R-03-02-13-13D6 - 2/13/2003RESOLUTION NO. R- 03- 02- 13 -13D6 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Martin K. Eby Construction Co., Inc. for the construction of the Water Treatment Plant Expansion, Phase V, and WHEREAS, the Council has determined that it is necessary to make changes to the plans or specifications of the Contract due to unforeseen circumstances, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 1, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 1 to the Contract with Martin K. Eby Construction Co., Inc. for the construction of the Water Treatment Plant Expansion, Phase V, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. o: woo AReSOLUTl \e3ou3o6.MFD /ec RESOLVED this 13th day of February, 2003. CHRISTINE R. MARTINEZ, City Secre 2 ELL, Mayor Ci ./f Round Rock, Texas CITY OF ROUND ROCK CHANGE ORDER N0.1 Date: Sheet 1 011 ADDED TIME DAYS CONTRACT Contract Water Treatment Plant Expansion, Phase V Owner: City of Round Rock, 221 East Maki Street, Round Rock Texas 78664 To: Martin K. Eby Construction Co., Inc. 5316 Hwy290 West, Suite 480 Austin, TX 78735 (Contractor) You are hereby requested to comply with the following changes from the Contract Plans and Specifications: Description of Changes 1.0 Fencing Revisions al NE Comer 2 0 Revised Tie -In for 24' and 30' Raw Water 3.0 Additional Concrete Fill at Ph V Sludge Vaults 4,0 Chip Concrete from 30•WBW 5.0 Fill void at Raw WaterlFilter Control Box 6.0 Modifications to Air Breathing System al the Chlorine FaUTity 7.0 Addition of pipe support and sidwalk at the Transfer Pump Station 8 0 Revised Phone Line Routing 9.0 Revised Routing of Sludge Piping at the 1st Stage Sludge Thickener and Washwater Recovery Tank 10.0 Revised Routing of Ouctbank at the 48' FLW 11.0 Addition of Sump Pump N Elevator Pit 12.0 Additional Conduit and Wire to Generator 13.0 Addition of an Electrical Receptado at the Condensing Unit Deck 14.0 Addnron of a Handhole at the CModne Feed Facility 15.0 Addition of Belt Press By -Pass Drain Line 16.0 Revised Steel Pipe Tie -Ins 17.0 Additional Electrical Duct Bank 18.0 Addihon 0142" BFV at Disinfection Basin 19.0 Change Mortar Color to White Mortar 20 0 Credit for Revision for 24' and 30' Raw Water Tie•In 21.0 Credit for Alternate High Service Pump Manufacturer 22.0 Credit for Revision to Vertical Turbine Pumps 23.0 Credit for Alternate Flocculator Manufacturer 24 0 Credit for Holeless Hydraulic Elevator 25 0 Credit for Elimination of 4-4' Electrical Conduits 26.0 Credit for Revisions to Filter Footings 27.0 Credit for Revised Layout of 54' FLW Piping 280 Credit for Crosslinked Polyethylene Tanks Decrease 91,366.00 515,000.00 5809.60 9134,000.00 52,000.00 $6,376.00 56,796.09 56,500.00 53,000.00 Increase 53,698.00 51,261.00 51,572.00 51,314.00 51,407.00 54.847.00 5838.00 09,182.00 52,416.00 53,088 00 52,291.00 5634.00 5270 00 53.580.00 533,929.00 513.749.00 92,523 00 513,831.00 54,602.00 JUSTIFICATION: Items identified during course of construction and represent changes In res onse to condihlions found in the field. ORIGINAL CONTRACT AMOUNT: Dollars:5 15,220,552 50 CONTRACT AMENDMENT (CA) AMOUNTS. Dollars 5 ' 000 THIS CHANGE ORDER (C.O.) AMOUNT: Dollars.$ (70.81000) PREVIOUS CHANGE ORDER AMOUNT: Dollars$ 0.00 CHANGE ORDERS TO -DATE AMOUNT: Do1ars•S (70.810 00) TOTAL CONTRACT PLUS C.0 S AND CA Defiers 5 ' 15,158.742.50 TOTAL PERCENT CHANGE: PERCENT %: (0.47) This document will bacon 's a supplement to the contract and all provisions will apply hereto: CDM Engl y Date: 25 0 EXHIBIT Martin by Construction Co., Inc. Con y a e: trAn City of Round Rock Own Date: Change Order No 1.010 w WTP PHASE V 1 W.T.P. , Phase V Expansion ROUND ROCK. TEXAS PAM ASTON FAOSIllan &GRAPHICS/COUNCIL AGENDA ITEMSMIP EXPANSIONWP PHASE V laM33 RLR DATE: February 7, 2003 SUBJECT: City Council Meeting — February 13, 2003 ITEM: 13.D.6. Consider a resolution authorizing the Mayor to execute Change Order No. 1 with Martin K. Eby Construction Company, Inc. for the construction of the Water Treatment Plant Expansion, Phase V. Resource: Tom Clark, Director of Utilities History: Martin K. Eby Construction Company is currently under contract with the City to construct a 24 -MGD Water Treatment Plant, including an additional high service pumping capacity, and a new chlorine storage and feed facility. During the course of work, the Contractor has discovered several items related to unforeseen conditions including items that were not shown on existing record drawings, modifications that will improve the project to the City's benefit and provide for more efficient operations of the plant. When the project was bid Eby proposed several alternate product manufactures for the City's consideration and associated credits to the contract amount. After careful review by the City and CDM the City accepted some of these alternate product manufacturers resulting in a credit to the project of approximately $149,000.00. CDM prepared and reviewed the proposed Change Order to Martin K. Eby Construction Company Inc. contract with the City and recommends approval. Staff concurs and recommends Council approval of this resolution in the amount of (- $70,810.00). With this Change Order No. 1 the original contract amount of $15,229,552.50 will be decrease by 0.47 %. Funding: Cost: ($70,810.00) Source of funds: Capital Improvements (Self - Financed Utility Funds) Outside Resources: Martin K. Eby Construction Company Inc. Impact/ Benefit: To maintain the integrity and reliability of our Water Treatment Plant to the City's peak water demands. Public Comment: N/A Sponsor: N/A CITY OF ROUND ROCK CONTRACT CHANGE ORDER N0.1 Date. ADDED TIME DAYS Sheet 1 011 Contract• Water Treatment Plant Expansion. Phase V Owner. City of Round Rock, 221 East Main Street, Round Rock Texas 78664 To: Martin K. Eby Construction Co., Inc. 5316 Hwy 290 West, Suite 480 Austin, TX 78735 (Contractor) You are hereby requested to comply with the following changes from the Contract Plans and Specifications: • `•" Description of Changes 1.0 Fencing Revisions at NE Comer 2.0 Revised Tie•In for 24' and 30' Raw Water 3 0 Additional Concrete All at Ph V Sludge Vaults 40 Chip Concrete from 30' WBW 5 0 Fill void at Raw WaterlFllter Control Box 6 0 Modifications to Air Breathing System at the Chlonne Facility 7 0 Addition of pipe support and sidwalk at the Transfer Pump Station 8.0 Revised Phone Line Routing 9.0 Revised Routing of Sludge Piping at the 1st Stage Sludge Thickener and Washwater Recovery Tank 10 0 Revised Routing of Ducibank at the 48' FLW 11.0 Addillon of Sump Pump In Elevator Pit 12.0 Additional Conduit and Wire to Generator 13 0 Addition of an Electncal Receptacle at the Condensing Unit Deck 14.0 Addillon of a Handhole al the Chlonne Feed Facility 15.0 Addillon of Bell Press By •Pass Drain Line 160 Revised Steel Pipe Tie -Ins 17 0 Additional Electrical Duct Bank 18 0 Addition 0842" BFV el Disinfection Basin 190 Change Mortar Color to White Mortar 20 0 Credit for Revision for 24' and 30' Raw Water Tie•In 21.0 Credo for Alternate High Service Pump Manufacturer 22 0 Credit for Revision to Vertical Turbine Pumps 23 0 Credit for Alternate Flocculator Manufacturer 24,0 Credit for Holeless Hydraulic Elevator 250 Credit for Elimination of 44' Electncal Conduits 26.0 Credit for Revisions to Filter Footings 27 0 Credit for Revised Layout of 54' FLW Piping 28 0 Credit for Crosslinked Polyethylene Tanks Decrease • 51,366.00 $15,000.00 5800.00 5134,000.00 $2,000.00 56,376.00 $6,798 00 56,500 00 $3,000.00 Increase $3,698 00 • 51,261.00 91,572 00 51,31400 $1,407.00 54,847.00 5836 00 $9,182 00 $2,416,00 $3,088.00 $2,291.00 5634 00 5270 00 53,58000 $33 929 00 513,74900 52.523 00 513.831 00 54,60200 JUSTIFICATION: Items identified dung course of construction and represent changes In response to conditions found In the field ORIGINAL CONTRACT AMOUNT' Dollars $ 15,229.552 50 -03 CONTRACT AMENDMENT (CA ) AMOUNTS Dollars 000 THIS CHANGE ORDER (C.O ) AMOUNT. Dollars $ (70.81000) PREVIOUS CHANGE ORDER AMOUNT: 00110,x•5 0 00 CHANGE ORDERS TO-DATE AMOUNT: Dollars $ (70.81000) TOTAL CONTRACT PLUS C 0 S AND C.A. Dollars $ 15,158,742 50 TOTAL PERCENT CHANGE: PERCENT %: (047) This do umant will become a supplement to the contract and all provisions will apply hereto. CDM /'' ,, weer Dale: 1,�,� I/1.7/ Ma in . Eby on Contractor Date. a AV1l..6 m4gWe L� m4yoo . a -l3 City of Ro • • • o Date: Change Order No 1 xis , 03 -0a -/3 -13 069 MARTIN K. EBY CONSTRUCTION CO., INC. 5316 HWY 290 WEST, SUITE 480 AUSTIN, TEXAS 78735 PH: 512- 891 -7224 FX: 512- 891 -7229 DATE: January 24, 2003 TO: City of Round Rock 2008 Enterprise Drive Round Rock, TX 78664 ATTN: Jeff Bell X Ph: 512 - 218 -4593 Fx: 512-238-9115 RE: City of Round Rock QTY 3 DESCRIPTION Change Order No. 1 APPROVAL YOUR USE AS REQUESTED REVIEW & COMMENT BIDS DUE REMARKS: COPY: 62010.01.35 62010.02.01 LETTER OF TRANSMITTAL #004 NO EXCEPTIONS EXCEPTIONS NOTED REVISE & RESUBMIT REJECTED FOR RECORD PROJECT: WTP Exp. Ph. V EBY PROJECT # 62010 METHOD OF DELIVERY: Hand RESUBMIT _ COPIES FOR DIST. SUBMIT _ COPIES FOR DIST. RETURN _ CORRECTED PRINTS FOR CONSTRUCTION SIGNED: hris ewis, Project Engineer Mayor Nyle Maxwell Mayor Pro-tem Tom Melson Council Members Alan McGraw Carrie Pitt Scot Knight Isabel Gallahan Gary Coe City Manager Jim Nuse City Attorney Stephan L Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. March 3, 2003 Mr. Chris Lewis Martin K. Eby Construction Co., Inc. 5316 Hwy 290 West, Suite 480 Austin, TX 78735 Dear Mr. Lewis: The Round Rock City Council approved Resolution No. R- 03- 02 -13- 13D6 at their regularly scheduled meeting on February 13, 2003. This Resolution approves Change Order No. 1 for the construction of the Water Treatment Plant Expansion, Phase V. Enclosed is a copy of the resolution and original change order for your files. If you have any questions, please do not hesitate to contact Tom Clark at 341 -3146. Christine R. Martinez City Secretary Enclosure CITY OF ROUND ROCK Administrative Dept , 221 East Main Street • Round Rock Texas 78664 Phone 512.218.5400 • Fax: 512 218.7097 • www.ct round - rock.tx us Mayor Nyle Maxwell Mayor Pro-tem Tom Nielson Council Members Alan McGraw Carrie P10 Scot Knight Isabel Gallahan Gary Coe City Manager Jim Nuse City Attorney Stephan L Sheets ROUND UI K, TEXAS PURPOSE. PASSION. PROSPERITY. March 3, 2003 Mr. Allen D. Woelke, P.E. Vice President Camp Dresser & McKee, Inc. 9111 Jollyville Road, Suite 105 Austin, TX 78759 Dear Mr. Woelke: The Round Rock City Council approved Resolution No. R- 03- 02 -13- 13D6 at their regularly scheduled meeting on February 13, 2003. This resolution approves Change Order No. 1 for the construction of the Water Treatment Plant Expansion, Phase V. Enclosed is a copy of the resolution and original agreement for your files. If you have any questions, please do not hesitate to contact Tom Clark at 341 -3146. Christine R. Martinez City Secretary Enclosure CITY OF ROUND ROCK Administrative Dept , 221 East Main Street • Round Rock. Texas 78664 Phone 512.218.5400 • Fax 512.218 7097 • www,cl round - rock.tx us