R-02-08-22-13D1 - 8/22/2002STATE OF TEXAS THE COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Baker - Aicklen & Assoc., Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract ", on the 12 of April 2001 to provide design and survey services related to Historic Downtown Sidewalk and Pedestrian Access Improvements Project. WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER, describes those engineering services to be provided by the Engineer as a part of the Contract, and WHEREAS, ARTICLE 3, CONTRACT PERIOD, requires the termination of the Contract on July 31, 2002, unless the Contract is extended, and WHEREAS, ARTICLE 4, COMPENSATION, establishes the maximum lump sum payable under this contract at $131,530.00 without modification of the contract, and WHEREAS, it is the City's best interest to extend the term of the Contract until October 1, 2002 and WHEREAS, it has become necessary to amend the contract to provide for additional services outlined in Addendum No. 1 to Attachment B, and WHEREAS, the Engineer has agreed to provide the additional work performed for $18,355.00 increasing the lump sum fee for the contract to $149,885.00. NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 3, CONTRACT PERIOD, shall be amended to extend the contract period to October 1, 2002, and ARTICLE 4, COMPENSATION, shall be amended by changing the lump sum amount payable under this contract to $149,885.00. ATTACHMENT `B ", Services to be Provided by the Engineer shall be amended as set forth in the attached ADDENDUM NO. 1 to ATTACHMENT B. IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. THE ENGINEER By: P A. William Waeltz /. B -Z•oZ Date Date o 40601- 2- 074\supp leageemen t# 18 -2 -02 Scope of Services: ADDENDUM NO. 1 TO ATTACHMENT B ADDITIONAL SERVICES TO BE PROVIDED BY THE ENGINEER 1. Investigation of existing wastewater main problems between Sheppard Street and Lampasas Street: 2. Design of approximately 415 L.F. of relief wastewater main and waterline lowerings: 3. Storm sewer additions and/or revisions on Lampasas Street and Sheppard Street, and inlets on Liberty Street: 4. Additional meetings and investigation of paving alternatives and schedules and negotiations with contractor: 5. Investigation and resolution of railing issues: 6. Unanticipated and extended construction phase services: Engineering assistant has been on -site for meetings on almost a daily basis, at the City's request. 0: \0601 -2- 074 /suppleagreement#1 8- 2 -02.doc Baker- Aicklen & Assoc., Inc. STATE OF TEXAS THE COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Baker - Aicklen & Assoc., Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract ", on the 12 of April 2001 to provide design and survey services related to Historic Downtown Sidewalk and Pedestrian Access Improvements Project. WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER, describes those engineering services to be provided by the Engineer as a part of the Contract, and WHEREAS, ARTICLE 3, CONTRACT PERIOD, requires the termination of the Contract on July 31, 2002, unless the Contract is extended, and WHEREAS, ARTICLE 4, COMPENSATION, establishes the maximum lump sum payable under this contract at $131,530.00 without modification of the contract, and WHEREAS, it is the City's best interest to extend the term of the Contract until October 1, 2002 and WHEREAS, it has become necessary to amend the contract to provide for additional services outlined in Addendum No. 1 to Attachment B, and WHEREAS, the Engineer has agreed to provide the additional work performed for $18,355.00 increasing the lump sum fee for the contract to $149,885.00. NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 3, CONTRACT PERIOD, shall be amended to extend the contract period to October 1, 2002, and ARTICLE 4, COMPENSATION, shall be amended by changing the lump sum amount payable under this contract to $149,885.00. ATTACHMENT `B ", Services to be Provided by the Engineer shall be amended as set forth in the attached ADDENDUM NO. 1 to ATTACHMENT B. IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. THE ENGINEER By: 7 ' e . William Waeltz CITY OF RO By: Date jr Mayor 8 Z — oar Date o:10601-2-074 \suppleagreementl l 8 -2 -02 Scope of Services: ADDENDUM NO. 1 TO ATTACHMENT B ADDITIONAL SERVICES TO BE PROVIDED BY THE ENGINEER 1. Investigation of existing wastewater main problems between Sheppard Street and Lampasas Street: 2. Design of approximately 415 L.F. of relief wastewater main and waterline lowerings: 3. Storm sewer additions and/or revisions on Lampasas Street and Sheppard Street, and inlets on Liberty Street: 4. Additional meetings and investigation of paving alternatives and schedules and negotiations with contractor: 5. Investigation and resolution of railing issues: 6. Unanticipated and extended construction phase services: Engineering assistant has been on -site for meetings on almost a daily basis, at the City's request. 010601 -2- 074 /suppleageement#1 8.2- 02.doc Baker - Aicklen & Assoc., Inc. RESOLUTION NO. R- 02- 08- 22 -13D1 WHEREAS, the City of Round Rock has previously entered into a contract for engineering services ( "Contract ") with Baker - Aicklen & Associates, Inc. in connection with the Historic Downtown Sidewalks and Pedestrian Access Improvements Project, and WHEREAS, Baker - Aicklen & Associates, Inc. has submitted Supplemental Agreement No. 1 to the Contract for Engineering Services for a change in the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 1 with Baker - Aicklen & Associates, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 1 to the Contract for Engineering Services with Baker- Aicklen & Associates, Inc., a copy of said Supplemental Agreement No. 1 being attached hereto as Exhibit "A" and incorporated herein. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. ,OO ORLDOX O : \WDOX \R ES OL UTI \R2DB /ec AT ST: RESOLVED this 22nd day of August, 2002. CHRISTINE R. MARTINEZ, City Secretary 2 N o vr WELL, Mayor City of Round Rock, Texas STATE OF TEXAS THE COUNTY OF WILLIAMSON § EXHIBIT ., SUPPLEMENTAL AGREEMENT NO. 1 TO CONTRACT FOR ENGINEERING SERVICES This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Baker - Aicklen & Assoc., Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract ", on the 12` of April 2001 to provide design and survey services related to Historic Downtown Sidewalk and Pedestrian Access Improvements Project. WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER, describes those engineering services to be provided by the Engineer as a part of the Contract, and WHEREAS, ARTICLE 3, CONTRACT PERIOD, requires the termination of the Contract on July 31, 2002, unless the Contract is extended, and WHEREAS, ARTICLE 4, COMPENSATION, establishes the maximum lump sum payable under this contract at $131,530.00 without modification of the contract, and WHEREAS, it is the City's best interest to extend the term of the Contract until October 1, 2002 and WHEREAS, it has become necessary to amend the contract to provide for additional services outlined in Addendum No. 1 to Attachment B, and WHEREAS, the Engineer has agreed to provide the additional work performed for $18,355.00 increasing the lump sum fee for the contract to $149,885.00. NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 3, CONTRACT PERIOD, shall be amended to extend the contract period to October 1, 2002, and ARTICLE 4, COMPENSATION, shall be amended by changing the lump sum amount payable under this contract to $149,885.00. ATTACHMENT `B ", Services to be Provided by the Engineer shall be amended as set forth in the attached ADDENDUM NO. 1 to ATTACHMENT B. IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. r -Z - 2....- Date CITY OF ROUND ROCK By: Nyle Maxwell, Mayor Date o:W601.2.074\vuppleagreemendf l 8 -2 -02 ADDENDUM NO. 1 TO ATTACHMENT B ADDITIONAL SERVICES TO BE PROVIDED BY THE ENGINEER Scope of Services: 1. Investigation of existing wastewater main problems between Sheppard Street and Lampasas Street: 2. Design of approximately 415 L.F. of relief wastewater main and waterline lowerings: 3. Storm sewer additions and/or revisions on Lampasas Street and Sheppard Street, and inlets on Liberty Street: 4. Additional meetings and investigation of paving alternatives and schedules and negotiations with contractor: 5. Investigation and resolution of railing issues: 6. Unanticipated and extended construction phase services: Engineering assistant has been on -site for meetings on almost a daily basis, at the City's request. o:\0601.2. 074 /suppleagreemenWl 8- 2 -02.doc Baker- Aicklen & Assoc., Inc. BAKER- AICKLEN & ASSOCIATES, INC. Engineers /Surveyor. August 2, 2002 Mr. William Dobrowolski, P.E. Senior Engineer City of Round Rock Public Works Department 2008 Enterprise Drive Round Rock, TX 78664 RE: City of Round Rock Historic Downtown Sidewalk Improvements Supplemental Agreement No. 1 Dear William: Please find attached three (3) originals of Supplemental Agreement No. 1 to the Contract for Engineering Services for the Historic Downtown Sidewalk Improvements project. This Supplemental Agreement covers additional work requested by the City and not covered by the original scope of services. A breakdown of the additional effort and corresponding request is as follows: 1. Investigation of existing wastewater main problems between Sheppard Street and Lampasas Street: Project Engineer 4 Hrs. @ $110.00/Hr. Engineering Assistant 22 Hrs. @ $ 70.00/Hr. 2. Design of approximately 415 L.F. of relief wastewater main and waterline lowerings: Project Engineer Engineering Assistant Engineering CAD Tech 5 Hrs. @ $110.00/Hr. 30 Hrs. @ $ 70.00/Hr. 12 Hrs. @ $ 55.00/Hr. $ 440.00 $1,540.00 $1,980.00 $ 550.00 $2,100.00 $ 660.00 $3,310.00 3. Storm sewer additions and/or revisions on Lampasas Street and Sheppard Street, and inlets on Liberty Street: Engineering Assistant 28 Hrs. @ $70.00/Hr. $1,960.00 Engineering CAD Tech 12 Hrs. @ $55.00/Hr. $ 660.00 $2,620.00 91 F Main St.. Suite 201 ■ Round Rock, Texas 78664 • 512/244 -9620 • FAX 512/244 -9623 Mr. William Dobrowolski, City of Round Rock Project # 0601 -2 -074 August 2, 2002 Page 2 4. Additional meetings and investigation of paving alternatives and schedules and negotiations with contractor: 5. Investigation and resolution of railing issues: 6. Unanticipated and extended construction phase services: Engineering assistant has been on -site for meetings on almost a daily basis, at the City's request. Engineering Assistant 25 Hrs. (est.) @ $70.00 $1,750.00 Total Fee Adjustment Request Supplemental Agreement No. 1: $18,355.00 We hope the above descriptions adequately justify the attached Supplemental Agreement No 1; however, should you have any questions or comments regarding this matter, please advise at your convenience. We truly appreciate your assistance throughout the course of this construction and look forward to the successful completion of the project. Sinceygly, AWW/vmb Enc. Project Engineer 10 Hrs. @ $110.00/Hr. $1,100.00 Engineering Assistant 24 Hrs. @ $ 70.00/Hr. $1,680.00 $2,780.00 Project Engineer 8 Hrs. @$110.00 / Hr. Engineering Assistant 18 Hrs. @ $70.00/Hr. Engineering CAD Tech 5 Hrs. $ $55.00/Hr. Sub - Consultant Fees (Hall Bargainer) William Waeltz, P.E. Branch Manager Cc: Mr. Jim Nuse, P.E., Director of Public Works Mr. Antonio Prete, Baker - Aicklen & Assoc., Inc. o:\0601- 2-074- 22 \wdobrowclskilt supple ltr r8- 2- 02-02.doc $ 880.00 $1,260.00 $ 275.00 $3.500.00 $5,915.00 S:Graphics \Council Agenda (teams\ ampasas & Sheppard DATE: August 16, 2002 SUBJECT: City Council Meeting — August 22, 2002 ITEM: 13.D.1. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 1 to the Contract for Engineering services with Baker Aicklen & Associates, Inc. for the Historic Downtown Sidewalks and Pedestrian Access Improvements Protect. Resource: Jim Nuse, Chief of Operations/Assistant City Manager William J. Dobrowolski III, Senior Engineer History: During the process of locating existing utilities for the possible conflicts with underground storm sewer, an active failing waste water line was found. The failing infrastructure was investigated by City Crews and determined there could be total failure in the future. A plan for the replacement of this segment of the collection system was prepared by with Baker - Aicklen & Associates, Inc. In addition, services are required for the unforeseen issues related to the drainage, pavement replacement with minimum closure of Main Street, safety railing on steps, and coordination not in the original scope of Professional Services Contract. Estimate cost of the increase scope of service is $18,355.00. Staff recommends approval. Funding: Cost: $18,355.00 Source of funds: General self financed construction, 2000 CO, & self finance wastewater utility funds Outside Resources: Baker — Aicklen & Associates, Inc. Impact: Avoid addressing the issues after the sidewalk replacement is complete. Benefit: Addressing the issue at a point in time where cost is minimized. Public Comment: N/A Mayor Nyle Maxwell Mayor Pro -tem Tom Nielson Council Members Alan McGraw Carrie Pitt Scot Knight Isabel Gallahan Gary Coe City Manager obert L. Bennett, Jr. City Attorney Stephan L. Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY August 29, 2002 Mr. Bill Waeltz, P.E. Baker - Aicklen & Associates, Inc. 203 E. Main Street, Suite 201 Round Rock, TX 78664 Dear Mr. Waeltz: The Round Rock City Council approved Resolution No. R- 02- 08- 22 -13D1 at their regularly scheduled meeting on August 22, 2002. This resolution approves Supplemental Agreement No. 1 for Historic Downtown Sidewalks and Pedestrian Access Improvements. Enclosed is a copy of the resolution and the original Supplemental Agreement No. 1 for your files. If you have any questions, please do not hesitate to contact William Dobrowolski at 218 -6601. Sincerely, Christine R. Martinez City Secretary Enclosure ca±unl. CITY OF ROUND ROCK za East Main Street • Round Rock Texas 78664 Phone: 5t2.218.5400 • Fax: 512.218.7097 • Voice. 1.800.735.2988 • t.800.7 35.2989 TDD • www.ci.round- rock.tx.us