R-02-12-19-9D8 - 12/19/2002RESOLUTION NO. R- 02- 12- 19 -9D8
WHEREAS, the City of Round Rock has previously entered into a
contract for Engineering Services ( "Contract ") with S.D. Kallman, L.P.
for the design of the Westinghouse Wastewater Interceptor, and
WHEREAS, S.D. Kallman, L.P. has submitted Supplemental Agreement
No. 2 to the Contract for a change in the scope of services, and
WHEREAS,the City Council desires to enter into said Supplemental
Agreement No. 2 with S.D. Kallman, L.P., Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City Supplemental Agreement No. 2 to the Contract with
S.D. Kallman, L.P., a copy of said agreement being attached hereto as
Exhibit "A" and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended.
Ma\ WORL00 E \01 \W00E \RESOLUTI \R2111908 .WPO /sc
ATTEST:
RESOLVED this 19th day of December, 2002.
CHRISTINE R. MARTINEZ, City Secretary
2
MAXWELL, Mayor
City of Round Rock, Texas
STATE OF TEXAS
THE COUNTY OF WILLIAMSON
SUPPLEMENTAL AGREEMENT NO. 2
TO CONTRACT FOR ENGINEERING SERVICES
This Amendment to the Contract for Engineering Services is made by and between the City of
Round Rock, Texas, hereinafter called the "City" and S.D. Kallman, L.P., hereinafter called the
"Engineer ".
WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter
called the "Contract ", on the 25` day of January 2001 to provide Design and Construction
Phase Services for the Westinghouse Wastewater Interceptor from the Chandler Creek In-
terceptor to the South Property Line of the Westinghouse Property in North Round Rock.
WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER,
describes those engineering services to be provided by the Engineer as a part of the Contract, and
WHEREAS, ARTICLE 3, CONTRACT PERIOD, requires the termination of the Contract on
March 1, 2002 unless the Contract is extended, and
WHEREAS, ARTICLE 4, COMPENSATION, establishes the maximum lump sum payable
under this contract at $125,500.00 without modification of the contract, and
WHEREAS, it has become necessary to amend the contract to provide for preparation of addi-
tional documents for easement acquisition and revising construction plans and specifica-
tions to include Alternate Bid Item No. 1 to upsize a portion of the Westinghouse Wastewa-
ter Interceptor, and
WHEREAS, the Engineer has agreed to have the additional work performed for $14,205.00 in-
creasing the lump sum fee for the contract to $149,705.00.
NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract
is amended as follows:
ARTICLE 3, CONTRACT PERIOD, shall be amended to extend the contract period to DE-
CEMBER 1, 2003, and
ARTICLE 4, COMPENSATION, shall be amended by the changing the lump sum amount pay-
able under this contract as S149,705.00.
ATTACHMENT `B ", Services to be Provided by the Engineer shall be amended as set forth in
the attached ADDENDUM NO. 2 to ATTACHMENT `B ".
Page 1 of 1
EXHIBIT
nAu
ATTACHMENT "C ", Work Schedule shall be amended as set forth in the attached ADDEN-
DUM NO. 2 to ATTACHMENT "C ".
ATTACHMENT "D ", Fee Schedule shall be amended as set forth in the attached ADDENDUM
NO. 2 to ATTACHMENT "D ".
IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement
in duplicate.
THE ENGINEER
By: �•
By:
Steven D. Kaltman, P.E., R.P.L.S.
Title: President, Steven D. Kaltman, L.L.0
General Partner, S.D. Kaltman, L.P.
l - 'z7 --r a
Date
CITY OF ROUND ROCK
Nyle Maxwell, Mayor
Date
Supplemental Agr Form doc/specs master /contracts & forms — Revised 10/2/02
Page 2 of 2
ATTACHMENT B
SERVICES TO BE PROVIDED BY THE ENGINEER - ADDENDUM NO. 2
Basic Services include:
Preparation of Plans and Specifications, governmental approvals, TxDOT Highway R.O.W.
crossing permits, assistance in advertising (City pays publication costs) and receiving Bids,
Construction Phase services, preparation of as -built drawings and attendance at staff and City
Council meetings, as requested. The preparation of the Sewage Collection System (SCS) and
Water Pollution Abatement Plan (WPAP) Applications (Addendum No. 1) for the project as it
lies in the Edwards Aquifer Recharge Zone and the preparation of a Stormwater Pollution
Prevention Plan (SWPPP) for conducting construction activities under the Nationwide Permit
System. Also, included is the revision for construction plans and specifications to include
Alternate Bid Item No. 1 to upsize a portion of the Westinghouse Wastewater Interceptor
(Addendum No. 2).
• Construction plans include the horizontal and vertical location of all existing utilities within the
construction area. The utilities shall include, but not be limited to electric, gas, water,
wastewater and communication utilities.
Construction plans shall provide horizontal and vertical control information sufficient, that
contractor's surveyor can reestablish said controls and provide required construction staking.
These control points shall be established on the ground.
• Engineer shall review and approve cut sheets, shop drawings and prepare and sign change
orders. -
Special Services include:
• Property surveys and preparation of wastewater line easement descriptions and drawings.
Addendum No. 1 - Tree surveys for the limits of the wastewater line alignment as requested by
the Owner.
• Addendum No. 2 - Preparation of additional documents for easement acquisition.
7. \Wpdou\ESAS\343-653 rt -Amend 2(1 I- 22 -02).wpd
Page 15 of 20
Date
December _, 2002
ATTACHMENT C
WORK SCHEDULE (REVISED 11- 26 -02) - ADDENDUM NO. 2
Milestone
TxDOT Bore Permit Application for F.M. 1431 Submitted
December 31, 2002 Submittals for Plans, Specifications and SCS and WPAP Applications
Approved by Public Works Department
January 8, 2003 SCS and WPAP Applications Submittal to TCEQ (allow 90 days for
review and approval); TxDOT Permit for F.M. 1431 Approved
April 8, 2003 SCS and WPAP Applications Approved by TCEQ; Wastewater Line
Easement Acquisition Complete
April 15 & 22, 2003 Public Notice Advertising Bids
May 6, 2003 Bids Received at City Hall
May 13, 2003 City Awards Contract
May 27, 2003 Contractor Returns Contract Documents with Signature, Bonds, and
Certificate of Insurance, Notice of Intent (NOI) Submitted to EPA
June 3, 2003 City Signs Contract Documents; City and Engineer Hold Pre - Construction
Conference and Issues Notice to Proceed.
June 10, 2003 Begin Construction
November 11, 2003 Construction Complete (5 Months)
November 18, 2003 City and Engineer Prepare Final Punch List
December 1, 2003 Final Project Acceptance -- Facility in Service
1 \wMrcaFC AC \4dt.651 rr- A.n.nd WI l )7.011 uml
Paee 16 of 20
ATTACHMENT D
FEE SCHEDULE - ADDENDUM NO. 2
PROJECT: Estimated Construction Cost Including 10% Contingency is $1,050,600.
Fee Schedule - Basic Services:
Compensation for Basic Services shall be as follows:
Phase I. Engineering Services for Design Phase $ 93,500.00
Sewage Collection System Application $ 5,000.00
Stormwater Pollution Prevention Plan $ 1,500.00
Addendum No. 1 - Water Pollution Abatement Plan Application $ 3,500.00
AddendumNo. 2 -Construction plans and specifications to include Alternate
Bid Item No. 1 to oversize a portion of the Westinghouse Wastewater
Interceptor $ 2,205.00
Phase II. Engineering Services for Construction Phase $ 16,500.00
1 \WodocAESAS\343 -653 rt-Amend 2(11 -22 -02) wpd
Total Original Basic Services Fee $ 116,500.00
Total Addendum No. 1 Basic Services Fee $ 3,500.00
Total Addendum No. 2 Basic Services Fee $ 2,205.00
Fee Schedule - Special Services:
Compensation for Special Services for field note and drawing preparation for wastewater line
easements shall be reimbursed in accordance with Attachment H - Hourly Rate Schedule not to
exceed $9,000. $ 9,000.00
Addendum No. 1 - Compensation for Special Services for a tree survey for the limits of the
wastewater line alignment as requested by the Owner shall be reimbursed in accordance with
Attachment H - Hourly Rate Schedule not to exceed $6,500. $ 6,500.00
Addendum No. 2 - Compensation for Special Services for preparation of additional
documents for easement acquisition as requested by the Owner shall be reimbursed in
accordance with Attachment H - Hourly Rate Schedule not to exceed $12,000. $ 12,000.00
Total Original Special Services Fee $ 6,500.00
Total Addendum No. 1 Special Services Fee $ 6,500.00
Total Addendum No. 2 Special Services Fee $ 12,000.00
Total Amended Special Services Fee $ 27,500.00
TOTAL ORIGINAL FEE $ 125,500.00
TOTAL ADDENDUM NO. 1 FEE $ 10,000.00
TOTAL AMENDED FEE $ 149,705.00
Note: Since it is assumed that the construction contractor shall provide construction staking for this project,
no fees have been included for that task.
Page 17 of 20
Total Amended Basic Services Fee $ 122,205.00
TOTAL ADDENDUM NO. 2 FEE $ 14,205.00
Legend
® Interceptor
Wastewater Lines
Westinghouse Wastewater Interceptor
S%GRAMICSCOUNGa AGENDA 17111AP.0461/01ERW411i1LIVWE5I10:G0{O11SE WASTEWATER WIERGFPIG0. 1.01
DATE: December 13, 2002
SUBJECT: City Council Meeting — December 19, 2002
ITEM: * 9.D.8. Consider a resolution authorizing the Mayor to execute Supplemental
Agreement No. 2 to the Contract for Professional Services with S.D.
Kalhnan, L.P. for the Westinghouse Wastewater Interceptor Project.
Resource: Jim Nuse, Chief of Operations /Assistant City Manager
Tom Clark, Director of Utilities
Don Rundell, Chief Utility Engineer
History: This project consists of the design approximately 8,500 linear feet of wastewater
main from 12- inches to 27- inches in diameter and serving approximately 4,000
acres. This Interceptor will run from the City's Water Treatment Plant connecting to
an existing 36 -inch wastewater interceptor (constructed in 1985) located
approximately 1,000 feet east of Ill 35 and 5,000 feet south of Chandler Road.
Amendment Number One was to provide a Tree Survey and to submit a Water
Pollution Abatement Plan Application (WPAP) to TNRCC, as required for an
additional fee of $10,000.00.
The work here under Supplemental Agreement Number Two is for revising the
construction plans to increase the pipe diameter for a portion of the Wastewater
Interceptor to 36- inches as requested by the City Engineer. Also, included in this
agreement is $12,000.00 additional cost for easement revisions per the City
Attorney's Office.
Funding:
Cost: $14,205.00
Source of funds: Capital Project Funds (Self financed Utility)
Outside Resources: S.D. Kaltman, L.P.
ImpactBenefit: This project is to upgrade the existing wastewater line in order to meet future
capacity requirements.
Public Comment: N/A
Sponsor: N/A
STATE OF TEXAS
THE COUNTY OF WILLIAMSON
SUPPLEMENTAL AGREEMENT NO. 2
TO CONTRACT FOR ENGINEERING SERVICES
This Amendment to the Contract for Engineering Services is made by and between the City of
Round Rock, Texas, hereinafter called the "City" and S.D. Kallman, L.P., hereinafter called the
"Engineer ".
WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter
called the "Contract ", on the 25 day of January 2001 to provide Design and Construction
Phase Services for the Westinghouse Wastewater Interceptor from the Chandler Creek In-
terceptor to the South Property Line of the Westinghouse Property in North Round Rock.
WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER,
describes those engineering services to be provided by the Engineer as a part of the Contract, and
WHEREAS, ARTICLE 3, CONTRACT PERIOD, requires the termination of the Contract on
March 1, 2002 unless the Contract is extended, and
WHEREAS, ARTICLE 4, COMPENSATION, establishes the maximum lump sum payable
under this contract at $125,500.00 without modification of the contract, and
WHEREAS, it has become necessary to amend the contract to provide for preparation of addi-
tional documents for easement acquisition and revising construction plans and specifica-
tions to include Alternate Bid Item No. 1 to upsize a portion of the Westinghouse Wastewa-
ter Interceptor, and
WHEREAS, the Engineer has agreed to have the additional work performed for $14,205.00 in-
creasing the lump sum fee for the contract to $149,705.00.
NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract
is amended as follows:
ARTICLE 3, CONTRACT PERIOD, shall be amended to extend the contract period to DE-
CEMBER 1, 2003, and
ARTICLE 4, COMPENSATION, shall be amended by the changing the lump sum amount pay-
able under this contract as $149,705.00.
ATTACHMENT `B ", Services to be Provided by the Engineer shall be amended as set forth in
the attached ADDENDUM NO. 2 to ATTACHMENT "B ".
E-0-1,9-19 -9
Page 1 of 1
ATTACHMENT "C ", Work Schedule shall be amended as set forth in the attached ADDEN-
DUM NO. 2 to ATTACHMENT "C ".
ATTACHMENT "D" Fee Schedule shall be amended as set forth in the attached ADDENDUM
NO. 2 to ATTACHMENT "D ".
IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement
in duplicate.
Steven D. Kallman, P.E., R.P.L.S.
Title: President, Steven D. Kallman, L.L.0
General Partner, S.D. Kallman, L.P.
Date
CITY OF RO ' i ROC
By:
ell, Mayor
1A-i9 -ca
Date
Supplemental Agr Form doe/specs master /contracts & forms — Revised 10/2/02
Page 2 of 2
ATTACHMENT B
SERVICES TO BE PROVIDED BY THE ENGINEER - ADDENDUM NO. 2
Basic Services include:
• Preparation of Plans and Specifications, governmental approvals, TxDOT Highway R.O.W.
crossing permits, assistance in advertising (City pays publication costs) and receiving Bids,
Construction Phase services, preparation of as -built drawings and attendance at staff and City
Council meetings, as requested. The preparation of the Sewage Collection System (SCS) and
Water Pollution Abatement Plan (WPAP) Applications (Addendum No. 1) for the project as it
lies in the Edwards Aquifer Recharge Zone and the preparation of a Stormwater Pollution
Prevention Plan (SWPPP) for conducting construction activities under the Nationwide Permit
System. Also, included is the revision for construction plans and specifications to include
Alternate Bid Item No. 1 to upsize a portion of the Westinghouse Wastewater Interceptor
(Addendum No. 2).
• Construction plans include the horizontal and vertical location of all existing utilities within the
construction area. The utilities shall include, but not be limited to electric, gas, water,
wastewater and communication utilities.
• Construction plans shall provide horizontal and vertical control information sufficient, that
contractor's surveyor can reestablish said controls and provide required construction staking.
These control points shall be established on the ground.
Engineer shall review and approve cut sheets, shop drawings and prepare and sign change
orders.
Special Services include:
• Property surveys and preparation of wastewater line easement descriptions and drawings.
• Addendum No. 1 - Tree surveys for the limits of the wastewater line alignment as requested by
the Owner.
• Addendum No. 2 - Preparation of additional documents for easement acquisition.
J \Wpdoa\FSAS'343 -653 rr-Amend 2(11 -22 -02) wpd
Page 15 of 20
Date
December _, 2002
ATTACHMENT C
WORK SCHEDULE (REVISED 11- 26 -02) - ADDENDUM NO. 2
Milestone
TxDOT Bore Permit Application for F.M. 1431 Submitted
December 31, 2002 Submittals for Plans, Specifications and SCS and WPAP Applications
Approved by Public Works Department
January 8, 2003 SCS and WPAP Applications Submittal to TCEQ (allow 90 days for
review and approval); TxDOT Permit for F.M. 1431 Approved
April 8, 2003 SCS and WPAP Applications Approved by TCEQ; Wastewater Line
Easement Acquisition Complete
April 15 & 22, 2003 Public Notice Advertising Bids
May 6, 2003 Bids Received at City Hall
May 13, 2003 City Awards Contract
May 27, 2003 Contractor Returns Contract Documents with Signature, Bonds, and
Certificate of Insurance, Notice of Intent (NOI) Submitted to EPA
June 3, 2003 City Signs Contract Documents; City and Engineer Hold Pre - Construction
Conference and Issues Notice to Proceed.
June 10, 2003 Begin Construction
November 11, 2003 Construction Complete (5 Months)
November 18, 2003 City and Engineer Prepare Final Punch List
December I, 2003 Final Project Acceptance -- Facility in Service
J: \Wpdocs\ESAS\343 -653 m -Amend 2(11- 22- 02).wpd
Page 16 of 20
ATTACHMENT D
FEE SCHEDULE - ADDENDUM NO. 2
PROJECT: Estimated Construction Cost Including 10% Contingency is $1,050,600.
Fee Schedule - Basic Services:
Compensation for Basic Services shall be as follows:
Phase I. Engineering Services for Design Phase $ 93,500.00
Sewage Collection System Application $ 5,000.00
Stormwater Pollution Prevention Plan $ 1,500.00
Addendum No. 1 - Water Pollution Abatement Plan Application $ 3,500.00
Addendum No. 2- Construction plans and specifications to include Alternate
Bid Item No. 1 to oversize a portion of the Westinghouse Wastewater
Interceptor $ 2,205.00
Phase II. Engineering Services for Construction Phase $ 16,500.00
Total Addendum No. 2 Basic Services Fee $ 2,205.00
Total Amended Basic Services Fee $ 122,205.00
Fee Schedule - Special Services:
Compensation for Special Services for field note and drawing preparation for wastewater line
easements shall be reimbursed in accordance with Attachment H - Hourly Rate Schedule not to
exceed $9,000. $ 9,000.00
Addendum No. 1 - Compensation for Special Services for a tree survey for the limits of the
wastewater line alignment as requested by the Owner shall be reimbursed in accordance with
Attachment H - Hourly Rate Schedule not to exceed $6,500. $ 6,500.00
Addendum No. 2 - Compensation for Special Services for preparation of additional
documents for easement acquisition as requested by the Owner shall be reimbursed in
accordance with Attachment H - Hourly Rate Schedule not to exceed $12,000. $ 12,000.00
Total Original Special Services Fee $ 6,500.00
Total Addendum No. 1 Special Services Fee $ 6,500.00
Total Addendum No. 2 Special Services Fee $ 12,000.00
Total Amended Special Services Fee $ 27,500.00
TOTAL ORIGINAL FEE $ 125,500.00
TOTAL ADDENDUM NO. 1 FEE $ 10,000.00
TOTAL ADDENDUM NO. 2 FEE $ 14,205.00
TOTAL AMENDED FEE $ 149,705.00
Note: Since it is assumed that the construction contractor shall provide construction staking for this project,
no fees have been included for that task.
1: \W pdocs\ESAS\343 2(11 22.02).wpd
Total Original Basic Services Fee $ 116,500.00
Total Addendum No. 1 Basic Services Fee $ 3,500.00
Page 17 of 20
Mayor
le Maxwell
t• Pro-tem
fom Nielson
cil Members
Alan McGraw
Carrie Pitt
Scot Knight
sabel Gallahan
Gary Coe
City Manager
en L Bennett, Jr
City Attorney
Stephan L Sheets
ROUND ROCK, TEXAS
PURPOSE. PASSION. PROSPERITY.
January 14, 2003
Mr. Steven Kallman, P.E., R.P.L.S.
S.D. Kallman, L.P.
1106 South Mays, Ste. 100
Round Rock, TX 78664
Dear Mr. Kallman:
The Round Rock City Council approved Resolution No. R- 02- 12 -19-
9D8 at their regularly scheduled meeting on December 19, 2002. This
resolution approves Supplemental Agreement No. 2 for the design of
the Westinghouse Wastewater Interceptor.
Enclosed is a copy of the resolution and original agreement for your
files. If you have any questions, please do not hesitate to Tom Clark at
218 -6617.
Christine R. Martinez
City Secretary
Enclosure
CITY OF ROUND ROCK 221 East Main Street • Round Rock, Texas 78664
Phone 512 218 5400 • Fax 512 218 7097 • www ct round rock tx us