Loading...
R-02-08-08-11G2 - 8/8/2002Mayor Nyle Maxwell Mayor Pro-tern Torn Nielson Coun ll Members Alan McGraw Carrie Pitt Scot Knight Isabel Gallahan Gary Coe City Manager )bert L Bennett, Jr. City Attorney Stephan L. Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY August 29, 2002 Mr. James K. Haney, P.E. HDR Engineering, Inc. 2211 South IH 35, Suite 300 Austin, TX 78738 Dear Mr. Haney: The Round Rock City Council approved the following two Resolutions at their regularly scheduled meeting on August 8, 2002: • Resolution No. R- 02- 08- 08 -11G1 which approves Amendment No. 3 for a change in the scope of services concerning the 1998 -1999 Water System Improvements Project. • Resolution No. R- 02 -08 -08 -1102 which approves Amendment No. 3 for a change in the scope of services concerning the Lake Creek Pump Station Improvements Project. Enclosed are copies of the resolutions and original amendments for your files. If you have any questions, please do not hesitate to contact Tom Clark at 218 -6617. Sincerely, Christine R. Martinez City Secretary Enclosure CITY OF ROUND ROCK 221 East Main Street • Round Rock, Texas 78664 Phone: 5112[8.540o • Fax: 512.2[8.7097 • Voice: 1.800.735.2988 • 1.800.735.2989 TDD • www.a.round- rock.tx. us RESOLUTION NO. R- 02- 08- 08 -11G2 WHEREAS, the City of Round Rock has previously entered into a contract for engineering services ( "Contract ") with HDR Engineering, Inc. for the Lake Creek Pump Station Improvements Project, and WHEREAS, HDR Engineering, Inc. has submitted Amendment No. 3 to the Contract for a change in the scope of services, and WHEREAS, the City Council desires to enter into said Amendment No. 3 to the Contract for Engineering Services with HDR Engineering, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Amendment No. 3 to the Contract with HDR Engineering, Inc., a copy of said amendment being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. ..ODMA\ WORLD O%\ O : \WDOX \RRSOLDTI \R20B00G2.WPD /rM RESOLVED this 8th day of August, 2002. CHRISTINE R. MARTINEZ, City Secreta 2 City of Round Rock, Texas AMENDMENT No. 3 To the CONTRACT FOR ENGINEERING SERVICES between THE CITY OF ROUND ROCK and HDR ENGINEERING, INC. Dated October 14, 1999 GENERAL This constitutes an Amendment to the Contract for Engineering Services — Lake Creek Pump Station Improvements Project for PROFESSIONAL SERVICES between the City of Round Rock "City" and HDR Engineering, Incorporated, of Austin, Texas (HDR). The scope of services to be provided by the Engineer as listed in Attachment B of the Contract is amended to include the following: For the Construction Phase, additional engineering services are required for facilities added in the design phase under Amendments 1 and 2 and for site conditions unforeseen or added during construction. The items specifically include the following: 1. Replacement of existing chlorine and ammonia control system and combining all telemetry at the site into one location for local monitoring and control as well as communication with the Water Treatment Plant. 2. Adding a new sodium hydroxide storage and feed facility. 3. Modifying existing well collection piping to address hydraulic concerns and providing for one master flow meter. 4. Modifying existing pump discharge piping to address hydraulic and pipe condition concerns and providing one master flow meter. 5. Demolishing the existing building housing Well Nos. 1 and 2 and the associated old chlorine storage and feed facility. 6. Developing a well plugging program for Well Nos. 2, 5, 8 and 10. 7. Providing protection from flooding for Well No. 3. 8. Coordinating asbestos removal and air monitoring. 9. Enclosing the existing chlorine and ammonia feed facilities on three sides to provide weather protection, including doors on the north side of the building. 10. Adding a new access road from the pump station to Burnet Street with site lighting and fencing. 11. Providing new fencing around the newly acquired site area that will allow for future expansion of the pump station facilities. 12. Coordinating overhead power line relocation with TXU. 13. Coordinating and investigating removal requirements for hazardous chemicals found during site cleanup. 14. Coordinating and investigating site piping and pump can modifications required due to problems found in the field. 15. Coordinating and investigating replacement of existing chlorine and ammonia gas detectors, and an existing chlorine controller and actuator. EXHIBIT IIAII 16. Investigating electrical changes needed to accommodate the HVAC equipment. 17. Coordinating and investigating relocating the Tower Drive Pump Station redundant radio to the new 81 South Elevated Storage Tank. The additional Construction Phase services required related to the items listed above will be completed on a Per Diem basis in the amount not to exceed of Thirty Thousand Two Hundred Dollars ($30,200.00). This amount includes a Per Diem fee of $3,700 for additional Construction Materials Testing provided by Fugro South, Inc. The term of this Amendment shall commence on the signing date and continue in effect until such time as terminated in writing by either party. The undersigned signatory on signatories for the Engineer hereby represents and warrant that the signatory is an officer of the organization for which he or she has executed this Contract and that he or she has full and complete authority to enter into this Contract on behalf of the firm. The above - stated representations and warranties are made for the purpose of entering into this Contract with the City. IN WITNESS HEREOF, the City and the Engineer have executed these presents in duplicate. The Engineer — HDR Engineering, Inc. Date: By: games K. (Ken) Ha(iey, P.E. Executive Vice President City of Round Rock, Texas By: Nyle Maxwell Mayor SIGNATURE WARRANTY July 16, 2002 Mr. Don Rundell, P.E. Chief Utility Engineer City of Round Rock 2008 Enterprise Drive Round Rock, TX 78664 RE: TRANSMITTAL City of Round Rock - Lake Creek Pump Station Improvements Project Amendment No. 3 to the Contract for Engineering Services Dear Mr. Rundell: hD: 1 Enclosed please find two original copies of Amendment No. 3 for the above referenced project. We are submitting this proposed Amendment for additional Construction Phase Services that we have provided. As you recall, Ammendment Nos.1 and 2 significantly increased our scope of services for the design phase by addition of the items listed below. • A new access road to the site. • New site lighting. • Enclosure of the chlorine and ammonia feed facilities. • Video inspection of four existing wells. • New fencing around larger plant site. • Construction of a new sodium hydroxide system storage and feed facility. • Replacement of the chlorine and ammonia control systems. • Consolidation of all telemetry at the site into one location. • Modification of the well collection piping to allow for installation of a new master meter. • Modification of the high service pump discharge piping to allow for installation of a discharge header and a new master meter. • Demolition of the building housing the existing wells on site. • Construction of a floodwall at Well #3. • Testing and preparation of specifications to address the presence of lead based coatings and asbestos in the facilities to be demolished. Note that when Amendment Nos. 1 and 2 were finalized, the associated Construction Phase Services were not adjusted. It was our intent at that time to try and complete the Construction Phase Services without exceeding the contractual maximum fee. Since construction began, we have taken great efforts to work within the original fee. However, the effort required to administer the increased design scope combined with several unforeseen conditions that have arisen will make this impossible. For your information, the major unforeseen conditions that have been addressed during construction include the following: HDR Engineering, Inc. 2211 South hi 35 Telephone Suite 300 512 912 -5100 Austi n, Texas Fax Employee Owned 78741 512 912 -5158 Mr. Don Runclell July 16, 2002 Page 2 • The presence of hazardous materials in one structure on the property. • Replacement of the suction cans on Pumps 1, 2, 3, and 4 due to degradation. • Changes to site piping due to inaccuracies in the City's record documents. • Relocation of the redundant radio system from Tower Drive to the 81 South Tank site. • The addition of a second chlorine controller and actuator. • The replacement of existing chlorine and ammonia gas leak detectors. For your reference, the City Council Resolution authorizing the Contract with HDR is No. R- 99- 10- 14 -13F1. If the Amendment meets with the City's approval, please return an executed copy to me for our records. We appreciate your consideration of this request and look forward to completing construction of the Lake Creek Pump Station. Please call Troy St.Tours or me if you have any questions. Sincerely, HDR Engineering, Inc. Neil A. Graff, P.E. Vice President Enclosure: Amendment No. 3 LAKECREEK PUMP STATION LAKECREEK PUMP STATION FACILITY /14.- AND SYSTEM IMPROVEMENTS S:`GRAPTOCSCOONC6.AGENDA ll@AS4N01NEERING2 -6011 MISREEX PUMP STATION 1.1602 DATE: August 2, 2002 SUBJECT: City Council Meeting — August 8, 2002 ITEM: *11.G.2. Consider a resolution authorizing the Mayor to execute Amendment No. 3 to the Contract for Engineering Services with HDR Engineering, Inc. for the Lake Creek Pump Station Improvements project. Resource: Jim Nuse, Chief of Operations /Assistant City Manager Tom Clark, Director of Utilities History: Council approved the current contract with HDR for the Lake Creek Pump Station Improvements on the 14 day of October 1999 for $167,280.00. These improvements were needed to replace and upgrade the existing vertical turbine pumps to deliver water to the 924 pressure plain. Also, council approved Contract Amendment No. 1 on the 22 day of February 2001, in the amount of $54,000.00, to consolidate the multiple electric feeds into the site into a single feed. Additionally, these improvements were to include upgrading the electrical building, the fluoridation system, and chemical feed system, which will simplify operations and maintenance. The council approved Contract Amendment No. 2 on the 23 day of August 2001. The general scope of work under this amendment is for additional service under the Construction Phase of the Contract due to unforeseen site conditions. These conditions were the presence of hazardous material, poor condition of four pump cans, and actual location of site piping did not match record drawings and the relocation of the redundant radio system from Tower to the South 81 Tank site. With this Amendment No. 3 the total contract amount will be $301,480.00. Funding: Cost: $30,200.00 Source of funds: Self - Financed Utility Fund Outside Resources: HDR Engineering, Inc. Impact/Beneft: The successful completion of the Project. Public Comment: N/A Sponsor: N/A AMENDMENT No. 3 To the CONTRACT FOR ENGINEERING SERVICES between THE CITY OF ROUND ROCK and HDR ENGINEERING, INC. Dated October 14, 1999 GENERAL This constitutes an Amendment to the Contract for Engineering Services — Lake Creek Pump Station Improvements Project for PROFESSIONAL SERVICES between the City of Round Rock "City" and HDR Engineering, Incorporated, of Austin, Texas (HDR). The scope of services to be provided by the Engineer as listed in Attachment B of the Contract is amended to include the following: For the Construction Phase, additional engineering services are required for facilities added in the design phase under Amendments 1 and 2 and for site conditions unforeseen or added during construction. The items specifically include the following: 1. Replacement of existing chlorine and ammonia control system and combining all telemetry at the site into one location for local monitoring and control as well as communication with the Water Treatment Plant. 2. Adding a new sodium hydroxide storage and feed facility. 3. Modifying existing well collection piping to address hydraulic concems and providing for one master flow meter. 4. Modifying existing pump discharge piping to address hydraulic and pipe condition concems and providing one master flow meter. 5. Demolishing the existing building housing Well Nos. 1 and 2 and the associated old chlorine storage and feed facility. 6. Developing a well plugging program for Well Nos. 2, 5, 8 and 10. 7. Providing protection from flooding for Well No. 3. 8. Coordinating asbestos removal and air monitoring. 9. Enclosing the existing chlorine and ammonia feed facilities on three sides to provide weather protection, including doors on the north side of the building. 10. Adding a new access road from the pump station to Bumet Street with site lighting and fencing. 11. Providing new fencing around the newly acquired site area that will allow for future expansion of the pump station facilities. 12. Coordinating overhead power line relocation with TXU. 13. Coordinating and investigating removal requirements for hazardous chemicals found during site cleanup. 14. Coordinating and investigating site piping and pump can modifications required due to problems found in the field. 15. Coordinating and investigating replacement of existing chlorine and ammonia gas detectors, and an existing chlorine controller and actuator. 16. Investigating electrical changes needed to accommodate the HVAC equipment. 17. Coordinating and investigating relocating the Tower Drive Pump Station redundant radio to the new 81 South Elevated Storage Tank. The additional Construction Phase services required related to the items listed above will be completed on a Per Diem basis in the amount not to exceed of Thirty Thousand Two Hundred Dollars ($30,200.00). This amount includes a Per Diem fee of $3,700 for additional Construction Materials Testing provided by Fugro South, Inc. The term of this Amendment shall commence on the signing date and continue in effect until such time as terminated in writing by either party. The undersigned signatory on signatories for the Engineer hereby represents and warrant that the signatory is an officer of the organization for which he or she has executed this Contract and that he or she has full and complete authority to enter into this Contract on behalf of the firm. The above - stated representations and warranties are made for the purpose of entering into this Contract with the City. IN WITNESS HEREOF, the City and the Engineer have executed these presents in duplicate. The Engineer — HDR Er ineering, Inc. By: B ames K. (Ken) H. - y, P.E. Executive Vice President City of Round Rock Tex i `yl "�axwell Mayor Date: 8- 13 SIGNATURE WARRANTY