Loading...
R-03-01-09-9E1 - 1/9/2003WHEREAS, the City of Round Rock has previously entered into a Contract for Engineering Services ( "Contract ") with Baker - Aicklen & Associates, Inc. for the design of roadway improvements on CR 122 from Forest Creek Drive to Brushy Creek, and WHEREAS, Baker - Aicklen & Associates, Inc. has submitted Supplemental Agreement No. 3 to Contract for Engineering Services for a change in the scope of services, and WHEREAS, the City Council desires to approve said Supplemental Agreement No. 3 with Baker - Aicklen & Associates, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 3 to Contract with Baker - Aicklen & Associates, Inc. for a change in the scope of services, a copy of said Supplemental Agreement No. 3 being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 9th day of January, ATTEST CHRISTINE R. MARTINEZ DDMA\ MDRLDOX \s \WDDX \RESDLDTI \R3D109E1 MPD /suc RESOLUTION NO. R- 03- O1- 09 -9E1 , City Secret y r"T7P Mayor sw- Round Rock, Texas STATE OF TEXAS § THE COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. #3 TO CONTRACT FOR ENGINEERING SERVICES This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Baker - Aicklen & Assoc., Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract ", on the February 22, 1999 to widen CR 122, Forest Creek Drive to Brushy Creek, and WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER, describes those engineering services to be provided by the Engineer as a part of the Contract, and WHEREAS, ARTICLE 3, CONTRACT PERIOD, subsequently revised by Supplemental Agreement No. 2, requires the termination of the Contract on October 31, 2003 unless the Contract is extended, and WHEREAS, ARTICLE 4, COMPENSATION, subsequently revised by Supplemental Agreement No. 2, establishes the maximum lump sum payable under this contract at $183,800.00 without modification of the contract, and WHEREAS, it has become necessary to amend the contract to provide for Additional Drainage Investigation & Hydraulic Design, Sidewalk Investigation at All Drainage Structures — Phase I, Design Surveys — Phase II (Forest Creek Drive to Gattis School Road), Extension of Design Effort from Forest Creek Drive to Gattis School Road and Right -of -Way Surveys from Forest Creek Drive to Gattis School Road, and WHEREAS, the Engineer has agreed to have the additional work performed for $134,657.31 increasing the lump sum fee for the contract to $318,457.31. NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 3, CONTRACT PERIOD, shall be amended to extend the contract period to October 31, 2004, and ARTICLE 4, COMPENSATION, shall be amended by the changing the lump sum amount payable under this contract as $318,457.31. ATTACHMENT "B ", Services to be Provided by the Engineer shall be amended as set forth in the attached ADDENDUM to EXHIBIT B. Page 1 of 2 EXHIBIT nA u IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. THE ENGINEE By: /j�y►Lf/�(N AME OF RESPO Cie E PARTY) Date CITY OF ROUND ROCK By: Nyle Maxwell, Mayor Date Supplemental Agr Fomtdoc/specs muter /contracts & forms —Revised 10/2/02 OA0601- 2 -058\Suppl Agree #3 104-02.doc Page 2 of 2 * A rnanhour estimate is attached behind this page for reference only. o \601- 2- 058\Supplemental Agree #3Addit Drainage Design.xls City of Round Rock Agreement For Engineeering Services with Baker - Aicklen & Associates, Inc. Additional Drainage Design (Not in Original Scope) DIRECT LABOR OVERHEAD PERCENTAGE TOTAL LABOR & OH FIXED FEE TOTAL COST LABOR COSTS: * 157 12% ENGINEERING SERVICES $13,396.00 $21,031.72 $34,427.72 $4,131.33 $38,559.05 TOTAL LABOR COST: $13,396.00 $21,031.72 $34,427.72 $4,131.33 $38,559.05 * A rnanhour estimate is attached behind this page for reference only. o \601- 2- 058\Supplemental Agree #3Addit Drainage Design.xls City of Round Rock Agreement For Engineeering Services with Baker - Aicklen & Associates, Inc. Additional Drainage Design (Not in Original Scope) ENGINEERING SERVICES PE PD EA SCT ECT ADM TOTAL Hydrology (Including Overall Drainage Map, Box Culverts & Field Recon for Ex. Detention Ponds, & As- Built Dwg. Review) 20 64 84 Hydraulics (Including Checking Road Side Ditches, Intersection & Cross Culverts, Drainage Map, & As- Built Dwg. Review) 30 120 150 Storm Sewer (Design) 16 80 96 Hydrology Drainage Map & Drainage Map Dwg. 5 40 45 Box Culverts, Profile Dwg. 5 30 35 Storm Sewer Profile 40 40 Draining Culvert Improvements to Plan Views & Details 8 45 53 Add Drainage Features & Wet Utilities to Cross Sections 16 36 52 Total Manhours 66 0 298 0 191 0 555 PE Project Engineer SCT Senior CAD Tech RPLS Registered Professional Land Surveyor GPS 2 GPS Operator 2 o. \601- 2 -058\Supplemental Agrec#3Addit Drar nge Design.xls MANHOUR ESTIMATE ENGINEERING Additional Drainage Design Not in Original Scope) PD Project Designer ECT Engineering CAD Tech SST Senior Survey Tech PC Party Chief IM Instrumment Operator EA Engineering Assistant ADM Administrative GPS GPS Operator 1 RM Rodman MANHOUR SUMMARY Supplemental Agreement #3 City of Round Rock CR 122 - Additional Drainage Design (Not in Original Scope) ENGINEERING SERVICES Manhours Salary Direct Labor Cost Project Engineer 66 638.00 $2,508.00 Project Designer 0 $31.00 $0.00 Engineering Assistant 298 $25.00 $7,450.00 Senior CAD Tech 0 $24.50 $0.00 Engineering CAD Tech 191 $18.00 $3,438.00 Administrative 0 $17.00 $0.00 Subtotal 555 $13,396.00 0:\601- 2- 058\Supplemental Agree #3Addit Drainage Design.xls * A manhour estimate is attached behind this page for reference only. 030601 -2 -058 Suppl Agreem #3 Sidewalk Invesn.xls City of Round Rock Agreement For Engineeering Services with Baker - Aicklen & Associates, Inc. Sidewalk Investigation DIRECT LABOR OVERHEAD PERCENTAGE TOTAL LABOR & OH FIXED FEE TOTAL COST LABOR COSTS: * 157 ENGINEERING SERVICES $2,996.00 $4,703.72 $7,699.72 $923.97 $8,623.69 TOTAL LABOR COST: $2,996.00 $4,703.72 $7,699.72 $923.97 $8,623.69 * A manhour estimate is attached behind this page for reference only. 030601 -2 -058 Suppl Agreem #3 Sidewalk Invesn.xls City of Round Rock Agreement For Engineeering Services with Baker - Aicklen & Associates, Inc. Sidewalk Investigation ENGINEERING SERVICES PE PD EA SCT ECT ADM TOTAL Review of Existing Plans for Future Sidewalk Design 2 16 18 Redesign of Drainage Structures for Future Sidewalks 4 24 40 68 Replotting & Resubmittal of Plans for City of Round Rock Review 4 4 Addressing City Comments (2 Times) 16 32 48 Total Manhours 6 0 56 0 76 0 138 PE Project Engineer SCT Senior CAD Tech RPLS Registered Professional Land Surveyor GPS 2 GPS Operator 2 0.\0601 -2 -058 Suppl Agreem #3 Sidewalk Investi.xls MANHOUR ESTIMATE ENGINEERING Sidewalk Investigation PD Project Designer ECT Engineering CAD Tech SST Senior Survey Tech PC Party Chief IM Instrumment Operator EA Engineering Assistant ADM Administrative GPS GPS Operator 1 RM Rodman Supplemental Agreement #3 City of Round Rock CR 122 - Sidewalk Investigation ENGINEERING SERVICES Manhours Salary Direct Labor Cost 0:\0601.2 -058 Suppl Agreem #3 Sidewalk investi.xls MANHOUR SUMMARY Project Engineer 6 $38.00 $228.00 Project Designer 0 $31.00 $0.00 Engineering Assistant 56 $25.00 $1,400.00 Senior CAD Tech 0 $24.50 $0.00 Engineering CAD Tech 76 $18.00 $1,368.00 Administrative 0 $17.00 $0.00 Subtotal 138 $2,996.00 City of Round Rock Agreement For Engineeering Services with Baker - Aicklen & Associates, Inc. CR 122 - Phase II Extension of Design From Forest Creek Drive to Gattis School Road * A manhour estimate is attached behind this page for reference only. 0:\0601- 2 -058\Suppl Agee #3 CR 122 Extens of Design.xls DIRECT LABOR OVERHEAD PERCENTAGE TOTAL LABOR & 011 FIXED FEE TOTAL COST LABOR COSTS: * 157 12% ENGINEERING SERVICES $20,964.00 $32,913.48 $53,877.48 $6,465.30 $60,342.78 TOTAL LABOR COST: $20,964.00 $32,913.48 $53,877.48 $6,465.30 $60,342.78 City of Round Rock Agreement For Engineeering Services with Baker - Aicklen & Associates, Inc. CR 122 - Phase II Extension of Design From Forest Creek Drive to Gattis School Road * A manhour estimate is attached behind this page for reference only. 0:\0601- 2 -058\Suppl Agee #3 CR 122 Extens of Design.xls ENGINEERING SERVICES PE PD EA SCT ECT ADM TOTAL Project Coordination, Set up, Meetings, Etc. 16 32 48 Preparation of Base Maps 16 40 56 Preliminary Design 15 40 20 80 155 Final Design 20 80 40 160 300 Revisions to Existing Plans For Phasing, Details, General Notes 2 8 16 26 Plotting & Submittal to City of Round Rock 2 5 7 Address City Comments (2 Times) 4 30 40 74 Quantity Takeoff & Engineer's Opinion of Probable Cost 16 16 8 40 Additional Specifications & Bid Document Prep. 2 4 16 22 Additional Construction Phase Services (Assumes 4 Month Construction) 16 80 20 116 Additional Construction Phase Services to Phase I Due to Increased Project Magnitude 16 40 10 66 Total Manhours 91 0 332 76 357 54 910 MANHOUR ESTIMATE ENGINEERING CR 122 - Phase II Extenson of Design From Forest Creek Drive to Gattis School Road PE Project Engineer SCT Senior CAD Tech RPLS Registered Professional Land Surveyor GPS 2 GPS Operator 2 o:\0601- 2.058\Supple Agreem #3 CR122 Extension of Des.xls PD Project Designer ECT Engineering CAD Tech SST Senior Survey Tech PC Party Chief IM Instrumment Operator EA Engineering Assistant ADM Administrative GPS GPS Operator 1 RM Rodman MANHOUR SUMMARY Supplemental Agreement #3 City of Round Rock CR 122 - Phase II Extension of Design from Forest Creek Drive to Gatis School Road ENGINEERING SERVICES Manhours Salary Direct Labor Cost Project Engineer 91 $38.00 $3,458.00 Project Designer 0 $31.00 $0.00 Engineering Assistant 332 $25.00 $8,300.00 Senior CAD Tech 76 $24.50 $1,862.00 Engineering CAD Tech 357 $18.00 $6,426.00 Administrative 54 $17.00 $918.00 Subtotal 910 $20,964.00 o:\0601 2 - 0581Supp Agree #3 CR 122 Extens of Design.xls * A manhour estimate is attached behind this page for reference only. 0:\0601.2- 0581Supplemental AgreementtSupp Agree#3 Surveying xis City of Round Rock Agreement For Surveying Services - Phase 11 Baker- Aicklen & Associates, Inc. CR 122 DIRECT LABOR OVERHEAD PERCENTAGE TOTAL LABOR & 011 FIXED FEE TOTAL COST LABOR COSTS: * 157 Surveying Services $9,426.00 $14,798.82 $24,224.82 $2,906.98 $27,131.80 TOTAL LABOR COST: $9,426.00 $14,798.82 $24,224.82 $2,906.98 $27,131.80 * A manhour estimate is attached behind this page for reference only. 0:\0601.2- 0581Supplemental AgreementtSupp Agree#3 Surveying xis City of Round Rock Agreement For Surveying Services - Phase 11 Baker- Aicklen & Associates, Inc. CR 122 SURVEYING SERVICES RPLS SST GPS1 GPS2 PC IM RM ADM TOT Design Surveys 18 68 88 88 88 8 358 ROW Surveys (Assumes 15 Parcels) 24 32 4 4 48 48 48 24 232 Total Manhours 42 100 4 4 136 136 136 32 590 MANHOUR ESTIMATE CR 122 SURVEYING SERVICES - PHASE II PE Project Engineer SCT Senior CAD Tech RPLS Registered Professional Land Surveyor GPS 2 GPS Operator 2 0:\0601.2.058\Supplemental Agreement\Supp Agree#3 Surveying xls PD Project Designer ECT Engineering CAD Tech SST Senior Survey Tech PC Party Chief IM Instrumment Operator EA Engineering Assistant ADM Administrative GPS GPS Operator 1 RM Rodman Supplemental Agreement #3 City of Round Rock CR 122 - Surveying Services - Phase II Surveying Services MANHOUR SUMMARY Reg Prof Land Surveyor 42 $36.00 $1,512.00 Senior Survey Tech 100 $20.00 $2,000.00 GPS Operator 1 4 $17.50 $70.00 GPS Operator 2 4 $15.00 $60.00 Party Chief 136 $15.00 $2,040.00 Instrument Operator 136 $13.00 $1,768.00 Rodman 136 $11.00 $1,496.00 Administrative 32 $15.00 $480.00 Subtotal 590 $9,426.00 0: \0601- 2- 058\Supplemental Agreement\Supp Agree #3 Surveying.xls WE 1-iF1 tr-A‘) t I - -Fr:vitil _4 Or '4, Tr - 7 \; I LJ1 :3 ----- 44:--i---- \ Lln ■ — 1 , - c:di 1 LI 1 TI 111,_ 17Irliit.1111-f_riti(:'.-1,ktf:1:1T.Ii,,iii7,11-19ils,1:171:tijili 1 6)1 i I • i ■ HI r ., , \ i - 1171 -- — 1, - -I- - I '‘.‘ I T I I i I ■ I' i t: I 7 ;11 1_ 1 -1 . I I- - -1 L I- Till - I ___ 1 _ J2/::-.S'3 -- (r'IMIT: 1 7t 71 - •• \illr-; 7 - - ' - ...\ 1 ..-1-1 1 ,: - : CR122 Phases 1 and 2 DATE: January 2, 2003 SUBJECT: City Council Meeting — January 9, 2003 ITEM: 9.E.1. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 3 with Baker-Aicklen & Associates, Inc., for CR 122 Improvement Project, from Forest Creek to Highway 79. Resource: Jim Nuse, City Manager Bill Stablein, Transportation Construction Coordinator History: The original contract was approved on May 13, 1999 by the Council (R- 99 -05- 13B15) for preparation of right of way documents, construction plans, specifications, and estimates for the interim widening of CR 122 from Forest Creek Drive to Brushy Creek; and the preparation of a right of way schematic and a roadway design schematic for the future widening of CR 122 from Forest Creek Drive to US 79 to a 4 -lane divided arterial. Supplemental Agreement No. 1, was approved on April 26, 2001 (R- 01- 04- 26- 14E6), which modified the Scope of Work to include the preparation of a traffic control plan. An additional services agreement was approved on September 13, 2001 (R- 01- 09- 13 -15F5) for the placement of right of way lathes every 50 feet on additional takings on CR 122; this work was at a cost of $1,400 and brought contract total to $182,900. Approval of Supplemental Agreement No. 2 (R- 02- 04- 25 -11D2) allowed for the placement of right of way lathes for six additional properties. Supplemental Agreement No. 3 would provide for additional drainage investigation and hydraulic design, sidewalk investigation at all drainage structures (Phase I: Design Surveys, Phase II: Forest Creek Drive to Gattis School Road), extension of design effort from Forest Creek Drive to Gattis School Road and right -of -way surveys from Forest Creek Drive to Gattis School Road. The engineer has agreed to perform the additional work for $134, 657.31 bringing the contract total to $318, 457.31. Funding: Cost: $134,657.31 Source of funds: 96 GO Bonds Outside Resources: Baker - Aicklen & Associates, Inc. Impact/Benefit: This project will improve safety and mobility for this road, and reduce maintenance activities and costs associated with the existing pavement. Public Comment: N/A Sponsor: N/A STATE OF TEXAS THE COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. #3 TO CONTRACT FOR ENGINEERING SERVICES This Amendment to the Contract for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Baker - Aicklen & Assoc., Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed a Contract for Engineering Services, hereinafter called the "Contract ", on the February 22, 1999 to widen CR 122, Forest Creek Drive to Brushy Creek, and WHEREAS, ARTICLE 2, SCOPE OF SERVICES TO BE PROVIDED BY ENGINEER, describes those engineering services to be provided by the Engineer as a part of the Contract, and WHEREAS, ARTICLE 3, CONTRACT PERIOD, subsequently revised by Supplemental Agreement No. 2, requires the termination of the Contract on October 31, 2003 unless the Contract is extended, and WHEREAS, ARTICLE 4, COMPENSATION, subsequently revised by Supplemental Agreement No. 2, establishes the maximum lump sum payable under this contract at $183,800.00 without modification of the contract, and WHEREAS, it has become necessary to amend the contract to provide for Additional Drainage Investigation & Hydraulic Design, Sidewalk Investigation at All Drainage Structures — Phase I, Design Surveys — Phase II (Forest Creek Drive to Gattis School Road), Extension of Design Effort from Forest Creek Drive to Gattis School Road and Right -of -Way Surveys from Forest Creek Drive to Gattis School Road, and WHEREAS, the Engineer has agreed to have the additional work performed for 5134,657.31 increasing the lump sum fee for the contract to $318,457.31. NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: ARTICLE 3, CONTRACT PERIOD, shall be amended to extend the contract period to October 31, 2004, and ARTICLE 4, COMPENSATION, shall be amended by the changing the lump sum amount payable under this contract as $318,457.31. ATTACHMENT `B ", Services to be Provided by the Engineer shall be amended as set forth in the attached ADDENDUM to EXHIBIT B. Page 1 of 2 IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. / /DTI Date CITY OFRO.'•D' 44/ yle well, Mayor g Date By: Supplemental Agr Forth doc/specs muter /contracts & forms — Revised 10/2/02 0:\0601- 2 -058\Suppl Agree #3 10 -0 -02.doc Page 2 of 2 Mayor Nyle Maxwell Mayor Pro-tem Tom Nielson Council Members Alan McGraw Carrie Pitt Scot Knight Isabel Gallahan Gary Coe City Manager Jim Nuse City Attorney Stephan L Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. March 3, 2003 Mr. Mike Weaver, Principal Prime Strategies, Inc. 1508 South Lamar Boulevard Austin, TX 78704 Dear Mr. Weaver: The Round Rock City Council approved Resolution No. R- 03- 02 -13- 13E1 at their regularly scheduled meeting on February 13, 2003. This resolution approves the agreement for consulting services for the Round Rock Higher Education Center. Enclosed is a copy of the resolution and original agreement for your files. If you have any questions, please do not hesitate to contact Jim Nuse at 218 -5401. Sincerely, Christine R. Martinez City Secretary Enclosure CITY OF ROUND ROCK Administrative Dept , 221 East Main Street • Round Rock, Texas 78664 Phone, 512.218.5400 • Fax: 512.218.7097 • www.ci round -rock tx us Mayor Nyle Maxwell Mayor Pro-tem Tom Nielson Council Members Alan McGraw Came Pitt Scot Knight Isabel Gallahan Gary Coe City Manager Jim Nuse City Attorney Stephan L Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY February 13, 2003 Mr. Bill Waeltz, P.E. Baker - Aicklen & Associates, Inc. 203 E. Main Street, Suite 201 Round Rock, TX 78664 Dear Mr. Waeltz: The Round Rock City Council approved Resolution No. R- 03- 01 -09- 9E1 at their regularly scheduled meeting on January 9, 2003. This resolution approves Supplemental Agreement No. 3 for the design of roadway improvements on CR 122 from Forest Creek Drive to Brushy Creek. Enclosed is a copy of the resolution and original agreement for your files. If you have any questions, please do not hesitate to contact Bill Stablein at 218 -3237. Christine R. Martinez City Secretary Enclosure CITY OF ROUND ROCK Administrative Dept , zzi East Main Street • Round Rock Texas 78664 Phone. 512 218.540o • Fax. 512.218.7097 • www.ci.round- rock.tx.us a