Loading...
R-02-09-12-13C7 - 9/12/2002RESOLUTION NO. R- 02- 09- 12 -13C7 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services with Chiang, Patel & Yerby, Inc. for the preparation of construction documents for the realignment and reconstruction of CR 113 from FM 1460 to the abandoned MKT Railroad right -of -way in Williamson County, and WHEREAS, Chiang, Patel & Yerby, Inc. has submitted Supplemental Agreement No. 3 to the Contract for Engineering Services to provide for revisions of plans, specifications, and estimates for the realignment and reconstruction of CR 113, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 3 with Chiang, Patel & Yerby, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 3 to Contract for Engineering Services with Chiang, Patel & Yerby, Inc. to provide for revisions of plans, specifications, and estimates for the realignment and reconstruction of CR 113, a copy of said agreement being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and ..00nr, \wowooz \o: \max \RRSOLUTI \R20912Cr.wvu /flc the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RE50LVED this 12th day of September, 200 AT .E T: CHRISTINE R. MARTINEZ, City Secrq ary 2 , Mayor City of Round Rock, Texas STATE OF TEXAS THE COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 3 TO CONTRACT FOR ENGINEERING SERVICES This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Chiang, Patel & Yerby, Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract ", on the 8 day of March, 2001 to provide professional engineering services for the preparation of construction documents for the realignment and reconstruction of CR 113 from FM 1460 to the abandoned MKT railroad right -of -way in Williamson County, and WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER, describes those engineering services to be provided by the Engineer as a part of the Contract, and WHEREAS, ARTICLE 4, COMPENSATION, establishes the maximum lump sum payable under this contract at $175,070 without modification of the contract, and WHEREAS, it has become necessary to amend the contract to provide for the revisions of plans, 'specifications and estimates (PS &E) for the realignment and reconstruction of CR 113 due to recent development, and WHEREAS, the City has agreed to have the additional work performed for $121,714 increasing the lump sum fee for the contract to $296,784. NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY THE ENGINEER, shall be amended to include the following services: Attachment B, Additional Services to be Provided by the Engineer These services will be performed as per Attachment C, Revised Work Schedule. ARTICLE 4, COMPENSATION, shall be amended by the changing the lump sum amount payable under this contract by $121,714 from $175,070 to $296,784. Attachment D, Fee Schedule, is attached with proposed costs for the additional services described in Attachment B. b n EXHIBIT IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. THE ENGII ER By: D�v V ice {'resident By: 46 /sr Z2 , Zoo Z Date CITY OF ROUND ROCK Nyle Maxwell, Mayor Date 2 ATTACHMENT B CITY OF ROUND ROCK CR113 — Realignment & Reconstruction from FM1460 to the MoKan Right -of -Way WILLIAMSON COUNTY SUPPLEMENTAL AGREEMENT NO. 3 ADDITIONAL SERVICES TO BE PROVIDED BY THE ENGINEER The Engineer shall provide the necessary engineering and technical services required for the revisions of the preparation of plans, specifications and estimates (PS&E) for the realignment and reconstruction of CR113. The revisions are due to the new development constructed along existing CR113 which conflicts with the proposed 95% design. The revisions to the construction plans will be included in the construction documents that the Engineer is currently designing under a separate contract for the Texas Department of Transportation for the reconstruction of FM1460 from US79 to CR113. These additional services are described in the TASK OUTLINE shown below. TASK OUTLINE L CR113 DESIGN SERVICES DESIGN SURVEY SERVICES 1) Provide right of entries (ROE's) to access needed properties for surveying services. 2) Contact utility locator service and various utility companies to have them locate and stake any underground utilities within the project area. No additional underground utility research beyond contacting the local service providers will be performed. 3) Perform research of current deeds and plats to ascertain possible locations of property lines within the project area. Assisting the client in resolution of boundary conflicts or discrepancies identified will be handled as an additional service by supplemental agreement. 4) Additional design survey will be obtained for the new Kiphen Road alignment. The survey will extend 100 feet on either side of the proposed centerline. The design survey shall also be extended to the east an additional 500' along CR113. 5) Provide Microstation 2D and 3D drawings and TIN file in Geopak format. Drawing will show all planimetrics, utility markings, property lines with ownership references, and one -foot contours. PROPERTY DESCRIPTIONS 1) Locate all property comers and indications of property lines crossed by the proposed route. 2) The Engineer will provide a written description with sketches for the proposed right -of -way taking. It has been assumed for this service, that this will affect four (4) properties. This includes the Camco Land LTD panel, two (2) Gordon Johnson tracts and the George Christianson tract. 3) Prepare a schematic drawing showing the overall layout of the proposed right -of -way as it relates to the affected properties (not a right -of -way map). 1 of 3 ROADWAY DESIGN SERVICES 1) The horizontal and vertical geometry will be established for the various roadways. This will include new alignments for Kiphen Road and Kiphen Cove. The vertical geometry for Double Creek Drive will be further developed to insure that adequate right of way (ROW) is acquired for future construction. A new horizontal and vertical alignment will be designed for the transition of Kiphen Road back to existing CR1 13. 2) Design cross sections will be produced at a 50' increment for the determination of cut and fill quantities. This will include preliminary cross sections for the Double Creek Drive extension to verify ROW requirements. Final design cross sections will be developed for Kiphen Road and Kiphen Cove. The GEOPAK design software package will be utilized to produce these cross sections. 3) Cut and fill quantities will be determined from the design cross sections and shown on the plan/profile sheets. 4) The Engineer will revise the typical sections to address changes due to the realignment of Kiphen Road and Kiphen Cove. 5) The roadway plan and profile sheets will be revised to depict the proposed construction of Double Creek Drive, Kiphen Road, and Kiphen Cove. 6) An additional miscellaneous roadway detail sheet will be created to describe the details of the special driveway from Kiphen Cove to the newly constructed development. 7) The horizontal alignment data sheet will be revised to depict the new horizontal geometric information for the project roadways. 8) The project layout sheet will be revised to show the new alignments for Kiphen Road and Kiphen Cove. 9) The Engineer will revise the title sheet and supplemental index to reflect the changes and additions due to Kiphen Cove and Kiphen Road. 10) The Engineer will revise the intersection layout sheet for Kiphen Road and Kiphen Cove. The Engineer will create a new intersection layout for the Kiphen Cove/Double Creek intersection. 11) The Engineer shall calculate new roadway quantities and revise the project summary sheets for the various roadway pay items. DRAINAGE DESIGN SERVICES 1) Hydraulic computations will be completed and/or revised for proposed culverts, curb inlets, area inlets, storm sewers and drainage outfall channels along Double Creek Drive, Kiphen Road, and Kiphen Cove. 2) The offsite drainage area map will be revised to reflect the proposed drainage design along Double Creek Drive, Kiphen Road, and Kiphen Cove. Hydrologic information will be calculated from existing drainage area and U.S.G.S. maps for the area. The information gathered and calculated will be shown on the plans. 3) The project drainage area maps will be completed and/or revised for the alignment changes made to Double Creek Drive, Kiphen Road, and Kiphen Cove. It is anticipated that an additional sheets will be required for the Kiphen Cove alignment. 2of3 • 4) Storm sewer design and inlet locations will be determined in accordance with the City of Round Rock's Drainage Design Guidelines. The Engineer will update the storm sewer plan and profile sheets to depict the revised drainage design for System 3 and 6. Additional sheets will be required to depict the storm sewer design along Kiphen Cove. 5) Quantities will be prepared and/or revised for drainage related items including culverts, inlets, manholes, storm sewer pipes, etc. 6) The erosion control layouts will be revised to reflect the proposed roadway design along Double Creek Drive, Kiphen Road, and Kiphen Cove. 7) Quantities will be prepared and/or revised for erosion control related items. SIGNING AND PAVEMENT MARKINGS 1) The signing and pavement marking layouts will be prepared to address the alignment changes to Double Creek Drive, Kiphen Road, and Kiphen Cove. 2) The small sign summary sheets will be revised for the necessary changes and additional signs required for the project roadways. 3) Quantities will be calculated for pavement markings, removal of pavement markings, and small signs. SEQUENCE 01? WORK AND TRAFFIC CONTROL PLAN 1) The traffic control plan will be revised to address the alignment changes to Double Creek Drive, Kiphen Road, and Kiphen Cove. An additional sheet will be required for Kiphen Cove. 2) - Quantities will be calculated for items utilized for the traffic control plan. PROJECT MANAGEMENT AND COORDINATION SERVICES 1) The Engineer will attend project coordination meetings with the City and will manage the production ofPS &E, prepare monthly progress reports and monthly invoices. 3 of 3 • ATTACHMENT C CITY OF ROUND ROCK CR113 — Realignment & Reconstruction from FM1460 to the MoKan Right -of -Way WILLIAMSON COUNTY SUPPLEMENTAL AGREEMENT NO. 3 REVISED WORK SCHEDULE Notice to Proceed for Supplemental Agreement No. 3 Ground Survey Complete Deliver ROW Descriptions to the City 95% Plane Submittal City and TxDOT Review of 95% Plans 100% Plans Submittal Project Letting Date 1 of 1 September 12, 2002 October 1, 2002 November 22, 2002 December 2, 2002 December 2 -16, 2002 January 17, 2003 April 2003 • ATTACHMENT D CITY OF ROUND ROCK CR113 — Realignment & Reconstruction from FM1460 to the MoKan Right -of -Way WILLIAMSON COUNTY SUPPLEMENTAL AGREEMENT NO. 3 FEE SCHEDULE For the services described under Attachment B, we request compensation on a lump sum basis. The estimated hours and dollars to accomplish this work are shown below. The breakdowns for man -hours and costs are shown on the following pages. ESTIMATE OF MAXIMUM COMPENSATION Direct Salary Cost (See attached summary) Project Manager 46 Hrs. @ $48.00 = $ 2,208.00 Senior Engineer 122 Hrs. @ $34.00 = $ 4,148.00 Design Engineer 395 Hrs. @ $30.00 = $ 11,850.00 Engineer -in- Training/Tech. 295 Hrs. @ $24.00 = $ 7,080.00 Clerical 8 Hrs. @ $15.00 = $ 120.00 TOTAL DIRECT SALARY $ 25,406.00 SALARY RELATED COST (173.08 %) $ 43,973.00 TOTAL LABOR COSTS $ 69,379.00 FEE (12 %) $ 8,325.00 EXPENSES Printing, Plotting, & Reproductions $ 576.00 Travel $ 62.00 MISCELLANEOUS EXPENSES $ 638.00 Baker - Aicklen & Associates — Surveying $ 6,900.00 Rodriguez Transportation Group — Drainage Design $ 36,472.00 SUBCONSULTANT EXPENSES $ 43,372.00 TOTAL EXPENSES $ 44,010.00 MAXIMUM AMOUNT PAYABLE $ 121,714.00 1 of 4 Attachment D CR 113 Realignment and Reconstruction Williamson County City of Round Rock Supplemental No. 3 Cost Proposal for Chiang, Patel & Yerby, Inc. I. LABOR COSTS 1. CR113 DESIGN SERVICES Design Survey Services This work Is being performed by Baker - Alcklen, Inc. Property rroperty Descriptions_ This work is being performed by Baker- Aicklen, Inc. Roadway Design Services 1 Horizon &Vertical Geomet 2 Desi n Cross Sections 3 Cut and Fill Quantities 4 T ical Sect'ons 5 Roadway Plan and Profiles 6 Misc. Roadway Details H.. 7 Horizontal Alignment Data Sheet 8 Project Layout Sheet 9 Sheet_ and Supplemental Index .• "10 Intersection Layouts e ....._._...._..._._...".......... _...._._._.........._...._._._. 11 Quantities and Summary Sheets_ 0 20 0 1 4 1 . 1 1 2 2 1 33 2 2 1 4 1 1 0 0 4 2 18 10 4 ;. 1 . 22 1 . 1 . 1 . 1 . 8 6 56 24 42 10 4 56 6 2 3 2 28 20 197 12 24 6 2 62 6 2 2 3 24 16 159 0 0 0 0 0 0 0 0 0 0 0 $1,308.00 $1,854.00 $472.00 $226.00 $3,694.00 $364.00 ....................... $172 $155.00 $149.00 $1 692.00 11 6 10, 4 ,99, .OD $11,242.00 8/22/2002 2of4 Attachment D CR 113 Realignment and Reconstruction Williamson County City of Round Rock Supplemental No. 3 Cost Proposal for Chiang, Patel & Yerby, Inc. RIV.995.1e. Design Services . This work Is being performed by Rodriguez & Huggins Inc. Si • nin, and Pavement Markin, s 1 Signing and Markings Layout 2 Small Sign Summary Sheet Quantities and Summary! Sheet Sequence of Work and Traffic Control 1 Traffic Control Plans, Sections, Detour Profiles, Details 2 Traffic Control Summaries Project Management &Coordination Services Project Coordination TOTAL SHEETS /HOURS AVERAGE HOURLY SALARY RATE BASE SALARY COST TOTAL LABOR OVERHEAD AT PROVISIONAL RATE SUBTOTAL LABOR COSTS FEE _......___. __._._._._.__._...._._._...._.. TOTAL LABOR COST 3 5 10 11 0 0 49 $25,406 $43,973 $69,379 $8,325 $77,704 4 6 8 2 10 12 12 46 $48.00 $2,208 12 14 ..._._.__._._.. 6 36 ............._.... 124 4 .._...._ ............. 40 146 12 ...._ .................._ 6 12 6 122 ................. 39 $34 $30.00 $ _..._ $ 11 ,85 0 28 6 8 42 78 16 94 0 0 295 $24.00 $7,080 $15.00 $120 0 0 0 0 0 0 0 8 8 8 $2,066.00 $364.00 2.4,„26,21 2836 $6,490.00 1146.00 $7,636.00 „$1,194.90 $1,194.00 8/22/2002 3 of 4 Attachment D CR 113 Realignment and Reconstruction Williamson County City of Round Rock Supplemental No. 3 Cost Proposal for Chian, , Patel & Yerby, Inc. II. DIRECT COSTS FOR CHIANG, PATEL & YERBY, INC. Estimated Estimated Units Unit Rate Cost Xerox Copies 540 Sheet $0.15 $81.00 Courier 5 Each $15.00 ._._._._._._._._._._.__..._._......____._._._._...._._......_...._._._._._._..._..._._ ._...._...._._._.___........... ............... $75.00 Mileage 200 Mile _........... ___.._._._.._..._._._._._..._..._._...._._._..._...._._._...__. ..._._._._._...._._._._.__.. _._._._._._._._.._.. .._._....._..........._._._._.. _._._._.._$ _._._._$ ; 00 Paper P _._....._._._._.__...._._._.__. _.__.._._._.._._._._._..._._ SF $2.00 $360.00 Mylar Plots 60 Sheets $1.00 $60.00 TOTAL DIRECT COSTS III. TOTAL COST TOTAL LABOR COSTS TOTAL DIRECT COSTS CHIANG, PATEL & YERBY TOTAL $77,704 $638 $78,342 $638.00 8/22/2002 Chiang, Patel & Yerby Provisional Overhead Rate Profit 4 of 4 173.08% 12% Christianson Plumbing CR 113 Phase! !til Card DATE: September 6, 2002 SUBJECT: City Council Meeting — September 12, 2002 ITEM: 13.C.7. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 3 to the Contract for Engineering Services with Chiang, Patel & Yerby, Inc. for the realignment and reconstruction of CR 113 from FM 1460 to the abandoned MKT Railroad right -of -way in Williamson County. Resource: Jim Nuse, Chief of Operations /Assistant City Manager Tom Word, Director of Transportation Services History: The Texas Department of Transportation (TxDOT) is proposing to reconstruct FM 1460 to widen the highway to 5 lanes with a continuous left turn lane. As part of the project, TxDOT plans to move the intersection of FM 1460 with CR 113 to the south to improve the safety of the intersection. This will require the relocation of CR 113 from this intersection to the abandoned MKT railroad right of way. To assure coordination of the City project and the state project, staff is proposing that the City use the same engineer for the relocation of CR 113 as TxDOT is using for FM 1460. The original contract, which was approved on March 8th, 2001, provided engineering services for the preparation of construction documents for the realignment and reconstruction of CR 113 from FM 1460 to the abandoned MKT Railroad right -of -way in Williamson County. Supplemental Agreement No. 1 approved by Resolution No. R- 01 -12- 20-10D8 on December 20th, 2001, extended the contract until June 28, 2002. Another extension was requested by Supplemental Agreement No. 2 which was approved at the July 25th council meeting and this extended it until June 30, 2003 so to allow for coordination between the City and TxDOT. Supplemental Agreement No. 3 will provide for the revision of plans, specifications, and estimates (PS &E) for the realignment and reconstruction of CR 113 due to recent developments. The engineer has agreed to perform the additional work for $121,714. Funding: Cost: $121, 714 Source of funds: Round Rock Transportation System Development Corporation Outside Resources: Chiang, Patel, & Yerby, Inc Impact: The change in alignment will change the roadway frontage of certain properties. Benefit: The relocation of CR 113 will provide a much safer intersection with FM 1460. Additionally, the new intersection will provide a much higher capacity, which will be beneficial for events at the Old Settlers Park and the Dell Diamond. Public Comment: N/A Sponsor: N/A STATE OF TEXAS THE COUNTY OF WILLIAMSON -22 SUPPLEMENTAL AGREEMENT NO. 3 TO CONTRACT FOR ENGINEERING SERVICES This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Chiang, Patel & Yerby, Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract ", on the 8 day of March, 2001 to provide professional engineering services for the preparation of construction documents for the realignment and reconstruction of CR 113 from FM 1460 to the abandoned MKT railroad right -of -way in Williamson County, and WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER, describes those engineering services to be provided by the Engineer as a part of the Contract, and WHEREAS, ARTICLE 4, COMPENSATION, establishes the maximum lump sum payable under this contract at $175,070 without modification of the contract, and WHEREAS, it has become necessary to amend the contract to provide for the revisions of plans, specifications and estimates (PS &E) for the realignment and reconstruction of CR 113 due to recent development, and WHEREAS, the City has agreed to have the additional work performed for $121,714 increasing the lump sum fee for the contract to $296,784. NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY THE ENGINEER, shall be amended to include the following services: Attachment B, Additional Services to be Provided by the Engineer These services will be performed as per Attachment C, Revised Work Schedule. ARTICLE 4, COMPENSATION, shall be amended by the changing the lump sum amount payable under this contract by $121,714 from $175,070 to $296,784. Attachment D, Fee Schedule, is attached with proposed costs for the additional services described in Attachment B. IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. THE ENG ER By: id A. Nachman, Vice - President /1 2 2 , Zoo Z Date 2 ATTACHMENT B CITY OF ROUND ROCK CR113 — Realignment & Reconstruction from FM1460 to the MoKan Right -of -Way WILLIAMSON COUNTY SUPPLEMENTAL AGREEMENT NO. 3 ADDITIONAL SERVICES TO BE PROVIDED BY THE ENGINEER The Engineer shall provide the necessary engineering and technical services required for the revisions of the preparation of plans, specifications and estimates (PS &E) for the realignment and reconstruction of CRI 13. The revisions are due to the new development constructed along existing CR113 which conflicts with the proposed 95% design. The revisions to the construction plans will be included in the construction documents that the Engineer is currently designing under a separate contract for the Texas Department of Transportation for the reconstruction of FM1460 from US79 to CR113. These additional services are described in the TASK OUTLINE shown below. TASK OUTLINE I. CR113 DESIGN SERVICES DESIGN SURVEY SERVICES 1) Provide right of entries (ROE's) to access needed properties for surveying services. 2) Contact utility locator service and various utility companies to have them locate and stake any underground utilities within the project area. No additional underground utility research beyond contacting the local service providers will be performed. 3) Perform research of current deeds and plats to ascertain possible locations of property lines within the project area. Assisting the client in resolution of boundary conflicts or discrepancies identified will be handled as an additional service by supplemental agreement. 4) Additional design survey will be obtained for the new Kiphen Road alignment. The survey will extend 100 feet on either side of the proposed centerline. The design survey shall also be extended to the east an additional 500' along CR113. 5) Provide Microstation 2D and 3D drawings and TIN file in Geopak format. Drawing will show all planimetrics, utility markings, property lines with ownership references, and one -foot contours. PROPERTY DESCRIPTIONS 1) Locate all property corners and indications of property lines crossed by the proposed route. 2) The Engineer will provide a written description with sketches for the proposed right -of -way taking. It has been assumed for this service, that this will affect four (4) properties. This includes the Camco Land LTD panel, two (2) Gordon Johnson tracts and the George Christianson tract. 3) Prepare a schematic drawing showing the overall layout of the proposed right -of -way as it relates to the affected properties (not a right -of -way map). 1 of 3 ROADWAY DESIGN SERVICES 1) The horizontal and vertical geometry will be established for the various roadways. This will include new alignments for Kiphen Road and Kiphen Cove. The vertical geometry for Double Creek Drive will be further developed to insure that adequate right of way (ROW) is acquired for future construction. A new horizontal and vertical alignment will be designed for the transition of Kiphen Road back to existing CR113. 2) Design cross sections will be produced at a 50' increment for the determination of cut and fill quantities. This will include preliminary cross sections for the Double Creek Drive extension to verify ROW requirements. Final design cross sections will be developed for Kiphen Road and Kiphen Cove. The GEOPAK design software package will be utilized to produce these cross sections. 3) Cut and fill quantities will be determined from the design cross sections and shown on the plan/profile sheets. 4) The Engineer will revise the typical sections to address changes due to the realignment of Kiphen Road and Kiphen Cove. 5) The roadway plan and profile sheets will be revised to depict the proposed construction of Double Creek Drive, Kiphen Road, and Kiphen Cove. 6) An additional miscellaneous roadway detail sheet will be created to describe the details of the special driveway from Kiphen Cove to the newly constructed development. 7) The horizontal alignment data sheet will be revised to depict the new horizontal geometric information for the project roadways. 8) The project layout sheet will be revised to show the new alignments for Kiphen Road and Kiphen Cove. 9) The Engineer will revise the title sheet and supplemental index to reflect the changes and additions due to Kiphen Cove and Kiphen Road. 10) The Engineer will revise the intersection layout sheet for Kiphen Road and Kiphen Cove. The Engineer will create a new intersection layout for the Kiphen Cove/Double Creek intersection. 11) The Engineer shall calculate new roadway quantities and revise the project summary sheets for the various roadway pay items. DRAINAGE DESIGN SERVICES 1) Hydraulic computations will be completed and/or revised for proposed culverts, curb inlets, area inlets, storm sewers and drainage outfall channels along Double Creek Drive, Kiphen Road, and Kiphen Cove. 2) The offsite drainage area map will be revised to reflect the proposed drainage design along Double Creek Drive, Kiphen Road, and Kiphen Cove. Hydrologic information will be calculated from existing drainage area and U.S.G.S. maps for the area. The information gathered and calculated will be shown on the plans. 3) The project drainage area maps will be completed and/or revised for the alignment changes made to Double Creek Drive, Kiphen Road, and Kiphen Cove. It is anticipated that an additional sheets will be required for the Kiphen Cove alignment. 2 of 3 4) Storm sewer design and inlet locations will be determined in accordance with the City of Round Rock's Drainage Design Guidelines. The Engineer will update the storm sewer plan and profile sheets to depict the revised drainage design for System 3 and 6. Additional sheets will be required to depict the storm sewer design along Kiphen Cove. 5) Quantities will be prepared and/or revised for drainage related items including culverts, inlets, manholes, storm sewer pipes, etc. 6) The erosion control layouts will be revised to reflect the proposed roadway design along Double Creek Drive, Kiphen Road, and Kiphen Cove. 7) Quantities will be prepared and/or revised for erosion control related items. SIGNING AND PAVEMENT MARKINGS 1) The signing and pavement marking layouts will be prepared to address the alignment changes to Double Creek Drive, Kiphen Road, and Kiphen Cove. 2) The small sign summary sheets will be revised for the necessary changes and additional signs required for the project roadways. 3) Quantities will be calculated for pavement markings, removal of pavement markings, and small signs. SEQUENCE OF WORK AND TRAFFIC CONTROL PLAN 1) The traffic control plan will be revised to address the alignment changes to Double Creek Drive, Kiphen Road, and Kiphen Cove. An additional sheet will be required for Kiphen Cove. 2) Quantities will be calculated for items utilized for the traffic control plan. PROJECT MANAGEMENT AND COORDINATION SERVICES 1) The Engineer will attend project coordination meetings with the City and will manage the production of PS&E, prepare monthly progress reports and monthly invoices. 3 of 3 ATTACHMENT C CITY OF ROUND ROCK CR113 — Realignment & Reconstruction from FM1460 to the MoKan Right -of -Way WILLIAMSON COUNTY SUPPLEMENTAL AGREEMENT NO. 3 REVISED WORK SCHEDULE Notice to Proceed for Supplemental Agreement No. 3 Ground Survey Complete Deliver ROW Descriptions to the City 95% Plans Submittal City and TxDOT Review of 95% Plans 100% Plans Submittal Project Letting Date 1 of 1 September 12, 2002 October 1, 2002 November 22, 2002 December 2, 2002 December 2 -16, 2002 January 17, 2003 April 2003 ATTACHMENT D CITY OF ROUND ROCK CR113 — Realignment & Reconstruction from FM1460 to the MoKan Right -of -Way WILLIAMSON COUNTY SUPPLEMENTAL AGREEMENT NO. 3 FEE SCHEDULE For the services described under Attachment B, we request compensation on a lump sum basis. The estimated hours and dollars to accomplish this work are shown below. The breakdowns for man -hours and costs are shown on the following pages. ESTIMATE OF MAXIMUM COMPENSATION Direct Salary Cost (See attached summary) Project Manager 46 Hrs. @ $48.00 = $ 2,208.00 Senior Engineer 122 Hrs. @ $34.00 = $ 4,148.00 Design Engineer 395 Hrs. ® $30.00 = $ 11,850.00 Engineer- in- Training/Tech. 295 Hrs. @ $24.00 = $ 7,080.00 Clerical 8 Hrs. @ $15.00 = $ 120.00 TOTAL DIRECT SALARY 5 25,406.00 SALARY RELATED COST (173.08 %) $ 43.973.00 TOTAL LABOR COSTS $ 69,379.00 FEE (12 %) $ 8,325.00 EXPENSES Printing, Plotting, & Reproductions Travel MISCELLANEOUS EXPENSES Baker - Aicklen & Associates — Surveying Rodriguez Transportation Group — Drainage Design SUBCONSULTANT EXPENSES TOTAL EXPENSES MAXIMUM AMOUNT PAYABLE 1 of 4 $ 576.00 $ 62.00 $ 638.00 $ 6,900.00 $ 36,472.00 $ 43,372.00 $ 44,010.00 $ 121,714.00 Attachment D Supplemental No. 3 Cost Proposal for Chiang, Patel & Yerby, Inc. L r 11111. I. LABOR COSTS 1. CR113 DESIGN SERVICES Design Survey Services This work is being performed by Baker-Aicklen, Inc. Property Descriptions This work is being performed by Baker-Aicklen, Inc. Roadway Design Services 1 Horizontal & Vertical Geomehy 2 Design Cross Section 3 Cut and Fill Quantities 4 Typical Sections 5 Roadway Plan and Profiles 6 Misc. Roadwaypetails 7 Horizontal Alignment Data Sheet • 8 Project Layout Sheet 9 Title Sheet and Supplemental Index 10 Intersection Layouts 11 Quantities and SummaaSheets CR 113 Realignment and Reconstruction Williamson County City of Round Rock 8/22/2002 2 of 4 0 2 10 24 12 0 $1,308.00 20 2 4 42 24 0 $1,854.00 0 1 1 10 6 0 $472.00 1 1 1 4 2 0 $226.00 4 4 22 56 62 0 $3,694.00 1 1 1 6 6 0 $364.00 1 1 1 2 2 0 $172.00 1 0 1 3 2 0 $155.00 2 0 1 2 3 0 $149.00 2 4 8 28 24 0 $1692.00 1 2 6 20 16 0 $1,156.00 33 18 56 197 159 . . . 0 611,242.00 Attachment D CR 113 Realignment and Reconstruction Williamson County City of Round Rock Supplemental No. 3 Cost Proposal for Chiang, Patel & Yerby, Inc. Drainage Design Services This work is being performed by Rodriguez & Huggins, Inc. Signing and Pavement Markings ........... ............................. 1 and, Markings Layout 2 Small Sign Summary Sheet 3 Quantities and SummarySheet Sequence of Work and Traffic Control 1 Traffic Control Plans, Sections, Detour Profiles, Details ......................................................................................................................... ............................... 2 Traffic Control Summaries Project Management &Coordination Services 1 Project Coordi TOTAL SHEETS /HOURS ............................... ............................... AVERAGE HOURLY SALARY RATE BASE SALARY COST . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . TOTAL LABOR . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . OVERHEAD AT PROVISIONAL RATE SUBTOTAL LABOR COSTS FEE TOTAL LABOR COST 3 1 1 5 0 0 49 $25,406 . . . . $43,973 $69,379 . . . . . . $8,325 $77,704 4 1 1 6 8 2 10 12 12 46 $48.00 $2,208 12 1 . 1 . 14 36 4 40 12 12 122 $34.00 $ ............... $4,148 34 6 6 46 124 22 146 6 6 395 $30.00 ......... $11,850 28 6 8 42 78 16 94 0 0 295 $24.00 .................. $7,080 0 0 0 0 0 0 0 8 8 8 $15.00 $120 $2,066.00 ........................ $364.00 ... ................... $406.00 2836 $6,490.00 1 ( 146.00 $7,636.00 ;1 194.00 $1,194.00 8/22/2002 3 of 4 Attachment D Supplemental No. 3 Cost Proposal for Chiang, Patel & Yerby, Inc. II. DIRECT COSTS FOR CHIANG, PATEL & YERBY, INC. Xerox Copies Courier Mileage Paper Plots Mylar Plots TOTAL DIRECT COSTS III. TOTAL COST TOTAL LABOR COSTS TOTAL DIRECT COSTS CHIANG, PATEL & YERBY TOTAL CR 113 Realignment and Reconstruction Williamson County City of Round Rock Estimated Estimated Units Unit Rate Cost ........................................................................................... ............................... 540 Sheet $0.15 $81.00 _........._ 5 Each $15.00 $75.00 200 Mile $0.31 $62.00 ........................................................................................... ............................... 180 SF $2.00 $360.00 60 Sheets $1.00 $60.00 $77,704 $638 $78,342 Chiang, Patel & Yerby Provisional Overhead Rate 173.08% Profit 12% 8/22/2002 4 of 4 $638.00 Mayor Nyle Maxwell Mayor Pro-tem Toni Nielson Council Members Alan McGraw Carrie Pitt Scot Knight Isabel Gallahan Gary Coe City Manager ibert L. Bennett, Jr. City Attorney Stephan L. Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. September 18, 2002 David A. Nachman Vice President Chiang, Patel 8s Yerby, Inc. 11149 Research Blvd., Suite 330 Austin, TX 78759 Dear Mr. Nachman: The Round Rock City Council approved Resolution No. R- 02- 09- 12 -13C7 at their regularly scheduled meeting on September 12, 2002. This resolution approves Supplemental Agreement No. 3 for revisions of plans, specifications, and estimates for the realignment and reconstruction of CR 113. Enclosed is a copy of the resolution and the original Supplemental Agreement No. 3 for your files. If you have any questions, please do not hesitate to contact Tom Word at 218 -5562. Sincerely, Christine R. Martinez City Secretary Enclosure CITY OF ROUND ROCK 221 East Main Street • Round Rock. Texas 78664 Phone: 512.218.5400 • Fax 512.218.7097 • Voice: L800.735.2988 • 1.800.735. 2989 TDD • www.c4round- rock.tx.us