rofa li ame City of Round Rock (Owner) Signature -49745834084— 4 9,741,073.67 3.56% r6.27 87/6 $9,45e 4( 9 673 . 01 Title J2. Title 170, 114.7 rTiato.-5 60 6 /€ AP Date RtM 6:4•49-rn,..e.re,n‘ L.P. I obel. 1 Company Name Title Date Revised: 9/01 Date I qiElioi Date A. W. Grimes Boulevard J DATE: December 14, 2001 SUBJECT: City Council Meeting — December 20, 2001 ITEM: 10.D.1. Consider a resolution authorizing the Mayor to execute Change Order No. 5 with RGM Constructors, L.P. for the construction of A. W. Grimes Boulevard. This change order consists of earthwork and paving changes due to adjustments of quantities. The amount of the change order is $299,651.40. Resource: Jim Nuse, Director of Public Works Bill Stablein, Traffic Engineer Assoc. History: A. W. Grimes is an on going four -lane arterial roadway project. Funding: Cost: $ 299,651.40 Source of funds: 4B Funding Outside Resources: RGM Contractors, L. P. Rodriguez Transportation Group Impact: This change order consists of earthwork and paving changes due to adjustments of quantities. Benefit: The benefit from these quantity changes will be some of the amenities along the roadway, such as the pedestrian tunnel. Public Comment: N/A Sponsor: N/A