R-02-10-24-11E3 - 10/24/2002BAKER- AICKLEN & ASSOCIATES, INC. ENGINEERS /SURVEYORS Job No. 0601-2-074-22 le- oa- io- a' -i,E3 CONTRACT CHANGE ORDER NO. 2 Contract For: City of Round Rock Historic Downtown Sidewalks Improvements Owner: City of Round Rock CO2 -A2 Add lowering of water line near existing plaza at the intersection of Sheppard and Main, including traffic control, materials, labor, and equipment, 1 LS @ $3,113, complete in place. CO2 -A3 Add sewer tap @ 116 E. Main, including 45 LF 6" PVC sewer, saw cut, two -way cleanout, core building wall, stabilized base to finish grade, @ $2,975, complete in place. Contractor: Chasco Contracting You are hereby requested to comply with the following changes from the contract plans and specifications: DECREASE INCREASE Description of Changes Contract Price Contract Price CO2 -Al Add lowering of water line near existing manhole at the intersection of Sheppard & Main, including removal and replacement of 30 LF of curb & gutter, traffic control, materials, labor, and equipment, 1 LS @ $3,607, complete in place. Date: 9 -9 -02 Page 1 of 3 $ 3,607.00 $ 3,113.00 $ 2,975.00 Main Street (Paving in original scope) CO2 -A4 Add 2" type "D" HMAC pavement replacement, including milling, 4040 SY @ $19.75/SY, complete in place. $79,790.00 CO2 -A5 Add demolition of islands at crosswalk, 3 EA. @ $500/EA, complete in place. $ 1,500.00 CO2 -A6 Add full street closure, 1 EA @ $3,000, complete in place. $ 3,000.00 CO2 -A7 Add night closure, 7 EA @ $1,200/EA, complete in place. $ 8,400.00 CO2 -D1 Delete 2" type "D" pavement replacement (all pavement on Main Street within project limits), including all required flexible base (Add altemate Bid Item #1), 3,694 SY @ $16.50 /SY. $60,951.00 CO2 -D2 Delete trench street repair 648 LF @ $23/LF. $14,904.00 Change Order # 2 :% Jeff) No. 0601-2-074-22 Description of Changes Intersection of Sheppard & Main (Paving added to scope). CO2 -A8 Add 2" type "D" HMAC pavement replacement, including milling, 487 SY @ $15 /S.Y, complete in place. $ 7,305.00 CO2 -A9 Add adjust manholes at Main & Sheppard, 2 EA @ $300/EA, complete in place. $ 600.00 CO2 -A10 Add demolition of valley gutter, 480 SF @ $3.30/SF, complete in place. $ 1,584.00 CO2 -All Add saw cut 2" asphalt, 90 LF @ $1.50/LF, complete in place. $ 135.00 North Lampasas (Paving added to scope) CO2 -Al2 Add 2" type "D" HMAC overlay @ N. Lampasas from Main to Alley, 690 SY @ $9.50 /SY, complete in place. CO2 -A13 Type "D" HMAC with 2" crown at N. Lampasas Alley to Liberty, 50 TON @ $73.50 /TON, complete in place. CO2 -A14 Add edge milling with canter, 7'wide milling width, 260 SY @ $7.15 /SY, complete in place. CO2 -A15 Add adjust manholes, 5 EA @ $300/EA, complete in place. Library & Sheppard Parking (Paving added to scope) CO2 -A20 2" type "D" HMAC pavement replacement, 99 SY @ $26.75/SY, complete in place. Date: 9 -9 -02 Page 2 of 3 DECREASE INCREASE Contract Price Contract Price $ 6,555.00 $ 3,675.00 $ 1,859.00 $ 1,500.00 CO2 -A16 Add saw cut 2" asphalt, 350 LF @ $1.50/LF, complete in place. $ 525.00 South Lampasas (Paving added to scope) CO2 -A17 Add overlay ® South Lampasas, 750 SY @ $9.75/SY, complete in place. $ 7,312.50 CO2 -A18 Add adjust manholes at Main & Sheppard, 2 EA @ $300/EA, complete in place. $ 600.00 CO2 -A19 Add saw cut 2" asphalt, 40 LF @ $1.50/LF, complete in place. $ 60.00 $ 2,648.25 CO2 -A21 Add adjust valve box at Library & Sheppard in parking area, 1 EA @ $190/EA, complete in place. $ 190.00 Change Order # 2 ;; Job No. 0601-2-074-22 Description of Changes Sheppard at Library (Paving added to scope) CO2 - A22 Add 2" type "D" HMAC pavement replacement at trench, 52 SY @ 33 /SY, complete in place. CO2 -A23 Add saw cut 2" asphalt, 5 LF @ $1.50/LF, complete in place. $ 7.50 CO2 -D3 Delete 6" thick concrete valley gutter fillets, 80 SF @ 5 /SF. $ 400.00 CO2 -D4 Delete %2 street closures, 2 EA @ $1,800/EA. $ 3,600.00 SUBTOTALS $79,855.00 $138,657.25 Net Changes in Contract Price: Justification: City Requested The amount of the Contract before this Change Order is Five Hundred Fifty Five Thousand, Forty Five and 05 /100 Dollars The Amount of the Contract will DECREASE/INCREASE by the sum of Fifty Eight Thousand, Eight Hundred Two and 25/100 Dollars The CONTRACT TOTAL including this Change Order will be Six Hundred Thirteen, Eight Hundred Forty Seven and 30/100 Dollars The Contract Completion Date has been extended 10 days. Contrac This document will become Chasco er- Aicklen & A W City o ' o .' ock (Owner o.W601- 074- 22\Change O,d,, 92 9.9.02 doe DECREASE INCREASE Contract Price Contract Price $ $ 58,802.25 ement to the Contract and all provisions will apply hereto. - /Z -ozr Date Date /0-9 Date Date: 9 -9 -02 Page 3 of 3 $ 1,716.00 $555,045.05 $ 58,802.25 $613,847.30 Mayor Nyle Maxwell Mayor Pro -tem Tom Nielson Council Members Alan McGraw Carrie Pitt Scot Knight Isabel Gallahan Gary Coe City Manager Robert L Bennett, Jr. City Attorney Stephan L Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. November 18, 2002 Mr. Bill Waeltz, P.E. Baker - Aicklen & Associates, Inc. 203 E. Main Street, Suite 201 Round Rock, TX 78664 Dear Mr. Waeltz: The Round Rock City Council approved Resolution No. R- 02- 10 -24- 11E3 at their regularly scheduled meeting on October 24, 2002. This resolution approves Change Order No. 2 with Chasco Contracting, Inc. for the Downtown Sidewalk Improvements Project. Enclosed is a copy of the resolution and original Change Order No. 2 for your files. If you have any questions, please do not hesitate to contact William Dobrowolski, Senior Engineer at 218 -6601. Sincerely, Christine R. Martinez City Secretary Enclosure CITY OF ROUND ROCK 221 East Main Street • Round Rock Texas 78664 Phone 512 218.5400 • Fax- 512.218.7097 • www ci round -rock tx us Mayor Nyle Maxwell Mayor Pro -tem Tom Nielson Council Members Alan McGraw Carrie Pin Scot Knight Isabel Gallahan Gary Coe City Manager Robert L Bennett, Jr. City Attorney Stephan L Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. November 18, 2002 Mr. Temple Aday Chasco Contracting, Inc. P.O. Box 1057 Round Rock, TX 78680 Dear Mr. Aday: The Round Rock City Council approved Resolution No. R- 02- 10 -24- 11E3 at their regularly scheduled meeting on October 24, 2002. This resolution approves the Change Order No. 2 to the Contract with Chasco Contracting, Inc. for the Downtown Sidewalk Improvements Project. Enclosed is a copy of the resolution and the original Change Order No. 2 for your files. If you have any questions, please do not hesitate to contact William Dobrowolski, Senior Engineer at 218 -6601. Christine R. Martinez City Secretary Enclosure CITY OF ROUND ROCK 221 East Main Street • Round Rock, Texas 78664 Phone: 512 218 5400 • Fax 512 218 7097 • www.ci.round -rock tx us $30 @m\ WORLDOX\ O AWDO% \RESOLUTI \R31024E3.WPD /rmc RESOLUTION NO. R- 02- 10- 24 -11E3 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Chasco Contracting, Inc. for the Downtown Sidewalk Improvements Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 2, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 2 to the Contract with Chasco Contracting, Inc. for the Downtown Sidewalk Improvements Project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 24th day of October, 2002. ST: CHRISTINE R. MARTINEZ, City Secretar 2 WELL, Mayor City of Round Rock, Texas BAKER- AICKLEN & ASSOCIATES, IfV'C. ENGINEERS /SURVEYORS Job No. 0601 -2- 074 -22 Contract For: City of Round Rock Historic Downtown Sidewalks Improvements Owner: City of Round Rock CONTRACT CHANGE ORDER NO. 2 Contractor: Chasco Contracting You are hereby requested to comply with the following changes from the contract plans and specifications: DECREASE INCREASE Description of Changes Contract Price Contract Price CO2 -Al Add lowering of water line near existing manhole at the intersection of Sheppard & Main, including removal and replacement of 30 LF of curb & gutter, traffic control, materials, labor, and equipment, 1 LS @ $3,607, complete in place. CO2 -A2 Add lowering of water line near existing plaza at the intersection of Sheppard and Main, including traffic control, materials, labor, and equipment, 1 LS @ $3,113, complete in place. CO2 -A3 f Add sewer tap @ 116 E. Main, including 45 LF 6" PVC sewer, saw cut, two -way cleanout, core building wall, stabilized base to finish grade, @ $2,975, complete in place. Date: 9 -9 -02 Page 1 of 3 $ 3,607.00 $ 3,113.00 $ 2,975.00 Main Street (Paving in original scope) CO2 -A4 Add 2" type "D" HMAC pavement replacement, including milling, 4040 SY @ $19.75/SY, complete in place. $79,790.00 CO2 - A5 Add demolition of islands at crosswalk, 3 EA. @ $500/EA, complete in place. $ 1,500.00 CO2 -A6 Add full street closure, 1 EA @ $3,000, complete in place. CO2 - Add night closure, 7 EA @ $1,200/EA, complete in place. CO2 -D 1 Delete 2" type "D" pavement replacement (all pavement on Main Street within project limits), including all required flexible base (Add alternate Bid Item #1), 3,694 SY @ $16.50 /SY. $60,951.00 CO2 -D2 Delete trench street repair 648 LF @ $23/LF. $14,904.00 $ 3,000.00 $ 8,400.00 EXHIBIT IIA II Change Order # 2 , :Date: 9 -9 -02 • - Job No. 0601 -2- 074 -22 . . Page 2 of 3 DECREASE INCREASE Description of Changes Contract Price Contract Price Intersection of Sheppard & Main (Paving added to scope). CO2 -A8 Add 2" type "D" HMAC pavement replacement, including milling, 487 SY @ $15 /S.Y, complete in place. $ 7,305.00 CO2 -A9 Add adjust manholes at Main & Sheppard, 2 EA @ $300/EA, complete in place. $ 600.00 CO2 -A10 Add demolition of valley gutter, 480 SF @ $3.30 /SF, complete in place. $ 1,584.00 CO2 -All Add saw cut 2" asphalt, 90 LF @ $1.50/LF, complete in place. $ 135.00 North Lampasas (Paving added to scope) CO2 -Al2 Add 2" type "D" HMAC overlay @N. Lampasas from Main to Alley, 690 SY @ $9.50 /SY, complete in place. $ 6,555.00 CO2 -A13 Type "D" HMAC with 2" crown at N. Lampasas Alley to Liberty, 50 TON @ $73.50/TON, complete in place. $ 3,675.00 CO2 -A14 Add edge milling with canter, 7'wide milling width, 260 SY @ $7.15 /SY, complete in place. $ 1,859.00 CO2 -A15 Add adjust manholes, 5 EA @ $300/EA, complete in place. $ 1,500.00 CO2 -A16 Add saw cut 2" asphalt, 350 LF @ $1.50/LF, complete in place. $ 525.00 South Lampasas (Paving added to scope) CO2 -A17 Add overlay @ South Lampasas, 750 SY @ $9.75/SY, complete in place. $ 7,312.50 CO2-A1 8 Add adjust manholes at Main & Sheppard, 2 EA @ $300/EA, complete in place. $ 600.00 • CO2 -A19 Add saw cut 2" asphalt, 40 LF @ $1.50/LF, complete in place. $ 60.00 Library & Sheppard Parking (Paving added to scope) CO2 -A20 2" type "D" HMAC pavement replacement, 99 SY @ $26.75/SY, complete in place. $ 2,648.25 CO2 -A21 Add adjust valve box at Library & Sheppard in parking area, 1 EA @ $190 /EA, complete in place. $ 190.00 Change Order # 2 . • . Job No. 0601-2-014-22 o 060I -074-22\Change Order 02 9 -9 -02 doc Description of Changes Sheppard at Library (Paving added to scope) CO2 -A22 Add 2" type "D" HMAC pavement replacement at trench, 52 SY @ 33 /SY, complete in place. ' •. 9-9-02 -Page 3 of 3 DECREASE INCREASE Contract Price Contract Price $ 1,716.00 CO2 -A23 Add saw cut 2" asphalt, 5 LF @ $1.50/LF, complete in place. $ 7.50 CO2 -D3 Delete 6" thick concrete valley gutter fillets, 80 SF @ 5 /SF. $ 400.00 CO2 -D4 Delete %z street closures, 2 EA @ $1,800/EA. $ 3,600.00 SUBTOTALS $79,855.00 $138,657.25 Net Changes in Contract Price: Justification: City Requested The amount of the Contract before this Change Order is Five Hundred Fifty Five Thousand, Forty Five and 05 /100 Dollars The Amount of the Contract will DECREASE/INCREASE by the sum of Fifty Eight Thousand, Eight Hundred Two and 25/100 Dollars The CONTRACT TOTAL including this Change Order will be Six Hundred Thirteen, Eight Hundred Forty Seven and 30/100 Dollars The Contract Completion Date has been extended 10 days. This document will become a ement to the Contract and all provisions will apply hereto. ,2 -/z B.. er- Aicklen & Associj c., (Engineer) City of Round Rock (Owner) Date $ $ 58,802.25 $555,045.05 $ 58,802.25 $613,847.30 S.Graphics \Counal Agenda Iteams\Lampasas & Sheppard I NA \\ t ' \ O \ O \ \ iSw •\S PEE a ! .. M � y �� V 4 � 00 pYSSj � � • 6� gym U .* • * .*w itno ,,,,k IIS W. #* N µ A I N E `:10 Downtown Sidewalks °�°� MAR S.Graphics \Counal Agenda Iteams\Lampasas & Sheppard DATE: October 18, 2002 SUBJECT: City Council Meeting — October 24, 2002 ITEM: 's 11.E.3. Consider a resolution authorizing the Mayor to execute Change Order No. 2 with Chasco Contracting for the Downtown Sidewalk Improvements Project. Resource: Jim Nuse, Chief of Operations /Assistant City Manager William J Dobrowolski III, Senior Engineer History: It was unforeseen that the pavement sections encountered would vary greatly from the plans on record and the proposed pavement process could not be used with most of these pavement sections. An additional problem was the Contractor's proposed schedule for the original process closed Main Street to vehicle traffic for seven weeks. To totally replace the pavement would require closing Main Street approximately six weeks at an estimated cost increase that would push the contract over the twenty-five percent state law allowable limit. Other pavement within the construction area needing rehabilitation escalated complexity of the problem. Addressing the entire pavement needs under one contract would reduce warranty responsibility questions. This strategy addresses all of the pavement needs and held estimated cost increase below within allowable limits. In addition this change order addresses proposed wastewater main conflicts with the existing water mains. Funding: Cost: $58,802.25 Source of funds: Outside Resources: Baker - Aicklen & associates, Inc. and Chasco Impact: Contract cost increase of $58,802.25, impacts to businesses from closing Main Street to vehicle traffic for up to 7 days, delays installation of the wastewater main, interrupts water supply to approximately 50 services. Benefit: Addresses Warranty Responsibility Limits Issues, Change in contract cost within allowable state limits, Reduces the impact on businesses because of the closing of Main Street to vehicle traffic from 7 weeks to 7 days, addresses all of the different pavement needs, brings the separation between water and wastewater mains to City standards. Public Comment: N/A Sponsor: N/A Capital Project Funds — GO Bonds Funds and Self- Financed wastewater Utility Funds