R-02-09-12-13C5 - 9/12/2002RESOLUTION NO. R- 02- 09- 12 -13C5 WHEREAS, the Round Rock Transportation System Development Corporation ( "RRTSDC ") has previously adopted a Transportation Capital Improvement Plan ( "Plan "), and WHEREAS, the RRTSDC wishes to amend said Plan, and WHEREAS,the bylaws of the RRTSDC require that said amendments to the Plan be approved by the City Council, and WHEREAS, the City Council wishes to approve said amendments to the Plan, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the amendment to the Transportation Capital Improvement Plan approved by the Round Rock Transportation System Development Corporation, which is attached hereto as Exhibit "A ", is hereby approved. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. ATT RESOLVED this 12th day of September 002 CHRISTINE R. MARTINEZ, City Secret- y :: ODMA\ WORLDOX\ O:\ WDOX\ RESOLUTI \R20913C5.WPD/r City of Round Rock, Texas NY LL, Mayor Pro ject Name Project Limits Work Description Fiscal Year - In TCIP Construction Date Estimated Trans. Corp. Funding Other Funding Total Cost Arterial A From US 79 to Forest Creek Drive Preliminary engineering 10 establish alignment and ROW requirements. Protective ROW purchase 2000 N/A $650,000 $650,000 Forest Creek From Double Creek Drive to 800' West of Forest Ridge Subdivision 2000 April 1, 2001 $2,204,030 $2,204,030 54,408,060 Double Creek Drive From GaAs School Rd to MI(T ROW 2000 Summer 2003 $2,500,000 c $2,500,000 A.W. Grimes Blvd (Arterial B) From US 7910 Louis Henna Blvd Phase I: Preliminary Engineering; Phasg II; Engineering, ROW, & 1999 Fall 2000 518,100,000 - 52,500,000 b $20,600,000 Construction from Louis Henna to 1900' South along CR 170 (Pflugerville Loop); Phase 111: ROW Acquisition-4 Tracts (Hardship Purchase) Arterial C From RM 620 to Sam Bass Rd Acquire ROW for Arterial C and construct bicycle/sidewalk facility to access high school and swimming pool 2000 Summer 2003 $800,000 $800,000 CR 113 From FM 146010 CR 122 Design, purchase right -of -way and construct 4dane divided arterial 2000 Spring 2003 $4,383,500 51,116,500 b $5,500,000 FM 1460 From US 79 10 1200' N of US 79 Acquire ROW for highway relocation 2000 Winter 2003 $600,000 55,300,000 a $5,900,000 Greenlawn Extension From Louis Henna Blvd to IH 35 Frontage Road Construct 41ane divided arterial 1998 March 1, 1999 63,825.000 $636,556 a $4,461,556 Greenlawn Interchange At IH 35 Construct Greenlawn Interchange with IH 35 2001 Not Scheduled $5,000,000 55,000,000 a $10,000,000 Hagler- Bailly Study 1. SH 130 Toll Study; 2. SH 45 Implementation Strategy; 3. Railroad Relocation Feasibility Study, 4. Implementation Strategy for 10 -Year Roadway Plan 2000 - N/A $350,000 $350,000 2001 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION /F TWO YEAR ELEMENT a = Slaleederal Fund b = Private c = 96 GO Bonds d = Williamson County EXHIBIT Page 1 o12 Amendment 66 Updated 8/22/02 'Project Name - Project Limits -- - Work Description - • Fiscal Year In TCIP Estimated Trans. Corp. Funding • Other Funding Total Cost IH 35 Tumarounds FM 1325/Louis Henna Hester's Crossing Construct frontage road turnarounds 1999 June & Oct 2000 $3,650,000 $3,175,000 a 38,825,000 IH 35 Area Improvements from Westinghouse Road to FM 1431 provide schematics, estimates, and TIA for various road improvements 2002 5100,000 3100,000 Prime Strategies Assist City in interagency coordination for SH 45 2000 N/A $100,000 $100,000 RIO 620 at Union Pacific Railroad Construct railroad grade separation 2001 Not Scheduled $2,500,000 $4,600,000 a $7,100,000 Regional Mobility Authority Study SH 45 North, US 183A, and Loop 1 Evaluate advantages & disadvantages to RR in establishing an RMA 2002 November 1, 2001 $75,000 $75,000 SH 45 Round Rock East City Limits to Round Rock West City Limits Acquire ROW for SH 45 2000 FY 2000 $30,000,000 015,000,000 a $8,000,000 d $53,000,000 South Mays Street Improvements South Mays Street, Dell Way & Bettis School Road Extension Realign streets, widen streets, extend streets 1999 August 2000 & FY 2001 $4.580,000 $5,876,000 a $10,456,000 Traffic Signals Various locations Design and construct traffic signals 2001 2000 $800,000 $800,000 Traffic Modeling Citywide (SH 130) Assist City in assessing impacts of SH 130 2000 N/A $75,000 575,000 Traffic Signal Coordination FM 1325/Louis Henna McNeilAH 35/RM 620 US 79 Construct and implement coordinated traffic signal systems 1998 May 1, 2000 $100,000 $100000 US 79 From CR 195 to CR 110 Reconstruct highway to 41ane divided highway 1999 December -99 $2,550,000 $3,500,000 a 5300,000 (est) d $6350000 US 79 From FM 1460 to CR 195 _ Construct 4 -lane divided highway 2000 Spring 2004 $4,160 000 9200,000 $3,000 a $7 160,000 Transportation Consulting Miscellaneous consuhing work in supoon 01 transportation program 2001 N/A $200000 ■ =, _ _ o._._,__._ - _, .__. TWO - YEAR ELEMENT TOTALS • ... _ '.587,302,930 �-+r$50■204,086 �':e -;T, ;P2147,510,616 b = Private c = 96 GO Bonds d = Williamson County 2001 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAN ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION TWO YEAR ELEMENT Page 2 of Amendment N6 Updated 6/22/02 DATE: September 6, 2002 SUBJECT: City Council Meeting — September 12, 2002 ITEM: 13.C.5. Consider a resolution approving the action of the Round Rock Transportation System Development Corporation in amending the Transportation Capital Improvement Plan. Resource: Jim Nuse, Chief of Operations /Assistant City Manager Tom Word, Director of Transportation Services History: The Transportation Capital Improvement Program (TCIP) is a two -year spending plan for improvements to major roads and arterials in the City. Funding for this plan is provided through the A% sales tax established for the purpose of transportation improvements. The TCIP is being amended to supplement funding for an additional project to provide schematics, estimates and TIA for various road improvements around I -35 from Westinghouse Road to FM 1431. Funding: Cost: $100,000 Source of funds: Outside Resources: N/A `/a% sales tax (Round Rock Transportation System Development Corporation) Impact/Benefrt: Increased mobility and traffic safety in Round Rock. Public Comment: A public hearing for these amendments was held by the Round Rock Transportation System Development Corporation August 8, 2002. Sponsor: N/A Project Name Project Limits Work Description - Preliminary engineering to establish alignment and ROW requirements. Protective ROW purchase Fiscal Year in TCIP - 2000 . Construction Date N/A Estimated Trans. Corp. Funding $650,000 Other Funding Total Cost $650,000 Arterial A From US 79 to Forest Creek Drive Forest Creek From Double Creek Drive to 800' West of Forest Ridge Subdivision From Gattis School Rd to MKT ROW 2000 2000 April 1, 2001 Summer 2003 $2,204,030 $2,500,000 $2,204,030 c $4,408,060 $2,500,000 Double Creek Drive A.W. Grimes Blvd (Arterial B) From US 79 to Louis Henna Blvd Phase I: Preliminary Engineering; Phase 11: Engineering, ROW, & 1999 Fall 2000 $18,100,000 $2,500,000 b $20,600,000 Construction from Louis Henna to 1900' South along CR 170 (Pfiugerville Loop); Phase III: ROW Acquisition -4 Tracts (Hardship Purchase) Arterial C From RM 620 to Sam Bass Rd Acquire ROW for Arterial C and construct bicycle /sidewalk facility to access high school and swimming pool 2000 Summer 2003 $800,000 $800,000 CR 113 From FM 1460 to CR 122 Design, purchase right-of-way and construct 4-lane divided arterial 2000 Spring 2003 $4,383,500 $1,116,500 b $5,500,000 FM 1460 From US 79 to 1200' N of US 79 Acquire ROW for highway relocation 2000 Winter 2003 $600,000 $5,300,000 a $5,900,000 Greenlawn Extension From Louis Henna Blvd to IH 35 Frontage Road Construct 4 lane divided arterial 1998 March 1, 1999 $3,825,000 $636,556 a $4,461,556 Greenlawn Interchange At IH 35 Construct Greenlawn Interchange with IH 35 2001 Not Scheduled $5,000,000 $5,000,000 a $10,000,000 Hagler- Bailly Study 1 FQFNrl 1. SH 130 Toll Study; 2. SH 45 Implementation Strategy; 3. Railroad Relocation Feasibility Study, 4. Implementation Strategy for 10 -Year Roadway Plan n — Sfsfc/FMu.M c,,,..a 2000 N/A $350000 $350000 b = Private c = 96 GO Bonds d = Williamson County 2001 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION 1 EXHIBIT nAn Page 1 of 2 Amendment #6 Updated 8/22/02 Project Name . Project Limits Work Description - , - . Fiscal Year In TCIP Estimated Trans. Corp. Funding Other Funding Total Cost IH 35 Turnarounds FM 1325/Louis Henna Hester's Crossing Construct frontage road turnarounds 1999 June & Oct 2000 $3.650,000 $3,175,000 a $6,825,000 IH 35 Area Improvements from Westinghouse Road to FM 1431 provide schematics, estimates, and TIA for various road improvements 2002 $100,000 $100000 Prime Strategies Assist City in interagency coordination for SH 45 2000 N/A $100,000 $100,000 RM 620 at Union Pacific Railroad Construct railroad grade separation 2001 Not Scheduled $2,500,000 $4,600,000 a $7,100 Regional Mobility Authority Study SH 45 North, US 183A, and Loop 1 Evaluate advantages & disadvantages to RR in establishing an RMA 2002 _ November 1, 2001 $75,000 $75,000 SH 45 Round Rock East City Limits to Round Rock West City Limits Acquire ROW for SH 45 2000' FY 2000 530,000,000 $15,000,000 a $8,000,000 d $53,000,000 South Mays Street Improvements South Mays Street, Dell Way & Gattis School Road Extension Realign streets, widen streets, extend streets 1999 August 2000 & FY 2001 $4,580,000 $5,876,000 a $10,456,000 Traffic Signals Various locations Design and construct traffic signals 2001 2000 $800,000 $800,000 Traffic Modeling Citywide (SH 130) Assist City In assessing impacts of SH 130 2000 N/A $75,000 $75,000 Traffic Signal Coordination FM 1325/Louis Henna McNeiUIH 35 /RM 620 US 79 Construct and implement coordinated traffic signal systems 1998 May 1, 2000 $100,000 $100000 US 79 From CR 195 to CR 110 Reconstruct highway to 4 lane divided highway 1999 December -99 $2,550,000 $3,500,000 a $300,000 (est) d $6,350,000 US 79 From FM 1460 to CR 195 Construct 4 -lane divided highway 2000 Spring 2004 $4,160,000 $3,000,000 a $7,160,000 Transportation Consulting _ Miscellaneous consulting work in supoort of transportation program 2001 N/A $200,000 $200,000 TWO YEAR ELEMENT TOTAL S87,302,530 n 4460,208,086 ;; ; = $147,510 616 b = Private c = 96 GO Bonds d =Williamson County 2001 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAN ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATIOA TW O YEAR ELEMENT Page 2 of 2 Amendment #6 Updated 8/22/02