Loading...
R-02-03-14-13D2 - 3/14/2002RESOLUTION NO. R- 02- 03- 14 -13D2 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with J.C. Evans Construction Co., Inc. for the construction of Forest Creek Drive from Collingwood Drive to Double Creek Drive, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with J.C. Evans Construction Co., Inc. for the construction of Forest Creek Drive from Collingwood Drive to Double Creek Drive, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted :: ODMA\ WORLDOX\ O : \WDOX \R65OLUTI \R20314D2.WPD /sc upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 14th day of March, 2002. AT T: CHRISTINE R. MARTINEZ, City Secreta 2 ROA. STLUKA, , Mayor City of Round Rock, Texas Item # Description of Changes Unit Price Original + Previously Revised Qty. Original Item Price tig z §4 New Quantity Revised Item Price Increase / Decrease Contract Price Changes to Headwall and 1 Apron due to 12" waterline. Lump Sum $3,903.00 1.00 $3,903.00 Change in length of Handrail 2 on Wing Walls. Linear Foot $47.50 59.00 $2,802.50 Change in length of TRF 3 footing. Linear Foot $75.75 100.00 $7,575.00 Change handrail from C202 to 4 C201 Linear Foot $88.76 54.00 $4,793.04 Deduct 390 linear feet of 1" 5 PVC Schedule 40 Conduit Linear Foot 1200.00 $6.65 810.00 - $2,593.50 Add 137sy Concrete Rip -Rap, complete in place per the plan 6 specifications. Square Yard 111.00 $27.90 248.00 $3,822.30 Hydro- seeding, complete in place per the plan 7 specifications. Square Yard $1.35 2901.00 $3,916.35 Type C Erosion Control Matting, complete in place as required by the City of Round 8 Rock Square Yard $2.35 640.00 $1,504.00 Traffic Contol as required by 9 the City of Round Rock. Lump Sum $4,235.61 1.00 $4,235.61 Stabilized Construction Entrance, complete in place 10 per the plan specifications. Each 2.00 $750.00 -1.00 - $750.00 Standard Street Barricade with street end marker, complete in place per the 11 specifications. Each 2.00 $550.00 -1 - $550.00 French Drain over existing waterline as required by the 12 City of Round Rock. Lump Sum EXHIBIT $750.00 1 $750.00 TOTAL: $29,408.30 CHANGE ORDER NO: DIVISION: Public Works CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER 1 PAGE: 1 of 2 DATE: 2/19/02 PROJECT: Forest Creek Drive from Collingwood Drive to 1,100' west of Collingwood Drive JUSTIFICATION: Changes requested by the City of Round Rock. CHANGE DATA nAn CHANGE ORDER NO: 1 DIVISION: Public Works PROJECT: Forest Creek Drive from Collingwood Drive to 1,100' west of Collingwood Drive Original Contract Price: Amount of Previous Change Orders: Amount the Contract will Increase with this change order: Total Change Orders to Date: Contract Total including this Change Order will be: PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: PREVIOUS CHANGE ORDER: TOTAL % CHANGE: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: PREPARED BY: En•ineer. Contractor: . / e 1f 11/45 !1J 6 It i ,/ bl e / Print Name /Signature APPROVED: gnature City of Round Rock (Owner) pwserver /admin /farms /cost change order.xls/Ik CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER Z—Gra - Jansin $489,208.65 $0.00 $29,408.30 $29,408.30 $518,616.95 $29,408.30 0 6.0% $518,616.95 ompany and Associates Title ame Inc PAGE: 2 of 2 DATE: 2/19/02 ns Construction Co., Inc. Date � Z � Company Name te Revised: 9/01 Date r a • • 44 _nu , ut r � 1f-11 ILd in •) FOREST CREEK DRIVE 1 7TITT I] CRT 1i Forest Creek Drive ,r • • L ILL TI F L "i =f7�Jl � �� —I \7J I — 1 1 r osnalO• ZS 0 to, DATE: March 8, 2002 SUBJECT: City Council Meeting — March 14, 2002 ITEM: *13.D.2. Consider a resolution authorizing the Mayor to execute Change Order No. 1 with J.C. Evans Construction Co., Inc. for additional items in the Forest Creek Drive Roadway Project. The amount of the change order is $29,408.30. This will increase the contract amount to $518,616.95. Resource: Jim Nuse, Public Works Director Bill Stablein, Engineering Associate History: This is an addition of a handrail system along both sides of the box culvert creek crossing, along with signage and striping to the roadway. Additional erosion measures were added as well. Funding: Cost: $29, 408.30 Source of funds: Transportation System Development Corporation funding Outside Resources: J.C. Evans Construction Co., Inc. Impact: Some additional costs to improve the handrail system along the box culverts, add signage and striping to roadway, and add hydro - mulching and matting to aid in erosion control along the creek slopes. Benefit: To improve the transportation system and add accessibility to new developments. Public Comment: N/A Sponsor: N/A Item # Description of Changes Unit Price Original + Previously Revised Qty. Original Item Price New Unit Price New Quantity Revised Item Price Increase / Decrease Contract Price Changes to Headwall and 1 Apron due to 12" waterline. Lump Sum $3,903.00 1.00 $3,903.00 Change in length of Handrail 2 on Wing Walls. Linear Foot $47.50 59.00 $2,802.50 Change in length of TRF 3 footing. Linear Foot $75.75 100.00 $7,575.00 Change handrail from C202 to 4 C201 Linear Foot $88.76 54.00 $4,793.04 Deduct 390 linear feet of 1" 5 PVC Schedule 40 Conduit linear Foot 1200.00 $6.65 810.00 -$2,593.50 Add 137sy Concrete Rip -Rap, complete in place per the plan 6 specifications. Square Yard 111.00 $27.90 248.00 $3,822.30 Hydro- seeding, complete in place per the plan 7 specifications. Square Yard $1.35 2901.00 $3,916.35 Type C Erosion Control Matting, complete in place as required by the City of Round 8 Rock Square Yard $2.35 640.00 $1,504.00 Traffic Contol as required by 9 the City of Round Rock. Lump Sum $4,235.61 1.00 54,235.61 Stabilized Construction Entrance, complete in place 10 per the plan specfications. Each 2.00 $750.00 -1.00 - $750.00 Standard Street Barricade with street end marker, complete in place per the 11 specifications. Each 2.00 $550.00 -1 - $550.00 French Drain over existing waterline as required by the 12 City of Round Rock. Lump Sum $750.00 1 $750.00 TOTAL: $29,408.30 1 CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER CHANGE ORDER NO: 1 PAGE: 1 of 2 DIVISION: Public Works DATE 2/19/02 PROJECT: Forest Creek Drive from Collingwood Drive to 1,100' west of Collingwood Drive JUSTIFICATION: Changes requested by the City of Round Rock. CHANGE ORDER NO: DIVISION: Public Works Original Contract Price: Amount of Previous Change Orders: Amount the Contract will Increase with this change order: Total Change Orders to Date: Contract Total including this Change Order will be: PERCENT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: PREVIOUS CHANGE ORDER: TOTAL % CHANGE: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: PREPARED BY: pwserver /admin /farms /Const change order.xls/Ik CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER 1 PROJECT: Forest Creek Drive from Collingwood Drive to 1,100' west of Collingwood Drive 5489,208.65 $0.00 529,408.30 $29,408.30 5518,616.95 $29,408.30 5518,616.95 Gray - Jansing and Associates, Inc. Company Name Contractor: 114 / 60.4 // C. ` . C. Evans Construction Co., Inc. •rint Name Signature Company Name 0 6.0% PAGE: 2 of 2 DATE: � J Da Revised: 9/01 Date 2/19/02 GRAY • JANSING & ASSOCIATES, INC. February 22, 2002 Mr. Terry Cox City of Round Rock Public Works Department 2008 Enterprise Round Rock, Texas 78664 Re: Forest Creek Drive from Collingwood Drive To 1,100 feet west of Collingwood Drive Change Order No. 1 GJA No. 1398 - 8437 -57 Dear Mr. Cox: Attached please find enclosed three (3) copies of Change Order No. 1 for the above - referenced project showing a net additional amount of $29,408.30. This change order submitted by J. C. Evans Construction Co., Inc., reflects the changes requested by the City of Round Rock. Please review the enclosed documents and have the documents signed in the spaces provided then forward the copies back to my office for further processing. Once the documents are fully executed, we will forward an original to you for your files. If after reviewing the enclosed documents you have any questions or comments, please contact me. Sincerely, GRAY • JANSING & ASSOCIATES, INC. Donald K. Bayes, P. DKB:HE:tm Attachments cc: Mr. Vernon Cook; J. C. Evans Construction Co., Inc. (w /encl.) Mr. Tom Word, P. E; City of Round Rock (w /encl.) Mr. Danny Halden, P. E.; City of Round Rock (w /encl.) Mr. Herb Edmonson, Jr.; Gray • Jansing & Associates, Inc. (w /encl.) Coo.nlNng F0g!nner. 9217 Shod Creek BI..I., 511 200 A , Tovas 79757 - 7592 151'_)152 -0371 FAA )512)434 -4933 Mayor Robert A. Stlaka, Jr Mayor Pro -tean Tom Nielson Coundl Members Alan McGraw Carrie Pitt Earl Palmer Isabel Callahan Gary Coe City Manager RobertL. Bennett, Jr. City Attorney Stephan L Sheets 221 East Maio Street Round Rock, Texas 78664. • 512- 218 -5400 CITY OF ROUND ROCK March 19, 2002 Mr. Donald K. Bayer, Engineer Gray — Jansing and. Associates, Inc. 8217 Shoal Creek Boulevard, Suite -200 Austin, TX 78757 Dear Mr. Bayer: The Round Rock City Council approved Resolution No. R- &2- -0i3- 14 -13D2 at their regularly scheduled meeting on March 14, 2002. This resolution approves Contract Change Order No. 1 with J.C. Evans Construction Co., Inc. for the construction of Forest Creek Drive from Collingwood Drive to Double, Creek Drive. Enclosed is a copy of the resolution and the original Change Order No. 1 for your files. If you have any questions, please do not hesitate to contact Bill Stablein at 218 -3237. Christine R. Martinez City Secretary Enclosure Fax 512- 218 -7097 1.800- 735 -2989 TDD 1- 800-735 -2988. Voice ww.ci.mund- rock.tx.us -