Loading...
R-02-06-27-9B1 - 6/27/2002 RESOLUTION NO. R-02-06-27-9B1 WHEREAS, §8.610(4) and 98.611(10) , Code of Ordinances (1995 Edition) provide for the reimbursement for the oversizing of water and wastewater mains, and WHEREAS, Bon Terre Lake Forest has submitted a reimbursement request for the oversizing of water and wastewater mains associated with the Lake Forest II, Village I development, and WHEREAS, the City Council wishes to approve said reimbursement, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,TEXAS, That the City Council hereby approves of the reimbursement to Bon Terre Lake Forest of $8,593.42, which is the cost of oversizing water and wastewater mains associated with the Lake Forest II, Village I development. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. i ODM\WORLOOX\0:\W00%\RESOLD l\R2027BI-WPD/.c RESOLVED this the 27th day of June, 2002. L WELL, d ayor City of Round Rock, Texas AT EST: CHRISTINE R. MARTINEZ, City Secr ary 2 FEPNEPPING DMVE LOOL PIVEP LWP P �m5 S Polo 8 N LAKE FOREST PHASE 2 wE VILLAGE 1J` s BAKER-AICKLEN 6 ASSOCIATES,INC. Engineers/Surveyors February 12,2002 Mr.Danny Halden,P.E. City of Round Rock Department of Public Works 2008 Enterprise Drive Round Rock,TX 78664 RE: Lake Forest II,Village I,Subdivision improvements Reimbursement Fee for Water&Wastewater Line Oversize Job#1056-2-003-26 Dear Mr.Halden: On behalf of Mr.Joel Robuck,we are submitting this request for reimbursement for the following line oversizing associated with the referenced project. Attached you will find a copy of the contractor's bid difference between the 8"vs. 12"water line connection at Gattis School Road. 12"Wastewater 05.29 LF x 4 in.x$2.60/in.-LF = $7,335.02 12"Water&Connection �,�• TOTAL $�2 4i `78— If you have any questions abo t this reimbursement amount,please give me call at 244- 9620. Since el 1Z1 L.F. x 4-j^ X 2.6o/;„-t.f- 11258,40 a. )a.slw� 7,33S,oz H.D. o�P E. r L -4 el o Tel HDR/vmb Attachment b�r� Cc: Mr.Joel Robuck a� 81 Sq 3,Bri pQ�-, 0:\1056-2-003-26\dhaldm oversize talcs ltr 2.12-02 �`” a�� 203 E. Mein St.. Suite 201 •Round Rock.Texas 713664- 512/244-9620 FAX 512/244-9623 DATE: June 21,2002 SUBJECT: City Council Meeting—June 27,2002 ITEM: 9.B.1. Consider a resolution approving the reimbursement to Bon Terre Lake Forest of$8,593.42,for the cost of oversizing water and wastewater mains associated with the Lake Forest II, Pillage I development Resource: Jim Nuse,Chief of Operations/Assistant City Manager Danny Halden,City Engineer History: Water and wastewater mains were oversized in Lake Forest II,Village I for future service to serve future development in the same vicinity. Funding: Cost: $8,593.42 Source of funds: Oversize account established in Chapter 8 of the Round Rock City Code. Outside Resources: Baker-Aicklen and Associates Inc. Impact: Minimal. To date approximately$139,000.00 has been paid in to the oversize account by the entire Lake Forest development and the City has reimbursed approximately$85,000.00. Benefit: Helps reduce possibility of constructing parallel mains in the future. Public Comment:N/A Sponsor:N/A