R-03-04-24-14F1 - 4/24/2003RESOLUTION NO. R- 03- 04- 24 -14F1
WHEREAS, the City of Round Rock ( "City ") and Round Rock Baseball,
Inc. ( "RRB ") are parties to that one certain Convention Center Complex
Lease Agreement ( "Lease'), and
WHEREAS, the Lease covers the land and improvements called the
Dell Diamond' / United Heritage Center Complex ( "Complex "), and
WHEREAS, the Round Rock Express Double A baseball team utilizes
the Dell Diamond portion of the Complex for its home games, and
WHEREAS, during the first three years of its existence, the
Express has broken the season attendance records of all Double A teams,
with an average paid attendance of 9,574 per game in a stadium with a
seating capacity of 7,816, and
WHEREAS, the Complex is used virtually every day for conventions,
meetings, trade shows, exhibitions, concerts, and similar uses which
serve to encourage tourism in the City and to promote the arts, and
WHEREAS, due to the overwhelming success of the Complex, the City
and RRB wish to consider the expansion and upgrading of the Complex to
further the tourism industry in the City, and
WHEREAS, the City and RRB wish to enter into a Memorandum of
Understanding Regarding the Proposed Expansion of the Dell Diamond /
United. Heritage Center Complex for the purpose of outlining the parties
mutual intent and understandings with respect to the proposed
0: \,dox \RESOI,T1`s30424F1. 000 /sls
expansion, Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City a Memorandum of Understanding Regarding the Proposed
Expansion of the Dell Diamond / United Heritage Center Complex, a copy
of same being attached hereto as Exhibit "A" and incorporated herein.
The City Council hereby finds and declares that written notice of
the date, hour, place and subject of the meeting at which this
Resolution was adopted was posted and that such meeting was open to the
public as required by law at all times during which this Resolution and
the subject matter hereof were discussed, considered and formally acted
upon, all as required by the Open Meetings Act, Chapter 551, Texas
Government Code, as amended.
RESOLVED this 24th day of April, 2003.
ATTEST:
CHRISTINE R. MARTINEZ, City Secr ary
2
N
WELL, Mayor
City of Round Rock, Texas
MEMORANDUM OF UNDERSTANDING REGARDING
THE PROPOSED EXPANSION OF THE
DELL DIAMOND / UNITED HERITAGE CENTER COMPLEX
This Memorandum of Understanding Regarding the Proposed Expansion of the Dell
Diamond / United Heritage Center Complex ( "MOU ") is executed by the City of Round Rock
( "City ") and Round Rock Baseball, Inc. ( "RRB ") a Texas corporation (collectively referred to as
"the Parties ") for the purpose of outlining the Parties' mutual intent and understandings with
respect to negotiating an agreement whereby the City and RRB will construct certain expansions
and improvements ( "Improvements ") to the Dell Diamond / United Heritage Center Complex
( "Complex "). Accordingly, the Parties set forth their intent and understandings as follows:
I. Recitals
A. Lease Agreement. On January 20, 1999, the City and Ryan Sanders Ryan, Inc. entered
into that one certain Convention Center Complex Lease Agreement ( "Lease ") for the
Complex. In accordance with the terms the Lease, Ryan Sanders Ryan, Inc. assigned its
interest in the Lease to RRB by document dated March 29, 1999.
B. Previous Improvements. Following the execution of the Lease, RRB has made significant
improvements to the Complex, including the installation and /or construction of a
scoreboard, an outdoor restaurant on the right field berm, additional parking area,
concession and kitchen equipment, picnic area, and kid play area. These improvements
have been installed and /or constructed at the cost of approximately $3,933,966.00, which
cost was borne solely by RRB. The City contributed no funds to the installation and/or
construction of the improvements. In accordance with the terms of the Lease, these
improvements are now the sole property of City.
C. Use of the Complex. The Round Rock Express Double A baseball team utilizes the Dell
Diamond portion of the Complex for its home games. During the first three years of its
existence, the team has broken the season attendance records for all Double A teams in
the nation. During the 2002 season, the team had an average paid attendance of 9,574 per
game in a stadium with a permanent seating capacity of 7,816. The United Heritage
Center is used virtually every day for conventions, meetings, trade shows, exhibitions,
concerts, and similar uses. The uses of the Complex serve to encourage tourism in the
City and/or to promote the arts. Due to the overwhelming success of the Complex, the
Parties agree that it is in their mutual interest to expand and upgrade the components of
the Complex.
A. Design of Improvements. RRB has begun preliminary efforts to design the
Improvements. A preliminary list of the needed Improvements is set forth in Exhibit "A ".
Without obligating the City to expend funds for the Improvements, RRB agrees to
continue its design efforts for the Improvements and to obtain preliminary cost estimates
and preliminary designs for the Improvements. RRB agrees to keep the City fully
O:\ wdox\ cort \gnl\dellexpn\mou100047798.DOC
II. Plans for the Improvements
1
EXHIBIT
1 „A„
informed of the cost and design efforts and to consider the City's input with respect to
such cost and design efforts.
B. Phases of Improvements. The Parties each acknowledge that, at the present time, it is in
the best interest of both of them to construct and/or install the necessary Improvements in
phases over several years.
0:lwdox1coregnlldellexpn\mou \00047798. DOC
III. Financing and/or Payment for Improvements
A. Phase I Improvements. The preliminary list of Phase I Improvements is shown on Exhibit
"A ". Without obligating the City, the City nevertheless acknowledges that an appropriate
source of funding for a portion of the Phase I Improvements would be available cash
balances in the City's Hotel Occupancy Tax ( "HOT ") account. The Parties acknowledge
that the available cash in the HOT is approximately $800,000.00. The City's contribution
to the Phase I Improvements will be fifty percent (50 %) of the cost of the Phase I
Improvements or $800,000.00, whichever is less. Without obligating RRB, RRB
nevertheless acknowledges that it would be willing to consider funding the remaining
cost of the Phase I Improvements.
B. Phase II Improvements. The Preliminary list of Phase II Improvements is shown on
Exhibit `B ". Without obligating the City, the City nevertheless acknowledges that an
appropriate source of funding of a portion or all of the Phase II Improvements would be a
combination of available cash balances in the HOT account and the issuance of additional
HOT revenue bonds. The Parties acknowledge that such cash and bond funding is subject
to many contingencies that are out of the control of the Parties, and in fact might not be
available. Without obligating RRB, RRB nevertheless acknowledges that it would be
willing to consider funding a portion of the cost of the Phase II Improvements.
IV. Additional Agreements
A. Financing and Phasing Agreements. The Parties agree to begin negotiating in good faith
the terms of one or more agreements to design, fund, and construct the Improvements in
phases.
B. Amendments to Lease. The Parties agree to begin negotiating in good faith appropriate
amendments to the Lease to accomplish the design, funding, and construction of the
Improvements in phases, as well as to clarify the Lease provisions regarding the
obligations and responsibilities of the Parties to maintain, repair, and replace the existing
components of the Complex and to add new improvements to the Complex.
2
V. Timetable
A. Phase I Improvements. The Parties intend, and agree to utilize their best efforts to:
(1)
Complete the design and financing plan for the Phase I Improvements by
June 15, 2003;
(2) Cause construction of the Phase I Improvements to begin construction by
October 1, 2003; and
(3) Cause final completion of the Phase I Improvements to occur by April 1,
2004.
B. Phase II Improvements. The Parties intend, and agree to utilize their best efforts to
develop one or more agreements for the design, financing and construction of the Phase
II Improvements.
VI. Miscellaneous Provisions
A. Good Faith Negotiations. The Parties each understand and acknowledge that this MOU
does not obligate either party in any way. However, each party pledges to continue to
negotiate in good faith to accomplish the mutual goals and interests set forth herein.
B. Outline of Terms. The Parties each understand and acknowledge that the terms and
provisions contained herein are only an outline of the terms of the agreements
contemplated herein and the final agreements will contain terms and provisions not
covered herein.
Executed this 24th day of April, 2003.
O: \wdox\ con \gnl\dellexpn\mou\00047798.DOC
CITY OF ROUND ROCK, TEXAS
By:
Nyle Maxwell, Mayor
ROUND ROCK BASEBALL, INC.
By:
Reid Ryan, President
3
Exhibit "A"
Phase I Improvements
Homerun Porch — An elevated grandstand area over the left field concourse. The
Homerun Porch will add approximately 850 chair back seats and provide additional
covered concourse for larger conventions, exhibitions, and craft and trade shows.
Upper concourse — The upper concourse will connect the suite and party level with the
Homerun Porch. It allows for additional covered concourse on the lower level and it will
allow for the utilization of existing elevators.
East Entrance Gate —The Convention Center Complex has a need for an East gate to
better serve fans and for better ingress and egress into the facility for conventions,
exhibitions, and craft and trade shows. This gate will accomplish this along with a
ticketing booth, ADA access and replacement of the existing playground equipment.
Sky Boxes — Although included in the original design of the Convention Center
Complex, six suites were deleted as a cost saving measure in 1998. The spread footings
are already in place to accommodate the six additional suites. This will add to the covered
concourse on the lower level, thus enhancing the Complex's capacity for convention and
trade business. This section will also cover the last exposed concession stand.
Phase II Improvements
United Heritage Center Expansion— The current plan provides for the doubling of the
amount of space that the United Heritage Center has now. Also, there would be needed
break -out space, additional offices and ample conditioned storage.
Maintenance & Storage — A self - contained grounds maintenance facility which will
allow for weather proofing of equipment and storage of materials vital to the facility's
success as a multi - purpose venue. (i.e. concert staging, flooring, chairs, tables, vehicles,
generators, etc.)
\wdox \CORR \gnl\del lexpn\mou \00047768. DOC
DATE: April 18, 2003
SUBJECT: City Council Meeting — April 24, 2003
ITEM: 14.F.1. Consider resolution authorizing the Mayor to execute a
Memorandum Of Understanding between the City of Round Rock
and the Round Rock Baseball Club regarding the proposed
expansion of the Dell Diamond/United Heritage Center Complex.
Resource: Jim Nuse, City Manager
History: The City of Round Rock owns the Convention Center/ Stadium Complex. It is
leased to the Round Rock Express Baseball Club for 38 years. The City
contributed $7.2 million towards the initial project and RREBC contributed nearly
$17.5 million. Subsequent to the initial construction, RREBC has performed
nearly $4 million in improvements to the facility without participation from the
City. RREBC wishes to further improve the complex by constructing: a Home
Run Porch; Upper Concourse; East Entrance Gate; and six additional Sky Boxes.
The estimated cost of these improvements is $1.6 million. RREBC desires that
the City participate in these improvements by using up to $800,000 of the cash
reserve from the Hotel Occupancy Tax.
Funding:
Cost: Up to $800,000
Source of funds: Hotel Occupancy Tax fund
Outside Resources: Round Rock Express Baseball Club
Impact: This proposal will utilize a portion of the current cash balance from the HOT fund.
Benefit: The improvements will improve our ability to attract and promote tourism.
Public Comment: None
Sponsor: Staff
MEMORANDUM OF UNDERSTANDING REGARDING
THE PROPOSED EXPANSION OF THE
DELL DIAMOND / UNITED HERITAGE CENTER COMPLEX
This Memorandum of Understanding Regarding the Proposed Expansion of the Dell
Diamond / United Heritage Center Complex ( "MOU ") is executed by the City of Round Rock
( "City ") and Round Rock Baseball, Inc. ( "RRB ") a Texas corporation (collectively referred to as
"the Parties ") for the purpose of outlining the Parties' mutual intent and understandings with
respect to negotiating an agreement whereby the City and RRB will construct certain expansions
and improvements ( "Improvements ") to the Dell Diamond / United Heritage Center Complex
( "Complex "). Accordingly, the Parties set forth their intent and understandings as follows:
I. Recitals
A. Lease Agreement. On January 20, 1999, the City and Ryan Sanders Ryan, Inc. entered
into that one certain Convention Center Complex Lease Agreement ( "Lease ") for the
Complex. In accordance with the terms the Lease, Ryan Sanders Ryan, Inc. assigned its
interest in the Lease to RRB by document dated March 29, 1999.
B. Previous Improvements. Following the execution of the Lease, RRB has made significant
improvements to the Complex, including the installation and/or construction of a
scoreboard, an outdoor restaurant on the right field berm, additional parking area,
concession and kitchen equipment, picnic area, and kid play area. These improvements
have been installed and/or constructed at the cost of approximately $3,933,966.00, which
cost was borne solely by RRB. The City contributed no funds to the installation and/or
construction of the improvements. In accordance with the teens of the Lease, these
improvements are now the sole property of City.
C. Use of the Complex. The Round Rock Express Double A baseball team utilizes the Dell
Diamond portion of the Complex for its home games. During the first three years of its
existence, the team has broken the season attendance records for all Double A teams in
the nation. During the 2002 season, the team had an average paid attendance of 9,574 per
game in a stadium with a permanent seating capacity of 7,816. The United Heritage
Center is used virtually every day for conventions, meetings, trade shows, exhibitions,
concerts, and similar uses. The uses of the Complex serve to encourage tourism in the
City and/or to promote the arts. Due to the overwhelming success of the Complex, the
Parties agree that it is in their mutual interest to expand and upgrade the components of
the Complex.
II. Plans for the Improvements
A. Design of Improvements. RRB has begun preliminary efforts to design the
Improvements. A preliminary list of the needed Improvements is set forth in Exhibit "A ".
Without obligating the City to expend funds for the Improvements, RRB agrees to
continue its design efforts for the Improvements and to obtain preliminary cost estimates
and preliminary designs for the Improvements. RRB agrees to keep the City fully
O: \wdox\ tort \gnl\dellexpn\mou \00047798.DOC
,e-03-0-c2
1
informed of the cost and design efforts and to consider the City's input with respect to
such cost and design efforts.
B. Phases of Improvements. The Parties each acknowledge that, at the present time, it is in
the best interest of both of them to construct and/or install the necessary Improvements in
phases over several years.
O: \wdox\cort\gilW ellexpn\mou \00047798.DOC
III. Financing and/or Payment for Improvements
A. Phase I Improvements. The preliminary list of Phase I Improvements is shown on Exhibit
"A ". Without obligating the City, the City nevertheless acknowledges that an appropriate
source of funding for a portion of the Phase I Improvements would be available cash
balances in the City's Hotel Occupancy Tax ( "HOT') account. The Parties acknowledge
that the available cash in the HOT is approximately $800,000.00. The City's contribution
to the Phase I Improvements will be fifty percent (50 %) of the cost of the Phase I
Improvements or $800,000.00, whichever is less. Without obligating RRB, RRB
nevertheless acknowledges that it would be willing to consider funding the remaining
cost of the Phase I Improvements.
B. Phase II Improvements. The Preliminary list of Phase II Improvements is shown on
Exhibit `B ". Without obligating the City, the City nevertheless acknowledges that an
appropriate source of funding of a portion or all of the Phase II Improvements would be a
combination of available cash balances in the HOT account and the issuance of additional
HOT revenue bonds. The Parties acknowledge that such cash and bond funding is subject
to many contingencies that are out of the control of the Parties, and in fact might not be
available. Without obligating RRB, RRB nevertheless acknowledges that it would be
willing to consider funding a portion of the cost of the Phase II Improvements.
IV. Additional Agreements
A. Financing and Phasing Agreements. The Parties agree to begin negotiating in good faith
the terms of one or more agreements to design, fund, and construct the Improvements in
phases.
B. Amendments to Lease. The Parties agree to begin negotiating in good faith appropriate
amendments to the Lease to accomplish the design, funding, and construction of the
Improvements in phases, as well as to clarify the Lease provisions regarding the
obligations and responsibilities of the Parties to maintain, repair, and replace the existing
components of the Complex and to add new improvements to the Complex.
2
V. Timetable
A. Phase I Improvements. The Parties intend, and agree to utilize their best efforts to:
(1) Complete the design and financing plan for the Phase I Improvements by
June 15, 2003;
(2) Cause construction of the Phase I Improvements to begin construction by
October 1, 2003; and
(3) Cause final completion of the Phase I Improvements to occur by April 1,
2004.
B. Phase II Improvements. The Parties intend, and agree to utilize their best efforts to
develop one or more agreements for the design, financing and construction of the Phase
II Improvements.
Executed this 24th day of April, 2003.
O: \wdox\ con\ gnl\dellexpn\mou \00047798.DoC
VI. Miscellaneous Provisions
A. Good Faith Negotiations. The Parties each understand and acknowledge that this MOU
does not obligate either party in any way. However, each party pledges to continue to
negotiate in good faith to accomplish the mutual goals and interests set forth herein.
B. Outline of Terms. The Parties each understand and acknowledge that the terms and
provisions contained herein are only an outline of the terms of the agreements
contemplated herein and the final agreements will contain terms and provisions not
covered herein.
CITY OF ROUND ROCK, TEXA
By:
ROUND CK.: SEBALL, INC.
By:
3
yle xwe , Mayor
Rei
Ryan,
United Heritage Center Expansion — The current plan provides for the doubling of the
amount of space that the United Heritage Center has now. Also, there would be needed
break -out space, additional offices and ample conditioned storage.
Maintenance & Storage — A self - contained grounds maintenance facility which will
allow for weather proofing of equipment and storage of materials vital to the facility's
success as a multi- purpose venue. (i.e. concert staging, flooring, chairs, tables, vehicles,
generators, etc.)
O:\ wdox\ CORR \gnI\dellexpn\mou\00047768.00C
Exhibit "A"
Phase I Improvements
Homerun Porch — An elevated grandstand area over the left field concourse. The
Homerun Porch will add approximately 850 chair back seats and provide additional
covered concourse for larger conventions, exhibitions, and craft and trade shows.
Upper concourse — The upper concourse will connect the suite and party level with the
Homerun Porch. It allows for additional covered concourse on the lower level and it will
allow for the utilization of existing elevators.
East Entrance Gate — The Convention Center Complex has a need for an East gate to
better serve fans and for better ingress and egress into the facility for conventions,
exhibitions, and craft and trade shows. This gate will accomplish this along with a
ticketing booth, ADA access and replacement of the existing playground equipment.
Sky Boxes — Although included in the original design of the Convention Center
Complex, six suites were deleted as a cost saving measure in 1998. The spread footings
are already in place to accommodate the six additional suites. This will add to the covered
concourse on the lower level, thus enhancing the Complex's capacity for convention and
trade business. This section will also cover the last exposed concession stand.
Phase II Improvements