R-02-06-13-14G8 - 6/13/2002RESOLUTION NO. R- 02- 06- 13 -14G8 WHEREAS, the City of Round Rock desires to construct a forty - eight inch (48 ") pipeline for potable water across Georgetown Railroad Company ( "GRR ") right -of -way, and WHEREAS, the Council wishes to enter into a Pipeline License Agreement with GRR, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City a Pipeline License Agreement with Georgetown Railroad Company, a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 13th day of June, 200 ST: CHRISTINE R. MARTINEZ, City Secreta L,ODPIA \WORLDOX \O: \WDOX \RESOLUTI \R30613GB.WPD /sc 1 1111111t 4110 , NYL 01.5r LL, Mayor City of Round Rock, Texas PIPELINE LICENSE AGREEMENT W I T N E S S E T H: EXHIBIT 1 "A" This Pipeline License Agreement (the "License ") is made and entered into effective the date last executed herein be- low, by and between Georgetown Railroad Company, a Texas cor- poration ( "GRR "), as licensor, and the City of Round Rock, Texas ( "Round Rock "), as licensee. WHEREAS, the City of Round Rock desires to construct a forty -eight (48) inch pipeline, with a sixty (60) inch steel incasement, for the transportation of water (the "Pipeline "), which Pipeline will cross under the tracks of GRR; and WHEREAS, GRR wishes to grant to the City of Round Rock a license to construct and maintain the Pipeline; NOW THEREFORE, the parties hereby agree as follows: Article I • - License Granted; Term; Consideration For and in consideration of the mutual covenants and contracts herein contained, GRR hereby grants to Round Rock a license to construct and maintain the Pipeline to cross under GRR's main line track and side track, ],581 feet north of Mile Post 5 and 1,094 feet south of the former common boundary line between Texas Crushed Stone Company and Westinghouse Electric Corporation, Williamson County, Texas and further described in Exhibit "A" attached hereto and incorporated herein for all pertinent purposes, on the terms and conditions described herein below. This License shall be effective from and after the date fully executed, and shall terminate at such time as the Pipeline is no longer used by the City of Round Rock for the use provided hereinabove. Article II Pipeline Location The Pipeline shall be located as described in Article I hereof. The Pipeline, when installed by Licensee, shall be installed so that the upper surface of the ripe is at least five and one -half (5t) feet below the bottom of the rail thereover, or at such lower depth which may be necessary to provide adequate support for the rail. Installation shall be made in conformity with the engineering profile contained in Exhibit "A" hereto. -2- Article III Responsibilities of Round Rock 3.1. Installation and Maintenance; Removal of Pipe Round Rock shall install or cause to be installed the Pipeline at the location provided•in Article I hereinabove. The Pipeline shall be installed safely and in a good workman- like .mapner, and during the construction, Round Rock or its contractor involved'in the construction shall secure a policy: of Owner's and Contractor's Protective Liability Insurance with limits of. liability of at least $2,000,000.00, naming GRR as the named insured and loss payee. Round Rock agrees to provide satisfactory evidence of such insurance coverage prior to beginning construction of the Pipeline. During the term of.the License, Round Rock agrees that it will properly maintain the Pipeline and will take any and all actions and expend any and all funds which may be required to maintain the Pipeline. Round Rock further agrees that the construction, maintenance, and operation of the Pipeline will comply with .. all applicable State,-Federal and local laws, rules or regula- tions, and upon any notification by any person that the Pipeline is not in compliance with such laws, rules and regulations, Round Rock agrees to take prompt action to bring the Pipeline into such pompliance.. In the event that Round Rock fails to properly maintain the Pipeline or to take any action required -3- to bring the Pipeline, into conformance with all applicable laws, rules or regulations, the GRR, after 10 days notice to Round Rock, may take any such action as may be reasonably . necessary to render the Pipeline safe for railroad operations or in compliance with applicable laws, rules and regulations, and Round Rock agrees that in the event-GRR takes such action, Round Rock shall, with twenty (20) days, reimburse GRR for the actual cost of . labor performed by or on behalf of'GRR, including wages of foremen, plus 10% to cover supervision and accounting, plus vacation allowances, paid- holidays and health and welfare benefit payments applicable to such labor, GRR's cost - price of all materials f.o.b. GRR's rails plus 10% to cover handling and accounting, plus freight at tariff to'point .of use, and excise taxes applicable to said labor and materials Upon termination of this License, Round.Rock shall. take prompt action. to remove the pipe and all associated materials and re- pair any damage to GRR's property which may be caused by such removal. Such removal shall be undertaken by Round.Rock with- out any demand from GRR,, but shall in any event commence. within thirty (30) days after. termination of this License and written demand for removal - being made by GRR. 3.2. Indemnification and Hold Harmless. During the term of this License,' Round Rock agrees -4- indemnify GRR and hold it harmless from any suits, claims, costs, loss or damage which may accrue to GRR, Round Rock or third parties, from the operation of the Pipeline arising out of, or occasioned by, the negligent acts of Round Rock or its employees or agents. The loss or damage for which Round Rock shall indemnify GRR and hold it harmless shall specifically include, but not be limited to, the following: (a) damage to or destruction of railroad track and track bed, railroad cars and engines, or to the Pipeline; (b) personal injury to or damage to property, owned, leased or operated by (i) GRR employees or agents, (ii) Round Rock employees, agents or contractors, or (iii) any third parties; and (c) economic loss to any party caused by damage to or destruction of the Pipeline or the inter- ruption of Pipeline service, caused by negligence of Round Rock, its employees or agents. Such indemhification shall include all actual monetary cost to GRR, including expenses and attorney's fees. Article IV Representations and Warranties of Round Rock Round Rock hereby represents and warrants.to GRR that the construction, operation and maintenance of the Pipeline have been properly approved by the City of Round Rock, and that - 5 - Round Rock has been authorized by resolution, or if required by its Charter, by ordinance, to enter into this Pipeline License Agreement, that the resolution or ordinance has not been repealed and -is - in effect at, -the date of execution hereof, and that this License Agreement is enforceable against Round Rock in accordance with its terms. Round Rock further warrants and represents that the city officer executing: this License has been duly authorized to execute the same on behalf.of,,and as the act and deed of, "the City of Round Rock. Article V Assignment The License hereby granted by GRR to RoundI Rock is personal: to.the grantee hereof; and Round Rock shall. have no' right to assign this.License without the express prior written consent • of GRR. GRR's rights hereunder shall be freely assignable." -6- Article VI Notice Any notice required or permitted hereunder shall be per- sonally delivered or sent by registered or certified mail, re- turn receipt requested to the addressee at the address listed below, and such notice shall be effective on the date of de- livery, or date of mailing. Round Rock Georgetown Railroad Company City of Round Rock 221 East Main Street Round Rock, Texas 78664 Georgetown Railroad Company P.O. Box 529 Georgetown, Texas 78627 EXECUTED on the date indicated below: City of Round Rock ATTEST: - BY: (Date) (Title) (City Seal) Georgetown Railroad Company ATTEST: BY: (Date) (Title) (Seal) -7- Chairman of the Board STEEL CASING WALL THICKNESS CHART MINIAU.1 THICKNESS DIIJAETER OF CASING PIPE .2500' 000000 .3125' ,3750' .4375' .5000' .6620. .6250' OVER 48 MJST BE APPROVE0 BY 0.R. CO. NOTE: THIS CHART I5 ONLY FOR 5110058 STEEL CASING PIPES WITH 1414114.11 YIELD STRENGTH OF 35.000 P57. Al B) C) 0) El PLACE ARROW INDICATING NORTH DIRECTION RELATIVE TO CROSSING +—rO PELb, 7X INTANEST R.R. TOANI C' e e� NON- FLAMMABLE PIPELINE CROSSING NOTE:. ALL AVAILABLE DIMENSIONS LUST BE v e ee l NO SCALE FILLED IN TO EXPEDITE THIS APPLICATION. O �4 OB I FT. .6_ SWITey P' I OCXAIK 1(0EO ONJECTI ISEE NOTE S1 101STAICE µ0K MCA FINN SECTION LINE 0001SING1 FT. I INTO THIS 0REW11♦1 80001NED IN ALL CASES. AT LOCATIOK 707 1.511. SECTIONS, 01SSANCE AR'S IVN TO A LECM. WIND LIRE 1S NEO110(0, 5!D FT • _a_ FT 1' v 3 6 FT 1114. 8757 45.. Not. 11. I SEE NOTE 1 E SI 71 FT.-1 40 1S PIPELINE CROSSING WITHIN DEDICATED STREET IF YES, NAME OF STREET DISTRIBUTION LINE CARRIER PIPE COMA007 TY TO BE CONVEYED rREA% Ft WATER OPERATING PRESSURE P51 �J ST>`E'!, o/t WALL TH ICKNE55 RR� r_esS ;DIAMETER 7 8 MATERIAL w�T![. /R CASING PIPE : WALL THICKNESSP• ; DIAMETERGOF ;MATERIAL S7E EL ; NOTE: CASING MUST HAVE 2' CLEARANCE BETWEEN GREATEST OUTSIDE DIAMETER OF CARRIER PIPE AND INTERIOR DIAMETER OF CASING PIPE. WHEN FURNISHING DIMENSIONS, GIVE OUTSIDE OF CARRIER PIPE AND INSIDE OF CASING PIPE. F) METHOD OF INSTALLING CASING PIPE UNDER TRACKIS): ?G DRY BORE AND JACK IWET BORE NOT PERMITTED); ' — TUNNEL ; OTHER — G) *ILL CONSTRUCTION BE BY AN OUTSIDE CONTRACTOR? X YES ;_J10; H) DISTANCE FROM CENTER LINE OF TRACK TO NEAR FACE OF BORING AND JACKING PITS WHEN MEASURED AT RIGHT ANGLES T9 TRACK YO MlJV I) APPLICANT HAS CONTACTED r fo Rr eno... Jo Kr c.o. 130• u1L l AND HAS DETERMINED FIBER OPTIC CABLE =DOES ;215_DOES NOT ; EXIST IN VICINITY OF WORK TO BE PERFORMED. APPLICATION FOR ENCASED FT — Fr --•• ISEE AWE 1 8 5I" @ 1 ..O'CL'Q IYK E iceasslxcl r CANNIDI PIPE A— FT FT. gQ FT. 143110 LENGTH L:1M MEN YEASYITO µK 0 PIPELINE. B / NOTES SI N A p 11 ALL HORIZONTAL DISTANCES TO BE MEASURED AT RIGHT ANGLES FROM F OF TRACK, EXCEPT AS NOTED. T j+ 21 CASING TO EXTEND BEYOND THE CENTERLINE OF TRACK AT RIGHT ANGLES THE GREATER OF 20 • 20 FT., OR 30 FT., 1` AND BEYOND LIMIT OF RAILROAD RIGHT -OF -NAT IF NECESSARY TO PROVIDE PROPER LENGTH OUTSIDE OF TRACK. 31 010108.11 OF 50' FROM THE END OF ANY RAILROAD BRIDGE, F OF ANY CULVERT, OR FROM ANY SNITCHING AREA. 41 SIGNAL REPRESENTATIVE MUST BE PRESENT DURING INSTALLATION Ir RAILROAD SIGNALS ARE IN THE VICINITY OF CROSSING. S) ALLOWABLE FIXE0 OBJECTS INCLUDE: BACKNALLS OF BRIDGES;'5 OF ROAD CROSSINGS K OVERHEAD VIADUCTS (GIVE ROAD MANE), ORE OF CULVERTS. 7= _YES;�NO; OR TRANSMISSION LINE X IGESCOINE MEP OBJECT) 11E0 NOTE 11 owe Su1FACE WARNING FT. FT. FORM DR 0404 -B REV.- 05 -01 -90 To KERRTTX— MEANEST L L TO1M1 FORYILA TO FIGURE Y2 CASING LENGTH NITN ANGLE OF CROSSING OTHER THAN 90• EXHIBIT "A" ITN WOO. lat 1114T - 10 WO VOTE IN TEO kol MIN.OIST. NOTE Z1 Su - 5 -N EagGE72 .) R�rioA\a IMO NO M. P. 5;30 E S 23,1 ICC ENCASED WATER LINE CROSSING AT FELD, I.JILL,/,I1svII W. 'T'xis . r..cTr r 33333 IwnT, FOR CITY op.RoUN4 ROCK RR FILE NO ast.69a DATE1v APR 2au IN ALL OCCASIONS. U. P. C0&A.NICATIONS OVANTIENT WS0 NC CONTACTED IN AON.■.CE OF ANT WILE TO OCTCNU110 UISTCNCC AW LOCATION OF EISEN 41570 CMS. PRP& 1.CGo-3).-111) DATE: June 7, 2002 SUBJECT: City Council Meeting — June 13, 2002 ITEM: 14.G.8. Consider a resolution authorizing the Mayor to execute a Pipeline License Agreement with Georgetown Railroad Company. Resource: Jim Nuse, Public Works Director History: In order for the City to complete the needed 48" East Transmission Water Line improvements, it is necessary to cross property owned by Georgetown Railroad Company. Funding: Cost: The license is at no cost to the City, but granted as partial consideration for the extension of the Industrial District. Source of funds: N/A Outside Resources: Georgetown Railroad Company Sponsor: N/A PIPELINE LICENSE AGREEMENT This Pipeline License Agreement (the "License ") is made and entered into effective the date last executed herein be- low, by and between Georgetown Railroad Company, a Texas cor- poration ( "GRR "), as licensor, and the City of Round Rock, Texas ( "Round Rock "), as licensee. W I T N E S S E T H: WHEREAS, the City of Round Rock desires to construct a forty -eight (48) inch pipeline, with a sixty (60) inch steel incasement, for the transportation of water (the "Pipeline "), which Pipeline will cross under the tracks of GRR; and WHEREAS, GRR wishes to grant to the City of Round Rock a license to construct and maintain the Pipeline; NOW THEREFORE, the parties hereby agree as follows: • Article I License Granted - ;: Term;' Consideration For and in consideration of the mutual covenants and contracts herein contained, GRR hereby grants to Round Rock a license to construct and maintain the Pipeline to cross under GRR's main line track and sidetrack, 7,581 feet north of Mile Post 5 and 1,094 feet south of the former common boundary line between Texas Crushed Stone Company and Westinghouse Electric Corporation, Williamson County, Texas and further described in Exhibit "A" attached hereto and incorporated herein for all pertinent purposes, on the terms and conditions described herein below. This License shall be effective from and after the date fully executed, and shall terminate at such time as the Pipeline is no longer used by the City of Round Rock for the use provided hereinabove. Article II Pipeline Location The Pipeline shall be located as described in Article I hereof. The Pipeline, when installed by Licensee, shall be installed so that the unner surface of the pipe is at least five and one -half (5k) feet below the bottom of the rail thereover, or at such lower depth which may be necessary to provide adequate support for the rail. Installation shall be made in conformity with the engineering profile contained in Exhibit "A" hereto. -2- Article III Responsibilities of Round Rock. 3.1. Installation and Maintenance; :of Pipe Round Rock shall install or cause to be installed the Pipeline at the location provided-in Article S hereinabove. The Pipeline shall be installed safely and in a good workman- .like manner, and during the construction, Round Rock or its contractor involved'in the construction shall secure a policy of Owner's and Contractor's Protective Liability Insurance with limits of.- liability of at -least $2,000,000.00, naming GRR as the named insured and loss payee. Round Rock agrees • to provide satisfactory evidence of such insurance coverage prior to beginning construction of the Pipeline.. During the term of the License, Round Rock agrees that it will properly maintain the Pipeline and will take any and all actions and • expend any and all funds which may be required to maintain the Pipeline. Round Rock .further agrees that the construction, maintenance, and operation of the Pipeline will comply with .. all applicable State,•Federal and local laws, rules or regula- tions, and upon any notification by any person that the Pipeline is not incompliance with such laws, rules and regulations, Round Rock agrees to take prompt action to bring the Pipeline into such compliance. In the event that Round Rock fails to properly maintain the Pipeline or to take any.action required 3.2. Indemnification and Hold Harmless • to bring the Pipeline, into conformance with all applicable • laws, rules or regulations, the GRR, after 10 days notice to Round Rock, may take any such action as may be reasonably . necessary to render =,the Pipeline safe for railroad operations or in compliance with applicable laws, rules and regulations, and Round Rock agrees that in the event-GRR takes such action, Round Rock shall, with twenty (20) days, reimburse GRR for the actual cost of. labor performed by or on behalf of GRR, including wages of foremen, plus 10% to cover supervision and accounting, plus vacation allowances, paid.holidays and health and welfare benefit payments applicable to such labor, GRR's cost of all materials f.o.b. GRR's rails plus 10% to cover handling and accounting, plus freight - at 'tariff to point .of use, and excise taxes applicable to said labor and materials Upon termination of this License, Round.Rock shall. take prompt action. to remove the'pipe and all associated materials and re- . pair any damage to GRR's property which may be caused by such removal. Such removal shall be undertaken by Round.Rock with- out any demand from GRR, but shall in any event commence.within thirty-(30) days after. termination of this License and written demand for removal being made by GRR. During the term of this License, Round Rock agrees,to indemnify GRR and hold it harmless from any suits, claims, costs, loss_or damage which may accrue to GRR, Round Rock or third parties, from the operation of the Pipeline arising out of, or occasioned by, the negligent acts of Round Rock or its employees or agents. The loss or damage for which Round Rock shall indemnify GRR and hold it harmless shall specifically include, but not be limited to, the following: (a) damage to or destruction of railroad track and track bed, railroad cars and engines, or to the Pipeline; (b) personal injury to or damage to property, owned, leased or operated by (i) GRR employees or agents, (ii) Round Rock employees, agents or contractors, or (iii) any third parties; and (c) economic loss to any party caused by damage to or destruction of the Pipeline or the inter- ruption of Pipeline service, caused by negligenbe of Round Rock, its employees or agents. Such indemnification shall include all actual monetary cost to GRR, including expenses and attorney's fees. Article IV Representations and Warranties of Round Rock Round Rock hereby represents and warrants.to GRR that the construction, operation and maintenance of the Pipeline have been properly approved by the City of Round Rock, and that - 5 - Round Rock has been authorized by resolution, or if required by its Charter, by ordinance, to enter into this Pipeline License Agreement, that the resolution or ordinance has not been repealed and isin effect at date of execution hereof, and that this License Agreement is enforceable against Round Rock in accordance with its terms. Round Rock .further warrants and represents that the city officer executing this License has been duly authorized to execute the same on behalf as the act and deed of., 'the City of Round Rock. Article V Assignment The License hereby granted by GRR to Round! Rock is personal to the grantee hereof; and Round Rock shall. have no' right to assign this- License without the express prior written consent of GRR. GRR's rights hereunder shall be greely assignable.: -6-- Article VI Notice Any notice required or permitted hereunder shall be per- sonally delivered or sent by registered or certified mail, re- turn receipt requested to the addressee at the address listed below, and such notice shall be effective on the date of de- livery, or date of mailing. Round Rock City of Round Rock 221 East Main Street Round Rock, Texas 78664 (Date) (Seal) Georgetown Railroad Company EXECUTED on the date indicated below: R_ 02-06-13-124k D ` y � ATTEST: O h i l ( •U ) / V L BY : CI Ty See/25742y n]fiyoRf (Date) J i6 /3,a.00a✓ (Title) NyLE inAKWEW (City Seal) ATTEST: BY: -7- Georgetown Railroad Company P.O. Box 529 Georgetown, Texas 78627 City of Round Rock Georgetown Railroad Company Chairman of the Board (Title) STEEL CASING WALL TN CXNESS CHART MINIIAM THICKNESS DIAMETER OF CASING PIPE .2500' N +1V i4 S.o N� r �aa � y a 71WWT}>� 000CCC OO .3125' .3750" .4375 V .5000' .5625' .625? OVER 48 MAT BE APPROVED BY R.R. CO. NOTE: THIS CHART 15 ONLY FOR 51100TH STEEL CASING PIPES •ITN 111N11-11 YIELD STRENGTH OF 35.000 P31. PLACE ARROW INDICATING NORTH DIRECTION RELATIVE TO CROSSIN • . I ` r '>. APPLICATION FOR ENCASED e�Q J NON- FLAMMABLE PIPELINE CROSSING „rat., 77( ` IT 11GDEST K.R. lam RI POW NO SCALE s+Jlre Pow I DESG1BE 011E0 M4E501 SEE MOTE 11 11/UTAICC 04_010 MACH TRW SECTtDl 111E CHOSSINGI 1103TO THIS DHAE510.1 REQUIRED IK AIL aaES. as =OWNS MOT 01110 SECTIONS, DISTANCE TO A LEGAL RWIET LINE IS 1mR1EDI 4 10 'FT 111. DIST J S.. IMO.. 31. FT. IS FT.--1 _LIFT I 1 I ,gQ FT ICAS1NG LEKTN MEN NLLSUIEI *LCMO PIPELIOF.I Al 15 PIPELINE CROSSING WITHIN DEDICATED STREET ?._ TES ;AC_NO; 01 IF YES, NAME OF STREET +• C) DISTRIBUTION LINE OR TRANSMISSION LINE X DI CARRIER PIPE : C0!.&IODITY TO BE CONVETED TREA% & LS)I¢! ER OPERATING PRESSURE- / P51 J��J STTEL �R WALL THICKNESSV 1 S DIAMETER 70 ; MATERIALAVGTILE /RJ3A E) CASING PIPE : WALL THICKNESSD. ,H ; DIAMETERGOpL ;MATERIAL srE EL. ; NOTE: CASING MUST HAVE 2' CLEARANCE BETWEEN GREATEST OUTSIDE DIAMETER OF CARRIER PIPE AND INTERIOR DIAMETER OF CASING PIPE. WHEN FURNISHING DIMENSIONS, GIVE OUTSIDE OF CARRIER PIPE ANO INSIDE OF CASING PIPE. F1 METHOD OF INSTALLING CASING PIPE UNDER TRACKIS): X DRY BORE AND JACK IWET BORE NOT PERMITTED); - _ TUNNEL ; OTHER G) WILL BE BY AN OUTSIDE CONTRACTOR? 1j' YES ;_NU; HI DISTANCE FROM CENTER LINE OF TRACK TO NEAR FACE OF BORING AND JACKING PITS WHEN MEASURED AT RIGHT ANGLES T9 TRACK YO M/N I) APPLICANT HAS CONTACTED .( Kr Co. 1w NIC1 01 o A .. „ , CT. -- AND HAS DETERMINED FIBER OPTIC CABLE — DOES;�1 yy -DOES NOT ; EXIST IN VICINITY OF WORK TO BE PERFORMED. NOTE:. ALL AVAILABLE DIMENSIONS MUST DE FILLED IN TO EXPEDITE THIS APPLICATION. 0 ® cFT.' _FT. Fr 51 I °-` - _-� C ISEE MOTES 5 SI ISCE MOTE 3 • SI” • 5 .+ FT. • 1 010 Of V I OESCR,BE 011(0 0aJtC11 Su MOTE SD 4 FT • FT. FT. WARN I N G EXHIBIT "A" ,Tr aN,Anr,.L A... • AO .91' MIK IV n„ v, FORM DR 0404 -5 REV..05 -01 -90 MI' s VW l0 Kt RRETSC 1K311E5T _0. TON, FORMULA TO FIGURE jy CASING LENGTH WITH ANGLE OF CROSSING OTHER THAN 50' NOTES : II ALL HORIZONTAL DISTANCES TO BE MEASURED AT RIGHT ANGLES FROM E OF TRACK, EXCEPT AS NOTED. 2) CASING TO EXTEND BEYOND THE CENTERLINE OF TRACK AT RIGHT ANGLES THE GREATER OF 20 • 20 FT., OR 30 FT., AND BETONO LIMIT OF RAILROAD RIGHT -OF -RAT IF NECESSARY TO PROVIDE PROPER LENGTH 0117510E OF TRACK. 3) MINIMUM OF 50' FROM THE ENO OF ANT RAILROAD BRIDGE, 1 OF ANT CULVERT, OR FROM ANY SWITCHING AREA. A) SIGNAL REPRESENTATIVE MIST BE PRESENT DURING 1 S AA TION IF RAILROAD SIGNALS ARE IN THE VICINITY OF CROSSING. 5) ALLOWABLE FIXE0 OBJECTS INCLIAE: BACK5*LLS OF 001030S; f OF ROAD CROSSINGS U OVERHEAD VIADUCTS 101VE ROAD NANE1, OR F OF CULVERTS. 1111.0157. MIT x, 511 -Y-0 GEDRGEroWnl RAILROAI\ co M. P. 5, 30 E S rec. ENCASED klATEZ LINE CROSSING AT FELD, WILLW-150!»J CA. 7><xAs FOR CITY or gouNn RocK RR FILE NO aS 1.‘02 DATEd01APR2 111 ALL occAslCon. 0. P. COIALR11tA110N5 OvaenclT NNT Bt 0O•1307E0 11 AOVANU 01 ANT 4044 10 DCT(*IIIC 1F11113C1 ANO LOtaT1010511101 OPTIC C.x1. 1 2 1- 10o-)) -3153