August 29, 2002
Mr. Bill Waeltz, P.E.
Baker - Aicklen & Associates, Inc.
203 E. Main Street, Suite 201
Round Rock, TX 78664
Dear Mr. Waeltz:
The Round Rock City Council approved Resolution No. R- 02- 08 -08-
11D1 at their regularly scheduled meeting on August 8, 2002. This
resolution approves the additional service authorization for the design
of the City Wide Trail System - Phase I.
Enclosed is a copy of the resolution and the original authorization for
your files. If you have any questions, please do not hesitate to contact
James Hemenes at 218 -3345.
Sincerely,
Christine R. Martine z
City Secretary
Enclosure
CITY OF ROUND ROCK 221 East Main Street • Round Rock, Texas 78664
Phone: 512218.5400' Fax: 512.218.7097 • Voice: 1-80o.735.2988 • 1.800.735.2989 TDD • www.ci.round-rock.tx.us
RESOLUTION NO. R- 02- 08- 08 -11D1
WHEREAS, the City of Round Rock has previously entered into an
agreement for engineering services ( "Agreement ") with Baker - Aicklen &
Associates, Inc. for professional engineering and surveying services
for the design of the City Wide Trail System - Phase I, and
WHEREAS, Baker - Aicklen & Associates, Inc. has submitted an
Additional Services Authorization for a change in the scope of
services, and
WHEREAS, the City Council desires to enter into said Additional
Services Authorization with Baker - Aicklen & Associates, Inc., Now
Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City an Additional Services Authorization for a change
in the scope of services, a copy of said authorization being attached
hereto as Exhibit "A" and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended.
::ODMA \WOPLDOX \o: \WDOX RESOLUTI \Raoe"en1."e" /caouaai /ac
AT T:
RESOLVED this 8th day of August, 2002.
CHRISTINE R. MARTINEZ, City Secretar
2
E ►• WELL, Mayor
City of Round Rock, Texas
Client -
CITY OF ROUND ROCK - - -
Project No.
0601 -2-066
Project
City Wide Trail System
Contract Date
2/22)00
SObject of Additional Services -
Construction Services -
Additional Services Project No.
0601 -2- 066-11
1. As presented in the initial Proposal, the subject lump sum services were based on an estimate of the personnel time
required to perform the described Scope of Services. The Proposal however provided for seeking additional
compensation for changes beyond our control and not anticipated, as indicated below. See Attached Letter.
Reason for Increase: - - The extent of effort required was not initially anticipated, and time extension of construction phase.
Vz
Baker - Aicklen
& Associates, Inc.
Engineers /Surveyors
ADDITIONAL SERVICES AUTHORIZATION
EXHIBIT
nAu
Date 61191102
Proposal No.02 -5042
Compensation:
Hourly charge plus reimbursable expense basis, as defined In the PROFESSIONAL SERVICES AGREEMENT, and
in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are
estimated to be approximately $ 7.221.
Lump sum charge basis plus reimbursable expenses, as defined in the PROFESSIONAL SERVICES AGREEMENT,
and in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are to
be I
Estimated Date of Completion:
PREPARED BY: A. William Waeltz. P.E.
PROPOSED BY:
APPROVED BY:
Client
Tkle;
ilium Waeltz,
BAKER ASSOCIATES, INC.
(Sign, keep Client's copy & return all others.)
June 19.2002
Date
Date
' v4
Baker- Aicklen
& Associates, inc.
Engineers /Surveyors
STANDARD RATE SCHEDULE
(Labor Rate Table 35)
Effective September, 2000, the following rates are recommended. for work performed on an hourly-charge basis.
Rates include company overhead and profit for services accomplished during regular working hours.
DIRECT LABOR
OFFICE PERSONNEL SERVICES
Classification Rates
Project Engineer /Surveyor/Planner $110.00 per hour
Staff Engineer /Surveyor/Planner $95.00 per hour
Project Designer /Coordinator $85.00 per hour
Engineering Assistant/Surveying Assistant/GPS Processor $70.00 per hour
Senior Engineering/Surveying CAD Technician $60.00 per hour
Engineering/Surveying CAD Technician/Field Representative $55.00 per hour
CAD Draftsman $45.00 per hour
Secretary $45.00 per hour
Expert Witness/Testimony/Deposition Services Two Times Rates
Principal (as appropriate) $120.00 per hour
FIELD PARTY SERVICES Rates
1 -Man Field Party $70.00 per hour
2 -Man Field Party $95.00 perhour:...._ ..
3 -Man Field Party $120.00 per hour
4-Man Field Party $145.00 per hour
GPS Field Unit with Operator (Note 5) $100.00 per hour
GPS Field Unit without Operator (Note 5) $60.00 per hour
DIRECT EXPENSES
Transportation:
By Firm's Passenger Vehicles (Note 1) $ 0.35 per mile
By Firm's Survey Trucks (Notes 1, 2, 3 & 4) $ 0.35 per mile
Subsistence of out - of-city work $100.00 per day
Reproduction & Printing by Firm, Prevailing Com-
Survey Stakes, Lathes, Iron Rods mercial Rates Or
and other Direct Expense Cost, Plus 10%
Notes:
1. A mileage charge will be billed for projects exceeding a 50 -mile radius of the base office only.
2. Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of stakes,
lathes, etc., used such as during the construction phase of a project will be charged as indicated.
3 A minimum of two (2) hours field party time charge will be made for show -up time and retum to office,
resulting from inclement weather conditions, etc.
4. Field Party stand -by time will be charged for at the above -shown appropriate rates.
5. Rates apply to actual time GPS units are in use. All other time will be charged as appropriate normal field
party rates.
6. The firm's professional liability is limited to the total amount of compensation associated with a specific
project up to a maximum of $50,000.
VA
Baker•Aicklen
& Associates, Inc.
Engineers/Surveyors
DATE: August 2, 2002
SUBJECT: City Council Meeting — August 8, 2002
ITEM: 11.D.1. Consider a resolution authorizing the Mayor to execute an
Additional Services Authorization with Baker-Aicklen & Associates,
Inc. for the City Wide Trail System - Phase I.
Resource: Sharon Prete, Parks and Recreation Director
M. James Hemenes, Park Planner
History: Camp Excavation was hired to construct 3.2 miles of trail in Old Settlers Park at
Palm Valley. Through the inspection process, it has been determined that some
sections of the trail are not built to ADA standards and must be rebuilt. Baker -
Aicklen & Associates' contract did not anticipate a construction contract
extension and PARD is in need their professional services through completion of
the reconstruction.
Funding:
Cost: $7,221.00
Source of funds:
CORR Certificates of Obligation and Williamson County
contributions.
Outside Resources: Baker - Aicklen & Associates, Inc.
Impact/Benefit: Additional services through this contract extension will ensure quality and
completeness of the project
Public Comment: N/A
Sponsor: PARD
Client
CITY OF ROUND ROCK
Project No.
0601 -2 -066
Project
City Wide Trail System
Contract Date
2/22/00
Subject of Additional Services
Construction Services
Additional Services Project No.
0601 -2- 066-11
1. As presented in the initial Proposal, the subject lump sum services were based on an estimate of the personnel time
required to perform the described Scope of Services. The Proposal however provided for seeking additional
compensation for changes beyond our control and not anticipated. as indicated below. See Attached Letter.
Reason for lncrease:
The extent of effort required was not initially anticipated, and time extension of construction phase.
Baker - Aicklen
& Associates, Inc.
Engineers /Surveyors
ADDITIONAL SERVICES AUTHORIZATION
Date 6/19//02
Proposal No.02 -5042
Compensation:
X Hourly charge plus reimbursable expense basis, as defined in the PROFESSIONAL SERVICES AGREEMENT, and
In addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are
estimated to be approximately $ 7.221
Lump sum charge basis plus reimbursable expenses, as defined in the PROFESSIONAL SERVICES AGREEMENT,
and In addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are to
be
Estimated Date of Completion:
PREPARED BY: A. William Waeltz, P.E.
PROPOSED BY: BAKER- KL N & ASSOCIATES, INC.
APPROVED BY:
Client: •rer, R$W6W
/j ii
Title:
Iliam
(Sign, keep Client's copy & retum all others.)
June 19.2002
Date
S- l3-o2.'
Date
Baker - Alcklen
& Associates, Inc.
Engineers /Surveyors
OFFICE PERSONNEL SERVICES
STANDARD RATE SCHEDULE
(Labor Rate Table 35)
NW
Effective September, 2000, the following rates are recommended for work performed on an hourly- charge basis.
Rates include company overhead and profit for services accomplished during regular working hours.
DIRECT LABOR
Classification Rates
Project Engineer / Surveyor/Planmer $110.00 per hour
Staff Engineer /Surveyor/Planner $95.00 per hour
Project Designer /Coordinator $85.00 per hour
Engineering Assistant/Surveying Assistant/GPS Processor $70.00 per hour
Senior Engineering/Surveying CAD Technician $60.00 per hour
Engineering/Surveying CAD Technician/Field Representative $55.00 per hour
CAD Draftsman $45.00 per hour
Secretary $45.00 per hour
Expert Witness/Testimony /Deposition Services Two Times Rates
Principal (as appropriate) $120.00 per hour
FIELD PARTY SERVICES Rates
1 -Man Field Party $70.00 per hour
2 -Man Field Party $95.00 per hour
3 -Man Field Party $120.00 per hour
4 -Man Field Party $145.00 per hour
GPS Field Unit with Operator (Note 5) $100.00 per hour
GPS Field Unit without Operator (Note 5) $60.00 per hour
DIRECT EXPENSES
Transportation:
By Firm's Passenger Vehicles (Note 1) $ 0.35 per mile
By Firm's Survey Trucks (Notes 1, 2, 3 & 4) $ 0.35 per mile
Subsistence of out -of -city work $100.00 per day
Reproduction & Printing by Firm, Prevailing Com-
Survey Stakes, Lathes, Iron Rods mercial Rates Or
and other Direct Expense Cost, Plus 10%
Notes:
1. A mileage charge will be billed for projects exceeding a 50 -mile radius of the base office only.
2. Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of stakes,
lathes, etc., used such as during the construction phase of a project will be charged as indicated.
3 . A minimum of two (2) hours field party time charge will be made for show -up time and return to office,
resulting from inclement weather conditions, etc.
4. Field Party stand -by time will be charged for at the above -shown appropriate rates.
5. Rates apply to actual time GPS units are in use. All other time will be charged as appropriate normal field
party rates.
6. The firm's professional liability is limited to the total amount of compensation associated with a specific
project up to a maximum of $50,000.
Baker - Aicklen
& Associates, Inc.
tif Engineers /Surveyors
BAKER- AICKLEN
& ASSOCIATES, INC.
Engineers /Surveyors
June 19, 2002
City of Round Rock
Parks & Recreation Department
605 Palm Valley Blvd.
Round Rock, Texas 78664
Attn: Mr. James Hemenes
RE: City Wide Trail System — Additional Services Authorization (ASA)
Dear James,
As presented in the initial proposal and the previous additional services, the
construction phase services were based on an estimate of the personnel time required to
perform the Scope of Services. However, based on the extent of effort, which was not
initially anticipated, we have exceeded the estimated budget. In the previous additional
services authorization we had proposed to complete the construction phase services on a
hourly basis. We would like for you to consider accepting this proposal of hourly
compensation for the remainder of the project. Below I have estimated the amount of
time required to complete the construction phase of the project.
Scheduled Meetings
2 Hr. per Meeting
4 Meetings Remaining (Assumed)
Project Closeout
Punch list/Re- Inspections/
Closeout Documents /As- Builts
Total Hours
Engineering Project Engineer
Assistant ($70/Hr,) ($110/Hrj
8 Hrs. 2 Hrs.
40 Hrs. 6 Hrs.
48 Hrs. 8 Hrs.
Currently, due to the increased effort for the construction phase services, we have
already exceeded the previous additional services amount by approximately $3,641.
Based on the estimate of personnel time required for the scope of services, the additional
203 E. Main St., Site 201 • Round Rock, Texas 76664 • 512/244 -9620 • FAX 512/244 -9623
• r
CORR PARD, Mr. James Hemenes Project #601 -566
Page 2
June 19, 2002
budget amount for the project completion would be approximately $3,580. Therefore, we
are respectfully requesting an additional services agreement to cover the current overages
and the time it will take to finish the project. These additional services are proposed to be
provided on an hourly basis with a budget amount of $7,221., (not to be considered a
maximum).
Please find the two attached Additional Services Authorizations. Please sign and
retum one of the originals to our office and keep the other for your files.
Sincerel
If you have any questions or comments please feel free to contact me at 244 -9620.
A.William Wael
AWW/aap
0:\601- 566 \ConstBudgetlncreaseNolification 5-3 I-02.doc