Loading...
R-03-03-27-9H3 - 3/27/2003Mayor Nyle Maxwell PURPOSE. PASSION. PROSPERITY. May 19, 2003 Dear Mr. Toungate: Mayor Pro-tem Christine R. Martinez Tom Nielson City Secretary Council Members Alan McGraw Carrie Pitt Enclosure Scot Knight Isabel Gallahan Gary Coe City Manager Jim Nuse City Attorney Stephan L Sheets Mr. Mark Toungate Austin Filter Systems, Inc. 13653 Rutledge Spur Austin, Texas 78717 The Round Rock City Council approved Resolution No. R- 03- 03- 27 -9H3 at their regularly scheduled meeting on March 27, 2003. This resolution approves Change Order No. 11 for the construction of roadway improvements to Dell Way, Dell Center Boulevard, and Gattis School Road. Enclosed is a copy of the resolution and original Change Order No. 11 for your files. If you have any questions, please do not hesitate to contact Bill Stablein at 218 -3237. CITY OF ROUND ROCK Administrative Dept., 221 East Main Street • Round Rock, Texas 78664 Phone: 512,218.540o • Fax, 512.218-7097 • www.ci.round- rock.tx.us Mayor Nyle Maxwell Mayor Pro -tem Tom Nielson Council Members Alan McGraw Carrie Pitt Scot Knight Isabel Callahan Gary Coe City Manager Jim Nuse City Attorney Stephan L. Sheets D ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. May 14, 2003 Mr. Richard Zamarripa Project Representative Earth Tech Transportation Services, Inc. 811 Barton Springs Road, Suite 400 Austin, Texas 78704 Dear Mr. Zamarripa: The Round Rock City Council approved Resolution No. R- 03- 03 -27- 9H3 at their regularly scheduled meeting on March 27, 2003. This resolution approves Change Order No. 11 with Austin Filter System for the construction of roadway improvements to Dell Way, Dell Center Boulevard, and Gattis School Road. Enclosed is a copy of the resolution and original Change Order No. 11 for your files. If you have any questions, please do not hesitate to contact Bill Stablein at 218 -3237. Christine R. Martinez City Secretary Enclosure CITY OF ROUND ROCK Administrative Dept., 22! East Main Street • Round Rock, Texas 78664 Phone. 92.218.5400 • Fax 512.218.7097 • www.ci.round -rock. tx_us RESOLUTION NO. R- 03- 03- 27 -9H3 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Austin Filter Systems, Inc. for the construction of roadway improvements to Dell Way, Dell Center Boulevard, and Gattis School Road, and WHEREAS, the Council has determined that it is necessary to make changes to the quantity of work to be performed or materials, equipment, or supplies to be provided, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 11, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 11 to the Contract with Austin Filter Systems, Inc., a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. O : \wdox \RESOLUTI \R30327K3.WPD /sc ATTEST: RESOLVED this 27th day of March, 2003. 0,1 altunu ie CHRISTINE R. MARTINEZ, City Secret(r 2 ayor .T of Round Rock, Texas Item It Description of Changes Unit Price Original+ Previously Revised Qty. Original Item Price New Price New Quantity Revised Item Price Decrease :e RE, q ; ;amRaRR :R@:A Item #42 additional traffic signs Item #44 additional 4:(W)(SLD) White Solid Line Item #46 additional 4 "(1)(SLD) yellow white line item #44 Pvmnt Mkg. 4" W SLD Item #49 Pvmnt Mkg 24" Y SLD Item #53 Med. Nose Item 1155 TY II -AA CO #8 Mortared Rock Wall New Mort. Rock Wall @ Driveway Item #9 Abutment Item #10 Bent Item #11 Relnf, Slab Item #12 surf. Treatment item #13 18" Drill Shaft item 111 30" Drill Shaft Item #38 Rail C201 Item #39 Armor Jt A) Fabricated Reber B) PCP Mtl & Handling D -F) Overhd & Profit on Expenses incurred on deleted items, Bond paid on deleted items Additional surveying on Fairlane 4" Conc. Riprop @ Transformer on oprox. 3/4;1 slope Driveway includes demo, excavation. &5" of flex base on the west side of Kenny Fort Trail Tabs Lane Closure Concrete Cap over AC Waterline Underdraln Adjust Manhole Adjust New Water Valve Box Rework Base Lane Closure, 6 Months Item #48 Additional 90 LF 20'x15' area In Parking Lot Adjust New Water Valve Box Asphalt Crew Time 8888788Rg888ee8 & § wa g 2888888888288 " /mg\e;m[,,, \§ 6 a= § §/\ \)\sae/ 88888 -- ) !; 'a\ =- I � (( /2 ! a s 8 8 9;8 8 8 Ga ae ° 8888888 ® *\ \i( § \ \ } # \ \ §]77)( 888§888 f ). TOTAL: - 032011.30 CHANGE ORDER NO: 11 CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER DIVISION: Public Works PROJECT Dell Way Blvd, South Mays JUSTIFICA Additional work not foreseen In original scope of work: lane closure, final course of HMAC, overruns/addiNonal Items, place of a concrete cap on the AC waterline at Gaff's School Road & Kenny Fort CHANGE DATA PAGE: DATE: EXHIBIT Ile CHANGE ORDER NO: 11 DIVISION: Public Works PROJECT Dell Way Blvd, South Mays Extension Original Contract Price: Amount of Previous Change Orders: Amount the Contract will Decease /Increose with this change order: Total Change Orders to Date: Contract Total Including this Change Order will be: JFRCFNT OF ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: PREVIOUS CHANGE ORDER: TOTAL % CHANGE: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: PREPARED BY: f 1cn ineer: Engineer: Contractor: Contractor: • Signa 2C(Ai2 ti Z MAP Olt✓e4 Print Name APPROVED: Print Name TovH Print Name CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER 51,173,403.00 5270,756.10 (532,011 ,30) $238,744.80 51,412,147.80 -2.73% 23.07% 20.34% 51,412,147.80 PAGE: 2 of 2 DATE: 3/4/03 Company Name Arco 10?z.r ,2 -e 3/2/20..,3 Title Date Company Name Date /ze�Q�v 3 -f/ - 63 Title Date City of Round Rock (Owner) Title Dote Revised: 9/01 Roadway Improvements to Dell Way, Dell Center Blvd., m.w caam..w r DATE: March 21, 2003 SUBJECT: City Council Meeting — March 27, 2003 ITEM: *9.H.3. Consider a resolution authorizing the Mayor to execute Change Order No. 11 with Austin Filter Systems, Inc. for roadway improvements to Dell Way, Dell Center Boulevard, and Gattis School Road. Resource: Tom Word, Director of Transportation Services Bill Stablein, Transportation Engineering Associate History: On August 10 2000, the City Council approved Resolution No. R- 00- 08 -10- 10B7 in which Austin Filter Systems, Inc., would be responsible for the construction of the Dell Way, Dell Center Blvd, Gattis School Rd and entrance to the Boardwalk Shopping Center in the amount of $1,173,403.00. Changes in quantities due to design changes have resulted in a need for Change Order No. 11 which will credit to the project the amount of $32,011.30. Bringing the total cost of the project to $1,413,366.30. Funding: Cost:: $- 32,011.30 Source of funds: Sales Tax for Economic Growth and Development Outside Resources: Austin Filter Systems, Inc. Impact: /Benefit: Completion of South Mays, Dell Center Boulevard and the Home Depot Bridge will result in less traffic congestion on surrounding neighborhood streets such as Gattis School Road, Greenlawn Boulevard, etc. Public Comment:: N/A Sponsor: N/A t # Description of Changes Unit Price Original + Previously Revised Qty. Original item Price New Price New Quantity Revised Rem Price Decrease e | 0 ,,,,.0,�., ;; R ,,,,RmRa:@R74, Item #42 additional traffic signs Item #44 additional 4:(W)(SLD) White Solid Line Item #46 additional 4 "(Y)(SLD) yellow white line Item #44 Pvmnt Mkg, 4" W SLD Item #49 Pvmnt Mkg 24" Y SLD Item #53 Med. Nose Rem #55 Pe' II -AA CO #8 Mortared Rock Wall New Mort. Rock Wall @ Driveway Item #9 Abutment Rem 1110 Bent Item 4111 Relnf. Slab Item #12 surf. Treatment Item #13 18" Drill Shaft Item #14 30" Drill Shaft Item #38 Rail C201 Item #39 Armor Jt A) Fabricated Rebar B) PCP Mt! & Handling D -F) Overhd & Profit on Expenses incurred on deleted Items, Bond on deleted items a@a @aa¥AAe 8V088 L0 2 88 2 ge 88 8 888eaga e %SS a jg / ® E E §G aa \ a a ;) \ §A \\& & 1 I 2 888%- 2;SG»8R2R , R2 ^R -, g SR �a ;,- ;4 ,, �2 888888 R8 888888Rq 88 8 8888888888888 ¥ \ $ )77 § *) } ) i % } 7 \ \ § $ 7q / / \ f §q §;! ; , 0? . u> `, #2& I, 2 a ;�2 paid Additional surveying on Fabian° 4" Conc. Rlprap @ Transformer on aprox. 3/&1 slope Driveway includes demo, excavation, 8.5" of flex base on the west side of Kenny Fort Trail Tabs Lane Closure Concrete Cap over AC Waterline Underdroln Adjust Manhole Adjust New Water Valve Box Rework Base Lane Closure, 6 Months Item #48 Additional 90 LF 20'x15' area In Parking Lot Adjust New Water Valve Box Asphalt Crew Time TOTAL: - 132,011.30 DIVISION: Public Works PROJECT Dell Way Blvd, South Mays k- o3 -o3 c 1- 9143 CITY OF ROUND ROCK PUBLIC WORK CONSTRUCTION CHANGE ORDER CHANGE ORDER NO: 11 FICA Additional work not foreseen In original scope of work: lane closure, final course of HMAC, overnms/additional items, place of a concrete cap on the AC waterline at Gatti, School Road CHANGE DMA PAGE: DATE: APPROVED: DIVISION: Public Works PREPARED BY: Engineer: Engineer: Contractor: Contractor: PROJECT Dell Way Blvd, South Mays Extension Original Contract Price: $1,173,403.00 Amount of Previous Change Orders: $270,755.10 Amount the Contract will Decease /Increase with this chonge order: 032,011 30) Total Change Orders to Date: $238,744.80 Contract Total Including this Change Order will be: $1,412,147.80 PERCENT OE ORIGINAL CONTRACT PRICE THIS CHANGE ORDER: PREVIOUS CHANGE ORDER: TOTAL % CHANGE: ORIGINAL CONTRACT PRICE PLUS CHANGE ORDERS: CITY OF ROUND ROCK PUBLIC WORKS CONSTRUCTION CHANGE ORDER CHANGE ORDER NO: 11 PAGE: 2 of 2 DATE: 3/4/03 // RIgnay re kl 7 tCA ?nc, 4 A n. A24 Print Name -2.73% 23.07% 20.34% $1,412,147.80 Z p4 777f 7?71.6 Company Name zrzr 7 / Title Print Name SI�'at fe Company Name City of Round Rock (Owner) Title 3/1 1 /Z�L3 Date Title Date 3-/(-a3 Date i? y02 3 - x7 - 03 Date Revised: 9/01