Loading...
R-02-12-19-9D5 - 12/19/2002RESOLUTION NO. R- 02- 12- 19 -9D5 WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ( "Contract ") with Earth Tech Transportation Services, Inc. for the preparation of schematics, environmental documents, right -of -way documents, plans, specifications, and estimates for the realignment of South Mays Street, Dell Way, Hester's Crossing, and the extension of Gattis School Road from South Mays Street to the IH 35 East Frontage Road, and WHEREAS, Earth Tech Transportation Services, Inc. has submitted Supplemental Agreement No. 6 to the Contract for Engineering Services to extend the contract date, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 6 to the Contract for Engineering Services with Earth Tech Transportation Services, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 6 to the Contract for Engineering Services with Earth Tech Transportation Services, Inc., a copy of said agreement being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the 1,ODMA \WORLDOX \o. \W00% \RESOLUTI \R21119D5.WPD /SC public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 19th day of December, 2002. ATTEST: CHRISTINE R. MARTINEZ, City Secretary 2 s i n ^'MAXWELL, Mayor City of Round Rock, Texas STATE OF TEXAS § THE COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. #6 TO CONTRACT FOR ENGINEERING SERVICES This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Earth Tech Transportation Services, Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract ", on the 24 of November 1998 to retain engineering services for the prepa- ration of schematics, environmental documents, right -of -way documents, plans, specifications, and estimates for the realignment of South Mays Street, Dell Way, Hester's Crossing, and the extension of Gattis School Road from South Mays Street to the IH -35 East Frontage Road, and WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER, describes those engineering services to be provided by the Engineer as a part of the Contract, and WHEREAS, ARTICLE 3, CONTRACT PERIOD, requires the termination of the Contract on December 31,2002 unless the Contract is extended, and WHEREAS, ARTICLE 4, COMPENSATION, establishes the maximum lump sum payable under this contract at $351,078.59 without modification of the contract, and WHEREAS, it is in the City's best interest to extend the term of the contract until February 28, 2003, and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 3, CONTRACT PERIOD, shall be amended to extend the contract period to February 28, 2003. EXHIBIT 1 Page 1 of 2 IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. (NAME OF RESPONSIBLE PARTY) CITY OF ROUND ROCK Date Z By: Nyle Maxwell, Mayor Supplemental Agr Form.doc/specs master /contracts & Corms— Revised 10/2102 Page 2 of 2 11111111111 p1111P VON tworame vat 1:4 111 Roadway Improvements to Dell Way, Dell Center Blvd., Gattis School Rd. and entrance to Boardwalk Shopping Center DATE: December 13, 2002 SUBJECT: City Council Meeting — December 19, 2002 ITEM: 9.D.5. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 6 to the Contract for Engineering Services with Earth Tech Transportation Services, Inc. for the Dell Way project. Resource: Jim Nuse, Chief of Operations/Asst. City Manager Bill Stablein, Transportation Construction Coordinator History: At its regularly scheduled meeting on November 24, 1998, the City Council approved the original contract as Resolution No. 98- 11- 24 -14C1 to have Earth Tech Transportation Services Inc., provide services for the preparation of schematics, environmental documents, right -of -way documents, plans, specifications, and estimates for the realignment of South Mays Street. The Council approved Supplemental Agreement No. 1 on November 21, 2000, which extended the contract and provided for construction inspection services. The approval of Supplemental Agreement No. 2 on December 20, 2001 allowed Earth Tech to provide design for the wall for Dell Way at South Mays Street. Supplemental Agreement No. 3, R - 02 - 05- 23-13C2, allowed for a change in the scope of services to: (1) provide plan, profile sheets detailing a mortared rock wall at Dell Way, and (2) provide plan, specifications and contract documents for a fence that will serve as a visual and sound barrier at the intersection of Dell Way and Mays Street. Supplemental Agreement No. 4, R- 02- 05- 23 -13C3, approved additional work that provided plans, specifications, and contract documents for the Home Depot Bridge. Supplemental Agreement No. 5, R- 02- 08- 08 -11G3 provided additional funds for project representative services. Further works to be completed under this contract were as -built plans, bid documents and bid process. Due to inclement weather and the holidays, a time extension will be needed. Supplemental Agreement No. 6 will extend the contract until February 28, 2003. Staff recommends approval. Funding: Cost: NONE Source of funds: N/A Outside Resources: Earth Tech Transportation Services ImpactBenefit: The approval of this agreement will allow continuous project representative services of the Dell Way Project. Public Comment: N/A Sponsor: N/A STATE OF TEXAS § THE COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. #6 TO CONTRACT FOR ENGINEERING SERVICES This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Earth Tech Transportation Services, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract ", on the 24` of November 1998 to retain engineering services for the prepa- ration of schematics, environmental documents, right -of -way documents, plans, specifications, and estimates for the realignment of South Mays Street, Dell Way, Hester's Crossing, and the extension of Gattis School Road from South Mays Street to the IH -35 East Frontage Road, and WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER, describes those engineering services to be provided by the Engineer as a part of the Contract, and WHEREAS, ARTICLE 3, CONTRACT PERIOD, requires the termination of the Contract on December 31,2002 unless the Contract is extended, and WHEREAS, ARTICLE 4, COMPENSATION, establishes the maximum Lump sum payable under this contract at $351,078.59 without modification of the contract, and WHEREAS, it is in the City's best interest to extend the term of the contract until February 28, 2003, and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 3, CONTRACT PERIOD, shall be amended to extend the contract period to February 28, 2003. ,2- oa- ia- i9 - 9o5 Page 1 of 2 IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. CITY OF R By: (NAME OF RESPONSIBLE PARTY) /Z / to Z well, Mayor l 19 -D/ Date Supplemental Agr Form.doc/specs master /contracts & forms — Revised 10/2/02 Page 2 of 2 Mayor le Maxwell a Pro -tem ram Nielson City Manager toberi L Benne Jr City Attorney Stephan L Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. January 14, 2003 Mr. Richard Zamarripa Project Representative Earth Tech Transportation Services, Inc. 811 Barton Springs Road, Suite 400 Austin, Texas 78704 Dear Mr. Zamarripa: The Round Rock City Council approved Resolution No. R- 02- 12 -19- 9D5 at their regularly scheduled meeting on December 19, 2002. This resolution approves Supplemental Agreement No. 6 to extend the contract date for the preparation of schematics, environmental documents, right -of -way documents, plans, specifications, and estimates for the realignment of South Mays Street, Dell Way, Hester's Crossing, and the extension of Gattis School Road from South Mays Street to IH 35 East Frontage Road. Enclosed is a copy of the resolution and original agreement for your files. If you have any questions, please do not hesitate to contact Bill Stablein at 218 -3237. Christine R. Martinez ml Members Alan McGraw City Secretary Carrie Pitt Scot Knight Isabel Gallahan Gary Coe Enclosure CITY OF ROUND ROCK 221 East Main Street • Round Rock. Texas 78664 Phone 512 2i8 5400 - Fax 512 218 7097 • www a round -rock tic us