Loading...
R-02-05-23-13C1 - 5/23/2002RESOLUTION NO. R- 02- 05- 23 -13C1 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services with Chiang, Patel & Yerby, Inc. for the construction of water and sewer facility adjustments within the proposed FM 1460 Roadway Reconstruction Project, and WHEREAS, Chiang, Patel & Yerby, Inc. has submitted Supplemental Agreement No. 1 to the Contract for Engineering Services to extend the contract date, and WHEREAS,the City Council desires to enter into said Supplemental Agreement No. 1 with Chiang, Patel & Yerby, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 1 to Contract for Engineering Services with Chiang, Patel & Yerby, Inc. to extend the contract date, a copy of said agreement being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. .,OOWA \WORLDOX \O: \WOOX \RESOLUTI \R20523C1.WP0 /. ATTEST: RESOLVED this 23rd day of May, 2002. elininfuite)P. CHRISTINE R. MARTINEZ, City Secret 2 City of Round Rock, Texas y `✓ /P ,vr WEL < Mayor THE STATE OF TEXAS § THE COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Chiang, Patel & Yerby, Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 20 day of December, 2001 to retain professional engineering and technical services for the construction of water and sanitary sewer facility adjustments within the proposed FM 1460 Roadway Reconstruction Project, and WHEREAS, ARTICLE 3, CONTRACT PERIOD, requires termination of the Contract on May 31, 2002, and WHEREAS, it has become necessary to amend the contract to reflect the actual date of the notice to proceed, and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 3, CONTRACT PERIOD, shall be extended until July 31, 2002 IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. By: THE EN : / 21; Zoo Z Date CITY OF ROUND ROCK By: Nyle Maxwell, Mayor Date EXHIBIT A FM 1460 From US 79 to CR 113 FM 1460 From US 79 to CR 113 Chiang, Patel & Yerby, Inc. J Consulting Engineers • Planners • Project Managers 1820 REGAL ROW, SUITE 200, DALLAS, TEXAS 75235 214- 638 -0500 FAX 214 -638 -3723 WEBSITE: WWW.CPYI.COM April 25, 2002 Mr. Bill Stablein City of Round Rock Public Works Department 2008 Enterprise Drive Round Rock, Texas 78664 RE: Water and Wastewater Line Relocations FM 1460 Round Rock, Texas Dear Mr. Stablein: Transmitted herewith please find two (2) copies of Supplemental Agreement No. 1 for our contract for engineering services on the above referenced project. Philip S. Yerby executed our signature block in his capacity as Executive Vice President. When the city has had the opportunity to sign the original, we would appreciate a copy for our records. If you have any questions or require additional information, please do not hesitate to call us. Respectfully submitted, Chiang, Patel, and Yerby, Inc Lawrence R. Beenken, P.E. Associate RECEIVED APR 3 u 2002 PRINCIPALS: W. Walter Chiang, P.E. • Pete K. Patel, P.E. • Philip S. Yerby, P.E. • Edward M. Motley, P.E. • Philip M. Armstrong, P.E. S. Gillett Cobb, P.E. • Michael S. Hartzler, PE. • David A. Nachman, P.E. • L. John Tipton, P.E. DATE: May 17, 2002 SUBJECT: City Council Meeting — May 23, 2002 ITEM: 13.C.1. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 1 to the Contract for Engineering Services with Chiang, Patel & Yerby, Inc. for the construction of water and sewer facility adjustments within the proposed FM 1460 Roadway Reconstruction Project. Resource: Jim Nuse, Public Works Director Bill Stablein, Transportation Construction Coordinator History: The City Council approved an engineering contract as Resolution No. R- 01 -12- 20-10D9 at its regular council meeting on December 20, 2001. This original contract expires May 31, 2002. In order for Chiang, Patel, & Yerby, Inc., to complete their scope of work they need an additional two months. No additional costs are associated with this time extension. Staff recommends extending the termination date until July 31, 2002. Funding: Cost: $0 Source of funds: N/A Outside Resources: Chiang, Patel, & Yerby, Inc. Impact/Benefit: A time extension on this contract will allow the engineer to complete the City's scope of work under the original contract. Public Comment: N/A Sponsor: N/A Mayor Robert A. S11ulo; Jr. Mayor Pro -tem Tom Nielson Council Members Alan McGraw Carrie Pitt Earl Palmer Isabel Callahan Gary Coe City Manager Robert L Bennett, Jr, City Attorney Stephan L Sheets CITY OF ROUND ROCK May 24, 2002 Mr. Lawrence R. Beenken, P.E. Chiang, Patel & Yerby, Inc. 1820 Regal Row, Suite 200 Dallas, Texas 75235 Dear Mr. Beenken: 221 Fast Main Street Round Rock, Texas 78664 512 -218 -5400 The Round Rock City Council approved Resolution No. R- 02- 05 -23- 13C 1 at their regularly scheduled meeting on May 23, 2002. This resolution approves Supplemental Agreement No. 1 which extends the contract date for the construction of water and sewer facility adjustments within the proposed FM 1460 Roadway Reconstruction Project. Enclosed is a copy of the resolution and original Supplemental Agreement No. 1 for your files. If you have any questions, please do not hesitate to contact Bill Stablein at 218 -3237. Sincerely, Christine R. Martinez City Enclosures Fax: 512 - 218.7097 1 -800- 735 -2989 TDD www.ci.round- rock.tx.us 1-800-735-2988 Voice THE STATE OF TEXAS § THE COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Chiang, Patel & Yerby, Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract," on the 20` day of December, 2001 to retain professional engineering and technical services for the construction of water and sanitary sewer facility adjustments within the proposed FM 1460 Roadway Reconstruction Project, and WHEREAS, ARTICLE 3, CONTRACT PERIOD, requires termination of the Contract on May 31, 2002, and WHEREAS, it has become necessary to amend the contract to reflect the actual date of the notice to proceed, and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 3, CONTRACT PERIOD, shall be extended until July 31, 2002 IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement in duplicate. THE EN By: E • gat 6xt (. y P. paPiti / 25; 20o Z. Date CITY OF ROUND ROCK By: Nyle Maxwell, Mayor S -07 (2L Date