Loading...
R-02-10-10-13D5 - 10/10/2002RESOLUTION NO. R- 02- 10- 10 -13D5 WHEREAS, the City of Round Rock has previously entered into an agreement for engineering services ( "Agreement ") with Baker - Aicklen & Associates, Inc. for the reconstruction of Chisholm Trail from Chisholm Trail Hotel Centre to Wolle Lane, and WHEREAS, Baker - Aicklen & Associates, Inc. has submitted Supplemental Agreement No. 3 to Contract for Engineering Services for a change in the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 3 with Baker - Aicklen & Associates, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 3 to Contract for Engineering Services with Baker - Aicklen & Associates, Inc. for a change in the scope of services. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended, and the Act. RESOLVED this 10th day of October, 2002. ST:. CHRISTINE R. MARTINEZ, City Secre 0!\ ,00x \RESOLUTI \R3101o05.urD /rloc N ^f W L, Mayor City of Round Rock, Texas STATE OF TEXAS THE COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. #3 TO CONTRACT FOR ENGINEERING SERVICES This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Baker - Aicklen & Assoc., Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract ", on the 27 of April 2000 to provide Design and Survey Services related to the reconstruction of Chisholm Trail From Chisholm Trail Hotel Centre to Wolle Lane, and WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER, describes those engineering services to be provided by the Engineer as a part of the Contract, and WHEREAS, ARTICLE 3, CONTRACT PERIOD, requires the termination of the Contract on April 30, 2003 unless the Contract is extended, and WHEREAS, ARTICLE 4, COMPENSATION, establishes the maximum lump sum payable under this contract at $87,450.00 without modification of the contract, and WHEREAS, it has become necessary to amend the contract to provide for Additional Easements, and WHEREAS, the Engineer has agreed to have the additional work performed for $28,830.00. increasing the lump sum fee for the contract to $116,280.00. NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 4, COMPENSATION, shall be amended by the changing the lump sum amount payable under this contract as $116,280.00 ATTACHMENT "B ", Services to be Provided by the Engineer shall be amended as set forth in the attached ADDENDUM to EXHIBIT B. EXHIBIT " Page 1 of 2 IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. By: _ .//(.CGS (N E OF ' SPON' IBLE PARTY) /0 - 2 -0� Date CITY OF ROUND ROCK o:\0601 -2 -059 ASA 02 -5074 By: Nyle Maxwell, Mayor Date Supplemental Agr Fomvdoc /specs muter /contracts & forms — Revised 10/2/02 Page 2 of 2 Client CITY OF ROUND ROCK Protect No. 0601 -2-059 Project Chisholm Trail Contract Date 01/12/99 Subject of Additional Services Additional Easements Additional Services Project No. 0601 -2 -059-53 1. Field survey and prepare three (3) temporary construction easements for existing parking lot reconstruction outside of right -of -way. Reason For Change Design change affects offsite properties. Compensation: Hourly charge plus reimbursable expense basis, as defined In the PROFESSIONAL SERVICES AGREEMENT, and In addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are estimated to be approximately $_ X Lump sum charge basis plus reimbursable expenses, as defined In the PROFESSIONAL SERVICES AGREEMENT, and In addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are to be x1.960.00. • Estimated Date of Completion: PREPARED BY: Henry D. Rove. P.E. PROPOSED BY: BAKER APPROVED BY: Baker - Aicklen & Associates, Inc. - Engineers/Surveyors Client: Title: A. William Wael ADDENDUM TO EXHIBIT B ADDITIONAL SERVICES AUTHORIZATION N & ASSOCIATES, INC. (Sign, keep Client's copy & retum all others.) q/z,/o 2— Date Date Date 09 /2402 Proposal No. 02 - 5074 DATE: October 4, 2002 SUBJECT: City Council Meeting — October 10, 2002 ITEM: 13.D.5. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 3 to Contract for Engineering Services with Baker- Aicklen & Associates, Inc for the Chisholm Trail Road Project. Resource: Jim Nuse, Chief of Operations/Assistant City Manager Tom Word, Director of Transportation Services History: With approval of this Supplemental Agreement No. 3, Baker - Aicklen will be performing additional surveying for the bank parking lot that will need to be reconstructed because of the improvements to Chisholm Trail Road. Funding: Cost: $1,960 Source of funds: Capital Project Funds (1998 GO Bonds) Outside Resources: Baker - Aicklen & Associates, Inc. Impact:/Benefit: Ensuring that all the related driveways and parking lots along Chisholm Trail Road around FM 3406 are adequate prior to the reconstruction of Chisholm Trail, will move the construction phase along more rapidly. Public Comment: N/A Sponsor: N/A STATE OF TEXAS THE COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. #3 TO CONTRACT FOR ENGINEERING SERVICES This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Baker - Aicklen & Assoc., Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract ", on the 27 of April 2000 to provide Design and Survey Services related to the reconstruction of Chisholm Trail From Chisholm Trail Hotel Centre to Wolle Lane, and WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER, describes those engineering services to be provided by the Engineer as a part of the Contract, and WHEREAS, ARTICLE 3, CONTRACT PERIOD, requires the termination of the Contract on April 30, 2003 unless the Contract is extended, and WHEREAS, ARTICLE 4, COMPENSATION, establishes the maximum lump sum payable under this contract at $87,450.00 without modification of the contract, and WHEREAS, it has become necessary to amend the contract to provide for Additional Easements, and WHEREAS, the Engineer has agreed to have the additional work performed for $28,830.00. increasing the lump sum fee for the contract to $116,280.00. NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 4, COMPENSATION, shall be amended by the changing the lump sum amount payable under this contract as $116,280.00 ATTACHMENT "B ", Services to be Provided by the Engineer shall be amended as set forth in the attached ADDENDUM to EXHIBIT B. R- 0- IO- IO -/3D5 Page 1 of 2 IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. 2 00601 -2 -059 ASA 02 -5074 Date CITY O R0 4 1 �� • 'CITY yle Maxwell, Mayor /D /C C Date Supplemental Agr Form.doe /specs master /contracts & forms — Revised 10/2/02 Page 2 of 2 Client CITY OF ROUND ROCK Project No. 0601 -2 -059 P Chisholm Trail Contract Date 01/12/99 Subject of Additional Services Additional Easements Additional Services Project No. 0601-2-059-53 1. Field survey and prepare three (3) temporary construction easements for existing parking lot reconstruction outside of right -of -way. Reason For Change Design change affects offsite properties. I ak I Compensation: Hourly charge plus reimbursable expense basis, as defined In the PROFESSIONAL SERVICES AGREEMENT, and In addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are estimated to be approximately $_ X Lump sum charge basis plus reimbursable expenses, as defined in the PROFESSIONAL SERVICES AGREEMENT, and In addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are to be $1.960.00. Estimated Date of Completion: PREPARED BY: Henry D. Rove, P.E. /►"' �- PROPOSED BY: BAKER - AIC`KLJ2 & ASSOCIATES, INC. APPROVED BY: Baker - Alcklen & Associates, Inc. Engineers /Surveyors Client Title: W illiam Wael ADDENDUM TO EXHIBIT B ADDITIONAL SERVICES AUTHORIZATION (Sign, keep Client's copy & return all others.) 9 /is z, Date Date Date 09/24/02 Proposal No. 02 - 5074 BAKER-AICKLEN & 0 ASSOCIATES. INC. Engl /Surveyors August 20, 2002 Mr. Bill Stablein City of Round Rock Department of Public Works 2008 Enterprise Drive Round Rock, TX 78664 RE: Chisholm Trail Road Additional Service Request Job # 601-2-059 Dear Bill: Below is a summary of the additional manhours that we have already spent and/or expect to spend on additional surveying. 1. Additional Out of Right -of -way Survey 4 hours (3 man crew) @ $110/hr = $ 440 1 hour (Surveyor) @ $110/hr = $ 110 2. Three Temporary Construction Easements 18 hours (Survey Tech) @ $60/hr= $1080 3 hours (Surveyor) @ $110/hr = $ 330 i TOTAL $ 1960 The additional surveying is for the bank parking lot that will need to be reconstructed along with the roadway. The three easements are for driveway reconstruction for the bank, Cracker Barrel, and the next property to the south. If you have any questions regarding any of the above, please give me a call at 244 -9620. Sincere] rY� H. D. Ro Y 203 E. Mein St.. Suite 201 • Round Rock. Texas 78664 • 512/244 -9620 • FAX 512/244-9623 Baker-Aicklen & Associates, Inc. STANDARD RATE SCHEDULE Engineers /Surveyors (Labor Rate Table 35) Effective September, 2000, the following rates are recommended for work performed on an hourly- charge basis. Rates include company overhead and profit for services accomplished during regular working hours. DIRECT LABOR I, OFFICE PERSONNEL SERVICES Classification Rates Project Engineer /Surveyor/Planner $110.00 per hour Staff Engineer /Surveyor/Planner $95.00 per hour Project Designer /Coordinator $85.00 per hour Engineering Assistant/Surveying Assistant/GPS Processor $70.00 per hour Senior Engineering/Surveying CAD Technician $60.00 per hour Engineering/Surveying CAD Technician/Field Representative $55.00 per hour CAD Draftsman $45.00 per hour Secretary $45.00 per hour Expert Witness/Testimony/Deposition Services Two Times Rates Principal (as appropriate) $120.00 per hour FIELD PARTY SERVICES Rates 1 -Man Field Party $70.00 per hour 2 -Man Field Party $95.00 per hour 3 -Man Field Party $120.00 per hour 4 -Man Field Party $145.00 per hour GPS Field Unit with Operator (Note 5) $100.00 per hour GPS Field Unit without Operator (Note 5) $60.00 per hour DIRECT EXPENSES Transportation: By Firm's Passenger Vehicles (Note 1) $ 0.35 per mile By Finn's Survey Trucks (Notes 1, 2, 3 & 4) $ 0.35 per mile Subsistence of out - of-city work $100.00 per day Reproduction & Printing by Firm, Prevailing Com- Survey Stakes, Lathes, Iron Rods mercial Rates Or and other Direct Expense Cost, Plus 10% Notes: 1. A mileage charge will be billed for projects exceeding a 50 -mile radius of the base office only. 2. Field Party rates include conventional equipment, supplies and survey vehicles. Abnormal use of stakes, lathes, etc., used such as during the construction phase of a project will be charged as indicated. 3. A minimum of two (2) hours field party time charge will be made for show -up time and return to office, resulting from inclement weather conditions, etc. 4. Field Party stand -by time will be charged for at the above -shown appropriate rates. 5. Rates apply to actual time GPS units are in use. All other time will be charged as appropriate normal field party rates. 6. The firm's professional liability is limited to the total amount of compensation associated with a specific project up to a maximum of $50,000. Baker-Aicklen & Associates, Inc. Eng!neers /Sur eyors 14\ Client CITY OF ROUND ROCK Project No. 601 -759 Project - Chisholm Trail Proposed Improvements Contract Date 1/12/99 Subject of Additional Services ROW Design and Doc. Prep. Additional Services Project No. 601- 759 -23 1. Additional ROW Survey south past Onion Creek to define future centerline beyond limits of this project. Requested by Mr. Tom Word. Reason For Change Client Request I Baker-Aicklen & Associates, Inc. Engineers /Surveyors ADDITIONAL SERVICES AUTHORIZATION Date 81 P D r o o t Compensation: Hourly charge plus reimbursable expense basis, as defined in the PROFESSIONAL SERVICES AGREEMENT, and in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are estimated to be approximately $ X Lump sum charge basis plus reimbursable expenses, as defined in the PROFESSIONAL SERVICES AGREEMENT, and In addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are to be $3.000.00 . (Add a new phase #24) Estimated Date of Completion: Completed PREPARED BY: H.D. Rove, P, E. PROPOSED BY: BAKER-Al APPROVED BY: VFt Cli 'i�;/� rl. � Welt i Title R.P.L.S. ES. INC. (Sign, keep Client's copy & return all others.) Dat Dat gt3 i /I! V Client CITY OF ROUND ROCK Project No. 601 - 759-25 Project Chisholm Trail Contract Date 1 -12 -99 Subject of Additional Services Additional ROW, Design and Documents Additional Services Project No. 601 - 759 -25 1. Locate sufficient property corners or evidence of corners to determine the boundaries for four (4) additional parcels located along the eastern ROW line of Chisholm Trail south of the hotel tract. Write a description of all four parcels and set pins delineating the proposed taking. Budget to increase from $3,000. (Additional Service Author. # 00 -5120) to $7,400. Reason For Change Client Request Baker-Aicklen & Associates, Inc. Engineers /Surveyors ADDITIONAL SERVICES AUTHORIZATION Pit:1 14-k ) Date 9 -13 -00 Proposal No. 00 -5135 Compensation: Hourly charge plus reimbursable expense basis, as defined in the PROFESSIONAL SERVICES AGREEMENT, and In addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are estimated to be approximately X Lump sum charge basis plus reimbursable expenses, as defined in the PROFESSIONAL SERVICES AGREEMENT, and in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are to be $4.400 making total budget $7.400 . Estimated Date of Completion: PREPARED BY: PROPOSED BY: APPROVED BY: H. D. Rove. P.E. BAKER - C N & ASSOCIATE , INC. / y P.E. IP 013 a8 C/TV NANAtreg- Printed Name and Title: (Sign, keep Client's copy & return all others.) 9 - -00 Date a5 -4g5 Client CITY OF ROUND ROCK Protect No. 601 -559 Project Proposed Improvements to Chisholm Trail Contract Date 1/12/99 Subject of Additional Services Off -Site 12 -inch water line Additional Services Project No. 601 - 559 -27, 28, 29 1. On the ground 30 -foot wide, design survey, of edge of pavement, fences, power poles, 1-foot contours and property comers. $2,000. 2. Prepare field notes and sketch of two 15' PUE's. $1,500. 3. Prepare construction drawings for 1300 L.F. of 12 -inch water line and add to existing Chisholm Trail improvements $3,500. Reason For Change City Requested Baker-Aicklen & Associates, Inc. Engineers /Surveyors ADDITIONAL SERVICES AUTHORIZATION 7/13/01 Proposal Date No. 01 -5074 Compensation: Hourly charge plus reimbursable expense basis, as defined in the PROFESSIONAL SERVICES AGREEMENT, and in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are estimated to be approximately $_ X Lump sum charge basis plus reimbursable expenses, as defined In the PROFESSIONAL SERVICES AGREEMENT; and in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are to be $7 000.00 Estimated Date of Completion: ASAP PREPARED BY: H. D. Rove. P. E. PROPOSED BY: BAKER CKLEN & ASSOCIATES, INC. AJairfer i11iam Waeitz, P. APPROVED BY: Client Title: (Sign, keep Client's copy & return all others.) 7 -/3 -6/ Date Date Client CITY OF ROUND ROCK Project No. 601 -559 Project Proposed Improvements to Chisholm Trail Contract Date 1/12/99 Subject of Additional Services Off - site 12 inch water line Additional Services Project No. 601- 559 -50, 51.52 1. Remove approximately 3000 LF of 12 -inch water line from Chisholm Trail improvement construction plans. Create new set of construction drawings and details for the 12 -inch water line. $3,650. 2. Prepare bid documents and bid 12 -inch water line project. $1,780. 3. Provide construction phase services for 12 -inch water line project. $3,540. Reason For Change City Request. Baker - Aicklen & Associates, Inc. Engineers /Surveyors ADDITIONAL SERVICES AUTHORIZATION bRIGIr - - Date 8/9/01 Proposal No. 01 -5084 Compensation: Hourly charge plus reimbursable expense basis, as defined in the PROFESSIONAL SERVICES AGREEMENT, and in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are estimated to be approximately $_ X Lump sum charge basis plus reimbursable expenses, as defined in the PROFESSIONAL SERVICES AGREEMENT, and in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are to be $.8,970. Estimated Date of Completion: ASAP PREPARED BY: H. D. Rove P. E. rYeh PROPOSED BY: BAKER - N & ASSO IATES, INC. APPROVED BY: i Clie'llP" mi3yae, Title: (Sign, keep Client's copy & return all others.) r Date Q — 0/ Date Client CITY OF ROUND ROCK Project No. 601 -559 Project PROPOSED IMPROVEMENTS TO CHISHOLM TRAIL Contract Date 01/12/99 Subject of Additional Services EASEMENT EVALUATION Additional Services Project No. 601 - 759-10 1. Evaluate existing easements within new right -of -way for eight (8) parcels. Tech RPLS Clerical Deed Research 8 3 Prepare Sketches 16 4 Easement Evaluation 16 4 2 Total 40 11 2 Technician Hours: 40 x $ 55.00/hr = $2,200.00 RPLS Hours: 11 x $110.00/hr = $1,210.00 Clerical Hours: 2 x $ 45.00/hr = $ 90.00 Total $3,500.00 Reason For Change Client Request Baker - Aicklen & Associates, Inc. Engineers /Surveyors HK INAL IJ ADDITIONAL SERVICES AUTHORIZATION Date 09/14/01 Proposal No.01 - 7135R compensation: X Hourly charge plus reimbursable expense basis, as defined In the PROFESSIONAL SERVICES AGREEMENT, and in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are estimated to be approximately $ 3.500.00 Lump sum charge basis plus reimbursable expenses, as defined in the PROFESSIONAL SERVICES AGREEMENT, and in addition to the compensation for BASIC SERVICES. Total charges for these ADDITIONAL SERVICES are to be Estimated Date of Completion: BAKER - AICKLEN & ASSOCIATES, INC. PREPARED BY: Donald J. Kirby. R.P.LS. OFFERED BY: APPROVED BY: PIK :i/ ,,^-w tale p , r Ma c >?IPPA P. ) C ry OF POI/MD kocki (Sign, keep Client's copy & return all others.) 9 /7 - o/ Date /0 -11 -0/ Date Mayor Nyle Maxwell Mayor Pro-tem Torn Nielson City Manager Robert L. Bennett. Jr. City Attorney Stephan L. Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. October 21, 2002 Mr. Bill Waeltz, P.E. Baker - Aicklen & Associates, Inc. 203 E. Main Street, Suite 201 Round Rock, TX 78664 Dear Mr. Waeltz: Council Members Alan McGraw Carrie Pitt Scot Knight Enclosure Isabel Gallahan Gary Coe The Round Rock City Council approved Resolution No. R- 02- 10 -10- 13D5 at their regularly scheduled meeting on October 10, 2002. This resolution approves Supplemental Agreement No. 3 to the with Baker - Aicklen & Associates, Inc. for the reconstruction of Chisholm Trail from Chisholm Trail Hotel Centre to Wolle Lane. Enclosed is a copy of the resolution and original Agreement for your files. If you have any questions, please do not hesitate to contact Tom Word at 218 -5562. Christine R. Martinez City Secretary CITY OF ROUND ROCK 221 East Main Street • Round Rock, Texas 78664 Phone: 512.218.5400 • Fax: 912.218.7097 • www.ci.round-rock.tx.us