R-03-03-27-9H4 - 3/27/2003RESOLUTION NO. R- 03- 03- 27 -9H4
WHEREAS, the Round Rock Transportation System Development
Corporation ( "RRTSDC ") has previously adopted a Transportation Capital
Improvement Plan ( "Plan "), and
WHEREAS, the RRTSDC wishes to amend said Plan, and
WHEREAS,the bylaws of the RRTSDC require that said amendments to
the Plan be approved by the City Council, and
WHEREAS, the City Council wishes to approve said amendments to
the Plan, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the amendment to the Transportation Capital Improvement Plan
approved by the Round Rock Transportation System Development Corporation,
which is attached hereto as Exhibit "A ", is hereby approved.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended.
RESOLVED this 27th day of March, 2003.
CHRISTINE R. MARTINEZ, City Secr ary
o. \,&,ARRSouvrr \R3o32'7m.wnn /ra O214 3/s=
NYLE
L -7 Ma -• r
City o Round Rock, Texas
Project Name
Project Limits
Work Description
Construction Date
Estimated Trans.
Corp. Funding
Other Funding
Total Cost
Arterial A
From US 79 to Forest Creek Drive
Preliminary engineering to establish alignment and
ROW requirements. Protective ROW purchase
N/A
$650,000
$650,000
Forest Creek
From Double Creek Drive to 800' West of
Forest Ridge Subdivision
Summer 2003
$2,742,741
$1.379.645 6
$77,614 a
$4,200,00C
Double Creek Drive
From Gattis School Rd to MKT ROW
Fall 2003
92,850,000
92,650,000
A.W. Grimes Blvd (Arterial
B)
From US 79 to Louis Henna Blvd
Fall 2000
$20,801,354
01,962,701 b
$765,945 e
$23,550,00C
Arterial C
From RM 620 to Sam Bass Rd
Acquire ROW for Arterial C and construct
bicycle/sidewalk facility to access high school and
swimming pool
Summer 2004
6800,000
0800,000
Kiphen Road (CR 113)
From FM 1460 to CR 122
Design, purchase right-of-way and construct 4 -lane
divided arterial
Fall 2003
97,367,350
$222,650 b
$1 000,000 d
99.590,000
FM 1460
From U5 79 to 1200' N of US 79
Acquire ROW for highway relocation
Fall 2003
$600,000
$8,200.000 a
$8.800,000
Greenlawn Extension
From Louis Henna Blvd to IH 35 Frontage
Road
Construct 4 lane divided arterial
Complete
93.825,000
$86,556 b
$547,139 e
$4,458,695
Greenlawn Interchange
At IH 35
Construct Greenlawn Interchange with IH 35
Not Scheduled
$5,000,000
$12,000,000 a
$17,000,000
IH 35 Turnarounds
FM 1325/Louis Henna Hester's
Construct frontage road turnarounds
Complete
$3,650,000
93,175,000 a
$6,825,000
IH 35 Area Improvements
from Westinghouse Road to FM 1431
Relocate ramps, widen frontage road, and construct
frontage road turnaround
Summer 2004
55,000,000
$5,000,000
IH 35 Frontage Rd C -D and
Hester's Crossing Bridge
Replacement
IH 35 ® Hester'S Crossing
Construct Frontage road collector- distributor and
replace Hester's Crossing Bridge
Fall 2003
$6,500,000
$5,500,000
Prime Strategies
Assist City in interagency coordination for SH 45
N/A
$100,000
$100,00C
RM 620
at Union Pacific Railroad
Construct railroad grade separation
Fall 2005
$2,500,000
$8,500,000 a
$11,000,000
SH 45
Round Rock East City Limits to Round
Rock West City Limits
Acquire ROW for SH 45
FY 2000
$31076,911
9215,200,000 a
826,000,000 d (est)
$272,576,911
South Mays Street
Improvements
South Mays Street, Dell Way & Gattis
School Road Extension
Realign streets, widen streets, extend streets
August 2000 & FY 2001
94,960,000
$4,990,000
Traffic Signals
Various locations
Design and construct traffic signals
2000
$800,000
$800,000
Traffic Signal Coordination
FM 1325/Louis Henna MLNeit/IH 35/RM
620 US 79
Construct and implement coordinated traffic signal
systems
Summer 2003
$100,000
9100,000
US 79
From CR 195 to CR 110
Reconstruct highway to 4 lane divided highway
December -99
$2,550,000
$3,500,000 a
$300.000 (est) d
$6,350,000
US 79
From FM 1460 to CR 195
Construct 4.1ane divided highway
Fall 2003
05,240000
93,000,1700 a
$8,240,000
Transportation Consulting
Miscellaneous consulting work in supoort of
transportation program
N/A
$200,000
$200,000
- - . 3-YEAR ELEMENT TOTAL " - -
$107,633,356
$285,937,250 .
- .$393'570,606
2003 TRANSPORTATION CAPITAL IMPROVEMENTS PROGRAM
ROUND ROCK TRANSPORTATION SYSTEM DEVELOPMENT CORPORATION
LEGEND
a = State/Federal Fund
h = Private
c = 96 GO Bonds
d = Williamson County
e- City Utility Fund
EXHIBIT
3 nAll
Page 1 o11
Amendment 97
Updated 3127/03
DATE: March 21, 2003
SUBJECT: City Council Meeting — March 27, 2003
Resource: Tom Word, Director of Transportation Services
ITEM: 9.H.4. Consider a resolution approving the action of the Round Rock
Transportation System Development Corporation in amending the
Transportation Capital Improvement Plan (TCIP).
History: The Transportation Capital Improvement Program (TCIP) is a three -year
spending plan for improvements to major roads and arterials in the City. Funding
for this plan is provided through the %% sales tax established for the purpose of
transportation improvements. The TCIP is being amended to supplement funding
to existing projects, and to add new projects for roadway improvements on I11-35
at Hester's Crossing and in the Chandler Road/Westinghouse Road area.
Funding:
Cost: $107,633,356.00
Source of funds: %a% sales tax (Round Rock Transportation System Development
Corporation)
Outside Resources:
Impact: /Benefit:
N/A
Increased mobility and traffic safety in Round Rock.
Public Comment: A public hearing for these amendments will be held by the Round Rock
Transportation System Development Corporation March 27, 2003.
Sponsor: N/A