Loading...
R-02-11-14-13B2 - 11/14/2002Mayor Nyle Maxwell Mayor Pro -tem Tom Nielson Council Members Alan McGraw Enclosure Carrie Pitt Scot Knight Isabel Gallahan Gary Coe City Manager Robert L Bennett. Jr. City Attorney Stephan L. Sheets ROUND ROCK, TE PURPOSE. PASSION. PROSPERITY. December 3, 2002 MW Builders, Inc. Attn: Operations Manager 1701 N. General Bruce Drive Temple, TX 76455 Dear Operations Manager: The Round Rock City Council approved Resolution No. _ 02- 11_14- 13B2; at their regularly scheduled meeting on November 14, 2002. This 'resolution approves the City Contract Change Order No. 1 for the Lake Creek Pump Station Facility and System Improvements Project. Enclosed is a copy of the Resolution and Change Order for your files. If you have any questions, please do not hesitate to Tom Clark at 218 -6617. Christine R. Martinez City Secretary CITY OF ROUND ROCK 221 East Main Street • Round Rock. Texas 78664 Phone 5iz zi8 5400 • Fax 511218 7097 • www.ci round -rock tx us RESOLUTION NO. R- 02- 11- 14 -13B2 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with MW Builders, Inc. for the Lake Creek Pump Station Facility and System Improvements Project, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with MW Builders, Inc. for the Lake Creek Pump Station Facility and System Improvements Project, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. .. O17MA\ MO RLOOX \O.\WOOY \RBSOL"S1 \R21114B .MPD /Re RESOLVED this 14th day of November, 2002. A � p A S ly th Q 1e. CHRISTINE R. MARTINEZ, City Secret 2 City of Round Rock, Texas Y WELL, Mayor Item No. Item and Description of Changes Contract Price Contract Time Decrease Increase Decrease lncrease CPR 1 Modify project completion dates $0 $0 0 days 0 days CPR 2 &3 Delete electrical manholes and add 3 pull boxes $2,300.00 0 days 0 days CPR 4 Delete Well No. 10 video survey from the project $6,000.00 0 days 0 days CPR 5 Replace pump cans 1 -4 and 12" inlet valves $41,586.00 50 days CPR 6 Modify suction piping for pumps 1 & 2, and modify connections to existing site piping on west side of site. $14,277.00 14 days CPR 7 Replace the existing chlorine and ammonia gas detectors $5,774.00 3 days CPR 8 Provide second chlorine controller and v -notch actuator $7,108.00 4 days CPR 9 1) Relocate the Tower Drive redundant radio to the new 81 South Elevated tank. 2) Provide electrical wiring and lighting panel changes to accommodate proposed HVAC equipment. 3) Install Fluoride and Caustic feed system controls based on tank levels. $8,899.00 14 days CPR 10 Delete the grating platforms around the booster pumps. $7,410.00 3 days CPR 11 Provide credit for failing density tests. $727.00 0 days 0 days CPR 12 Replace existing leaking valves as directed by CORR staff. $5,647.00 5 days CPR 13 Provide fused power correction capacitors for the booster pumps and wells. $22,852.00 74 days CPR 14 Repaint existing piping, valves, well pump motors and CMU building. $3,046.00 7 days CPR 15 Repair and install 1 Y" forcemain for the sample water sump and tie into the sewer adjacent to the pump station site. $2,874.00 5 days CPR 16 Provide a 1 Yi' asphalt overlay on the access road from S. Mays St. to the gate for the Hall property. $3,487.00 2 days Sub -Total Difference Net $16,437.00 $115,550.00 3 days 178 days $99,113.00 175 days I -DR Project Name: Contract No. 5, Lake Creek Pump Station Facility and System Improvements Project Owner (Name, Address) City of Round Rock 2008 Enterprise Drive Round Rock, TX 78664 Project Contractor (Name, Address) MW Builders, Inc. 1701 N. General Bruce Drive Temple, Texas 766455 It Is ag reed to modify the Contract referred to above as follows: $1 569,000.00 Net Increase (decrease) of this Change Order $99,113.00 EXHIBIT " FORM 111- 5020 -2 (Vcrsion 10 Oct 90) Task 5020 CopYnght 1991 N111 e319,neenng, Inc. HDR Protect No.: 07225-047-036 Owner's Protect No. NA Dale of Issuance. Date ofContract. November 8, 2001 Change Order No. 1 Contract Period: Substantial Completion for Pumps — May 1, 2002 Substantial Completion for All Work — June 1, 2002 Final Completion —July 1, 2002 Summary: It Is agreed to modify the Contract referred to above as follows: Contract Price prior to this Change Order Contract Time prior to this Change Order Substantial Completion for Pumps — May 1, 2002 Substantial Completion for All Work — June 1, 2002 Final Completion — July 1, 2002 Net Increase (decrease) of this Change Order 160 calendar days 111 -5020-2 hD3 Revised Contract Price with all approved Change Orders $1,668,113.00 The changes Included In his C nge Order are to be accomplished In accordance with the terms, stipulations and conditions of the original ont as oug included therein. 1 (DrmliMS Aklaaer 1 io - Z4 - OZ Accepted for Contractor (MW Builders, nc lb] 1 Date . .,ser 1 l O .:Z•51 Recommended for Approval By (HD ngineering, Inc) Date Approved for Owner (City of Round Rock) by Approved. (Other -when required) DlslrlhWon I or (Contractor Substantial Completion for Pumps — June 20, 2002 (revised by CPR 5 only) Substantial Completion for All Work— November 23, 2002 Final Completion — December 23, 2002 Anesl 1 O ffice Change Order No. 1 Date Data ' 1 O her FORM 111 - 5020.2 (Version 10 Oct 90) Task 5020 111. 5020 -2 Copyright 1991 HMI Engineering. Inc. nso 0 LAKECREEK PUMP STATION LAKECREEK PUMP STATION FACILITY AND SYSTEM IMPROVEMENTS 5 AGENDA TTFJF ASPNOWEERRINO]dOBLAKECREEX PUMP STATION 7 -1101 DATE: November 7, 2002 SUBJECT: City Council Meeting — November 14, 2002 ITEM: 13.B.2. Consider a resolution: authorizing the Mayor to execute Change Order No. 1 with MW Builders, Inc. for the Lake Creek Pump Station Facility and System Improvements Project. Resource: Jim Nuse, Chief of Operations /Assistant City Manager Tom Clark, Director of Utilities Don Rundell, Chief Utility Engineer History: This project replaced the existing vertical turbine pumps, the chemical control and telemetry system and increased the capacity of the pump station from 11 to 17.3 million gallons per day. It will also include the plugging of three wells no longer in service. Also, included in this project is the demolition of the Tower Drive Pump Station and Tank. Sponsor: N/A This Change Order No. 1 is necessary for the successful completion of this project. It covers unanticipated items that were discovered during construction and represents necessary changes in response to conditions found in the field. Existing pump cans 1 through 4 were found to be deteriorated beyond repair and had to be replaced. Also, some of the existing piping was not found as shown in the as -built plans that required additional modification. The original contract amount was $1,569,000.00. With this Change Order No. 1 the original contract amount will be increased by $99,113.00 or 6.31% over the original contract amount for a total cost of $1,668,113. Funding: Cost: $99,113.00 Source of funds: Capital Project Funds (Self - Financed Utility Fund) Outside Resources: MW Builders, Inc. Impact / Benefit: Successful completion of this project will simplify the operation and maintenance of the Lake Creek Pump Station. Public Comment: N/A Item No Item and Oescdpllon of Changes Contract Price Contract lime Decrease Increase Decrease increase CPR 1 Modify project completion dates $0 $0 0 days 0 days CPR 2 &3 Delete electrical manholes and add 3 pull boxes $2,300.00 0 days 0 days CPR 4 Delete Well No. 10 video survey from the project $6,000.00 0 days 0 days CPR 5 Replace pump cans 1 -4 and 12" inlet valves $41,586.00 50 days CPR 6 Modify suction piping for pumps 1 & 2, and modify connections to existing site piping on west side of site. $14,277.00 14 days CPR 7 Replace the existing chlorine and ammonia gas detectors $5,774.00 3 days CPR 8 Provide second chlorine controller and v -notch actuator $7,108.00 4 days CPR 9 1) Relocate the Tower Drive redundant radio to the new 81 South Elevated tank. 2) Provide electrical wiring and lighting panel changes to accommodate proposed HVAC equipment. 3) Install Fluoride and Caustic feed system controls based on tank levels. $8,899.00 14 days CPR 10 Delete the grating platforms around the booster pumps. $7,410.00 3 days CPR 11 Provide credit for failing density tests. $727.00 0 days 0 days CPR 12 Replace existing leaking valves as directed by CORR staff. $5,647.00 5 days CPR 13 Provide fused power correction capacitors for the booster pumps and wells. $22,852.00 74 days CPR 14 Repaint existing piping, valves, well pump motors and CMU building. $3,046.00 7 days CPR 15 Repair and install 1 Y2 forcemain for the sample water sump and tie into the sewer adjacent to the pump station site. $2,874.00 5 days CPR 16 Provide a 1 Y2" asphalt overlay on the access road from S. Mays St. to the qate for the Hall property. $3,487.00 2 days Sub -Total Difference Net $16,437.00 $115,550.00 3 days 178 days $99,113.00 175 days Project Name: Contract No. 5, Lake Creek Pump Station Facility and System Improvements Project Owner (Name, Address), City of Round Rock 2008 Enterprise Drive Round Rock, TX 78664 Project Contractor, (Name, Address) MW Builders, Inc. 1701 N. General Bruce Drive Temple, Texas 766455 It Is agreed to modify the Contract referred to above as follows: Summary: It Is agreed to modify the Contract referred to above as follows: Contract Price prior to this Change Order 1 $1,569,000.00 Net Increase (decrease) of this Change Order $99,113.00 k- 0a -11- 1 13,6j. FORM III- 5020.2 (Version 1 0 Oct 90) Copyng9t 1991 NDR Fngmeenng, Inc HOP Project No.: 07225-047-036 Ownets Project No . NA Date of Issuance: Task 5020 Change Order No. 1 Date of Contract November 8, 2001 Contact Penod Substantial Completion for Pumps — May 1, 2002 Substantial Completion for All Work — June 1, 2002 Final Completion — July 1, 2002 Contract Time prior to this Change Order Substantial Completion for Pumps — May 1, 2002 Substantial Completion for All Work — June 1, 2002 Final Completion — July 1, 2002 Net Increase (decrease) of this Change Order 160 calendar days 111. 5020.2 hD3 Revised Contract Price with all approved Change Orders $1,668,113.00 The changes included In his C nge Order are to be accomplished In accordance with the terms, stipulations and conditions of the original onttgct{as oug Included therein. Accepted for Contractor (MW Builders Recommended for Approval By (HD ngineering, Inc ) Opertr{r1MS Ma ✓tQ 9Cr 'Contractor Change Order No. 1 Substantial Completion for Pumps — June 20, 2002 (revised by CPR 5 only) Substantial Completion for All Work— November 23, 2002 Final Completion — December 23, 2002 /b -Z4 - OZ t0 2'S-0 Attest AL) ,. 11 1 ,114/l+j, 11— /4-0Z Ty 5EC,CB 4 I ,f,oe Date Date Date IFIeld FORM 111.5020.2 (Version I 0 Oct 90) Task 5020 111.5020.2 Copyright 1991 HDR Esgmeefisg, Inc. VscS • of \ \y 0 LAKECREEK PUMP STATION FACILITY ipp— AND SYSTEM IMPROVEMENTS 51GMPHICSLGGNCG. AGENDA 2IPMSENGI NEERENP2bll1UAKE REEK PUMP STAi1ON 71802