Loading...
R-02-12-19-9D6 - 12/19/2002RESOLUTION NO. R- 02- 12- 19 -9D6 WHEREAS, the City of Round Rock has previously entered into a contract for engineering services ( "Contract ") with HDR Engineering, Inc. for a preliminary programming report for the IH 35 modifications from Chandler Road to Westinghouse Road, and for the development of a parallel arterial to IH 35, and WHEREAS, HDR Engineering, Inc. has submitted Supplemental Agreement No. 1 to the Contract to extend the contract date, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 1 to the Contract with HDR Engineering, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 1 to the Contract with HDR Engineering, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted pon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. 220DWA\ WORLDOX\ 0, \WDOX \RESOLVPI \R21119O6.WPD /ec ATTEST: RESOLVED this 19th day of December, 2002. m_u CHRISTINE R. MARTINEZ, City Secretary 2 E MAXWELL, Mayor City of Round Rock, Texas STATE OF TEXAS THE COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. # 1 TO CONTRACT FOR ENGINEERING SERVICES This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering, Inc., hereinafter called the "Engineer". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract ", on the 12 of September, 2002 to prepare a preliminary programming re- port and traffic impact analysis, and WHEREAS, ARTICLE 3, CONTRACT PERIOD, requires the termination of the Contract on December 31, 2002 unless the Contract is extended, and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 3, CONTRACT PERIOD, shall be amended to extend the contract period to March 31, 2003, and IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. THE ENG j By: J es K. (Ken) Haney, .E. /)7/ / / / /// Date CITY OF ROUND ROCK Date By: Nyle Maxwell, Mayor Supplemental Agr Form doc/specs muter /contracts & forms — Revised 10/2/02 Page 1 of 1 EXHIBIT nA 1 H 35 Modifications From Chandler Rd to Westinghouse Rd & Development of A Parallel Arterial to I H 35 ROUNOH/Nx,TL%AS DATE: December 13, 2002 SUBJECT: City Council Meeting — December 19, 2002 ITEM: * 9.D.6. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 1 to the Contract for Engineering Services with HDR Engineering, Inc. for a preliminary programming report for the IH 35 modifications from Chandler Road to Westinghouse Road. Resource: Jim Nuse, Chief of Operations /Asst. City Manager Tom Word, Director of Transportation Services History: A report will be developed to establish the preliminary cost estimates for five separate projects listed below. The report will also include information required to complete the final design of each project. The projects are as follows: I. Ramp Reversal of northbound ramp pair between Chandler Road and Westinghouse Road. 2. Adding a frontage road lane between new ramp pair configuration. 3. Adding northbound to southbound turn- around bridge at Westinghouse Road. 4. Adding southbound to northbound turn- around bridge at Chandler Road/RM 1431. 5. Arterial roadway approximately 4,000 feet long extending from the northbound frontage road to FM 1431. A traffic impact analysis will be developed to provide data for the report. The area to be studied will be bounded by IH 35 to the West, Westinghouse Road to the North, FM 1460 to the East, and Chandler Road to the South. The analysis will develop current and Future Level of Service based on the planned development for the area for the intersections listed below and the roadway segments between those roadways as follows: 1. Intersection of IH 35 with Chandler Road and Westinghouse Road. 2. Modifications to the frontage road and ramp reversals. 3. Intersection of FM 1460 with Chandler Road and Westinghouse Road. 4. Adding turn- around bridges at Chandler Road and Westinghouse Road. 5. Arterial roadway approximately 4,000 feet long extending from the northbound frontage road to FM 1431. 6. Terra Vista Parkway and the frontage road. Additional time will be needed to submit designs to the TxDOT. This Supplemental Agreement No. 1 will extend the contract until March 31, 2003. Funding: Cost: NONE Source of funds: N/A Outside Resources: HDR Engineering, Inc. Impact/Benefit: The approval of this agreement requesting a contract extension will allow the engineer to coordinate with TxDOT for design approval. Public Comment: N/A Sponsor: N/A STATE OF TEXAS THE COUNTY OF WILLIAMSON This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and HDR Engineering, Inc., hereinafter called the `Engineer ". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract ", on the 12 of September, 2002 to prepare a preliminary programming re- port and traffic impact analysis, and WHEREAS, ARTICLE 3, CONTRACT PERIOD, requires the termination of the Contract on December 31, 2002 unless the Contract is extended, and NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 3, CONTRACT PERIOD, shall be amended to extend the contract period to March 31, 2003, and IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. THE EN INEER By: 7 es K. (Ken) Han y, P.E. [Lk: p 2/ Date SUPPLEMENTAL AGREEMENT NO. # 1 TO CONTRACT FOR ENGINEERING SERVICES CITY OF RO : i RO K ell, Mayor Date Supplemental Agr Form.doc /specs master /contracts & forms — Revised 10/2/02 ,€- O 1s -19 -qA Page 1of1 Mayor 4yle Maxwell yor Pro -tem Tom Nielson City Manager Robe 8enneti, Jr City Attorney Stephan L Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. January 14, 2003 Mr. George Tillett Project Manager HDR Engineering, Inc. 2211 South IH 35, Suite 300 Austin, TX 78741 Dear Mr. Tillett: The Round Rock City Council approved Resolution No's R- 02- 12 -19- 9D6 at their regularly scheduled meeting on December 19, 2002. Resolution No. R- 02- 12- 19 -9D6 approves Supplemental Agreement No. 1 for the preliminary programming report for the IH 35 modifications from Chandler Road to Westinghouse Road, and for the development of a parallel arterial to IH 35. Resolution No. R- 02- 12- 19 -9D9 approves Supplemental Agreement No. 1 for the design of the East Water Transmission Line (Phase II) Improvements. Enclosed is a copy of the resolutions and agreements for your files. If you have any questions, please do not hesitate to Tom Word at 218- 5562. cerely, nicuL Christine R. Marti nez mcd Members Alan McGraw City Secretary Carrie Pitt - Scot Knight Isabel Gallahan Gary Coe Enclosure CITY OF ROUND ROCK 221 East Main Street • Round Rock. Texas 78664 Phone 512 218 5400 • Fax 512 218 7097 • www a round -rock tx us