R-02-09-26-11D6 - 9/26/2002REM OTY DESCRIPTION TSWREF CU MU 1 6 63 REBAR,10' DIAMETER 600*, r OVERLAP 314470 317621 -- SIF25 2 4 *5 REBAR, STRAIGHT, 60' LONG 3 4 ANCHOR BOLT, GALV. r SUPPLIED 25 5 30' POLES AND 114' 44 SUPPLIED V480' POLES .. 4 A8 RFOC CONCRETE FOUNDATION TUBE, 24' DIAMETER 313841 303244 5 AS 5665 CONDOR, PVC OR PEC INOT IN FOUNDATION AUNT 6 .5 LB WIRE, Y6 COPPER, SOUD 7 1 GROUND, POLE BUTT WIRE COIL 8 A6 sox CONCRETE 213 — 330 12 - 01 FINISHED GRADE 0 TRENCH BOTTOM 0 NOTE 6 STREET LIGHT FOUNDATION 25',30' & 40' SQUARE STEEL POLE 40' M.H. ROUND STEEL POLE T �— r —r SECTION " A — A " _ _ _ A c. �p PR OJECTION I 3" PROJECTION 1 AS REO'D A P P R O V E D B Y 213 — 330 D - 01 24" MIN NOTES: 1. CONCRETE TD BE MINIMUM 3000 PSI AT 28 DAYS. (6 SACK) MAXIMUM AGGREGATE 3'4' TOP OF FOUNDATION TO BE TROWELED TO A FLAT AND LEVEL SURFACE AVOID EXCESSIVE TROWELING. CONCRETE TO SET A MINIMUM OF 72 HOURS BEFORE POLE INSTALLATION. 2. REBAR HOOPS ARE TIED BEGINNING SEE NOTE 3 3' BELOW TOP OF CONCRETE FORM AND ARE REPEATED AT APPROXIMATE 3" 6 " 1' INTERVALS TO BOTTOM OF MAX FOUNDATION. 3. r ANCHOR BOLTS TO BE SUPPLIED WITH 25 & 30' POLE. 114' ANCHOR BOLTS TO BE SUPPLIED WITH 4 POLE. USE TEMPLATE FURNLSNED BY POLE MANUFACTURER FOR ALIGNING ANCHOR BOLTS. PROJECTION OF 3' ON 25 IL 30' SQUARE AND 3 sr ON 40' SQUIRE AND ROUND POLES. 4. CONCRETE FORM OF SONOTUBE TO EXTEND 7O BOTTOM OF TRENCH OR AS NEEDED. 5. PROVIDE MINIMUM 24' GROUND WIRE PIGTAIL OUT OF CONCRETE FOR CONNECTION TO POLE. 6. A MINIMUM OF 1Y OF BARE 06 SO CU WIRE TO BE PLACED IN 8OT7OM OF HOLE AND COVERED WRH Y OF DIRT 7. IF SOIL HAS BEEN 0151110BE0. EXTEND FOUNDATION BY DEPTH OF DISTURBED SOIL, 8. FOR POLE FOUNDATIONS LARGER THAN 40' NOMINAL MOUNTING HEIGHT, CONTACT DISTRIBUTION STANDARDS ® lxU 1301E•4018110R, ITEM QTY I DESCRIPTION TSW REF CU MU 1 1 ! BOX. SECONDARY 12" X 12" X 12" 3--306 SLSCB 1 Y 8 213 - 120 L DRAIN HOLE FOR INSERT 10 -05 SECONDARY CONNECTION BOX PLAN WITH COVER REMOVED 143'4" INSERT FOR STD. 3 - 16NC X 1 V2" PENTAGON HEAD LOCKING BOLT LIGHTING AND TRAFFIC CONTROL 213 - 120 143'4" 12 3/ 4" NOTES: 1. FOR USE WHEN CONDUCTOR SI2E AND NUMBER OF TERMINATIONS WARRANT. USES INCLUDE STREET LIGHTING, AREA LIGHTING, TRAFFIC CONTROL. IRRIGATION SYSTEMS. ETC. 2. 1-10 (LIGHT VEHICULAR TRAFFIC LOADING). 3. REPLACEMENT COVER TSN IS 326507. APPROVED BY Thr(T;`TTl LIFTING SLOT 7E/ELECTRIC NON -SKID SURFACE COVER - TOP VIEW 10 -95 Mayor Nyle Max dell Mayor Pro -tem Tom Nielson Council Members Alan McGraw Carrie Pitt Scot Knight Isabel Gallahan Gary Coe City Manager Robert L. Bennett, Jr. City Attorney Stephan L. Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. October 21, 2002 Mr. Paul Elkins Engineering Analyst Oncor Energy Delivery Company 3110 North IH 35 Round Rock, TX 78681 Dear Mr. Elkins: City Secretary Enclosure The Round Rock City Council approved Resolution No. R- 02- 09 -26- 11D6 at their regularly scheduled meeting on September 26, 2002. This resolution approves an Agreement for electrical services with Oncor Energy Delivery Company, for the A.W. Grimes Boulevard, Phase I Street Lighting Project. Enclosed is a copy of the resolution and original Agreement for your files. If you have any questions, please do not hesitate to contact Tom Word at 218 -5562. Sincerely, ct� an Christine R. Martinez CITY OF ROUND ROCK 221 East Main Street • Round Rock. Texas 78664 Phone: 5i12i8.540o • Fax: 512 218.7097 • www_ci.round•rock.tx. us RESOLUTION NO. R- 02- 09 -26- 1 ) Dip WHEREAS, the City of Round Rock desires to retain electrical services for the A. W. Grimes Boulevard, Phase I Street Lighting Project, and WHEREAS, Oncor Energy Delivery Company has submitted an Agreement for electrical services to provide said services, and WHEREAS, competitive bids were not necessary for this project because it is for utility related items that are available from only one source, namely Oncor Energy Delivery Company, and WHEREAS, the City Council desires to enter into said agreement with Oncor Energy Delivery Company, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City an Agreement for electrical services with Oncor Energy Delivery Company, for the A. W. Grimes Boulevard, Phase I Street Lighting Project, a copy of said agreement being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended RESOLVED this 26th day of September, 2002. 0 : \ wdo x \RESOL \R2092606 /rmc CHRISTINE R. MARTINEZ, City Secf/etary 2 MAXWELL, Mayor ity of Round Rock, Texas August 28, 2002 Mr, Tom Word Transportation Services Director City of Round Rock 2008 Enterprise Drive Round Rock, Texas 78664 Re: Electric Facilities Extension for A.W. Grimes Blvd. Phase 1 Street Lighting. Dear Mr. Word: Paul B. Elkins Engineering Analyst, Sr. Project Management & Design Services Oncor Energy Delivery Company South Region 3110 North IH 35 Round Rock, Texas 78681 Tel 512 310 -3881 Fax: 512 310 -3819 Cell: 512 -750 -6774 paul.elkins @oncorgroup.com The City of Round Rock ( "Customer") has requested that Oncor Electric Delivery Company ( "Company") provide street lighting facilities sufficient to provide underground electric service to 42 -250 watt BPS street lights on 40 foot anchor base poles along both sides of A.W. Grimes Blvd between St. Hwy. 45 and Gaits School Road. The project is scheduled to begin the week of September 9`" and be complete by October 15 provided that all material necessary for project arrive on time and no problems occur with the Customer installed facilities. Pursuant to Company's Tariff for Retail Delivery Service, Customer is responsible for $ 84,745 as payment for the Customer's portion of the cost of installation of Company's additional electric delivery facilities, such payment to be and remain the property of the Company. Customer's payment in full is due upon receipt of invoice to be sent at completion of project. A detail of this cost is attached. Company at all times shall have title to and complete ownership and control over said facilities. Customer is responsible for providing, underground conduit raceway per Companies specifications. Company to provide and install at cost of Customer the concrete light pole foundations and conduit raceway connection to foundations. This agreement supersedes all previous agreements or representation, either written or oral, between Company and Customer made with respect to the matters herein contained, and when duly executed constitutes the agreement between the parties hereto and is not binding upon Company unless and until signed by one of its duly authorized representatives. A description of charges is attached to this document. This agreement and the costs set forth therein, if not accepted within 30 days of the date of this letter, will be of no force and effect. Acceptance shall consist of delivery of an executed copy of this agreement to Company along with Customer's payment as set forth above. Paul Elkins If the City of Round Rock agrees to the conditions set forth in this agreement, please execute both original copies and return one executed copy to me with your payment $ 84,745. The additional copy is for your files. Signature Title Name Date EXHIBIT nAn Item Quantity Unit Price Line Totals 40 foot round anchor base street light standards 42 $980.00 $41,160 Precast foundations 14 " bolt circle 42 $252.00 $10,584 Trench and 1" conduit 210 $5.58 $1,172 Breakaway Bases 42 $411.57 $17,286 Sub Total $70,202 Gross up $14,543 Total $84,745 Summary of Cost A.W. Grimes Streetlighing Phase One July 24, 2002 Michael Thane City of Round Rock 2008 Enterprise Drive Round Rock, Texas 78664 Re: Oncor Design & Specifications for A.W. Grimes Street Lighting Phase 1 Dear Michael: Paul B. Elkins Engineering Analyst, Sr. Project Management 8 Design Senioes Oncor Energy Delivery Company South Region 3110 North II-135 Round Rods, Texas 78681 Tel 512 310 -3881 Fax 512 310 -3819 Cell: 512-750-6774 paul.elkins @oncorgroup.com Enclosed are copies of our layout and specifications for the above referenced project. Due to most of the conduit being installed with no Oncor inspection 1 will need a letter from signed by both City of Round Rock and Austin Traffic Signal guaranteeing the depth of the conduit to meet attached specifications. Also the conduit installed by Austin Traffic Signal will be required to install 1 /8" pull string in all conduits as specified this should help validate the integrity of the conduit. Your contractor will be responsible for the following requirements: • Materials and workmanship must be inspected by Oncor prior to any cover -up • Contact Mr. Paul Elkins at (512) 310 -3881 to schedule your inspection. • A twenty-four (24) hour advance notice is needed for scheduling the inspection. • Your contractor must have the attached specifications in possession at the time of inspections. Failure by your contractor to comply with these requirements will delay the inspection process. Once accepted, all facilities will become the property of Oncor. You will be held responsible for repair or replacement of these materials for a period of two years. If you have any questions, please feel free to call me at (512) 310 -3881 Paul Enclosures SPECIFICATIONS FOR ELECTRICAL UNDERGROUND DISTRIBUTION SYSTEMS FROM OVERHEAD TRANSFORMATION, GENERAL SERVICE ACCOUNTS DDS-4 OH REV.3 DATE 02 -02 SECTION 1- SCOPE Page 1 SECTION 2- REFERENCES Page 1 SECTION 3- DEFINITIONS Page 1 SECTION 4- GENERAL Page 1 SECTION 5- COMPANY RESPONSIBILITY Page 2 SECTION 6- CONTRACTOR RESPONSIBILITY Page 3 SECTION 7- ACCEPTANCE Page 5 r ONCOR ELECTRIC DELIVERY COMPANY SPECIFICATIONS FOR ELECTRICAL UNDERGROUND DISTRIBUTION SYSTEMS FROM OVERHEAD TRANSFORMATION, GENERAL SERVICE ACCOUNTS SPECIFICATION NUMBER DDS-4 OH ATTACHMENTS: DDS-4 OH Detail Sheets 1- 7 Copyright 2002 Oncor Electric Delivery Company. All rights reserved. TABLE OF CONTENTS ONCOR ELECTRIC DELIVERY COMPANY SPECIFICATIONS FOR ELECTRICAL UNDERGROUND DISTRIBUTION SYSTEMS FROM OVERHEAD TRANSFORMATION, GENERAL SERVICE ACCOUNTS SPECIFICATION NUMBER DDS-4 OH 1. SCOPE This document represents the minimum requirements and specifications for the installation of the electrical underground distribution systems fed from overhead transformation serving General Service Accounts to be transferred to Oncor Electric Delivery Company ownership. 2. REFERENCES This specification shall be used in conjunction with the latest revision of the following publications. 2.1 The Electric Service Guidelines, Oncor Electric Delivery Company. 3. DEFINITIONS 4. GENERAL 3.1 Company: Oncor Electric Delivery Company and its designated representatives. 3.2 Contractor: Individual or firm installing electric underground service for General Service Accounts. 3.3 Authority Having Jurisdiction: Generally an incorporated City or Town, but may be an agency of the County, State or Federal Government. 3.4 Point of Delivery: The point where Company's conductors are connected to premise's conductors, typically at the meter socket or service enclosure. 4.1 The latest edition of all applicable building and safety codes shall be followed in the installation of the electrical underground distribution system. Included, but not limited to, are the: 4.1.1 Local City Building and Fire Codes or any other applicable codes for a particular project location Copyright 2002 Oncor Electric Delivery Company. All rights reserved. 1 4. GENERAL (continued) 4.1.2 National Electrical Safety Code (NESC) 4.1.3 U.S. Occupational Safety and Health Act of 1970 (OSHA) 4.1.4 The American Concrete Institute (ACI) 4.1.5 The American Society for Testing and Materials (ASTM) 4.2 Upon receipt of all necessary information from the Contractor, a project sketch showing the route of the conduit line and other pertinent information will be furnished by the Company. 4.3 Prior to construction a meeting shall be held to discuss and coordinate construction and inspection. 4.4 The Company will require a signed easement at no cost or a filed plat incorporating Company easement requirements prior to the Company installing any electrical facilities. 4.5 Joint use ditch will be determined by the Company on an individual basis. 4.6 No electrical facilities shall be connected by the Company until after the final inspection is made and approval by the Authority Having Jurisdiction, as required by code, has been received. 5. COMPANY RESPONSIBILITY The following shall be performed by, and the responsibility of, the Company: 5.1 The Company inspector is to inspect all conduit installations prior to the placing of backfill. 5.2 The Company inspector is responsible for all field changes and coordinates changes with the local Engineering office. 5.3 After approval of the installed conduit system by the Company inspector, and after the Contractor has signed all appropriate contracts, agreements, easements and has paid any required CIAC (contribution in aid of construction), the Company shall install service lateral cables up to the line side of the point of delivery. Copyright 2002 Oncor Electric Delivery Company. All rights reserved. 2 5. COMPANY RESPONSIBILITY (continued) 5.4 Upon notification of final electrical inspection from the Authority Having Jurisdiction, the Company is to make final electrical connections at the point of delivery. 6. CONTRACTOR RESPONSIBILITY- The following shall be performed by, and the responsibility of, the Contractor: 6.1 The Contractor is to provide the Company a Site Plan, a Dimension Control Plan, an Elevation Plan, a Grading Plan and loading information. 6.2 The Contractor is to coordinate with the Company inspector for inspection of work prior to backfilling. 6.3 The Contractor is to provide personnel and vehicular access to the facility at all times. 6.4 The Contractor is to be held responsible for the full direction and supervision of all work being performed by his employees, agents or contractors. The Contractor shall also be responsible for the area at all times prior to acceptance, particularly in the prevention of damage to the electrical distribution system by the activities of other trades and utilities. 6.5 All testing of concrete and backfill which is deemed necessary by the Company is to be performed by an independent testing laboratory at the Contractor's expense. 6.6 The Contractor is to replace at his expense any damaged equipment or work not in compliance with the requirements in these specifications, the project sketch, the DDS -4 OH Detail Sheets or as specified by the Company. 6.7 The Contractor is to furnish equipment and labor to lay out ditch, set grade, dig ditches, place conduit in ditch and place electrical connection boxes. The line shall run in as straight alignment as practicable. All conduit and bends (Schedule 40 PVC, Schedule 80 PVC and Rigid Steel) shall be electrical grade. All PVC conduit and bends shall be gray in color. PR.:.wR 6c..os , erewSrrrc 3G ".Pn.o. St CSr^. Qr....,j .Scrs fro PvL 6.8 The Contractor may be required to furnish aare conduit in the same ditch with service lateral conduit(s) and cap both ends at bends. 6.9 The Contractor is to complete rough site grading, establish final grade and clear all obstructions. Any change in final grade which requires the lowering or raising of electrical conductors or associated equipment is at the expense of the Contractor. Copyright 2002 Oncor Electric Delivery Company. All rights reserved. 3 6. CONTRACTOR RESPONSIBILITY (continued) 6.10 Minimum vertical crossing clearance of electrical conduits from other utilities' conduits is twelve (12) inches. 6.11 A lateral separation of five (5) feet from electrical conduits to other utilities' conduits is required on private property. 6.12 Backfilling of conduit trenches under paved areas and around conduit bends at riser poles is to be compacted to 95% of the density of surrounding undisturbed soil as per ASTM D 698. Stabilization must be uniform to bottom of ditch. 6.13 The Contractor is to pull a mandrel through each conduit to check and clear blockage and leave a minimum 1/8 inch nylon pulling cord in each conduit (cord and mandrel furnished by Contractor). Conduit shall be plugged at both ends. 6.14 Approved self - contained meter sockets are to be provided and installed by the Contractor. Transocket meter bases and service enclosures (when required) are to be provided by the Company and installed by the Contractor. Reference the Electric Service Guidelines for approved self- contained meter sockets. 6.15 For single occupant, C. T. metered general service accounts fed from overhead transformation, the Contractor is to provide and install the underground raceway to the riser pole. The Company shall provide, install, connect and maintain the service lateral conductor. 6.16 If socket type metering fed from overhead transformation is utilized, the Contractor is to mount the meter socket on the building(s) with the location approved by the Company and provide and install the underground raceway to the riser pole. The Company shall provide, install, connect and maintain the service lateral conductor. 6.17 For multiple occupancy general service accounts fed from overhead transformation, the Contractor is to provide and install (1) the service lateral raceway from the service enclosure to the riser pole and (2) the conductors and associated raceways from the service enclosure to the line side of the meters. The Company shall provide, install, connect and maintain the service lateral conductors to the line side of the service enclosure. Copyright 2002 Oncor Electric Delivery Company. All rights reserved. 4 6. CONTRACTOR RESPONSIBILITY (continued) 6.18 For General Service Accounts fed from subsurface secondary/ service boxes, the Contractor is to (1) provide and install the underground raceway and conductor to the load side of the secondary/ subsurface box, and (2) provide and install the underground raceway between the secondary/ service box and the riser pole. The service lateral conductors between the overhead transformer and the source side of the secondary/ service box shall be supplied, installed, connected and maintained by the Company. The Contractor shall provide the connectors and the Company shall install these connectors on the Contractor's conductors and connect to the load side of the secondary/ service box. Reference the Electric Service Guidelines for approved compression type connectors. 6.19 The Contractor is to secure inspection and approval of premise's facilities by the Authority Having Jurisdiction prior to the connection of electrical facilities. 7. ACCEPTANCE 7.1 The Company inspector shall meet with the Contractor and review the project prior to acceptance. Electrical facilities will be installed as approved by the Company inspector only after acceptance of the project. Copyright 2002 Oncor Elecuic Delivery Company. All rights reserved, 5 tl 0 3 DIRECTION OF OVERHEAD CONDUCTORISI 10 OI WIRE 10' OF CONDUIT IN PLACE WHEN REQUIRED v Ir - n i -Ir- I nrai Air RISER POLE BY- Wi A,, COMPANY u ,.u i �' TOP VIEW PLAN VIEW ALTERNATE POSITION ///- -- EXTEND BEND WITH 10' OF RIGID STEEL Mt SINNOV PAC CONDUIT FOR ALIGNMENT OF BEND INSTALL NIPPLE WHEN REQUIRED TO EXTEND BEND MIN. 6" ABOVE FINISHED GRADE FINISHED GRADE NOTES 1. CONTACT COMPANY REPRESENTATIVE FOR: ROUTING OF CONDUIT UNE AND SIZE OF CONDUIT. FOR INSTALLATIONS REQUIRING MORE THAN ONE RISER ON POLE. 2. UMIT RACEWAY TO THREE BO DEGREE BENDS. IF MORE THAN THREE 90 DEGREE BENDS ARE REQUIRED, CONTACT COMPANY REPRESENTATIVE. 3. UMIT DISTANCE BETWEEN 90 DEGREE BENDS TO FIVE FEET MINIMUM WHEREVER POSSIBLE. 4. ALL SECONDARY HORIZONTAL AND VERTICAL BENDS TO BE A MINIMUM 24 INCH RADIUS. TERMINATION OF SECONDARY CONDUIT AT RISER POLE DDS-4 OH DETAIL SHEET 1 OF 7 BOX SIZE (IN.( OVERALL (IN.) MA1L NO. CIRCUITS A B 13 X 24 16 20 6 17X30 20 33 8 J L GROUP BENDS IN BOX 0\ 0 0 0 0 8 PLAN WITH COVER REMOVED SECTION "X—x" J A NOTES: L CONSULT COMPANY IEfESENTATME FOL AMLOVEO PRECAST SECONDARY SUWJEFACE BOXES LIE OF CONDUIT TO BE INSTALLED WANING PATH OF CONDUIT INTO SECONDARY LJISUIFACE 102 2. FOR INSULATION OF CONDUIT TO IN- SERVICE SECONDARY SUISUIFACE IO2ES, CONSULT COMPANY IEFI601TAINE FOR DETARS. X. ALL 14c0810280 HORIZONTAL AND VERTICAL LENDS 70 IF 21' MIN. RADIUS. LIFTING SLOT COVER — TOP VIEW 3)R SUBSURFACE SECONDARY /SERVICE BOX DDS-4 OH DETAIL SHEET 2 OF 7 a 2 1 24" MIN 24 MIN DOME TOP FOR 4" MIN 4" MIN SETTLING FINISHED FINISHED / GRADE FINISHED - ":SIR \I:\\ \\ \1 \ \\ \ \\ 1 SECONDARY, SERVICE, OR STREET LIGHT CONDUIT 6' MIN 1 SECONDARY CONDUIT AND 1 STREET UGHT CONDUIT HORIZONTALLY ARRANGED DOME TOP FOR SETTLING FINISHED GRADE TAMPED BACKFILL Y MIN. TAMPED BACKFILL LEGEND: C.) -- Cu NOTE: 1. SEE DETAIL SHEETS 4 AND 6 FOR NOTES AND INSTRUCTIONS. 24" MIN i L 1 SECONDARY CONDUIT AND 1 STREET UGHT CONDUIT VERTICALLY ARRANGED PRIMARY CABLE SECONDARY/SERVICE CABLE STREET LIGHT CABLE TRENCH REQUIREMENTS DDS-4 OH DETAIL SHEET 3 OF 7 J 1. TRENCH AIGNMENT SMALL BE AS STRAIGHT AS CONDITIONS PERMIT. ANY DEVIATIONS FROM PLANNED ALIGNMENT SHALL HAVE PRIOR APPROVAL BY THE PROJECT ENGINEER/INSPECTOR. ALL TRENCH CUTS SHALL BE IN ACCORDANCE WITH EXISTING SAFETY REGULATIONS IN EFFECT. 2. TRENCH BOTTOM SHOULD BE UNDISTURBED, TAMPED, OR RELATIVELY SMOOTH EARTH. WHERE EXCAVATION IS IN ROCK, THE CONDUIT SHOULD BE LAID ON A LAYER OF CLEAN BACKFILL. a ALL BACKFILL SHOULD BE FREE OF DEBRIS OR OTHER MATERIAL THAT MAY DAMAGE THE CONDUIT SYSTEM OR CAUSE SETTLING. THE MATERIAL SHOULD FILL THE VOIDS AROUND THE CONDUIT TO PREVENT HOT SPOTS & SETTLING. 4. BACKFILL SHOULD BE ADEQUATELY COMPACTED. BACKFILL NOT UNDER PAVEMENT SHOULD BE OOMPACTED TO THE DENSITY OF THE SURROUNDING UNDISTURBED SOIL. BACKFILL UNDER PAVEMENT SHOULD BE COMPACTED TO NOT LESS THAN 95% OF THE DENSITY OF UNDISTURBED SOIL AS DETERMINED BY ASTM DESIGNATION 0-B98. 5. EACH CONDUIT RUN SHALL BE CHECKED BY PULLING A MANDREL THROUGH THE ENTIRE LENGTH. A V8 INCH NYLON PULLING CORD SHALL BE LEFT IN EACH CONDUIT CONDUIT SHALL BE PLUGGED AT BOTH ENDS. 6. CONTACT COMPANY REPRESENTATIVE FOR TRENCH DIMENSIONS FOR MORE THAN 2 CONDUITS IN SAME DITCH. INSTALLATION OF CONDUITS NOTES AND INSTRUCTIONS DDS-4 OH DETAIL SHEET 4 OF 7 THE CHEMICALS USED IN SOLVENT WELDING OF CONDUIT ARE INTENDED TO PENETRATE THE SURFACE OF BOTH PIPE AND FITTING. WHICH AFTER CURING RESULT IN A COMPLETE FUSION AT THE JOINT. THE OVER -USE, OR THE UNDER USE OF CHEMICALS RESULTS IN LEAKY JOINTS 011 WEAKENED PIPE. A CLEAN CONDUIT BY WIPING OFF ALL DUST. 01115. AND MOISTURE FROM SURFACES TO BE CEMENTEO. EITHER BY MECHANICAL OR CHEMICAL CLEANING. 1. MECHANICAL CLEANING - FINE ABRASIVE PAPER OR CLOTH 1180 GRIT OR FINER) OR CLEAN OIL -FREE STEEL WOOL. 2. CHEMICAL CLEANING - CLEANER RECOMMENDED BY MANUFACTURER OR EQUIVALENT (METHYL ETHYL KETONE - MEKI. B. WITH A NON-SYNTHETIC BRISTLE BRUSH, APPLY AN EVEN COATING OF CEMENT TO THE OUTSIDE OF THE PIPE AND INSIDE THE SOCKET. MAKE SURE THAT THE AMOUNT OF CEMENT APPUED TO THE CONDUIT IS EQUAL TO THE DEPTH OF THE SOCKET. BEFORE ASSEMBLY. IF SOME EVAPORATION OF SOLVENT FROM THE SURFACES TO BE JOINED IS NOTED. REAPPLY CEMENT. THEN ASSEMBLE. IF CEMENT BEING USED HAS AN APPRECIABLE CHANGE IN VISCOSITY OR SHOWS SIGNS OF JELLING, IT SHALL BE DISCARDED. IN NO CASE SHALL THINNER BE USED IN AN ATTEMPT TO RESTORE JELLED PVC CEMENT. THINNER MAY ONLY BE USED TO CHANGE THE VISCOSITY OF A MEDIUM BODIED CEMENT TO THAT OF A REGULAR BODIED CEMENT FOR APPLICATION ON PVC PIPE SMALLER THAN 2 V2 INCH DIAMETER. A MEDIUM BODIED CEMENT SHALL BE USED ON 2 V2 TO 6 INCH PVC PIPE. IN COLD WEATHER. USE A PRIMER TO SOFTEN THE JOINING SURFACES BEFORE APPLYING CEMENT. ALLOW LONGER CURE TIME. (SEE ITEM 81. C .10I1J PIPE WITHIN 20 SECONDS OF APPLYING CEMENT. TURN THE PIPE V4 TURN TO ENSURE EVEN DISTRIBUTION OF CEMENT ON SURFACES TO BE BONDED. MAKE SURE THAT PIPE IS INSERTED TO THE FULL DEPTH OF THE SOCKET. D. CLEAN OFF ANY BEAD OR EXCESS CEMENT THAT APPEARS AT THE OUTER SHOULDER OF THE FITTING. EXCESS CEMENT ALLOWED TO REMAIN IN CONTACT WITH THE MATERIAL IS APT TO CAUSE WEAKENING OF THE MATERIAL AND SUBSEQUENT FAILURE. E. NEWLY ASSEMBLED JOINTS SHOULD BE HANDLED CAREFULLY UNTIL THE CEMENT HAS CURED THE RECOMMENDED SET PERIOD. SET PERIODS ARE RELATED TO THE AMBIENT TEMPERATURE AS FOLLOWS: 30 MIN. MINIMUM AT 60 TO 100 1 HR MINIMUM AT 40 TO 60°F 2 HR. MINIMUM AT 20 TO 40 4 HR MINIMUM AT 0 TO 20 INSTRUCTIONS FOR JOINING PVC CONDUIT DDS-4 OH DETAIL SHEET 5 OF 7 J a E a WATER, GAS STEAM OR SEWER FINISHEDGRADE GAS MAIN COMMUNICATION ELECTRIC 60' NOTES 1& 2 b s 24' MIN 12 MIN WATER. GAS STEAM OR SEWER 4r MIN PLUS GAS PIPE AND COMMUNICATION CONDUIT OUTSIDE DIAMETERS 12' NOTE 1 NOTES: 1. VERTICAL CROSSING CLEARANCE FROM OTHER UTILITIES SHALL BE 12 INCHES. A 60 INCH LATERAL SEPARATION OF PARALLELING FOREIGN UTILITIES (EXCLUDING GAS AND COMMUNICATIONS) SHALL BE REQUIRED. AN EXCEPTION WOULD BE TO ALLOW GAS, TELEPHONE AND /OR CAT/ IN THE SAME DITCH AS COMPANY CONDUIT SYSTEM PROVIDING THE NESC REQUIREMENTS FOR CONDUIT SEPARATION ARE MET OR EXCEEDED AND THE COMMUNICATIONS CIRCUITS ARE INSTALLED IN CONDUIT. 2. IT 18 UNOER$T00D THAT ONLY 12 INCH SEPARATION IS REQUIRED ON PUBLIC RIGHTS -OF -WAY. PERSONNEL INVOLVED IN EXCAVATION ON PUBLIC RIGHTS -OF -WAY ARE FULLY AWARE OF THE HAZARDS INVOLVED. HOWEVER, EXCAVATION ON PRIVATE PROPERTY CAN BE DONE BY INDIVIDUALS WHO ARE NOT UKELY TO BE FULLY AWARE OF THE HAZARDS. THEREFORE, THE 60 INCH LATERAL SEPARATION IS REQUIRED TD HELP PREVENT INJURY TO PERSONNEL DOING EXCAVATION ON PRIVATE PROPERTY. CLEARANCE REQUIREMENTS FROM FOREIGN UTILITIES ON PRIVATE PROPERTY DDS-4 OH DETAIL SHEET 6 OF 7 a Y c 3 a 4' MIN. EF MAX r SERVICE ENCLOSURE (NOTE 0 TYPICAL METER INSTALLATION 1 �NN 111 11I 1 I1 1 1 1 I • �... �'II; FINISHED GRADE - ,,.. _ ���� - - y in -.u�.• RI' MIN. RADIUS RIGID NOTE 3 CENTER BUS WILL BE POWER LEG FINISHED GRADE TYPICAL METER INSTALLATION WITH SERVICE ENCLOSURE 4' MIN. 6' MAX- CONDUIT RISER SHALL BE RIGID STEEL OR SCH.80 PVC. STEEL OR 5CH.40 PVC RENO NOTES: 1. SERVICE ENTRANCE ENCLOSURE FOR MULTIPLE METER INSTALLATIONS PROVIDED BY COMPANY AND INSTALLED BY CONTRACTOR. FOR SERVICE ENTRANCES THROUGH 2500 AMPS. 2. METER SOCKETS INSTALLED BY CONTRACTOR. 3. CONDUCTORS, RACEWAY AND GUTTER PROVIDED AND INSTALLED BY CONTRACTOR. 4. SERVICE ENTRANCE CONDUCTORS TO BE CONTINUOUS FROM METER SOCKET INTO ENCLOSURE. COUDUIT SHALL BE RIGID STEEL OR SCH. BO PVC. 24' MW. RADIUS RIGID STEEL OR 5CH.40 PVC REND TYPICAL METER INSTALLATIONS DDS-4 OH DETAIL SHEET 7 OF 7 3 feet typical 1" minimum sch 40 PVC ( (Back of Curb Street Light Foundation drawing 213 -330 Street Light Installation A.W. Grimes Blvd. 0 o t . • • • • 1 12 "x12 "Pull Box drawing 213 -120 1" sch 40 PVC minimum 45 degree bend • 2 feet typical assignment behind curb ITEM OTT DESCRIPTION TSWREF CU MU 1 6 13 RE840,18' DIAMETER HOOP, 3' OVERLAP 314470 4 45 RE8AR, STRAIGHT, 60• LONG 317821 3 4 ANCHOR BOLT, CALV. r SUPPLIED V4'25 & 30' POLES AND 1 W' SUPPLED W40 POLES -- - . • As mac CONCRETE FOUNDATION TUBE, 24' DIAMETER 313641 SLF26 5 As Mot CONDUIT. PVC OR PEC INOT IN FOUNDATION AUNI _ 6 .6 LB WIRE, 06 COPPER, SOLID 303244 7 1 GROUND, POLE BUTT WIRE COIL 6 A6 IIFff CONCRETE 6 213 - 330 12 -01 NNI611ED GRADE 0 0 TRENCH 0 BOTTOM.= 0 0 NOTE 6 STREET LIGHT FOUNDATION 25',30' & 40' SQUARE STEEL POLE 40' M.H. ROUND STEEL POLE 24 SECTION " A - A " _ _ A 2" PROJECTION 3" PROJECTION I AS REO'D SEE NOTE 8 A P P R O V E D B Y 3" 60" NOTES: 4. CONCRETE PORM OF 5ONOTUBE TO EXTEND TO BOTTOM OF TRENCH OR AS NEEDED. ® +/_V 1. CONCRETE TO BE MINIMUM 3000 PSIAT 28 DAYS. 15 SACK) MAXIMUM AGGREGATE 3'4" TOP OF FOUNDATION TO BE TROWELED TO A FLAT AND LEVEL SURFACE AVOID EXCESSIVE TROWEUNG. CONCRETE TO SET A MINIMUM OF 72 HOURS BEFORE POLE 1NSTALLATION. 5. PROVIDE MINIMUM 24' GROUND WARE PIGTAIL OUT OF CONCRETE FOR CONNECTION TO POLE ONF1nAa 213 - 330 12 - 01 2 REBAR HOOPS ARE TIED BEGINNING 3" BELOW TOP OF CONCRETE FORM AND ARE REPEATED AT APPROXIMATE 6 „ 1' INTERVALS TO BOTTOM OF MAX FOUNDATION. 3. r ANCHOR BOLTS TO BE SUPPLED WITH 25 & 30' POLE 1 W ANCHOR BOLTS TO BE SUPPLIED WITH 40' POLE. USE TEMPLATE FURNISHED BY POLE MANUFACTURER FOR ALIGNING ANCHOR BOLTS. PROJECTION OF 3 ON 25 & 30' SQUARE AND 3 N2' ON 40' SQUARE AND ROUND POLES. 6. A MINIMUM OF 12'0F BARE 46 5D CU WIRE TO BE PLACED IN BOTTOM OF HOLE AND COVERED WITH 2'OF DIRT 7. 10 SOIL HAS BEEN DSTURBED. EXTEND FOUNDATION By DEPTH OF D15TURBED SOIL 8. FOR POLE FOUNDATIONS LARGER THAN 40' NOMINAL MOUNTING HEIGHT, CONTACT DISTRIBUTION STANDARDS. ITEM I my ; DESCRIPTION TSW REF CU MU 1 BOX. SECONDARY 12' X 12" X 12" 300306 SLSCB 0 z 5 213 — 120 8 L 8 10-95 SECONDARY CONNECTION BOX DRAIN HOLE FOR INSERT 14 3/4" PLAN WITH COVER REMOVED INSERT FOR STD. 3 - 16NC X 1 V 2" PENTAGON HEAD LOCKING BOLT SECTION "A - A" LIGHTING AND TRAFFIC CONTROL 213 — 120 !41�nf'I 111�1�! l u� ° -u �IJ�1IIIlllillIII II 11� yll,lll. Ilt.l�i 14 3/ 4" 123'4" APPROVED BY Tu F Fri'k TUELECT RIC NON -SKID SURFACE COVER - TOP VIEW NOTES: 1. FOR USE WHEN CONDUCTOR SIZE AND NUMBER OF TERMINATIONS WARRANT. USES INCLUDE STREET LIGHTING. AREA LIGHTING. TRAFFIC CONTROL, IRRIGATION SYSTEMS, ETC. 2. 0 -10 (LIGHT VEHICULAR TRAFFIC LOADING). 3. REPLACEMENT COVER TSN IS 326507. 10 - 95 LIFTING SLOT DATE: September 20, 2002 SUBJECT: City Council Meeting — September 26, 2002 ITEM: 11.D.6. Consider a resolution authorizing the Mayor to execute an Agreement with Oncor Energy Delivery Company for the A.W. Grimes Boulevard, Phase 1, Street Lighting project Resource: Jim Nuse, Chief of Operations/Assistant City Manager Tom Word, Director of Transportation Services History: The City of Round Rock has requested that Oncor Electric Delivery Company provide street lighting facilities sufficient to provide underground electric service to street lights along both sides of A.W. Grimes Boulevard between State Highway 45 and Gattis School Road. Oncor has agreed to provide the services at a cost of $84,745.00. Funding: Cost: $84,745.00 Source of funds: Round Rock Transportation System Development Corporation Outside Resources: Oncor Energy Delivery Company Impact:Benefrt: Street lighting on A.W. Grimes will be beneficial for traffic during nighttime travel. Public Comment: N/A Sponsor: N/A August 28, 2002 Mr. Tom Word Transportation Services Director City of Round Rock 2008 Enterprise Drive Round Rock, Texas 78664 Dear Mr. Word: executed c to your signature N ICE /7)4)LLJELL, me 2- oa- 09- 1 -11Dlo NC Re: Electric Facilities Extension for A.W. Grimes Blvd. Phase 1 Street Lighting. mA yo2 Title Date taLl Paul B. Elkins Engineering Analyst, Sr. Project Management & Design Services Oncor Energy Delivery Company South Region 3110 North IH 35 Round Rock, Texas 78681 Tel 512 310 -3881 Fax: 512 310 -3819 Cell: 512 - 750 -6774 paul.elkins The City of Round Rock ( "Customer") has requested that Oncor Electric Delivery Company ( "Company") provide street lighting facilities sufficient to provide underground electric service to 42 -250 watt HPS street lights on 40 foot anchor base poles along both sides of A.W. Grimes Blvd between St. Hwy. 45 and Gattis School Road. The project is scheduled to begin the week of September 9 and be complete by October 15 provided that all material necessary for project arrive on time and no problems occur with the Customer installed facilities. Pursuant to Company's Tariff for Retail Delivery Service, Customer is responsible for $ 84,745 as payment for the Customer's portion of the cost of installation of Company's additional electric delivery facilities, such payment to be and remain the property of the Company. Customer's payment in full is due upon receipt of invoice to be sent at completion of project. A detail of this cost is attached. Company at all times shall have title to and complete ownership and control over said facilities. Customer is responsible for providing, underground conduit raceway per Companies specifications. Company to provide and install at cost of Customer the concrete light pole foundations and conduit raceway connection to foundations. This agreement supersedes all previous agreements or representation, either written or oral, between Company and Customer made with respect to the matters herein contained, and when duly executed constitutes the agreement between the parties hereto and is not binding upon Company unless and until signed by one of its duly authorized representatives. A description of charges is attached to this document. This agreement and the costs set forth therein, if not accepted within 30 days of the date of this letter, will be of no force and effect. Acceptance shall consist of delivery of an executed copy of this agreement to Company along with Customer's payment as set forth above. If the City of Round Rock agrees to - conditions set forth in this agreement, please execute both original copies and return one 84 745. The additional copy is for your files. Item Quantity Unit Price Line Totals 40 foot round anchor base street light standards 42 $980.00 $41,160 Precast foundations 14 " bolt circle 42 $252.00 $10,584 Trench and 1" conduit 210 $5.58 $1,172 Breakaway Bases 42 $411.57 $17,286 Sub Total $70,202 Gross up $14,543 Total $84,745 Summary of Cost A.W. Grimes Streetlighing Phase One July 24, 2002 Michael Thane City of Round Rock 2008 Enterprise Drive Round Rock, Texas 78664 Re: Oncor Design & Specifications for A.W. Grimes Street Lighting Phase 1 Dear Michael: Enclosed are copies of our layout and specifications for the above referenced project. Due to most of the conduit being installed with no Oncor inspection 1 will need a letter from signed by both City of Round Rock and Austin Traffic Signal guaranteeing the depth of the conduit to meet attached specifications. Also, the conduit installed by Austin Traffic Signal will be required to install 1 /8" pull string in all conduits as specified this should help validate the integrity of the conduit. Your contractor will be responsible for the following requirements: • Materials and workmanship must be inspected by Oncor prior to any cover -up • Contact Mr. Paul Elkins at (512) 310 -3881 to schedule your inspection. • A twenty-four (24) hour advance notice is needed for scheduling the inspection. • Your contractor must have the attached specifications in possession at the time of inspections. Paul B. Elkins Engineering Analyst. Sr. Project Management 8 Design Services Oncor Energy Delivery Company South Region 3110 North 111 35 Round Rock, Texas 78681 Tel 512 310 -3881 Fax: 512 310-3819 Cell: 512-750-6774 paul.elkins@n,oncorgroun.com Failure by your contractor to comply with these requirements will delay the inspection process. Once accepted, all facilities will become the property of Oncor. You will be held responsible for repair or replacement of these materials for a period of two years. If you have any questions, please feel free to call me at (512) 310 -3881 Enclosures w 0 — aw. EIECINO =NM mrMlf. r..MMi MEMO. Cc:19DIR SPECIFICATIONS FOR ELECTRICAL UNDERGROUND DISTRIBUTION SYSTEMS FROM OVERHEAD TRANSFORMATION, GENERAL SERVICE ACCOUNTS DDS-4 OH REV. 3 DATE 02 -02 SECTION 1- SCOPE Page 1 SECTION 2- REFERENCES Page I SECTION 3- DEFINITIONS Page 1 SECTION 4- GENERAL Page 1 SECTION 5- COMPANY RESPONSIBILITY Page 2 SECTION 6- CONTRACTOR RESPONSIBILITY Page 3 SECTION 7- ACCEPTANCE Page 5 ONCOR ELECTRIC DELIVERY COMPANY SPECIFICATIONS FOR ELECTRICAL UNDERGROUND DISTRIBUTION SYSTEMS FROM OVERHEAD TRANSFORMATION, GENERAL SERVICE ACCOUNTS SPECIFICATION NUMBER DDS-4 OH ATTACHMENTS: DDS -4 OH Detail Sheets 1- 7 Copyright 2002 Oncor Electric Delivery Company. All rights reserved. TABLE OF CONTENTS ONCOR ELECTRIC DELIVERY COMPANY SPECIFICATIONS FOR ELECTRICAL UNDERGROUND DISTRIBUTION SYSTEMS FROM OVERHEAD TRANSFORMATION, GENERAL SERVICE ACCOUNTS SPECIFICATION NUMBER DDS-4 OH 1. SCOPE This document represents the minimum requirements and specifications for the installation of the electrical underground distribution systems fed from overhead transformation serving General Service Accounts to be transferred to Oncor Electric Delivery Company ownership. 2. REFERENCES 4. GENERAL This specification shall be used in conjunction with the latest revision of the following publications. 2.1 The Electric Service Guidelines, Oncor Electric Delivery Company. Ld 3. DEFINITIONS 3.1 Company: Oncor Electric Delivery Company and its designated representatives. 3.2 Contractor: Individual or firm installing electric underground service for General Service Accounts. 3.3 Authority Having Jurisdiction: Generally an incorporated City or Town, but may be an agency of the County, State or Federal Government. 3.4 Point of Delivery: The point where Company's conductors are connected to premise's conductors, typically at the meter socket or service enclosure. 4.1 The latest edition of all applicable building and safety codes shall be followed in the installation of the electrical underground distribution system. Included, but not limited to, are the: 4.1.1 Local City Building and Fire Codes or any other applicable codes for a particular project location Copyright 2002 Oncor Electric Delivery Company. All rights reserved. 1 4. GENERAL (continued) 4.1.2 National Electrical Safety Code (NESC) 4.1.3 U.S. Occupational Safety and Health Act of 1970 (OSHA) 4.1.4 The American Concrete Institute (ACI) 4.1.5 The American Society for Testing and Materials (ASTM) 4.2 Upon receipt of all necessary information from the Contractor, a project sketch showing the route of the conduit line and other pertinent information will be furnished by the Company. 4.3 Prior to construction a meeting shall be held to discuss and coordinate construction and inspection. 4.4 The Company will require a signed easement at no cost or a filed plat incorporating Company easement requirements prior to the Company installing any electrical facilities. 4.5 Joint use ditch will be determined by the Company on an individual basis. 4.6 No electrical facilities shall be connected by the Company until after the final inspection is made and approval by the Authority Having Jurisdiction, as required by code, has been received. 5. COMPANY RESPONSIBILITY The following shall be performed by, and the responsibility of, the Company: 5.1 The Company inspector is to inspect all conduit installations prior to the placing of backfill. 5.2 The Company inspector is responsible for all field changes and coordinates changes with the local Engineering office. 5.3 After approval of the installed conduit system by the Company inspector, and after the Contractor has signed all appropriate contracts, agreements, easements and has paid any required CIAC (contribution in aid of construction), the Company shall install service lateral cables up to the line side of the point of delivery. C.opyriglu 2002 Oncor Electric Delivery Company. All rights reserved. 2 5. COMPANY RESPONSIBILITY (continued) 5.4 Upon notification of final electrical inspection from the Authority Having Jurisdiction, the Company is to make final electrical connections at the point of delivery. 6. CONTRACTOR RESPONSIBILITY The following shall be performed by, and the responsibility of, the Contractor: 6.1 The Contractor is to provide the Company a Site Plan, a Dimension Control Plan, an Elevation Plan, a Grading Plan and loading information. 6.2 The Contractor is to coordinate with the Company inspector for inspection of work prior to backfilling. 6.3 The Contractor is to provide personnel and vehicular access to the facility at all times. 6.4 The Contractor is to be held responsible for the full direction and supervision of all work being performed by his employees, agents or contractors. The Contractor shall also be responsible for the area at all times prior to acceptance, particularly in the prevention of damage to the electrical distribution system by the activities of other trades and utilities. 6.5 All testing of concrete and backfill which is deemed necessary by the Company is to be performed by an independent testing laboratory at the Contractor's expense. 6.6 The Contractor is to replace at his expense any damaged equipment or work not in compliance with the requirements in these specifications, the project sketch, the DDS -4 OH Detail Sheets or as specified by the Company. 6.7 The Contractor is to furnish equipment and labor to lay out ditch, set grade, dig ditches, place conduit in ditch and place electrical connection boxes. The line shall run in as straight alignment as practicable. All conduit and bends (Schedule 40 PVC, Schedule 80 PVC and Rigid Steel) shall be electrical grade. All PVC conduit and bends shall be gray in color. i &. os Rrwo -r,src 36 ".P•ao. St CO & .-,aj ..SG■,r ‹,s /1/4- 6.8 The Contractor may be required to furnish a conduit in the same ditch with service lateral conduit(s) and cap both ends at bends. 6.9 The Contractor is to complete rough site grading, establish final grade and clear all obstructions. Any change in final grade which requires the lowering or raising of electrical conductors or associated equipment is at the expense of the Contractor. Copyright 2002 Oncor Electric Delivery Company. All righis reserved. 3 6. CONTRACTOR RESPONSIBILITY (continued) 6.10 Minimum vertical crossing clearance of electrical conduits from other utilities' conduits is twelve (12) inches. 6.11 A lateral separation of five (5) feet from electrical conduits to other utilities' conduits is required on private property. 6.12 Backfilling of conduit trenches under paved areas and around conduit bends at riser poles is to be compacted to 95% of the density of surrounding undisturbed soil as per ASTM D 698. Stabilization must be uniform to bottom of ditch. 6.13 The Contractor is to pull a mandrel through each conduit to check and clear blockage and leave a minimum 1/8 inch nylon pulling cord in each conduit (cord and mandrel furnished by Contractor). Conduit shall be plugged at both ends. 6.14 Approved self contained meter sockets are to be provided and installed by the Contractor. Transocket meter bases and service enclosures (when required) are to be provided by the Company and installed by the Contractor. Reference the Electric Service Guidelines for approved self- contained meter sockets. 6.15 For single occupant, C. T. metered general service accounts fed from overhead transformation, the Contractor is to provide and install the underground raceway to the riser pole. The Company shall provide, install, connect and maintain the service lateral conductor. 6.16 If socket type metering fed from overhead transformation is utilized, the Contractor is to mount the meter socket on the building(s) with the location approved by the Company and provide and install the underground raceway to the riser pole. The Company shall provide, install, connect and maintain the service lateral conductor. 6.17 For multiple occupancy general service accounts fed from overhead transformation, the Contractor is to provide and install (1) the service lateral raceway from the service enclosure to the riser pole and (2) the conductors and associated raceways from the service enclosure to the line side of the meters. The Company shall provide, install, connect and maintain the service lateral conductors to the line side of the service enclosure. Copyright 2002 Oncor Elecuic Delivery Company. A11 rights reserved. 4 6. CONTRACTOR RESPONSIBILITY (continued) 6.18 For General Service Accounts fed from subsurface secondary/ service boxes, the Contractor is to (1) provide and install the underground raceway and conductor to the load side of the secondary/ subsurface box, and (2) provide and install the underground raceway between the secondary/ service box and the riser pole. The service lateral conductors between the overhead transformer and the source side of the secondary/ service box shall be supplied, installed, connected and maintained by the Company. The Contractor shall provide the connectors and the Company shall install these connectors on the Contractor's conductors and connect to the load side of the secondary/ service box. Reference the Electric Service Guidelines for approved compression type connectors. 6.19 The Contractor is to secure inspection and approval of premise's facilities by the Authority Having Jurisdiction prior to the connection of electrical facilities. 7. ACCEPTANCE 7.1 The Company inspector shall meet with the Contractor and review the project prior to acceptance. Electrical facilities will be installed as approved by the Company inspector only after acceptance of the project. Copyright 2002 Decor Electric Delivery Company. All rights reserved. 5 DIRECTION OF OVERHEAD CONDUCTORISI 1 1 1 WIRE 10' OF CONDUIT IN PLACE WHEN REQUIRED � EXTEND BEND WITH ICY OF RIGID STEEL BR Sikiaiftliore CONDUIT FOR ALIGNMENT OF BEND , r I -I IL IF'1 -II II - II RISER POLE BY .! COMPANY • TOP VIEW PLAN VIEW I n i ili U I �• ALTERNATE PoSInoN INSTALL NIPPLE WHEN REQUIRED TO EXTEND BEND MIN. 6" ABOVE FINISHED GRADE FINISHED GRADE t4r 24 " MIN RADIUS RIGID STEEL NW 24• MIN. R BEND _uI NOTES 1. CONTACT COMPANY REPRESENTATIVE FOR: ROUTING OF CONDUIT UNE AND SIZE OF CONDUIT. FOR INSTALLATIONS REQUIRING MORE THAN ONE RISER ON POLE. 2. UMIT RACEWAY TO THREE 90 DEGREE BENDS. IF MORE THAN THREE 90 DEGREE BENDS ARE REQUIRED. CONTACT COMPANY REPRESENTATIVE. 3. LIMIT DISTANCE BETWEEN 90 DEGREE BENDS TO FIVE FEET MINIMUM WHEREVER POSSIBLE. 4. ALL SECONDARY HORIZONTAL AND VERTICAL BENDS TO BE A MINIMUM 24 INCH RADIUS. TERMINATION OF SECONDARY CONDUIT AT RISER POLE DDS-4 OH DETAIL SHEET 1 OF 7 BOX D IM. I ) MAX NO. SIZE (IN.) A B GRCURS 1 3X24 16 25 6 1 7X30 20 33 B GROUP KENOS IN BOX 0\ 0 0 00 B PLAN 1MTH COVER REMOVED 24' MIN. RADIUS 501.40 PVC BEND SECTION "X-X" NJ , A 1. CONSULT COMPANY REPMESENTATIVE FOL APPROVED PRECAST SECONDARY SUBSURFACE EOM SIZE OF CONDUIT TO BE INSTALLED ROUTING PATH OF CONDUIT INTO SECONDARY SUBSURFACE 80.7 2.101 INSTALLATION OF CONDUIT TO IN- SERVICE SECONDARY SUBSURFACE BORES, CONSULT COMPANY BEMES8RAINE FOR DETAILS. 3. ALL SICONIMAY HORRONTAL AND VERTICAL BENDS 70 BE 24' MIN. RADIUS. LIFTING SLOT NON -SKID SURFACE COVER - TOP VIEW SUBSURFACE SECONDARY /SERVICE BOX DDS-4 OH DETAIL SHEET 2 OF 7 1 A 24" MIN 1 SECONDARY, SERVICE, OR STREET UGHT CONDUIT 24" MIN 4" MIN FINISH A 6" MIN DOME TOP FOR SETTLING 1 SECONDARY CONDUIT AND 1 STREET LIGHT CONDUIT HORIZONTALLY ARRANGED r MIN. FINISHED GRADE TAMPED BACKFILL DOME TOP FOR SETTLING FINISHED GRADE TAMPED BACKFILL LEGEND: NOTE: 1. SEE DETAIL SHEETS 4 AND 5 FOR NOTES AND INSTRUCTIONS. 4" MIN 24" MJN z 2 e•a 1 SECONDARY CONDUIT AND 1 STREET LIGHT CONDUIT VERTICALLY ARRANGED C.) PRIMARY CABLE CY SECONDARY/SERVICE CABLE STREET UGHT CABLE Cc:9)R TRENCH REQUIREMENTS DDS-4 OH DETAIL SHEET 3 OF 7 2 m 1 1. TRENCH ALIGNMENT SHALL BE AS STRAIGHT AS CONDITIONS PERMIT. ANY DEVIATIONS FROM PLANNED ALIGNMENT SHALL HAVE PRIOR APPROVAL BY THE PROJECT ENGINEEWINSPECTOR. ALL TRENCH CUTS SHALL BE IN ACCORDANCE WITH EXISTING SAFETY REGULATIONS IN EFFECT. 2. TRENCH BOTTOM SHOULD BE UNDISTURBED, TAMPED, OR RELATIVELY SMOOTH EARTH. WHERE EXCAVATION IS IN ROCK, THE CONDUIT SHOULD BE LAID ON A LAYER OF CLEAN BACKFILL. 3. ALL BACKFILL SHOULD BE FREE OF DEBRIS OR OTHER MATERIAL THAT MAY DAMAGE THE CONDUIT SYSTEM OR CAUSE SETTLING. THE MATERIAL SHOULD FILL THE VOIDS AROUND THE CONDUIT TO PREVENT HOT SPOTS & SETTLING. 4. BACKFILL SHOULD BE ADEQUATELY COMPACTED. BACKFILL NOT UNDER PAVEMENT SHOULD BE COMPACTED TO THE DENSITY OF THE SURROUNDING UNDISTURBED SOIL. BACKFILL UNDER PAVEMENT SHOULD BE COMPACTED TO NOT LESS THAN 95% OF THE DENSITY OF UNDISTURBED SOIL AS DETERMINED BY ASTM DESIGNATION D-696. 6 EACH CONDUIT RUN SHALL BE CHECKED BY PULLING A MANDREL THROUGH THE ENTIRE LENGTH. A V8 INCH NYLON PULLING CORD SHALL BE LEFT IN EACH CONDUIT. CONDUIT SHALL BE PLUGGED AT BOTH ENOS. 6. CONTACT COMPANY REPRESENTATIVE FOR TRENCH DIMENSIONS FOR MORE THAN 2 CONDUITS IN SAME DITCH. INSTALLATION OF CONDUITS NOTES AND INSTRUCTIONS DDS-4 OH DETAIL SHEET 4 OF 7 1 THE CHEMICALS USED IN SOLVENT WELDING OF CONDUIT ARE INTENDED TO PENETRATE THE SURFACE OF BOTH PIPE AND FITTING. WHICH AFTER CURING RESULT IN A COMPLETE FUSION AT THE JOINT. THE OVER -USE, OR THE UNDER -USE OF CHEMICALS RESULTS IN LEAKY JOINTS OR WEAKENED PIPE. A. CLEAN CONDUIT BY WIPING OFF ALL DUST. DIRT, AND MOISTURE FROM SURFACES TO BE CEMENTED, EITHER BY MECHANICAL OR CHEMICAL CLEANING, 1. MECHANICAL CLEANING - FINE ABRASIVE PAPER OR CLOTH (180 GRIT OR FINER( OR CLEAN OIL -FREE STEEL WOOL. 2. CHEMICAL CLEANING - CLEANER RECOMMENDED BY MANUFACTURER OR EQUIVALENT (METHYL ETHYL KETONE - MEK) . B. WITH A NON - SYNTHETIC BRISTLE BRUSH, APPLY AN EVEN COATING OF CEMENT TO THE OUTSIDE OF THE PIPE AND INSIDE THE SOCKET. MAKE SURE THAT THE AMOUNT OF CEMENT APPLIED TO THE CONDUIT IS EQUAL TO THE DEPTH OF THE SOCKET. BEFORE ASSEMBLY. IF SOME EVAPORATION OF SOLVENT FROM THE SURFACES TO BE JOINED IS NOTED. REAPPLY CEMENT. THEN ASSEMBLE. IF CEMENT BEING USED HAS AN APPRECIABLE CHANGE IN VISCOSITY OR SHOWS SIGNS OF JELLING, IT SHALL BE DISCARDED. IN NO CASE SHALL THINNER BE USED IN AN ATTEMPT TO RESTORE JELLED PVC CEMENT. THINNER MAY ONLY BE USED TO CHANGE THE VISCOSITY OF A MEDIUM BODIED CEMENT TO THAT OF A REGULAR BODIED CEMENT FOR APPLICATION ON PVC PIPE SMALLER THAN 2 V2 INCH DIAMETER. A MEDIUM BODIED CEMENT SHALL BE USED ON 2 Y2 TO 6 INCH PVC PIPE. IN COLD WEATHER. USE A PRIMER TO SOFTEN THE JOINING SURFACES BEFORE APPLYING CEMENT. ALLOW LONGER CURE TIME. (SEE ITEM E) C. JOIN PIPE WITHIN 20 SECONDS OF APPLYING CEMENT, TURN THE PIPE Y4 TURN TO ENSURE EVEN DISTRIBUTION OF CEMENT ON SURFACES TO BE BONDED. MAKE SURE THAT PIPE IS INSERTED TO THE FULL DEPTH OF THE SOCKET. D. CLEAN OFF ANY BEAD OR EXCESS CEMENT THAT APPEARS AT THE OUTER SHOULDER OF THE FITTING. EXCESS CEMENT ALLOWED TO REMAIN IN CONTACT WITH THE MATERIAL IS APT TO CAUSE WEAKENING OF THE MATERIAL AND SUBSEQUENT FAILURE. E. NEWLY ASSEMBLED JOINTS SHOULD BE HANDLED CAREFULLY UNTIL THE CEMENT HAS CURED THE RECOMMENDED SET PERIOD. SET PERIODS ARE RELATED TO THE AMBIENT TEMPERATURE AS FOLLOWS: 30 MIN. MINIMUM AT 80 TO 100 1 HR. MINIMUM AT 40 TO 60°F 2 HR. MINIMUM AT 20 TO 40 4 HR. MINIMUM AT 0 TO 20 INSTRUCTIONS FOR JOINING PVC CONDUIT DDS-4 OH DETAIL SHEET 5 OF 7 NOTES: WATER. GAS STEAM OR SEWER NY MIN PLUS GAS PIPE AND COMMUNICATION CONDUIT OUTSIDE DIAMETERS 1. VERTICAL CROSSING CLEARANCE FROM OTHER UTILITIES SHALL BE 12 INCHES. A 60 INCH LATERAL SEPARATION OF PARALLELING FOREIGN UTIUTIES )EXCLUDING GAS AND COMMUNICATIONS) SHALL BE REQUIRED. AN EXCEPTION WOULD BE TO ALLOW GAS, TELEPHONE AND /OR CATV IN THE SAME DITCH AS COMPANY CONDUIT SYSTEM PROVIDING THE NESC REQUIREMENTS FOR CONDUIT SEPARATION ARE MET OR EXCEEDED AND THE COMMUNICATIONS CIRCUITS ARE INSTALLED IN CONDUIT. 1 IT IS UNDERSTOOD THAT ONLY 12 INCH SEPARATION 15 REQUIRED ON PUBUC RIGHTS -OF -WAY. PERSONNEL INVOLVED IN EXCAVATION ON PUBLIC RIGHTS -OF -WAY ARE FULLY AWARE OF THE HAZARDS INVOLVED. HOWEVER, EXCAVATION ON PRIVATE PROPERTY CAN BE DONE BY INDIVIDUALS WHO ARE NOT LIKELY TO BE FULLY AWARE OF THE HAZARDS. THEREFORE. THE SD INCH LATERAL SEPARATION 15 REQUIRED TO HELP PREVENT INJURY TO PERSONNEL DOING EXCAVATION ON PRIVATE PROPERTY. CLEARANCE REQUIREMENTS FROM FOREIGN UTIUTIES ON PRIVATE PROPERTY DDS-4 OH DETAIL SHEET 6 OF 7 011 ICI- d "l TYPICAL METER INSTALLATION SERVICE ENCLOSURE (NOTE 0 4' MIN. 8' MAX. FINISHED GRADE *Meg CENTER BUS WILL BE POWER LEG r FINISHED GRADE 4' MIN. w MAX. i wl - - lu - I =u - °- �mwu4 Il!�i 14 ��!� I d a TYPICAL METER INSTALLATION WITH SERVICE ENCLOSURE t CONDUIT RISER SHALL BE RIGID STEEL OR SCH.80 PVC. 24' MIN. RADIUS RIGID STEEL OR SCH.40 PVC BEND NOTES: 1. SEIWICE ENTRANCE ENCLOSURE FOR MULTIPLE METER INSTALLATIONS PROVIDED BY COMPANY AND INSTALLED BY CONTRACTOR. FOR SERVICE ENTRANCES THROUGH 2500 AMPS. 2. METER SOCKETS INSTALLED BY CONTRACTOR. S. CONDUCTORS, RACEWAY AND GUTTER PROVIDED AND INSTALLED BY CONTRACTOR. 4. SERVICE ENTRANCE CONDUCTORS TO BE CONTINUOUS FROM METER SOCKET INTO ENCLOSURE. CONDUIT SHALL BE RIGID STEEL OR SMOG PVC. 24' MIN. RADIUS RIGID STEEL OR SCH.40 PVC BEND TYPICAL METER INSTALLATIONS DDS-4 OH DETAIL SHEET 7 OF 7 13 feet typical 1 1" sch 40 PVC minimum 'Back of Curb Street Light Foundation drawing 213 -330 Street Light Installation A.W. Grimes Blvd. 0 • • • • 2 eet typical assignment behind curb 1 12" x 12" Pull Box drawing 213 -120 1" sch 40 PVC minimum 1 45 degree bend 1