Loading...
R-02-09-12-13C8 - 9/12/2002RESOLUTION NO. R- 02- 09- 12 -13C8 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Austin Filter Systems, Inc. for the construction of roadway improvements to Dell Way, Dell Center Boulevard, and Gattis School Road, and WHEREAS, Austin Filter Systems, Inc. has submitted Change Order No. 9 to the Contract to include changes in quantities due to design changes in project, and WHEREAS, the City Council desires to enter into said Change Order No. 9 with Austin Filter Systems, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 9 to the Contract with Austin Filter Systems, Inc. for changes in quantities due to design changes in project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. :: ODMA\ WORLDOX\ O: \WDOX \RESOLUTI \R20913C8.WPD /rmc ATTEST: RESOLVED this 12th day of September 2002. CHRISTINE R. MARTINEZ, City Secret 2 NY 'o WELL, Mayor Cit of Round Rock, Texas y em 1 Description ol Changes - „ Ilan Pace Original a Previously Revised aN- Original Item Price New LIM Nice .�.....R_�.. Re Item Price i / Decrease Contract PIII. v - _ __.,.,.,.Fd..s,..". .erg_ Additional Saw Cut . vo �� 8� 888,9 o 88 N 8 8 8 8 8 C 8 88888 8 p C J N m Fi N 8 4 § N ° N ,0",A S Additional 12 -inch RCP Additional 12 -Inch RCP Bends Add Base Material Additional Curb and Gutter Additional Sidewalk Additional Curb Ramp Additional Surveying/Layout Additional Traffic Control Five-foot Manhole Demo /Remob Grading of West Slop from water tower to Dell Center Grading of East Slop. from Mays 900' towards Dell Center 8 8 8 Triangle cut /fill behind Hotel Hydromulch additional area Tle 12" RCP to36 "RCP Grade to Drain from Exlsfing Headwall to Existing curb Depose of geogrld from pipe excavation Remove 3x3 Grote inlets (deliver to CORR) 1 20' Curb Inlet Add 36" RCP (LF) Add 12" RCP (LF) Additional Surveying /Layout Additional Barricade Cost since 10/31/01 i TOTAL: SO3.919.85 CHANGE ORDER 9 PA( DIVISION: Public Works DATE: PROJECT: Dell Way, Gattis School Ftd, Dell Center Blvd, Home Depot Bridge Street & Drainage Conshuclion JUSTIFICATION: Changes in quantitys due to design changes pwserver /admin /loans /Consl change order.xlspk CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER CHANGE DATA 1 EXHIBIT Revised: 9/01 CHANGE ORDER NO: 9 PAGE: 2 of 2 DIVISION: Public Works DATE: 8/20/02 PROJECT: Dell Way, Gat Its School Rd, Dell Center Blvd, Home Depot Bridge Street & Drainage Construction Original Contract Price: 51,173.403.00 Amount of Previous Change Orders & Amendments: $190,236.00 Amount the Contract will Decease /Increase with this change order: $63,919.85 Total Change Orders to Date: $254,182.85 Contract Total Including this Change Order will be: $1,427,585.85 PFRCFNT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: 5.45% PREVIOUS CHANGE ORDER: 16.21% TOTAL % CHANGE: 21.66% ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: 51,427,585.85 PREPARED BY: Engineer: Signatyw Enalneer: Contractor: !7//1,,.(01.9 aon DSo Contractor: APPROVED: �A2Da 24m4,21P /PA rn ame Print Name City of Round Rock (Owner) CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER E #7N Company ame Title Date Title Date pwsen er /admIn /forms /corut change order.xls /Ik Revised: 9 ZL /zoa uate S� ✓ Acre,c Sysraaf Print Name Signature ' Company Nome Date • • DELL CENTER BLVD., -'\\ ----\-- ,----- ---z_ —1 ) - A . \--1. _,--- --------- NO ROADWAY IMPROVEMENTS TO DELL WAY, .>'..-.. n 0 4' PA: c o$ mond 6.2B-01 DATE: September 6, 2002 SUBJECT: City Council Meeting — September 12, 2002 ITEM: 13.C.8. Consider a resolution authorizing the Mayor to execute Change Order No. 9 with Austin Filter Systems, Inc. for roadway improvements to Dell Way, Dell Center Boulevard, and Gattis School Road. Resource: Jim Nuse, Chief of Operations /Assistant City Manager Bill Stablein, Traffic Engineer Assoc. History: On August 10 2000, the City Council approved Resolution No. R- 00- 8- 10 -10B7 in which Austin Filter Systems, Inc., would be responsible for the construction of the Dell Way, Dell Center Blvd, Gattis School Rd and entrance to the Boardwalk Shopping Center in the amount of $1,173,403.00. Changes in quantities due to design changes have resulted in a need for Change Order No. 9 in the amount of $63,919.85. Bringing the total cost of the project to $1,427,585.80. Funding: Cost: $63,919.80 Source of funds: RR Transportation System Development Corp Outside Resources: Austin Filter Systems, Inc. ImpactBenefit: Completion of South Mays, Dell Center Boulevard and the Home Depot Bridge will result in less traffic congestion on surrounding neighborhood streets such as Gattis School Road, Greenlawn Boulevard, etc. Public Comment: N/A Sponsor: N/A Nn a Description or Charges Unit Price Original a Prevbusry Revised Qty. Original Item Price New Unit Price New Quantity Revised NOT PdeO increase / Decrease Centeet Price Additional Saw Cut I 88 8.88888888 8 8 8 88 8 8 88888 8 0760.00 Additional 12 -inch RCP 018755 Additional 12 -Inch RCP Bends 0805.00 Add Bose Material 91,084.00 Additional Curb and Gutter 01,421.20 Additional Sidewalk 02288.00 Additional Curb Romps 02180.00 Additional Surveying/Layout 53,550.00 Additional Traffic Control Si A60,00 Five -foot Manhole 52,100,00 Demo /Remob 5700.00 Grading of West Slog from water tower to Dell Center 02285,00 Grading of East Slope from Mays 900' towards Dell Center 8 51,235.00 Triangle cut /fill behind Hotel 51,550.00 liydromulch additional area 3625.00 Tie 12" RCP to 36" RCP 5971.00 Grade to Drain from Existing Headwall to Existing curb 5303.00 Dispose of geogrid from pipe excavation 5544.00 Remove 3x3 Grate inlets (deliver to CORR) 5774.00 20' Curb Inlet 06.688.00 Add 36" RCP (LF) 5725.00 Add 12" RCP (LF) 59,01650 Additional Surveying /Layout 01,602.00 Additional Barricade Cost since 10/31/01 : 021.065.00 TOTAL: 563.919.85 DIVISION: Public Works CHANGE ORDER 9 PROJECT: Dell Way, Gatlis ScDool Rd, Dell Center Blvd, Home Depot Bridge Street & Drainage Construction JUSTIFICATION' Changes in quantitys due to design changes pwserver /adman /forms /cant change order.xis /Ik 2- o - 09 -1 -13e CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER CHANGE DATA PAGE: 1 of 2 DATE: 8 /20/02 Revised: 9/01 DIVISION: Public Works CHANGE ORDER NO: 9 CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER PAGE: 2 of 2 DATE: 8/20/02 PROJECT: Dell Way, Gattis School Rd, Dell Center Blvd, Home Depot Bridge Street & Drainage Construction Original Contract Price: 51,173,403.00 Amount of Previous Change Orders & Amendments: $190,236.00 Amount the Contract will Deceose /Increase with this change order: 963,919.85 Total Change Orders to Date: 9254,182.85 Contract Total including this Change Order will be: 91,427,585.85 PFPCFNT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: PREVIOUS CHANGE ORDER: TOTAL % CHANGE. ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: PREPARED BY: Engineer: 'e»' j7 Cf1 SlgnatyLe� Company ame Contractor: d y onDS — Print Name Contractor: APPROVED: 5.45% 16.21% 21.66% $1,427,585.85 — s >i�fr <7c� srsrw fr -z3 -02- Signature Company Name Date Print Name /? 2 yo. 9- Date -C end Roc (Owner) pwserver /admin /forms /cant change order.0s /1k Title Reu ed: 9 /01 Date ROADWAY IMPROVEMENTS TO DELL WAY, DELL CENTER BLVD., could 6.2.9-61ep Mayor Nyle Maxwell Mayor Pro-tem Tom Nielson Council Members Alan McGraw Carrie Pitt Scot Knight Isabel Gallahan Gary Coe City Manager ',ben L. Bennett, Jr. City Attorney Stephan L. Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. September 18, 2002 Mr. Harold Goodson Austin Filter Systems, Inc. 13653 Rutledge Spur Austin, Texas 78717 Dear Mr. Goodson: The Round Rock City Council approved Resolution No. R- 02- 09- 12 -13C8 at their regularly scheduled meeting on September 12, 2002. This resolution approves Change Order No. 9 for the construction of roadway improvements to Dell Way, Dell Center Boulevard, and Gattis School Road. Enclosed is a copy of the resolution and Change Order No. 9 for your files. If you have any questions, please do not hesitate to contact Bill Stablein at 218 -3237. Sincerely, oiniatthuuncato;Lit Christine R. Martinez City Secretary Enclosure CITY OF ROUND ROCK zzt East Main Street • Round Rock, Texas 78664 Phone: 92.2t8.540o • Fax: 5,2.218.7097 • Voice: L800.735.2988 • t.800. 735.2989 TDD • www.ci.round- rock,tx.us Mayor Nyle Maxwell Mayor Pro -tem Tom Nielson Council Members Alan McGraw Carrie Pin Scot Knight Isabel Gallahan Gary Coe City Manager Ebert L. Bennett, Jr. City Attorney Stephan L. Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY September 18, 2002 Mr. Richard Zamarripa Project Representative Earth Tech Transportation Services, Inc. 811 Barton Springs Road, Suite 400 Austin, Texas 78704 Dear Mr. Zamarripa: The Round Rock City Council approved Resolution No. R- 02- 09- 12 -13C8 at their regularly scheduled meeting on September 12, 2002. This resolution approves Change Order No. 9 with Austin Filter Systems for the construction of roadway improvements to Dell Way, Dell Center Boulevard, and Gattis School Road. Enclosed is a copy of the resolution and Change Order No. 9 for your files. If you have any questions, please do not hesitate to contact Bill Stablein at 218 -3237. Sincerely, n i Christine R. Martinez City Secretary Enclosure CITY OF ROUND ROCK 221 East Main Street • Round Rock, Texas 78664 Phone: 512 218 -y400 • Fax: 512.218.7097 • Voice: 1.800.735.2988 • L800.735.2989 TDD • www.ci.round- rock.tx.us