R-02-06-27-9B2 - 6/27/2002RESOLUTION NO. R- 02- 06- 27 -9B2
WHEREAS, the City of Round Rock has previously entered into a
contract for engineering services ( "Contract ") with Carter & Burgess,
Inc. for the preparation of plans, specifications, and estimates for
1.5 miles of US 79 from FM 1460 to CR 195, and
WHEREAS, Carter & Burgess, Inc. has submitted Supplemental
Agreement No. 4 to the Contract for a change in the scope of services,
to include additional design work, and
WHEREAS, the City Council desires to enter into said Supplemental
Agreement No. 4 to the Contract with Carter & Burgess, Inc., Now
Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City Supplemental Agreement No. 4 to the Contract with
Carter & Burgess, Inc., a copy of said supplemental agreement being
attached hereto as Exhibit "A" and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
.. ODMMWORLDOX\ 0 . \WOOX \RESOLUTI \R2062)D2.WRD /ec
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended.
RESOLVED this 27th day of June, 2002.
ATTEST:
CHRISTINE R. MARTINEZ, City Secret
2
City of Round Rock, Texas
y
STATE OF TEXAS * Contract No.
COUNTY OF WILLIAMSON
SUPPLEMENTAL AGREEMENT NO. 4
CONTRACT FOR ENGINEERING SERVICES
THIS SUPPLEMENTAL AGREEMENT to contract for engineering services is made by and
between the City of Round Rock, hereinafter called the "City ", and Carter - Burgess, Inc.,
hereinafter called the "Engineer ", and becomes effective when fully executed by both parties.
WITNESSETH
WHEREAS, the City and the Engineer executed a contract on the 23` day of March 2000
concerning the design of a four -lane divided section on US 79 from FM 1460 to CR 195 to
include bridge design at Arterial A; and,
WHEREAS, Article 2, Scope of Services To Be Provided by Engineer, as amended, establishes
engineering services to be performed in fulfillment of the Contract; and,
WHEREAS, Article 4. Compensation, as amended, limits the maximum amount payable for the
contract to $651,596; and,
WHEREAS, it has become necessary to further amend the contract;
AGREEMENT
NOW THEREFORE, premises considered, the City and the Engineer agree that said contract is
amended as follows:
I. The Engineer will be performing additional field survey at Palm Valley Lutheran Church,
16" waterline adjustment, additional bridge design, and project management. Services to
be provided as shown in Exhibit B.
II. The maximum amount payable of the contract is increased by $33,266.00, as shown in
Exhibit D, to $684,862.00.
EXHIBIT
nAu
1 oft
ALL OTHER PROVISIONS ARE UNCHANGED AND REMAIN IN FULL FORCE AND
EFFECT.
IN WITNESS WHEREOF, the City and the Engineer have executed this supplemental
agreement in duplicate.
THE CITY THE ENGINEER
By: By:
Bill Caffey, P.
Vice - President
LIST OF EXHIBITS:
Date
Exhibit B — Additional Services to be Provided by the Engineer
Exhibit D — Fee Schedule
2 of 2
S /0 —0 2—,
Date
EXHIBIT "B"
ADDITIONAL SERVICES TO BE PROVIDED BY THE ENGINEER
PROJECT: US 79
LIMITS: From 1400 ft West of FM 1460 to CR 195
COUNTY: Williamson
CONTRACT NO.
Field survey embankment placed by the Palm Valley Lutheran Church within the proposed
US 79 right of way.
Adjust 16" waterline crossing US 79 west of existing FM 1460. Adjustment includes new
crossing, casing, fire hydrant relocation and water valve placement.
Additional bridge design cost to the westbound US 79 bridge at Arterial A. The westbound
bridge width was increased from 40' to 58'. Original scope work was for the eastbound and
westbound bridges to be the same width; therefore some of the same design could be used on
both bridges. But since the width of the westbound bridge was increased for traffic control
purposes, the bridge design was not the same.
TAS AN4 DFSC
!E&ll k
fblF,.
F(
..
NK f
t te:
.,
TOTA{,
'- M/sNtiQl3RS.t
I, PROJECT MANAGEMENT
A. Coordination and Review
16
0
20
8. Contract Administration
4
10
C. Quality Assurance/Quality
4
6
24
0
0
0
36
II. ROUTE AND DESIGN STUDIES (F.C. 110)
A. Schematic Design
1. Data Collection
2. Initial Field Reconnaissance
3. Identify Property Ownership
4. Develop Designs
5. Typical Sections
6. Right of Way Requirements
0
B. Design Concept Conference
0
0
C. Preliminary Cost Estimate
SUBTOTALS:
0
0
111. SOCIAL ECONOMIC
STUDIES (F.C. 120)
A. Environmental Assessment
1, Agency Coordination
2. Purpose and Need for Action
3. Socioeconomic Data
4. Field Investigation
5. Land Use
6. Geology and Groundwater
7. Noise and Vibration
8. Surface Water Hydrology
9. Air Quality
10. Cultural Resources
11. Ecological Resources
12. Wetlands
13. Endangered Species
14. Relocation
15. Prime Farm Land
B. Assemble, Review and Process
0
0
SUBTOTALS:
0
0
0
CARTER & BURGESS,
4- LANE BLVD. SECTION
TIMATED MANHOURS OF EACH WORK TASK
ENGINEERING FEE ESTIMATE
US 79
WILLIAMSON COUNTY
ROM: FM 1460
TO: CR 195
LENGTH = 1.5 MILE
May , 2002
tA4)
SHEET 1 OF 6
TASKANP.: SM,F1. y
41
`:7gr4. :-
MI
IV. PUBLIC INVOLVEMENT (F.C. 120)
A. Public Meeting
1. Prepare Meeting Notice and Exhibits
0
2. Assist with Meeting
0
3. Prepare Draft Summary and Analysis
0
0
0
A. Public Hearing
1. Prepare Notice & Exhibits
0
2. Assist with Hearing
0
3. Prepare Final Summary and Analysis
0
SUBTOTALS:
0
V. UTILITY /R. O. W. COORD. (F.C. 130)
A. Ownership Data
B. Utility Locations
C. Right of Way Plans
1. Prepare Right of Way Plans
0
o
2. Calculate Right of Way Req.
3. Calculate Parcel Areas
D. Prepare Field Notes
E. Research and Tract Analysis
F. Notify /Meeting w /Utility Owners
0
0
SUBTOTALS:
0
0
0
0
0
VI. FIELD SURVEYS (F.C. 150)
l
A. Establish Horizontal and Vertical Control
B. Establish Benchmarks at (2000) Interivals
C. Stake Centerline
D. Existing Crass Sections and Ties
1. Proposed Roadway Centerline
2. Connecting Roads
3. Drainage Channels
o
4. Existing Bridges and Culverts
5. Connections to CR 195 & FM 1460
E. Survey and Stake Right -Of-Way
F. Stake Core Test Hales
SUBTOTALS:
0
0
0
0
0
CARTER & BURGESS,
4 - LANE BLVD. SECTION
IMATED MANHOUF F EACH WORK TASK
ENGINEERING FEE ESTIMATE
US 79
WILLIAMSON COUNTY
FROM: FM 1460
TO: CR 195
LENGTH = 1.5 MILE
May 10, 2002
(US79SA4)
SHEET 2 OF 6
VII. R_____ ..... . _
ROADWAY DESIGN (F.C. 160)
A. Geometric Design
1. Horizontal Alignment
2. Vertical Alignment
3. Right -Of -Way Requirements
4. Typical Sections
SUBTOTALS:
__
000o 0
J
0000000 0
VIII. PREPARATION OF CONSTRUCTION PLANS
:% F 9 7
9aEET
l3OU $
... `2 .
PER
SH EET "
A. ROADWAY DESIGN
1. Title Sheet & Index
2. Project Layout
3. Typical Sections
4. Plan and Profile/Intersection Sheets
5. Horiz. Allig. & Cross Slope
6. Roadway Summaries
7. General Notes and Spec.
8. Estimate and Quantities
9. Utility Layouts
' 000000000 0
000000000
000000000 0
000000000 0
000000000 0
000000000 0
000000000 0
B. DRAINAGE (F.C. 161
1. Drainage Area Maps
2. Hydraulic Data
3. Drainage Sheet
4. Culvert Cross Sec. & Details
5. Drainage Details
6. Storm Water Pol. Prev. Plan /Eros
7. Drainage Summary
SUBTOTAL: 0
CO CO CO C.4
0000000
00000coco
0000000 -
CARTER S. BURGESS,
4- LANE BLVD. SECTION
ESTIMATED MANHOURS OF EACH WORK TASK
ENGINEERING FEE ESTIMATE
US 7!
WILLIAMSON COUNTY
FROM: FM
TO: CR 11
LENGTH = 1.5 MILE
May 10, 2002
(US79SA4)
SHEET 3 OF 6
CARTER & BURGESS, 1
4 - LANE BLVD. SECTION
ENGINEERING FEE ESTIMATE
US 79
WILLIAMSON COUNTY
FROM: FM 1460
TO: CR 195
LENGTH = 1.5 MILE
May 10, 2002
US79SA4)
SHEET 4 OF 6
R' l
&I T,
'HRS1
''':?
HOURS
.
? >=R`.
H ET
C . SIGNING AND MARKINGS
00n 0 0 00 0 0 I...C.1,10N 07 N
.- 0 0 WI
1. Sign., Strip., and Del, Plan
0
0
Si
2. Summary of Small Signs
0
o
3. Sign Details
0
0
SUBTOTAL:
o
D - MISCELLANEOUS ROADVVAY (FL. 163)
1. Traffic Control Plan, Detour
0
Sequence of Construction
2. Signalizatlon (1- Inter.
0
3. Construction Time Estimates
0
0
4. Landscaping (Conceptual
0
SUBTOTAL:
0
E. BRIDGE DESIGN (KC.
1. Structure Layout
1
17
2. Abutment Details
2
26
3. Bent Details
2
46
4. Bridge Layout - Boring
,
cm
0..
.
c.,
N
.
g
5. Slab Details
1
12
6. Summary of Structure
1
13
123
0
SUBTOTAL:
0
0
TOTALS (Prep. of Const. Plans)
DESIGN TOTALS:
8
123
PERCENT OF TOTAL HOURS:
100.00%
CARTER & BURGESS, 1
4 - LANE BLVD. SECTION
ENGINEERING FEE ESTIMATE
US 79
WILLIAMSON COUNTY
FROM: FM 1460
TO: CR 195
LENGTH = 1.5 MILE
May 10, 2002
US79SA4)
SHEET 4 OF 6
B 9 ¢
..::
' -
.fyiATj £10`(~;k ..
e a `.�. 3 �y
Ei.NF.fi.iY3Sx; , .,
H TS1
:, i
`: Y
E36T1$
PA 11 ;:
a A
I. PROJECT MANAGEM ( 110)
-TOTAL HOURS
6
24
0
0
0
4
36
SALARY RATES:
$62.50
538.00
$33.00
$29.00
$27.00
$18.00
DIRECT SALARY COST:
5500
5912
50
$0
$0
$72
OVERHEAD MULTIPLIER: 1.7782
$889
$1,622
$0
50
$0
$128
PROFIT: 15.00%
$208
$380
50
$0
$0
$30
TOTAL
81,597
82.914
50
$0
00
$230
$4,741
II. ROUTE AND DE IGN STUDIES (F. . 110)
TOTAL HOURS
0
0
0
0
0
0
0
SALARY RATES:
$62.50
$38.00
033.00
$29.00
$27.00
018.00
DIRECT SALARY COST:
$0
$0
$0
50
$0
$0
OVERHEAD MULTIPLIER: 1.7782
$0
$0
$0
$0
$0
$0
PROFIT: 15.00%
$0
80
$0
$0
$0
50
TOTAL
00
0
- 0
$0
$0
$0
I . SOCIAL ECONOMIC & E - ONMENTAL
STUDIES (F.C. 120)
TOTAL HOURS
0
0
0
0
0
0
0
SALARY RATES:
$62.50
$38.00
$33.00
$29.00
$27.00
$18.00
DIRECT SALARY COST:
$0
$0
$0
50
$0
50
OVERHEAD MULTIPLIER: 1.7782
00
$0
$0
$0
$0
$0
PROFIT: 15.00%
$0
$0
$0
50
50
$0
TOTAL
- '0
$0
0
'.0
$0
$0
$0
IV. PUBLIC INVOLVEMENT (F.C. 120)
r
TOTAL HOURS
0
0
0
0
0
0', 0
SALARY RATES:
$62.50
$38.00
$33.00
$29.00
$27.001.
018.00'
DIRECT SALARY COST:
$0
$0
$0
$0
$0
$0
OVERHEAD MULTIPLIER: 1.7782
$0
$0
80
$0
50
$0
PROFIT:- 15.00%
$0
00
$0
$0
50
$0
TOTAL
$0
$0
'I
$0
$0
$0
$0
V. UTILITY /R. 0. W. COORD. (F.C. 130)
TOTAL HOURS
0
0
0
0
0
0
0
SALARY RATES:
$62.50
$38.00
$33.00
029.00
$27.00
$18.00
DIRECT SALARY COST:
$0
$0
$0
$0
$0
$0
OVERHEAD MULTIPLIER: 1.7782
50
50
$0
50
$0
$0
PROFIT: 15.00%
$0
$0
80
50
$0
$0
TOTAL
$0
.0
80
$0
$0
00
$01
VI. FIELD SURVEYS (F.C. 150)
TOTAL HOURS
0
0
0
0
0
0
0
SALARY RATES:
$62.50
$38.00
$33.00
$29.00
$27.00
$18.00
DIRECT SALARY COST:
$0
- $0
$0
$0
50
$0
OVERHEAD MULTIPLIER: 1.7782
$0
$0
50
$0
$0
$0
PROFIT: 15.00%
$0
$0
$0
$0
$0
50
TOTAL
$0
$0
$0
$0
$0
00
$0
CARTER & BURGESS, INC.
4- LANE BLVD. SECTION
MATED COST OF EACH WORK TASK
ENGINEERING FEE ESTIMATE
US 79
W ILL IAMSON COUNTY
FROM: FM 1460
TO: CR 195
LENGTH = 1.5 MILE
May 10, 2002
(US795A4)
SHEET 5 OF 6
TASKAN DEGGRIPt
tPCit3 G
„tvVsN A'GF ; Ft t
TrE'Slsa}t
N i p
AST P6£7GN
'• i lUbl( i .,
•. 3R CN ';
-. %5C} 6fFd✓�,t.:`
GAIIRF.
iiti9 TEtt
t: tO
..
<�A7At,
M YNt1OURS .,
VII. ROADWAY DESIGN (F.C. 160)
TOTAL HOURS
SALARY RATES:
DIRECT SALARY COST:
OVERHEAD MULTIPLIER: 1.7782
PROFIT: 15.00%
TOTAL.
0
$82.50
$0
50
$0
0
$38.00
80
50
$0
0
$33.00
$0
$0
$0
0
529.00
50
50
50
0
$27.00
SO
$0
$0
0
$18.00
50'
$0
$0
0
$0
50
$0
50
$0
$0
50
VIII. PREPARATIO11 0 CONS RUCTION PLANS
TOTAL HOURS
SALARY RATES:
DIRECT SALARY COST:
OVERHEAD MULTIPLIER: 1.7782
PROFIT: 15.00%
TOTAL
8
$62.50
$500
$889
$208
40
538.00
$1,520
$2.703
$633
38
533.00
$1,254
$2,230
0523
0
$29.00
50
50
50
37
$27.00
5999
$1,776
0416
0
$18.00
50
50
50
123
51,597
04,856
54.006
$0
$3,192
$0
513,652
TOTAL CARTER & BURGESS, INC.:
TOTAL HOURS.
SALARY RATES:
DIRECT SALARY COST:
OVERHEAD MULTIPLIER: 1.7782
PROFIT: 15.00%
TOTAL
PERCENT OF CARTER & BURGESS COST:
16
$62.50
$1,000
$1,778
5417
64
$38.00
52,432
54.325
51,013
38
$33.00
$1,254
52,230
$523
0
$29.00
00
$0
50
37
$27.00
$999
$1,776
$416
4
518.00
572
$128
$30
159
55,757
$10,237
$2,399
53,195
17.37%
57,770
42.24%
54,000
21.78%
$0
0.00%
53,192
17.35%
$230
1.25%
$18,393
100.00%
DIRECT COST - CARTER & BURGESS, INC.:
Mylar Plots Square Feet at 03.50 /Square Foot $0
Blueline Reproductions or Printing Square Feet at 50.25 /Square Foot 50
Survey Materials and Supplies SO
Express Deliveries Deliveries at 520.00 /Delivery 50
Auto Mileage (Incl. 18" Waterline Oversight) Mlles al $0.315 /Mile 50
Air Travel - Rights at 5250.00 /Round Trip $0
Lodging Nights 01 $85,00 /Night 50
Per Diem Days at $35.00 /Day 50
Auto Rental Days at 060.00 /day 50
Telephone, Communications and Advertisements 50
Court Recorder & Transcriber SO
Geotechnical /Pavement & Foundation Design so
TOTAL DIRECT COST - CARTER & BURGESS, INC. $0
SUMMARY - CARTER & BURGESS, INC.
Labor • Overhead • Profit $18,393
Direct Cost - 50
TOTAL CONTRACT COST • CARTER & BURGESS, INC. 'S *AP
CARTER & BURGESS, INC.
4 - LANE BLVD. SECTION
ESTIMATED COST OF EACH WORK TASK
ENGINEERING FEE ESTIMATE
US 79
WILLIAMSON COUNTY
FROM: FM 1460
TO: CR 195
LENGTH = 1.5 MILE
May 10, 2002
(US79SA4)
SHEET 6 OF 6
Carter: Burgess
DESIGN SURVEY FOR EXCESS FILL PLACEMENT FRONTING PALM VALLEY CHURCH PROPERTY - C &B TRANSPORTATION UNIT
No.
Description
Hourly Rate:
$70
Technician
$85
PM /FS
$110
RPLS
$105
2Man Crew
$125
2Man /GPS
Totals
CONTROL SURVEY
1 Recover Primary Horizontal & Vertical Survey Control
DESIGN SURVEY - 1000 L.F. more or less
1 Provide cross - sections at 50 -foot interval for approximate 50 foot wide strip
2 Process field data and prepare revised DTM; integrated into previous DTM
SURVEY ESTIMATE
SUBTOTAL
SUBTOTAL
Total Hours:
Total Days:
Total Months:
0.5
10 1
0.5
13
2.5
0
0
0.5
0
0
10
10
$2,733
12
1.5
0
US79RR -1
10 May - 02
$530
$1,363 .
$840
TASK 8 - Additional Waterline Connections
HOURS
RATES
FEE
CLER
CADD
TECH -
EIT
ENG
PM
CLER
CADD
TECH
EIT
ENG
PM
CLER
CADD
TECH
EIT
ENG
PM
1.1 Meetings with City and Consultants to address additional tie -ins
0
0
8
0
45
85
70
75
100
155
$0
$0
50
$0
5800
$200
$1,000
$0
$0
$155
1.2 Revise design to include tie -in at Joe Diamaggio Blvd
24
0
2
0
45
65
70
75
100
155
$0
$0
$1,680
$0
1.3 Design new Waterline at FM 1460, -250'
32
0
10
1
45
65
70
75
100
155
$0
$0
$2,240
$0
1,4 Coordinate with Baker - Aiklen to lie -in 18" WL west of Palm Valley
0
0
12
1
45
65
70
75
100
155
$0
50
$0
$0
$1,200
$155
1.5 Design connection with Baker- Aiklen to tie -in 18" WL w of Palm Valley
24
0
8
1
45
65
70
75
100
155
50
$0
$1,680
$0
$800
$155
1.6 Provide service tie-in at Palm Valley
16
0
8
1
45
65
70
75
100
155
50
$0
$1,120
$0
$800
$155_
$620
Total All Tasks
96
0
48
4
50
$0
56,720
$0
54,600
US 79 Additional Services
US 79
From FM 1460 to CR 195
Waterline Adjustments
5800
$1.880
83,395
$1,355
$2,635
52.075
$12,140
17111.[1
-N(
�1
d•`
. nn0�
Ai nr■
US 79
*01
r •
• n nn
1.1
CR 195
US 79 From FM 1460 to CR 195
li
- Li
Clj
DATE: June 21, 2002
SUBJECT: City Council Meeting — June 27, 2002
ITEM: 9.B.2. Consider a resolution authorizing the Mayor to execute
Supplemental Agreement Na 4 to the Contract for
Engineering Services with Carter & Burgess, Inc. for
improvements to US 79 from FM 1460 to CR 195.
Resource: Jim Nuse, Chief of Operations /Assistant City Manager
Tom Word, Director of Transportation Services
History: The City Council approved Supplemental Agreement No. 2 at its regular session
on September 13, 2001 as Resolution No. R- 01- 09- 13 -15F9 to provide for a
change in the scope of services to develop plans and specifications for additional
illumination of US 79. Approval of Supplemental Agreement No. 3 on January
10, 2002 allowed for additional field surveying and right -of -way surveying.
Supplemental Agreement No. 4 covers the additional services as follows: (A)
Additional survey along Park Valley Lutheran Church/Existing US 79 right of
way for embankment placed within the future right of way for the project
(B) 16" waterline adjustment on the west side of FM 1460 crossing under the
existing US 79 needs a new crossing so that casing will extend beyond the new
pavement limits and relocation of fire hydrants and water valves; (C) Changing of
the westbound bridge width from 40' to 58' increased design cost because both
the eastbound and westbound were originally the same width and therefore some
of the bridge design could be applied to both bridges.
Total cost of Supplemental Agreement No. 4 is $33,266.00 with project
management cost included. Bringing the total cost of the project to $684,862.00.
Funding:
Cost: $33,266.00
Source of funds: RR Transportation System Development Corp
Outside Resources: Carter - Burgess, Inc.
Impact/Benefit: Approval of Supplemental Agreement No. 4 will allow for finite detailing
as far as nearness of US 79 to the Palm Valley Lutheran Church, for
adjustments to the waterline and bridge and will include project
management when project goes to construction.
Public Comment: N/A
Sponsor: N/A
STATE OF TEXAS
COUNTY OF WILLIAMSON
Contract No.
SUPPLEMENTAL AGREEMENT NO. 4
CONTRACT FOR ENGINEERING SERVICES
ORIGINAL.
THIS SUPPLEMENTAL AGREEMENT to contract for engineering services is made by and
between the City of Round Rock, hereinafter called the "City", and Carter- Burgess, Inc.,
hereinafter called the "Engineer ", and becomes effective when fully executed by both parties.
WITNESSETH
WHEREAS, the City and the Engineer executed a contract on the 23 day of March 2000
concerning the design of a four -lane divided section on US 79 from FM 1460 to CR 195 to
include bridge design at Arterial A; and,
WHEREAS, Article 2, Scope of Services To Be Provided by Engineer, as amended, establishes
engineering services to be performed in fulfillment of the Contract; and,
WHEREAS, Article 4. Compensation, as amended, limits the maximum amount payable for the
contract to $651,596; and,
WHEREAS, it has become necessary to further amend the contract;
AGREEMENT
NOW THEREFORE, premises considered, the City and the Engineer agree that said contract is
amended as follows:
I. The Engineer will be performing additional field survey at Palm Valley Lutheran Church,
16" waterline adjustment, additional bridge design, and project management. Services to
be provided as shown in Exhibit B.
11. The maximum amount payable of the contract is increased by $33,266.00, as shown in
Exhibit D, to $684,862.00.
1 of 2
ALL OTHER PROVISIONS ARE UNCHANGED AND REMAIN IN FULL FORCE AND
EFFECT.
IN WITNESS WHEREOF, the City and the Engineer have executed 'this supplemental
agreement in duplicate.
THE CITY THE ENGINEER
Bv:
( -a7 -a --
LIST OF EXHIBITS:
Date
Exhibit B — Additional Services to be Provided by the Engineer
Exhibit D — Fee Schedule
2 of 2
By:
Bill Caffey, P.E.
Vice - President
Date
EXHIBIT "B"
ADDITIONAL SERVICES TO BE PROVIDED BY THE ENGINEER
PROJECT: US 79
LIMITS: From 1400 ft West of FM 1460 to CR 195
COUNTY: Williamson
CONTRACT NO.
Field survey embankment placed by the Palm Valley Lutheran Church within the proposed
US 79 right of way.
Adjust 16" waterline crossing US 79 west of existing FM 1460. Adjustment includes new
crossing, casing, fire hydrant relocation and water valve placement.
Additional bridge design cost to the westbound US 79 bridge at Arterial A. The westbound
bridge width was increased from 40' to 58'. Original scope work was for the eastbound and
westbound bridges to be the same width; therefore some of the same design could be used on
both bridges. But since the width of the westbound bridge was increased for traffic control
purposes, the bridge design was not the same.
I P OJECT MANAGER
A. Coordination and Review
B. Contract Administration
C. Quality Assurance/Quality Control
�
�
s! lir._..
16
4
24
1NirsNH�S1t T.
20
10
6
36
II. ROUTE AND DESIGN STUDIES (F.C. 110)
A. Schematic Design
1. Data Collection
2. Initial Field Reconnaissance
3. Identify Property Ownership
4. Develop Designs
5. Typical Sections
6. Right of Way Requirements
B. Design Concept Conference
0
0
C. Preliminary Cost Estimate
0
0
III. SOCIAL ECONOMIC & ENVIRONMENTAL
00000== =00,,, =000
STUDIES (F.C. 120)
A, Environmental Assessment
1. Agency Coordination
2. Purpose and Need for Action
3. Socioeconomic Data
4. Field Investigation
5. Land Use
6. Geology and Groundwater
7. Noise and Vibration
B. Surface Water Hydrology
9. Air Quality
10. Cultural Resources
11. Ecological Resources
12. Wetlands
13. Endangered Species
14. Relocation
15. Prime Farm Land
B. Assemble, Review and Process
0
0
SUBTOTALS:
0
0
0
CARTER & BURGESS,
4- LANE BLVD. SECTION
ESTIMATED MANHOURS OF EACH WORK TASK
ENGINEERING FEE ESTIMATE
US 79
WILLIAMSON COUNTY
FROM: FM 1460
TO: CR 195
NGTH = 1.5 MILE
May 0, 2002
5A4)
SHEET OF 6
...- r+I N ttx
t'.., . .-.:..� -Y v.0
v
yy!� K��y(
�km lG4t
;.
IV. PUBLIC INVOLVEMENT (F.C. 120)
A. Public Meeting
1. Prepare Meeting Notice and Exhibits
2. Assist with Meeting
3. Prepare Draft Summary and Analysis
A. Public Hearing
1. Prepare Notice & Exhibits
2. Assist with Hearing
3. Prepare Final Summary and Analysis '
SUBTOTALS:
000 000 0
000 000 0
00 00 0
00 000 0
000 000 0
000 000 0
V. UTILITY /R. 0, W. COORD. (F.C. 130)
A. Ownership Data
B. Utility Locations
C. Right of Way Plans
1. Prepare Right of Way Plans
2. Calculate Right of Way Req.
3. Calculate Parcel Areas
D. Prepare Field Notes
E. Research and Traci Analysis
F. Notify/Meeting w/Utility Owners
SUBTOTALS:
0
0
0
0
0
0
0
- 0
0
0
0
0
0
00 000000 0
VI. FIELD SURVEYS (F.C. 150)
A. Establish Horizontal and Vertical Control
B. Establish Benchmarks at (2000') Intedvals
C. Stake Centerline
D. Existing Cross Sections and Ties
1. Proposed Roadway Centerline
2. Connecting Roads
3. Drainage Channels
4. Existing Bridges and Culverts
5. Connections to CR 195 & FM 1460
E. Survey and Stake Right -Of -Way
F. Stake Core Test Holes
SUBTOTALS:
- 0
0
00000 0 0 0
0
0
0
000 00000 0 0 0
CARTER 8 BURGESS,
4 - LANE BLVD. SECTION
F ACH WORK TASK
ENGINEERING FEE ESTIMATE
US 79
WILLIAMSON COUNTY
FROM: FM 1460
TO: CR 195
LENGTH = 1.5 MILE
May , 2002
(A4)
SHEET 2 OF 6
CARTER & BURGESS, INC.
4 LANE BLVD, SECTION
ESTIMATED MANHOURS OF EACH WORK TASK
ENGINEERING FEE ESTIMATE
US 79
WILLIAMSON COUNTY
FROM: FM 1460
TO: CR 195
LENGTH = 1.5 MILE
May 10, 2002
(US79SA4)
SHEET 3 OF 6
VII. ROADWAY DESI N (F.C. 160)
A. Geometric Design
1. Horizontal Alignment
2. Vertical Alignment
3. Right-Of-Way Requirements
4. Typical Sections
SUBTOTALS:
0
0
0
0
VIII. PREPARATION OF CONSTRUCTION PLANS
SUBTOTAL:
B. DRAINAGE (F.C. 161)
1. Drainage Area Maps
2. Hydraulic Data
3. Drainage Sheet
4. Culvert Cross Sec. & Details
5. Drainage Details
6. Storm Water Pol. Prev. Plan/Eros
7. Drainage Summary
SUBTOTAL: 0
0
0
8
8
4
8
4
2
2
0
0
0
10
10
8
10
8
4
4
0
10
8
2
10
8
10
10
10
10
15
8
a
0
0
01 1
1447.10.0 .5 ,.....T, , . ,,- -,- 4, „1:!., .-5.ri,3 - .u,„7,..--,, , r .
CeNC 0:` ',,, ! !F.
A. ROA D WAY DESIGN (FL. 160)
2. Project Layout 1 1 2 :
1. Title Sheet & Index 1 2 8
3. Typical Sections 1 2 2
4. Plan and Profile/Intersection Sheets 1 4 4
5. Horiz. Allig. & Cross Slope 1 1 1
6. Roadway Summaries 1 2 4
7. General Notes and Spec. Data 1 8 4
8. Estimate and Quantities 1 2 4
9. Utility Layouts 4 6
0
...
CARTER & BURGESS, INC.
4 • LANE BLVD. SECTION
VIII. PREPARATION OF CONSTRUCTION PLANS CONTINUE
. SIGNING AND MARKINGS (F. . 1
1. Sign., Strip., and Del. Plan
2. Summary of Small Signs
3. Sign Details
SUBTOTAL:
D. MISCELLANEOUS ROADWAY (F.C. 163)
1. Traffic Control Plan, Detour
Sequence of Construction
2. Signalization (1- Intersection)
3. Construction Time Estimates
4. Landscaping (Conceptual Only)
E. BRIDGE DESIGN (F.C. 170),
1. Structure Layout
2. Abutment Details
3. Bent Derails
4. Bridge Layout • Boring Logs
5. Slab Details
6. Summary of Structure
SUBTOTAL:
SUBTOTAL:
SUBTOTAL:
TOTALS (Prep. of Const. Plans)
DESIGN TOTALS:
PERCENT OF TOTAL HOURS:
0
6.50%
ENGINEERING FEE ESTIMATE
US 79
WILLIAMSON COUNTY
FROM; FM 1460
TO: CR 195
LENGTH = 1.5 MILE
6 6
2 4
8 16
4 4
4 4
6 6
0
4
40
32.52%
0
38
38
30.89%
0
0.00%
37
30.08%
May 10, 2002
(US79SA4)
SHEET 4 OF 6
0.00%
123
100.00%
15
ifi A} W S t fPTl At
E '
C1t(3F i
tEI IC AO
F�3Tatt
I. PROJECT MANAGEMENT (F.C. 110)
TOTAL HOURS.
8
24
0
0
0
4
36
SALARY RATES:
562.50
838.00
533.00
529.00
527.00
518.00
DIRECT SALARY COST:
$500
$912
$0
$0
$0
572
OVERHEAD MULTIPLIER: 1.7782
8889
51,622
$0
50
$0
$128
PROFIT: 15.00%
$208
5380
$0
50
$0
530
TOTAL
51,597
52,914
50
50
50
$230
54,741
II. ROUTE AND DESIGN STUDIES (F.C. 110) .
TOTAL HOURS:
0
0
0
0
0
0
0
SALARY RATES:
562.50
538.00
533.00
$29.00
527.00
$18.00
DIRECT SALARY COST:
$0
50
50
50
50
$0
OVERHEAD MULTIPLIER: 1.7782
50
50
50
50
50
$0
PROFIT: 15.00%
50
50
50
50
50
50
TOTAL:
SO
50
50
$0
50
50
SO
III. SOCIAL ECONOMIC & ENVIRONMENTAL
STUDIES (F.C. 120)
TOTAL HOURS'
0
0
0
0
0
0
0
SALARY RATES:
562.50
538.00
533.00
529.00
$27.00
518.00
DIRECT SALARY COST:
50
50
SO
50
50
50
OVERHEAD MULTIPLIER: 1.7782
$0
50
$0
50
$0
50
PROFIT: 15.00%
SO
50
$0
50
$0
50
TOTAL
50
$0
50
50
$0
50
$0
IV. PUBLIC INVOLVEMENT (F.C. 120)
°$saw
TOTAL HOURS
0
0
0
0
0
0
SALARY RATES:
$82.50
538.00
$29.00
527.00
$18 -00
DIRECT SALARY COST:
50
$0
50
SO
50
OVERHEAD MULTIPLIER: 1.7782
50
$0
50
SO
$0
PROFIT: 15.00%
$0
$0
50
$0
50
TOTAL
$0
50
50
$0
$0
$0
50
V. UTILITY /R. O. W. COORD. (F.C. 130)
TOTAL HOURS
0
0
0
0
0
0
0
SALARY RATES:
862.50
538.00
$33.00
529.00
527.00
$18.00
DIRECT SALARY COST:
$0
50
$0
50
50
50
OVERHEAD MULTIPLIER: 1.7782
$0
50
50
$0
$0
$0
PROFIT: 15.00%
$0
50
$0
$0
50
50
TOTAL
$0
50
50
$0
$0
$0
$0
VI. FIELD SURVEYS (F.C. 150)
TOTAL HOURS
0
0
0
0
0
0
0
SALARY RATES:
562.50
538.00
533.00
$29.00
527.00
518.00
DIRECT SALARY COST:
50
SO
50
50
50
$0
OVERHEAD MULTIPLIER: 1.7782
$0
$0
$0
$0
50
50
PROFIT: 15.00%
50
50
50
50
50
50
TOTAL
$0
$0
50
50
50
$0
50
CARTER & BURGESS, INC.
4 - LANE BLVD. SECTION
ESTIMATED COST OF EACH WORK TASK
ENGINEERING FEE ESTIMATE
US 79
WILLIAMSON COUNTY
FROM: FM 1460
TO: CR 195
LENGTH = 1.5 MILE
May 10, 2002
(US79SA4)
SHEET 5 OF 6
0.y( [1P'i'1Q11 4.
1?ESi�aF4
'F$� "f
JRStcL:
Y"F{10`AL- 'IATa>;k..
VII. ROADWAY DE (F.C. 1AO)
TOTAL HOURS
0
0
0
0
0
0
0
SALARY RATES:
562.50
538.00
533.00
529.00
527.00
518.00
DIRECT SALARY COST:
$0
50
50
$0
$0
50
OVERHEAD MULTIPLIER: 1.7782
50
$0
50
$0
50
$0
PROFIT: 15.00%
50
50
50
50
$0
$0
TOTAL
0
$0
$0
r
50
$0
50
VIII. PREPARATION OF CONSTRUCTION PLANS
•
TOTAL HOURS.
8
40
38
0
37
0
123
SALARY RATES:
562.50
538.00
533.00
529.00
$27.00
518.00
DIRECT SALARY COST:
$500
51,520
51.254
50
5999
- 50
OVERHEAD MULTIPLIER: 1.7782
5889
52,703
52,230
50
51,776
50
PROFIT: 15.00%
$208
5633
$523
50
$416
50
TOTAL
51,597
54.856
4,006
0
$3.192
50
513.652
TOTAL CARTER & BURGESS, INC.:
TOTAL HOURS
16
64
38
' 0
37
4
159
SALARY RATES:
$62.50
538.00
$33.00
529.00
$27.00
518.00
DIRECT SALARY COST:
51,000
52.432
$1,254
50
$999
572
55,757
OVERHEAD MULTIPLIER: 1.7782
51.778
$4.325
52,230
50
51,776
5128
510,237
PROFIT: 15.00%
5417
$1,013
$523
50
5416
$30
$2,399
TOTAL
53,195
57,770
$4,006
50
$3,192
.230
18,393
PERCENT OF CARTER & BURGESS COST:
17.37%
42.24%
21.78%
0.00%
17.35%
1.25%
100.00%
DIRECT COST - ARTER & BURGESS, INC.:
Mylar Plots
Square Feet at $3.50 /Square Fool $0
Blueline Reproductions or Printing
Square Feet al 50.25 /Square Fool $0
Survey Materials and Supplies
SO
Express Deliveries
Deliveries at 020.00 /Delivery $0
Auto Mileage (Incl. 18" Waterline Oversight)
Mlles at 50.315 /Mile 50
Air Travel
Filghts al 5250.00 /Round Trip 50
Lodging
Nights at $85.00 /Night 50
Per Diem
Days at $35.00 /Day 50
Auto Rental
Days at 560.00 /day 50
Telephone, Communications and Advertisements 50
Court Recorder & Transcriber SO
Geotechnical/Pavement & Foundation Design SO
TOTAL DIRECT COST - CARTER & BURGESS, INC. 50
SUMMARY - CARTER & BURGESS, INC.
Labor + Overhead + Profit 518,393
Direct Cost $0
TOTAL CONTRACT COST - CARTER & BURGESS, INC. 2;2: ;$:
CARTER & BURGESS, INC.
4 - LANE BLVD. SECTION
ESTIMATED COST OF EACH WORK TASK
ENGINEERING FEE ESTIMATE
US 79
WILLIAMSON COUNTY
FROM: FM 1460
TO: CR 195
LENGTH = 1.5 MILE
May 10, 2002
(US79SA4)
SHEET 6 OF 6
Carter. Burgess
DESIGN SURVEY FOR EXCESS FILL PLACEMENT FRONTING PALM VALLEY CHURCH PROPERTY - C&B TRANSPORTATION UNIT
No.
Description
Hourly Rate:
570
Technician
585
PM/FS
5110
RPLS
5105
2Man Crew
$125
2Man /GPS
Totals
CONTROL SURVEY
1 Recover Primary Horizontal & Vertical Survey Control
DESIGN SURVEY - 1000 L.F. more or Tess
1 Provide cross - sections at 50 -foot interval for approximate 50 foot wide strip
2 Process field data and prepare revised DTM; integrated into previous DTM
SURVEY ESTIMATE
SUBTOTAL
SUBTOTAL
Total Hours:
Total Days:
Total Months:
13
2.5
0
0
0
0
2
1
10
0.5
1
0.5
0.
10
$530
10 $1,363
$840
12 $2,733
1.5
0
US79RR -1
TASK 1 - Additional Waterline Connections
HOURS
RATES
FEE
CLER
CADD
TECH
EIT
ENG
PM
CLER
CARD
TECH
EIT
ENG
PM
CLER
CADD
TECH
EIT
ENG
PM
1.1 Mee8nns with CiN_and Consultants t0 address additional tie-ins
0
8
0
45
65
70
75
100
155
$0
$0
$0
$0
$600_
$0
1.2 Revise design to include Ile-in at Joe Diamaggio Blvd
24
2
0
45
- 65
70
75
100
155
50
$0
51,680
50
5200
50
1.3 Design new Waterline at FM 1460, -250'
32
10
1
45
65
70
75
100
155
50
$0
52,240
50
51,000
5155
1.4 Coordinate with Baker -Alden to tie-in 18 WL west of Palm Valley
0
24
16
12
8
8
1
1
1
45
45
45
85
65
65
70
70
70
75
75
75
100
100
100
155
$0
50
50
$0
51,200
$155
155
155
50
50
$0
50
51,680
51,120
$0
$0
5800
5800
5155
5155
1.5 Design connection with Baker - Aiklen to tie-in 18 WL w of Palm Valley
1.6 Provide service lie-in al Palm Valley
Total All Tasks
96
48
4
$0
50
56,720
50
$4,800
5620
US 79 Additional Services
US 79
From FM 1460 to CR 195
Waterline Adjustments
5800
$1.880
53.395
$1,355
52,635
52.075
512,140
Mayor
Nyle Maxwell
Mayor Pro-tem
Tom Nielson
Council Members
Alan McGraw
Carrie Pitt
Scot Knight
Isabel Gallahan
Gary Coe
City Manager
obert L. Bennett, Jr_
City Attorney
Stephan L. Sheets
ROUND ROCK, TEXAS
PURPOSE. PASSION. PROSPERITY.
July 2, 2002
Mr. Bill Caffey, P.E., Vice President
Carter & Burgess, Inc.
901 S. Mopac Expressway
Bldg. 5, Suite 200
Austin, TX 78746
Dear Mr. Caffey:
The Round Rock City Council approved Resolution No. R- 02- 06- 27 -9B2 at their
regularly scheduled meeting on June 27, 2002. This resolution approves Supplemental
Agreement No. 4 to the contract for the US 79 project from FM 1460 to CR 195.
Enclosed is a copy of the resolution and the original Supplemental Agreement No. 4 for
your files. If you have any questions, please do not hesitate to contact Tom Word at
218 -6617.
Christine R. Martinez
City Secretary
Enclosures