Loading...
R-02-11-26-10D4 - 11/26/2002RESOLUTION NO. R- 02- 11- 26 -10D4 WHEREAS, the City of Round Rock is responsible for the acquisition of the right -of -way necessary for the road construction on the SH -45 frontage road project, and WHEREAS, Dell Computer Corporation ( "Dell ") has agreed to donate the right - of - way from their Round Rock campus necessary for the construction, and WHEREAS, the construction of the frontage road required Dell to relocate irrigation systems, signing, and parking lot lighting, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the City Council hereby approves of a $101,598.02 reimbursement to Dell for the relocation of irrigation systems, signing, and parking lot lighting due to the construction of the SH 45 frontage road project. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended ..omuWORLDOX O WOOX \RESOLUrx\R2112sna.WPD /ec AT T: RESOLVED this 26th day of November, 2002. le CHRISTINE R. MARTINEZ, City Secreta 2 MAXWELL, Mayor City of Round Rock, Texas IRRIGATION EXPENSES PAID Item 9 invoice Date Invoice # Descrigtior Cost $801.16 1 1/31/01 661189414 Replaced 7 irrigation rotor heads where a vehicle ran up on east lawn Capped irrigation mainline at 4 locations on Louis Henna due to $815.10 2 2/15/01 681208320 construction. Repairs needed to maintain irrigation at RR 2. Capped irrigation mainline in 5 places at RR8. Relocated mainline $5,812.95 3 3/30/01 661311218 and wires at RR8. Removal and replanting of 3 live oaks in path of highway at RR7 to 5844.59 4 4/30/01 661383944 behind RR7. 5/21/01 - Rerouted irrigation mainline by RR1. This supplied 3 islands $691.76 5 6/27/01 661510238 Southeast of RR1. 7/31/01 - Repaired mainline located at Louis Henna at Greenlawn on $428.46 6 6/27/01 661655117 eastslde of Greenlawn Rebuild mainline along SH 45 at RRB. Install new sleeve at $10,825.00 7 12/26/01 661311218 easternmost entry and at center entry. BID FOR IRRIGAT TOTAL EXPENSES PAID TO DATE 520,219.02 BID FOR LIGHTING MODIFICATION EXPENSES Top off 4 existing concrete pole bases, all material and labor for 6 new concrete pole bases, new anchor bolts for pole bases, furnish and install new underground circuitry for power to new bases, modify 12/18/01 Bid and re -wire existing poles that were removed due to construction. To repair and reconnect power from building to imgation controller. 57,000.00 2 6/13/02 Bid (estimate) 526,843.00 TOTAL BID FOR LIGHTING MODIFICATION Irrigation reconstruction along SH45 at RR1 and RR2. 7 - 2" control valves, 800' of 3" mainline, 51 rotary sprayheads. Heads will spray 1 4/1/02 Bid from Dell property outward due to the right of way. 2 5/14/02 Bid Placement of bed long loop of walking trail, SW comer of RR1. 52,911.00 3 5/14/02 Bid 12 beds along SH45 in turf area to enhance landscaping. $16,320.00 TOTAL BID FOR IRRIGATION RECONSTRUCTION 531,701.00 BID FOR MONUMENT SIGN AND DIRECTIONAL SIGN EXPENSES 1 4/3/02 Bid Reinstall Dell monument sign with foundation and concrete base 2 4/3/02 Bid Stone work to be done at base of sign. (not a hard number) Add 12" to existing 6" pads on directional signs at 4 driveways to form 18" high base. Chip old concrete from signs and poles then install 3 4/3/02 Bid Into new bases. Placement of 10 Harbor Dwarf Nandinas around each concrete base 58,315.00 4 4/3/02 Bid of directional signs. Create bed, install edging and mulch. TOTAL BID FOR MONUMENT SIGN AND DIRECTIONALS $22,835.00 TOTAL RECONSTRUCTION OF SH 45 EXPANSE FROM RR1 TO $101,598.02 RR8 LouisHennaReconsbuctionSummary $19,543.00 $12,470.00 $4,575.00 $7,556.00 $2,389.00 Reimbursement to Dell for expenses incurred due to SH 45 construction ROUND ROCK TEXAS DATE: November 21, 2002 SUBJECT: City Council Meeting — November 26, 2002 ITEM: 10.D.4. Consider a resolution approving the payment to Dell Computer Corporation for expenses incurred by Dell for the relocation of irrigation, lighting, and signing due to the construction of SH 45. Resource: Jim Nuse, Chief of Operations /Assistant City Manager Tom Word, Director of Transportation Services History: The City of Round Rock is responsible for the acquisition of the right -of -way necessary for the road construction on the SH 45 frontage road project. Dell agreed to donate the right -of -way from their Round Rock campus necessary for the construction. The construction of the frontage road required that Dell relocate irrigation systems, signing, and parking lot lighting. This disbursement will pay Dell for the hard costs they have incurred to repair and relocate these items due to the construction of the SH 45 frontage roads. Funding: Cost: $101,598.02 Source of funds: Round Rock Transportation System Development Corporation Outside Resources: N/A Impact/Benefit: Reimbursement will provide for timely letting of surrounding Texas Department of Transportation road projects. Public Comment: N/A Sponsor: N/A