Loading...
R-02-05-23-13C2 - 5/23/2002RESOLUTION NO. R- 02- 05- 23 -13C2 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services with Earth Tech Transportation Services, Inc. for the preparation of schematics, environmental documents, right -of -way documents, plans, specifications, and estimates for the realignment of South Mays Street, Dell Way, Hester's Crossing, and the extension of Gattis School Road from South Mays Street to the IH 35 East Frontage Road, and WHEREAS, Earth Tech Transportation Services, Inc. has submitted Supplemental Agreement No. 3 to the Contract for Engineering Services for a change in the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 3 to the Contract for Engineering Services with Earth Tech Transportation Services, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 3 to the Contract for Engineering Services with Earth Tech Transportation Services, Inc. for a change in the scope of services, a copy of said agreement being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this ::ODMA \wo"LDOx \o:\ x \RESOLUI \R2OS2Sca.wvn /sc Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 23rd day of May, 2002. ATTEST: 0)wdtAAA)k.n CHRISTINE R. MARTINEZ, City Secreta 2 NY ELL, Mayor City of Round Rock, Texas STATE OF TEXAS § THE COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 3 TO CONTRACT FOR ENGINEERING SERVICES This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Earth Tech Transportation Services, Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract ", on the 24` of November 1998 to retain engi- neering services for the preparation of schematics, environmental documents, right -of -way documents, plans, specifications, and estimates for the realignment of South Mays Street, Dell Way, Hester's Crossing, and the extension of Gattis School Road from South Mays Street to the IH -35 East Frontage Road, and WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER, describes those engineering services to be provided by the Engineer as a part of the Contract, and WHEREAS, ARTICLE 3, CONTRACT PERIOD, requires termination of the Contract on June 28, 2002, and WHEREAS, ARTICLE 4, COMPENSATION, establishes the maximum lump sum payable under this contract at $348,085.66 without modification of the con- tract, and WHEREAS, it is in the City's best interest to extend the term of the Contract until December 31, 2002, and WHEREAS, it has become necessary to amend the contract to provide plan and profile sheet detailing a mortared rock wall at Dell Way and provide plan and specifications, and contract documents for a fence that will serve as a visual and sound barrier at the intersection of Dell Way and Mays Street, and WHEREAS, the Engineer has agreed to have the additional work performed for $7,144.75 increasing the maximum lump sum fee for the contract to $355,230.41. EXHIBIT "An NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 3, CONTRACT PERIOD, shall be extended until December 31, 2002, ARTICLE 4, COMPENSATION, shall be amended by the changing the maxi- mum lump sum amount payable under this contract to $355,230.41. ATTACHMENT `B ", Services to be Provided by the Engineer shall be amended as set forth in the attached ADDENDUM NO. 3 to ATTACHMENT B. IN WITNESS WHEREOF, the City and the Engineer have executed Supple- mental Agreement in duplicate. THE ENGINEER By: �d� Signature 4 /2f /D2 Date CITY OF ROUND ROCK By: Mayor Date ADDENDUM NO. 3 TO ATTACHMENT B SERVICES TO BE PROVIDED BY THE ENGINEER The Engineer will provide the following services: 1. Provide plan and profile sheet detailing a mortared rock wall at Dell Way. 2. Provide plans, specifications, and contract documents for a fence that will serve as a visual and sound barrier at the intersection of Dell Way and Mays Street. Prepare Plans — The following sheets will be created or revised to provide a complete set of plans for the Bidders. The design for the fence was completed under a previous supplemental. • Title sheet with index • Project layout • General notes • Specification data • Summary Sheet o Fence quantities o Erosion control • Fence layout and details • Erosion control plan Bid Forms, Specifications, and Instructions to Bidders Document • Construction Time Estimate • Construction Cost Estimate • Prepare document Bid Package Management • Distribution of documents • Response to Bidder inquiries 3. Project Management • Manage Schedule • Prepare Invoices • Participate in meetings • QA /QC Task � llescnption " ' " .y�:,,� r i'e ,,. .._ a f „,�� " S a }�`{� Gleraeal Hours TdtaT Labor Rates mW /gverhedd.audrtaed S69 15 S0 8 g - .._S6 .-66 54773 Plan and profile sheet - mortared rock wall at Dell Way 1 4 36 40 $3,330.68 Fence Prepare Plans Title sheet with index 1 1 2 3 $211.90 Project layout 1 2 1 3 9226.82 General notes 1 3 I 4 9307.40 Specification data 1 2 1 3 9226.82 Summary Sheet 1 3 2 5 $373.06 Fence layout and details 3 1 1 965.66 Erosion control plan 1 1 3 4 9223.83 Bid Form, Spec., Ins-tr. Document Construction Time Estimate 2 2 9161.16 Construction Cost Estimate 2 2 $161.16 Prepare document 4 4 9322.32 Bid Package Management Distribution of documents 8 8 9382.00 Response to Bidder inquiries 8 8 $644.64 Project Management 2 4 6 9405.90 SUBTOTAL 6 64 8 15 93 97,043.35 .hTOT#%%l &::.!4r- Direct Expenses <'' # ° .; : ._.= v4 o rs#at .� 8 F.+9 m 0 t ittt ,U51.0. +, 4°5 te;. '., .93 ;,: Unit .r. . :57;043`;35 ,P :,, .. :s Mileage 120 $0.345 per mile $41.40 Overnight mail 4 $15.00 per package 960.00 9101.40 " .:;.. TOTL a : -_d -.: ".,•- "`: s`',;iy .�.... ° #r ,.,' , . _ ,,... . ,$7.,'144:75 ADDENDUM NO. 3 TO ATTACHMENT D FEE SCHEDULE EARTH TECH The above rates are the average rate in each classification of emp oyee. Invoices will be based on actual salaries for the individuals who worked on the project Non - exempt employees may be invoiced at time and a half based on actual costs. Direct Labor Rates Overhead Rate Fixed Fee Rate $36.00 527.00 1.5953 15% $22.00 $16.00 \ ` � � \ \ \ ~ '~ — � \ \ \ \ ~' .� \ ` ` \ \ ._'\ \ `\^''' ` ` , ` ` ` ' ~ .~ � � '^ ` .~ \\ ` \ \ T ` \- - �~,- \ � �~ ^ ` \/ 1 \ \ \ \ \ �� \ \ \ '-'r \ \ \'.'^'' .^~\` , \ ^` \ \ \ ` ''" ^ �\�-~- \ ` ' \ \ � -�^' ,r ` ` \ ~� ~ \ \ \ \ \ \ ./ / � . �-� Barrier Wall at S. Mays Vf DATE: May 17, 2002 SUBJECT: City Council Meeting — May 23, 2002 ITEM: 13.C.2. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 3 to the Contract for Engineering Services with Earth Tech Transportation Services, Inc., for a change in the scope of services which includes the design, plan, profile sheets, and contract documents for a wall for Dell Way Boulevard at Mays Street. Earth Tech has agreed to perform the additional work for $7,144.75 bringing the contract total to $355,230.41. Resource: History: Jim Nuse, Public Works Director Bill Stablein, Construction Coordinator At its regularly scheduled meeting on November 24, 1998, the City Council approved the original contract as Resolution No. 98- 11- 24 -14C1 to have Earth Tech Transportation Services Inc., provide services for the preparation of schematics, environmental documents, right -of -way documents, plans, specifications, and estimates for the realignment of South Mays Street. The council approved Supplemental Agreement No. 1 on November 21, 2000, which extended the contract and provided for construction inspection services. The approval of Supplemental Agreement No. 2 on December 20, 2001 allowed Earth Tech to provide design for the wall for Dell Way at South Mays Street. Funding: Cost: $7,144.75 Source of funds: Round Rock Transportation System Development Corporation Outside Resources: Earth Tech Transportation Services Impact/Benefit: The approval of this agreement will allow for the timely design of the barrier wall at Dell Way and Mays Street by a contractor already familiar with the project. Public Comment: N/A Sponsor: N/A dt /D 4-- ; CITY OF ROUND ROCK =3... " N II //I Mayor Robert A. Straka, Jr.. Mayor Pro-tem Tom Nielson Council Members Alan McGraw Carrie Pin Earl Palmer _ Isabel Callahan Gary Coe City Manager Robert L Bennett, Jr. City Attorney Stephan L Sheets May 24, 2002 Mr. Richardo Zamarripa Earth Tech Transportation Services, Inc. 811 Barton Springs Road, Suite 400. Austin, Texas 78704 Dear Mr. Zamarripa: The Round Rock City Council approved Resolution No. R- 02- 05- 23 -13C2 and No. R- 02- 05- 23 -13C3 at their regularly scheduled meeting on May 23, 2002. These resolutions approve Supplemental Agreement No. 3 for a change in the scope of services concerning a wall for Dell Way Blvd. at Mays Street. And Supplemental Agreement No. 4 for a change in the scope of services concerning a bridge from Dell Way to Boardwalk Shopping Center. Enclosed are copies of the resolutions and original Supplemental Agreements No. 3 and No. 4 for your files. If you have any questions, please do not hesitate to contact Bill Stablein at 218 -3237. Sincerely, Christine R. Martinez City Secretary Enclosures Fax: 512 -218 -7097 1 -800: 735 -2989 TDD www.ci.round- rock.tx.us 221 East Main Street Round Rock Texas 78664 512 - 218 -5400 1- 800 -735 -2988 Voice STATE OF TEXAS THE COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 3 TO CONTRACT FOR ENGINEERING SERVICES ORiC°&r E- 112- 05- 23 - /3cL This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Earth Tech Transportation Services, Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract ", on the 24 of November 1998 to retain engi- neering services for the preparation of schematics, environmental documents, right -of -way documents, plans, specifications, and estimates for the realignment of South Mays Street, Dell Way, Hester's Crossing, and the extension of Gattis School Road from South Mays Street to the IH -35 East Frontage Road, and WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER, describes those engineering services to be provided by the Engineer as a part of the Contract, and WHEREAS, ARTICLE 3, CONTRACT PERIOD, requires termination of the Contract on June 28, 2002, and WHEREAS, ARTICLE 4, COMPENSATION, establishes the maximum lump sum payable under this contract at $348,085.66 without modification of the con- tract, and WHEREAS, it is in the City's best interest to extend the term of the Contract until December 31, 2002, and WHEREAS, it has become necessary to amend the contract to provide plan and profile sheet detailing a mortared rock wall at Dell Way and provide plan and specifications, and contract documents for a fence that will serve as a visual and sound barrier at the intersection of Dell Way and Mays Street, and WHEREAS, the Engineer has agreed to have the additional work performed for $7,144.75 increasing the maximum lump sum fee for the contract to $355,230.41. NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 3, CONTRACT PERIOD, shall be extended until December 31, 2002, ARTICLE 4, COMPENSATION, shall be amended by the changing the maxi- mum lump sum amount payable under this contract to $355,230.41. ATTACHMENT `B ", Services to be Provided by the Engineer shall be amended as set forth in the attached ADDENDUM NO. 3 to ATTACHMENT B. IN WITNESS WHEREOF, the City and the Engineer have executed Supple- mental Agreement in duplicate. THE ENGINEER By: - ' .. Lam. � 1.,4,L By: Signature f/z /e 2 Date CITY OF $A ' RO yle axwell, Mayor 5 -�3 -0L Date ADDENDUM NO. 3 TO ATTACHMENT B SERVICES TO BE PROVIDED BY THE ENGINEER The Engineer will provide the following services: 1. Provide plan and profile sheet detailing a mortared rock wall at Dell Way. 2. Provide plans, specifications, and contract documents for a fence that will serve as a visual and sound barrier at the intersection of Dell Way and Mays Street. Prepare Plans — The following sheets will be created or revised to provide a complete set of plans for the Bidders. The design for the fence was completed under a previous supplemental. • Title sheet with index • Project layout • General notes • Specification data • Summary Sheet o Fence quantities o Erosion control • Fence layout and details • Erosion control plan Bid Forms, Specifications, and Instructions to Bidders Document • Construction Time Estimate • Construction Cost Estimate • Prepare document Bid Package Management • Distribution of documents • Response to Bidder inquiries 3. Project Management • Manage Schedule • Prepare Invoices • Participate in meetings • QA /QC ADDENDUM NO. 3 TO ATTACHMENT D FEE SCHEDULE EARTH TECH r'ltatc* SOr Plan and profile sheet - mortared rock wall at Dell Way Fence Prepare Plans Title sheet with index Project layout General notes Specification data Summary Sheet Fence layout and details Erosion control plan Bid Fomt, Spec., lnstr. Document Construction Time Estimate Construction Cost Estimate Prepare document Bid Package Management Distribution of documents Response to Bidder inquiries Project Management DiiinctEXpensekain..1 Mileage Overnight mail 1 1 1 3 1 SUBTOTAL 4 2 36 2 3 2 3 1 2 2 4 8 64 2 1 1 2 8 t?ud� ;ii 120 4 3 8 4 $0.345 15 $15.00 40 3 3 4 3 5 1 4 2 2 4 8 8 6 $7,043.35 93 per mile per package $3,330.68 $211.90 $226.82 $307.40 $226.82 $373.06 $65.66 $223.83 $161.16 $161.16 $322.32 $382.00 8644.64 $405.90 $41.40 $60.00 $101.40 The above rates are the average rate in each classification of emp oyee. Invoices will be based on actual salaries for the individuals who worked on the project Non - exempt employees may be invoiced at time and a half based on actual costs. Direct Labor Rates Overhead Rate Fixed Fee Rate $36.00 $27.00 $22.00 $16.00 1.5953 15% Barrier Wall at S. Mays cano15-09.02