R-02-08-22-13B1 - 8/22/2002RESOLUTION NO. R- 02- 08- 22 -13B1
WHEREAS, the City of Round Rock has previously entered into a
Professional Services Agreement with Trinity Engineering /Kleinfelder
for construction materials testing for the City Wide Trail System -
Phase I, and
WHEREAS, Trinity Engineering /Kleinfelder has submitted an
amendment to the Professional Services Agreement for a change in the
scope of services, and
WHEREAS, the City Council desires to enter into said amendment to
the Professional Services Agreement with Trinity
Engineering /Kleinfelder, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City an amendment to the Professional Services Agreement
with Trinity Engineering /Kleinfelder, a copy of said amendment being
attached hereto as Exhibit "A" and incorporated herein for all
purposes.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
:: 0n10. \W0RLDOX \o. \WDox \RESOLvrr \R2082291. WED/ ec
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended.
RESOLVED this 22nd day of August, 2002.
ATTEST:
CHRISTINE R. MARTINEZ, City Secretary
2
N - `y4WELL, Mayor
City of Round Rock, Texas
August 5, 2002
Mr. James Hemenes
City of Round Rock
Parks and Recreation Department
605 E. Palm Valley Blvd.
Round Rock, Texas 78664
Reference: Old Settler' s Park Trails
Additional Construction Materials Testing
Dear Mr. Hemenes:
TRINITY ENGINEERING /KLEINFELDER
An employ,. own,/ company
As a follow -up to our telephone conversation, I am requesting an increase in our Construction
Testing Budget for this project to cover consultations, job visits and testing costs that would not
be chargeable to Camp Excavation.
Our previously approved budget is $14473.00 and previous billings were $14,168.00, leaving a
remaining budget of $305.00. Since July 26, 2002, we have accumulated approximately
$1000.00 of unbilled charges for consultation and job visits. I am requesting an increase of
$2500.00 to a total budget of $16973.00. I would not expect to exceed this amount unless some
other unknown circumstance should occur. If you have any further thoughts on this, we would of
course welcome your input. Please feel free to call us at (512) 926 -6650. Please sign and return
one copy for our files.
Thank you very much. We appreciate working with you and the City of Round Rock on this
project and on future projects.
Sincerely,
TRINITY ENGINEERING/KLEINFELDER
Fred Hartmann, P.E.
Senior Materials Engineer
Approved by:
City of Round Rock
TETCO PN: 11182
11182wus2L082
Copyright 2002 Kleinfelder, Inc.
3601 Manor Road • Austin, Texas 78723 • (512) 926 -6650 • (512) 926 -3312 fax
EXHIBIT
“An
DATE: August 16, 2002
SUBJECT: City Council Meeting — August 22, 2002
ITEM: 13.B.1. Consider a resolution authorizing the Mayor to execute an
amendment to the Professional Services Agreement with Trinity
Engineering /Kleinfelder for construction materials testing for the
City Wide Trail System - Phase L
Resource: Sharon Prete, Parks and Recreation Director
M. James Hemenes, Park Planner
History: A 1500 ft. section of the Old Settlers Park at Palm Valley Trail failed due to
expansive clay soils. The random core samples taken prior to the beginning of
the project did not identify this problem area. Extending this contract will
provide the additional geotech testing required to insure the prescribed sub -
grade and sub base compaction and paving meets the recommended standard
set.
Funding:
Cost: $2,500.00
Source of funds:
Outside Resources: Trinity Engineering/Kleinfelder
Impact/Benefit: Correcting the trail foundation will reduce the amount of maintenance
time spent on this section of trail and enhance the quality of the
product.
Public Comment: N/A
Sponsor: PARD
City of Round Rock Certificates of Obligation and Williamson
County Contributions.
A
August 5, 2002
Mr. James Hemenes
City of Round Rock
Parks and Recreation Department
605 E. Palm Valley Blvd.
Round Rock, Texas 78664
Reference: Old Settler's Park Trails
Additional Construction Materials Testing
Dear Mr. Hemenes:
TRINITY ENGINEERING /KLEINFELDER
An employee owned company
As a follow -up to our telephone conversation, I am requesting an increase in our Construction
Testing Budget for this project to cover consultations, job visits and testing costs that would not
be chargeable to Camp Excavation.
Our previously approved budget is $14473.00 and previous billings were $14,168.00, leaving a
remaining budget of $305.00. Since July 26, 2002, we have accumulated approximately
$1000.00 of unbilled charges for consultation and job visits. I am requesting an increase of
$2500.00 to a total budget of $16973.00. I would not expect to exceed this amount unless some
other unknown circumstance should occur. If you have any further thoughts on this, we would of
course welcome your input. Please feel free to call us at (512) 926 -6650. Please sign and return
one copy for our files.
Thank you very much. We appreciate working with you and the City of Round Rock on this
project and on future projects.
Sincerely,
TRINITY ENGINEERING/KLEINFELDER
Approved by:
Pt
Fred Hartmann, P.E.
Senior Materials Engineer
TETCO PN: 11182
11182wus2L082
Copyright 2002 Kteinfelder, Inc.
3601 Manor Road • Austin, Texas 70723 (512) 926 -6650 • (512) 926 -3312 fax