R-03-05-22-11D1 - 5/22/2003hereof were discussed, considered and formally acted upon, all as
by the Open Meetings Act, Chapter 551, Texas Government Code, as
RESOLVED this 22nd day of May, 2003.
RESOLUTION NO. R - 03 - 05 22 - 11D1
WHEREAS, the City of Round Rock desires to retain engineering
services for the Dell Way /South Mays Extension Project, and
WHEREAS,Earth Tech Transportation Services, Inc. has submitted an
Agreement for Engineering Services to provide said services, and
WHEREAS, the City Council desires to enter into said agreement
with Earth Tech Transportation Services, Inc., Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City an Agreement for Engineering Services with Earth Tech
Transportation Services, Inc. for the Dell Way /South Mays Extension
Project, a copy of said agreement being attached hereto as Exhibit "A"
and incorporated herein for all purposes.
The City Council hereby finds and declares that written notice of the
date, hour, place and subject of the meeting at which this Resolution was
adopted was posted and that such meeting was open to the public as required
by law at all times during which this Resolution and the subject matter
AT
CHRISTINE R. MARTINEZ, City Secr_ ;ary
®PFDesk top \:; OOMA / WORLDOX/ o : /WOOX /RESOLUTZ /R3052201-WFO /sc
:
W , Mayor
City of Round Rock, Texas
required
amended.
ROUND ROCK, TEXAS
PURPOSE PASSION POSPERM
CITY OF ROUND ROCK AGREEMENT
FOR ENGINEERING SERVICES WITH
Earth Tech, Inc.
FOR
South Mays, Dell Way Boulevard, Gattis School Road Extension Project
THE STATE OF TEXAS
COUNTY OF WILLIAMSON
RECITALS:
THIS AGREEMENT FOR ENGINEERING SERVICES ( "Agreement ") is made and entered
into on this the 22 day of the month of May, 2003, by and between the CITY OF ROUND ROCK, a
Texas home -rule municipal corporation, whose offices are located at 221 East Main Street, Round Rock,
Texas 78664 -5299, (hereinafter referred to as "City"), and Earth Tech, Inc., whose principal place of
business is located at 811 Barton Springs Road, Suite 400, Austin, Texas, 78704 -1164, (hereinafter
called "Engineer "), and such Agreement is for the purpose of contracting for professional engineering
services.
WHEREAS, V.T.C.A., Government Code §2254.002(2)(A)(vii) under Subchapter A entitled
"Professional Services Procurement Act" provides for the procurement by municipalities of services of
professional engineers; and
WHEREAS, City and Engineer desire to contract for such professional engineering services; and
WHEREAS, City and Engineer wish to document their agreement concerning the requirements
and respective obligations of the parties;
NOW, THEREFORE, WITNESSETH:
That for and in consideration of the mutual promises contained herein and other good and
valuable considerations, and the covenants and agreements hereinafter contained to be kept and
performed by the respective parties hereto, it is agreed as follows:
CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement and any exhibits attached hereto (which
exhibits are hereby incorporated into and made a part of this Agreement) and all Supplemental
Engineering Sery Agreement -4 -2003
File name:R:t@cf onk/ProjectsDDell Way\Earth Tech Contract.5.22.03.doc
1
EXHIBIT
"
Rev, 4l1 /03
Agreements (as defined herein in Article 13) which are subsequently issued. These form the entire
contract, and all are as fully a part of this Agreement as if attached to this Agreement or repeated herein.
ARTICLE 1
SCOPE OF SERVICES TO BE PERFORMED BY CITY
City shall perform or provide services as identified in Exhibit A entitled "Services to be
Performed by City."
ARTICLE 2
SCOPE OF SERVICES TO BE PERFORMED BY ENGINEER
Engineer shall perform engineering services as identified in Exhibit B entitled "Services to be
Performed by Engineer."
Engineer shall develop a mutually acceptable schedule of work as identified in Exhibit C entitled
"Work Schedule." Such Work Schedule shall contain a complete schedule so that the Engineer's Scope
of Services under this Agreement may be accomplished within the specified time and at the specified
cost. The Work Schedule shall provide specific work sequences and definite review times by City and
Engineer of all work performed. Should the review times take longer than shown on the Work Schedule,
through no fault of Engineer, additional time may be authorized by City through a written Supplemental
Agreement only if same is requested by a timely written request from Engineer which is approved by
City.
ARTICLE 3
CONTRACT TERM
(1) Term. This Agreement shall be from the date hereof and shall terminate at the close of
business on the 31" day of the month of May, 2004, unless extended by written Supplemental
Agreement executed by Engineer and City prior to the date of termination, or as otherwise terminated as
provided in Article 20 entitled "Termination." Any work performed or costs incurred after the date of
termination shall not be eligible for reimbursement.
Engineer shall notify City in writing as soon as possible if he /she /it determines, or reasonably
anticipates, that the work under this Agreement will not be completed before the termination date. In
that event City may, at its sole discretion, extend the contract term by timely written Supplemental
Agreement. Engineer shall allow adequate time for review and approval of his/her /its request for time
extension by City prior to expiration of this Agreement.
(2) Work Schedule. Engineer acknowledges that the Work Schedule is of critical importance,
and agrees to undertake all necessary efforts to expedite the performance of services required herein so
that construction of the project will be commenced and completed as scheduled. In this regard, Engineer
shall proceed with sufficient qualified personnel and consultants necessary to fully and timely
accomplish all services required under this Agreement in the highest professional manner.
2 Rev.4 /1/03
(3) Notice to Proceed. After execution of this Agreement, Engineer shall not proceed with work
delineated in Article 2 entitled "Scope of Services to be Performed by Engineer" and in Exhibit B
entitled "Services to be Performed by Engineer" until authorized in writing by City to proceed as
provided in Article 7 entitled "Notice to Proceed."
ARTICLE 4
COMPENSATION
City shall pay and Engineer agrees to accept the amount shown below as full compensation for
all engineering services performed and to be performed under this Agreement.
The amount payable under this Agreement, without modification of the Agreement as provided
herein, is the sum of Sixty-nine Thousand, Five Hundred Sixty -four Dollars and Thirty -six cents
($69,564.36) as shown in Exhibit D entitled "Fee Schedule." The lump sum amount payable may be
revised only by written Supplemental Agreement in the event of a change in scope, additional
complexity from that originally anticipated, or change in character of work as authorized by City.
Engineer shall prepare and submit to City monthly progress reports in sufficient detail to support
the progress of the work and to support invoices requesting monthly payment. Any preferred format of
City for such monthly progress reports shall be identified in Exhibit B entitled "Services to be
Performed by Engineer." Satisfactory progress of work shall be maintained as an absolute condition of
payment.
The fee herein referenced may be adjusted for additional work requested and performed only if
approved by written Supplemental Agreement.
ARTICLE 5
METHOD OF PAYMENT
Payments to Engineer for services rendered shall be made while work is in progress. Engineer
shall prepare and submit to City, not more frequently than once per month, a progress report as
referenced in Article 4 above. Such progress report shall state the percentage of completion of work
accomplished during that billing period and to date. Simultaneous with submission of such progress
report, Engineer shall prepare and submit one (1) original and one (1) copy of a certified invoice in a
form acceptable to City. This submittal shall also include a progress assessment report in a form
acceptable to City.
Progress payments shall be made in proportion to the percentage of completion of work tasks
identified in Exhibit D entitled "Fee Schedule." Progress payments shall be made by City based upon
work actually provided and performed. Upon timely receipt and approval of each statement, City shall
make a good faith effort to pay the amount which, notwithstanding anything herein to the contrary, is
due and payable within thirty (30) days. City reserves the right to withhold payment pending verification
3
Rev. 4/1/03
of satisfactory work performed. Engineer has the responsibility to submit proof to City, adequate and
sufficient in its determination, that tasks were completed.
The certified statements shall show the total amount earned to the date of submission and shall
show the amount due and payable as of the date of the current statement. Final payment does not relieve
Engineer of the responsibility of correcting any errors and/or omissions resulting from his/her /its
negligence.
ARTICLE 6
PROMPT PAYMENT POLICY
In accordance with Chapter 2251, V.T.C.A., Texas Government Code, payment to Engineer
will be made within thirty (30) days of the day on which City receives the supplies, materials,
equipment, or within thirty (30) days of the day on which the performance of services was complete, or
within thirty (30) days of the day on which City receives a correct invoice for the supplies, materials,
equipment, or services, whichever is later. Engineer may charge a late fee (fee shall not be greater than
that which is permitted by Texas law) for payments not made in accordance with this prompt payment
policy; however, this policy does not apply to payments made by City in the event:
A. There is a bona fide dispute between City and Engineer concerning the supplies,
materials, or equipment delivered or the services performed that causes the payment to be
late; or
B. The terms of a federal contract, grant, regulation, or statute prevent City from making a
timely payment with federal funds; or
C. There is a bona fide dispute between Engineer and a subcontractor or between a
subcontractor and its supplier concerning supplies, materials, or equipment delivered or
the services performed which causes the payment to be late; or
D. The invoice is not mailed to City in strict accordance with instructions, if any, on the
purchase order, or this Agreement or other such contractual agreement.
City shall document to Engineer the issues related to disputed invoices within ten (10) calendar
days of receipt of such invoice. Any non - disputed invoices shall be considered correct and payable per
the terms of Chapter 2251, V.T.C.A., Texas Government Code.
ARTICLE 7
NOTICE TO PROCEED
City shall issue a written authorization to proceed with work identified in the Scope of Services.
City shall not be responsible for actions by Engineer or any costs incurred by Engineer relating to
additional work not included in Exhibit B entitled "Services to be Performed by Engineer."
4
Rev. 4/1 /03
Bill Stablein
2008 Enterprise Drive
Round Rock, Texas
Telephone Number (512) 218 -5562_
Fax Number (512) 218 -3242_
Email Address bstablein@round-rock.tx.us
ARTICLE 8
PROJECT TEAM
City's Designated Representative for purposes of this Agreement is as follows:
City's Designated Representative shall be authorized to act on City's behalf with respect to this
project. City or City's Designated Representative shall render decisions in a timely manner pertaining
to documents submitted by Engineer in order to avoid unreasonable delay in the orderly and sequential
progress of Engineer's services.
Engineer's Designated Representative for purposes of this Agreement is as follows:
Ricardo Zamarripa
811 Barton Springs Road Suite 400
Austin, Texas 78704 -1164
Telephone Number (512) 474 -5500_
Fax Number (512) 474 -6325_
Email Address ricardo.zamarripa @earthtech.com
ARTICLE 9
PROGRESS EVALUATION
Engineer shall, from time to time during the progress of the work, confer with City at City's
election. Engineer shall prepare and present such information as may be pertinent and necessary, or as
may be requested by City, in order for City to evaluate features of the work. At the request of City or
Engineer, conferences shall be provided at Engineer's office, the offices of City, or at other locations
designated by City. When requested by City, such conferences shall also include evaluation of
Engineer's services and work.
Should City determine that the progress in production of work does not satisfy the Work
Schedule, then City shall review the Work Schedule with Engineer to determine corrective action
required.
Engineer shall promptly advise City in writing of events which have or may have a significant
impact upon the progress of the work, including but not limited to the following:
5
Rev. 4/1/03
(1) Problems, delays, adverse conditions which may materially affect the ability to attain
program objectives, prevent the meeting of time schedules and goals, or preclude the
attainment of project work units by established time periods; and such disclosure shall be
accompanied by statement of actions taken or contemplated, and City assistance needed to
resolve the situation, if any; and
(2) Favorable developments or events which enable meeting the work schedule goals sooner
than anticipated.
ARTICLE 10
SUSPENSION
Should City desire to suspend the work, but not to terminate this Agreement, then such
suspension may be effected by City giving Engineer thirty (30) calendar days' verbal notification
followed by written confirmation to that effect. Such thirty -day notice may be waived in writing by
agreement and signature of both parties. The work may be reinstated and resumed in full force and
effect within sixty (60) days of receipt of written notice from City to resume the work. Such sixty-day
notice may be waived in writing by agreement and signature of both parties.
If City suspends the work, the contract period as determined in Article 3 is not affected and this
Agreement will terminate on the date specified unless this Agreement is amended indicating otherwise.
City assumes no liability for work performed or costs incurred prior to the date authorized by
City for Engineer to begin work, and/or during periods when work is suspended, and/or subsequent to
the contract completion date.
ARTICLE 11
ADDITIONAL WORK
If Engineer forms a reasonable opinion that any work he /she/it has been directed to perform is
beyond the scope of this Agreement and as such constitutes extra work, he /she /it shall promptly notify
City in writing. In the event City finds that such work does constitute extra work and exceeds the
maximum amount payable, City shall so advise Engineer and a written Supplemental Agreement will
be executed between the parties as provided in Article 13 entitled "Supplemental Agreements."
Engineer shall not perform any proposed additional work nor incur any additional costs prior to the
execution, by both parties, of a written Supplemental Agreement. City shall not be responsible for
actions by Engineer nor for any costs incurred by Engineer relating to additional work not directly
associated with the performance of the work authorized in this Agreement or any amendments thereto.
ARTICLE 12
CHANGES IN WORK
If City deems it necessary to request changes to previously satisfactorily completed work or
parts thereof which involve changes to the original scope of services or character of work under this
6
Rev. 4/1 /03
Agreement, then Engineer shall make such revisions as requested and as directed by City. Such
revisions shall be considered as additional work and paid for as specified under Article 11 entitled
"Additional Work."
Engineer shall make revisions to work authorized hereunder as are necessary to correct errors
appearing therein, when required to do so by City. No additional compensation shall be due for such
work.
ARTICLE 13
SUPPLEMENTAL AGREEMENTS
The terms of this Agreement may be modified by written Supplemental Agreement if City
determines that there has been a significant change in (1) the scope, complexity or character of the
service to be performed, or (2) the duration of the work. Any such Supplemental Agreement must be
duly authorized by City Council Resolution. Where such City Council authorization is required,
Engineer shall not proceed until the appropriate Resolution has been adopted. Additional
compensation, if appropriate, shall be identified as provided in Article 4 entitled "Compensation."
Both parties must execute any written Supplemental Agreement within the contract period
specified in Article 3 entitled "Contract Term."
It is understood and agreed by and between both parties that Engineer shall make no claim for
extra work done or materials furnished until City grants full execution of the written Supplemental
Agreement and authorization to proceed. City reserves the right to withhold payment pending
verification of satisfactory work performed.
ARTICLE 14
OWNERSHIP OF DOCUMENTS
All data, basic sketches, charts, calculations, plans, specifications, and other documents created
or collected under the terms of this Agreement are the exclusive property of City and shall be furnished
to City upon request. All documents prepared by Engineer and all documents furnished to Engineer by
City shall be delivered to City upon completion or termination of this Agreement. Engineer, at
his/her /its own expense, may retain copies of such documents or any other data which he /she /it has
furnished City under this Agreement. Any release of information shall be in conformance with
requirements of the Texas Open Records Act.
ARTICLE 15
PERSONNEL, EQUIPMENT AND MATERIAL
Engineer shall furnish and maintain, at his/her /its own expense, quarters for the performance of
all services, and adequate and sufficient personnel and equipment to perform the services as required.
All employees of Engineer shall have such knowledge and experience as will enable them to perform
the duties assigned to them. Any employee of Engineer who, in the opinion of City, is incompetent or
whose conduct becomes detrimental to the work shall immediately be removed from association with
7
Rev. 4/1/03
the project when so instructed by City. Engineer certifies that he /she /it presently has adequate qualified
personnel in his/her /its employment for performance of the services required under this Agreement, or
will obtain such personnel from sources other than City. Engineer may not change the Project Manager
without prior written consent of City.
ARTICLE 16
SUBCONTRACTING
Engineer shall not assign, subcontract or transfer any portion of the work under this Agreement
without prior written approval from City. All subcontracts shall include the provisions required in this
Agreement and shall be approved as to form, in writing, by City prior to work being performed under
the subcontract. No subcontract shall relieve Engineer of any responsibilities under this Agreement.
ARTICLE 17
EVALUATION OF WORK
City, or any authorized representatives of it, shall have the right at all reasonable times to review
or otherwise evaluate the work performed or being performed hereunder and the premises on which it is
being performed. If any review or evaluation is made on the premises of Engineer or a subcontractor,
then Engineer shall provide and require its subcontractors to provide all reasonable facilities and
assistance for the safety and convenience of City or other representatives in the performance of their
duties.
ARTICLE 18
SUBMISSION OF REPORTS
All applicable study reports shall be submitted in preliminary form for approval by City before
any final report is issued. City's comments on Engineer's preliminary reports shall be addressed in any
final report.
ARTICLE 19
VIOLATION OF CONTRACT TERMS/BREACH OF CONTRACT
Violation of contract terms or breach of contract by Engineer shall be grounds for termination of
this Agreement, and any increased costs arising from Engineer's default, breach of contract, or violation
of contract terms shall be paid by Engineer.
ARTICLE 20
TERMINATION
This Agreement may be terminated before the stated termination date by any of the following
conditions.
(1) By mutual agreement and consent, in writing, of both parties.
8
Rev. 4/1/03
(2) By City, by notice in writing to Engineer, as a consequence of failure by Engineer to
perform the services set forth herein in a satisfactory manner.
(3) By either party, upon the failure of the other party to fulfill its obligations as set forth
herein.
(4) By City, for reasons of its own and not subject to the mutual consent of Engineer, upon
not less than thirty (30) days' written notice to Engineer.
(5) By satisfactory completion of all services and obligations described herein.
Should City terminate this Agreement as herein provided, no fees other than fees due and
payable at the time of termination shall thereafter be paid to Engineer. In determining the value of the
work performed by Engineer prior to termination, City shall be the sole judge. Compensation for work
at termination will be based on a percentage of the work completed at that time. Should City terminate
this Agreement under Subsection (4) immediately above, then the amount charged during the thirty -day
notice period shall not exceed the amount charged during the preceding thirty (30) days.
If Engineer defaults in the performance of this Agreement or if City terminates this Agreement
for fault on the part of Engineer, then City shall give consideration to the actual costs incurred by
Engineer in performing the work to the date of default, the amount of work required which was
satisfactorily completed to date of default, the value of the work which is usable to City, the cost to City
of employing another firm to complete the work required and the time required to do so, and other
factors which affect the value to City of the work performed at the time of default.
The termination of this Agreement and payment of an amount in settlement as prescribed above
shall extinguish all rights, duties, and obligations of City and Engineer under this Agreement, except
the obligations set forth herein in Article 21 entitled "Compliance with Laws." If the termination of this
Agreement is due to the failure of Engineer to fulfill his/her /its contractual obligations, then City may
take over the project and prosecute the work to completion. In such case, Engineer shall be liable to
City for any additional costs incurred by City.
Engineer shall be responsible for the settlement of all contractual and administrative issues
arising out of any procurements made by Engineer in support of the scope of services under this
Agreement.
ARTICLE 21
COMPLIANCE WITH LAWS
(1) Compliance. Engineer shall comply with all applicable federal, state and local laws,
statutes, codes, ordinances, rules and regulations, and the orders and decrees of any court, or
administrative bodies or tribunals in any manner affecting the performance of this Agreement,
including without limitation, minimum/maximum salary and wage statutes and regulations, and
licensing laws and regulations. Engineer shall furnish City with satisfactory proof of his/her /its
compliance.
9
Rev. 4/1 /03
Engineer shall further obtain all permits and licenses required in the performance of the
professional services contracted for herein.
(2) Taxes. Engineer will pay all taxes, if any, required by law arising by virtue of the services
performed hereunder. City is qualified for exemption pursuant to the provisions of Section 151.309 of
the Texas Limited Sales, Excise, and Use Tax Act.
ARTICLE 22
INDEMNIFICATION
Engineer shall save and hold harmless City and its officers and employees from all claims and
liabilities due to activities of his/her /itself and his/her /its agents or employees, performed under this
Agreement, which are caused by or which result from error, omission, or negligent act of Engineer or of
any person employed by Engineer or under Engineer's direction or control.
Engineer shall also save and hold City harmless from any and all expenses, including but not
limited to attorneys fees which may be incurred by City in litigation or otherwise defending claims or
liabilities which may be imposed on City as a result of such activities by Engineer, its agents, or
employees.
ARTICLE 23
ENGINEER'S RESPONSIBILITIES
Engineer shall be responsible for the accuracy of his/her /its work and shall promptly make
necessary revisions or corrections resulting from errors, omissions, or negligent acts, and same shall be
done without compensation. City shall determine Engineer's responsibilities for all questions arising
from design errors and/or omissions. Engineer shall not be relieved of responsibility for subsequent
correction of any such errors or omissions or for clarification of any ambiguities until after the
construction phase of the project has been completed.
ARTICLE 24
ENGINEER'S SEAL
The responsible engineer shall sign, seal and date all appropriate engineering submissions to
City in accordance with the Texas Engineering Practice Act and the rules of the State Board of
Registration for Professional Engineers.
ARTICLE 25
NON - COLLUSION, FINANCIAL INTEREST PROHIBITED
(1) Non - collusion. Engineer warrants that he /she/it has not employed or retained any company
or persons, other than a bona fide employee working solely for Engineer, to solicit or secure this
Agreement, and that he /she /it has not paid or agreed to pay any company or engineer any fee,
commission, percentage, brokerage fee, gifts, or any other consideration, contingent upon or resulting
10
Rev. 4/1/03
from the award or making of this Agreement. For breach or violation of this warranty, City reserves and
shall have the right to annul this Agreement without liability or, in its discretion and at its sole election,
to deduct from the contract price or compensation, or to otherwise recover, the full amount of such fee,
commission, percentage, brokerage fee, gift or contingent fee.
(2) Financial Interest Prohibited. Engineer covenants and represents that Engineer,
his/her /its officers, employees, agents, consultants and subcontractors will have no financial interest,
direct or indirect, in the purchase or sale of any product, materials or equipment that will be
recommended or required for the construction of the project. -
ARTICLE 26
INSURANCE
(1) Insurance. Engineer, at Engineer's sole cost, shall purchase and maintain during the entire
term while this Agreement is in effect professional liability insurance coverage in the minimum amount
of One Million Dollars from a company authorized to do insurance business in Texas and otherwise
acceptable to City.
(2) Subconsultant Insurance. Without limiting any of the other obligations or liabilities of
Engineer, Engineer shall require each subconsultant performing work under this Agreement to maintain
during the term of this Agreement, at the subconsultant's own expense, the same stipulated minimum
insurance required in Article 26, Section (1) above, including the required provisions and additional
policy conditions as shown below in Article 26, Section (3).
Engineer shall obtain and monitor the certificates of insurance from each subconsultant in order
to assure compliance with the insurance requirements. Engineer must retain the certificates of insurance
for the duration of this Agreement, and shall have the responsibility of enforcing these insurance
requirements among its subconsultants. City shall be entitled, upon request and without expense, to
receive copies of these certificates of insurance.
(3) Insurance Policy Endorsements. Each insurance policy shall include the following
conditions by endorsement to the policy:
1. Each policy shall require that thirty (30) days prior to the expiration, cancellation, non -
renewal or any change in the limit or scope of coverage, a notice thereof shall be given to
City by certified mail to:
City Manager, City of Round Rock
221 East Main Street
Round Rock, Texas 78664
Engineer shall also notify City, within 24 hours of receipt, of any notices of expiration,
cancellation, non - renewal, or material change in coverage it receives from its insurer.
2. Companies issuing the insurance policies shall have no recourse against City for payment
of any premiums or assessments for any deductibles which are the sole responsibility of
and at the sole risk of Engineer.
11
Rev. 4/1/03
3. The term "City" or "City of Round Rock" shall include all authorities, boards,
commissions, departments, and officers of City and the individual members and
employees thereof in their official capacities, and/or while acting on behalf of the City of
Round Rock.
4. The policy clause "Other Insurance" shall not apply to any insurance coverage currently
held by City, to any such future coverage, or to City's Self- Insured Retentions of
whatever nature.
(4) Cost of Insurance. The cost of all insurance required herein to be secured and maintained by
Engineer shall be borne solely by Engineer, with certificates of insurance evidencing such minimum
coverage in force to be filed with City. Such Certificates of Insurance are evidenced as Exhibit F herein
entitled "Certificates of Insurance."
ARTICLE 27
COPYRIGHTS
City shall have the royalty-free, nonexclusive and irrevocable right to reproduce, publish or
otherwise use, and to authorize others to use, any reports developed by Engineer for governmental
purposes.
ARTICLE 28
SUCCESSORS AND ASSIGNS
This Agreement shall be binding upon and inure to the benefit of the parties hereto, their
successors, lawful assigns, and legal representatives. Engineer may not assign, sublet or transfer any
interest in this Agreement, in whole or in part, by operation of law or otherwise, without obtaining the
prior written consent of City.
ARTICLE 29
SEVERABILITY
In the event any one or more of the provisions contained in this Agreement shall for any reason
be held to be invalid, illegal or unenforceable in any respect, then such invalidity, illegality or
unenforceability shall not affect any other provision thereof and this Agreement shall be construed as if
such invalid, illegal or unenforceable provision had never been contained herein.
ARTICLE 30
PRIOR AGREEMENTS SUPERSEDED
This Agreement constitutes the sole agreement of the parties hereto, and supersedes any prior
understandings or written or oral contracts between the parties respecting the subject matter defined
herein. This Agreement may only be amended or supplemented by mutual agreement of the parties
hereto in writing.
12
Rev. 4/1/03
Records pertaining to the project, and records of accounts between City and Engineer, shall be
kept on a generally recognized accounting basis and shall be available to City or its authorized
representatives at mutually convenient times. The City reserves the right to review all records it deems
relevant which are related to this Agreement.
All notices to either party by the other required under this Agreement shall be personally
delivered or mailed to such party at the following respective addresses:
City:
City of Round Rock
Attention: City Manager
221 East Main Street
Round Rock, TX 78664
and to:
Stephan L. Sheets
City Attorney
309 East Main Street
Round Rock, TX 78664
Engineer:
Ricardo Zamarripa
Earth Tech, Inc.
811 Barton Springs Road Suite 400
Austin, Texas 78704 -1164
ARTICLE 31
ENGINEER'S ACCOUNTING RECORDS
ARTICLE 32
NOTICES
ARTICLE 33
GENERAL PROVISIONS
(1) Time is of the Essence. Engineer understands and agrees that time is of the essence and that
any failure of Engineer to complete the services for each phase of this Agreement within the agreed
Work Schedule may constitute a material breach of this Agreement. Engineer shall be fully responsible
for his/her /its delays or for failures to use his/her /its best efforts in accordance with the terms of this
Agreement. Where damage is caused to City due to Engineer's failure to perform in these
circumstances, City may withhold, to the extent of such damage, Engineer's payments hereunder
13
Rev. 4/1/03
without waiver of any of City's additional legal rights or remedies.
(2) Force Majeure. Neither City nor Engineer shall be deemed in violation of this Agreement
if prevented from performing any of their obligations hereunder by reasons for which they are not
responsible or circumstances beyond their control. However, notice of such impediment or delay in
performance must be timely given, and all reasonable efforts undertaken to mitigate its effects.
(3) Enforcement and Venue. This Agreement shall be enforceable in Round Rock,
Williamson County, Texas, and if legal action is necessary by either party with respect to the
enforcement of any or all of the terms or conditions herein, exclusive venue for same shall lie in
Williamson County, Texas. This Agreement shall be governed by and construed in accordance with the
laws and court decisions of the State of Texas.
The undersigned signatory for Engineer hereby represents and warrants that the signatory is an
officer of the organization for which he /she has executed this Agreement and that he /she has full and
complete authority to enter into this Agreement on behalf of the firm. The above - stated representations
and warranties are made for the purpose of inducing City to enter into this Agreement.
IN WITNESS WHEREOF, the City of Round Rock has caused this Agreement to be signed in
its corporate name by its Mayor, duly authorized to execute the same on its behalf by Resolution No.
, approved by the City Council on the 22 day of the month of May, 2003,
and Engineer, Earth Tech, Inc., signing by and through his/her /its duly authorized representative(s),
thereby binding the parties hereto, their successors, assigns and representatives for the faithful and full
performance of the terms and provisions hereof.
CITY OF ROUND ROCK, TEXAS:
By:
Nyle Maxwell, Mayor
ATTEST:
By:
Christine Martinez, City Secretary
ARTICLE 34
SIGNATORY WARRANTY
Signature of Principal 1 r
Printed Name: p1olna L. ki 1
14
Rev. 4/1/03
LIST OF EXHIBITS ATTACHED
(1) Exhibit A "Services to be Performed by City"
(2) Exhibit B "Services to be Performed by Engineer"
(3) Exhibit C "Work Schedule"
(4) Exhibit D "Fee Schedule"
(5) Exhibit E "Work Authorizations"
(6) Exhibit F "Certificates of Insurance"
15
Rev. 4/1/03
Exhibit A
Services to be Provided by the City of Round Rock
RM 2769 Schematic
THE City of Round Rock (CORR) is to provide the following services:
1. Project Management
2. Data and/or information owned by CORR necessary for design
3. Provide timely review of all activities /submittals
4. Prompt review of invoices to CORR guidelines
16
Rev. 4/1/03
Introduction
Field Surveying
Exhibit B
Services to be Provided by the Engineer
Home Depot Bridge PS &E
The work to be performed under this contract shall consist of engineering and Plans, Specification and
Estimate (PS &E) development to build a new location bridge behind Home Depot, adjacent parking lot
improvements, and new location 2 -land undivided connection from parking area to Dell Way Blvd. This
bridge design was completed under previous contract and is to be included. The intent of this work
authorization will be to develop one (1) approved final PS &E for the Home Depot Bridge at Dell Way.
The work will be performed by Earth Tech, Inc. and McGray & McGray Land Surveyors, Inc.
SECTION 1: SERVICES TO BE PROVIDED BY EARTH TECH, INC.
The work to be performed by Earth Tech under this work authorization, in general, shall consist of:
1. Providing project management services for the development of horizontal and vertical alignments for
new connection to Dell Way.
2. Providing engineering services for various tasks including cost estimate and drainage analysis.
3. Managing subconsultant efforts.
A detailed description of the services to be provided by Earth Tech is as follows:
Project Management
1. Project Management
2. Provide overall project management services including budget control, schedule control, project
coordination, subconsultant management, resource allocation, and preparation of invoices.
3. Ensure timely delivery of one (1) PS &E, GEOPAK files, electronic files, and hard copies of all
pertinent information, all in American Standard System of Measure format.
4. Perform Quality Control/ Quality Assurance reviews.
5. Project Meetings - Attend meetings with CORR other meetings at the direction of the CORR.
Meetings will be attended and billed only as necessary.
1. The Engineer will coordinate with CORR to identify what information is required from McGray and
McGray. The Engineer will manipulate CADD files to ensure uniformity with other CADD design
files. The Engineer will identify any additional survey data required.
17
Rev. 4/1/03
Roadway Design Controls
1. PS &E. The Engineer will provide PS &E with horizontal and vertical alignment, curve data,
proposed typical sections, proposed curb and gutter, sidewalks, ADA ramps, existing topography,
ROW, existing utilities and proposed drainage. The PS &E will be submitted to CORR for further
processing and ultimately final approval.
Drainage
1. Perform preliminary drainage analysis.
2. Develop drainage area map. Major drainage areas will be identified and hydrologic information will
be calculated.
3. A storm sewer layout will be developed. These maps will depict drainage area boundaries and flow
direction arrows. Each area will be identified with a unique number to be used to fmd runoff
information for further calculations of the stone sewer systems.
Miscellaneous Roadway
1. Prepare preliminary construction cost estimate. Includes quantity and construction cost estimates.
2. Prepare Project Layout, Horizontal Alignment Data Sheets, Grading Plans, Misc. Details,
Demolition Layout.
18
Rev. 4/1/03
SECTION 2: SERVICES TO BE PROVIDED BY McGray & McGray, INC.
THE ENGINEER is to provide the following services:
Field Surveying
Design Survey with 1' contours, improvements, visible utilities, and trees 6" or greater.
Boundary Services
Provide plats and descriptions for two areas of land for turning circle adjacent to Home Depot Bridge
and new connection to Dell Way.
19
Rev. 4/1/03
Task Description
Senior
Engineer
Staff
Engineer
Technician
Clerical
Hours
Total
Labor Rates w /overhead
and fixed fee
$146.63
$111.68
$95.45
$53.99
PROJECT MANAGEMENT
Project Management
8
8
16
$2,066.48
SUBTOTAL
8
8
16
$2,066.48
FIELD SURVEYING
Manipulate Survey Data
1
7
8
$928.39
SUBTOTAL
1
7
0
0
8
$928.39
ROADWAY DESIGN
CONTROLS
Horizontal & Verticle
Alignment
1
4
5
$593.35
Typical Sections
1
7
8
$928.39
Determine Cut & Fill
Quantities
8
8
$893.44
Plan & Profile Sheets
1
32
8
41
$4,483.99
Standards
1
1
$95.45
Summary of Quantities
1
1
$95.45
SUBTOTAL
3
51
10
0
64
$7,090.07
DRAINAGE
Drainage Area Map
1
9
10
$1,151.75
Hydraulic Computations
4
4
$446.72
Analyze Storm Sewers
4
4
$446.72
Analyze Cross Drainage
0
$0.00
Storm Sewer Layout
8
4
12
$1,275.24
Stone Sewer Plan & Profile
1
7
4
12
$1,310.19
Storm Sewer Details
8
8
$893.44
Storm Sewer Standards
1
1
$111.68
Hydraulic Data Sheets
4
4
$446.72
Summary of Quantities
1
1
$95.45
SUBTOTAL
2
45
9
0
56
$6,177.91
SIGNING AND
PAVEMENT MARKING
Signing and Pavement
Marking Layout
34
6
.
40
$4,369.82
Exhibit D
Fee Schedule
Earth Tech, Inc.
20
Rev. 4/1/03
Sign & Pav Mark Standards
1
1
$95.45
Summary of Quantities
1
1
$95.45
SUBTOTAL
0
34
8
0
42
$4,560.72
MISCELLANEOUS
Furnish Design Data to
Utility Companies
2
2
$223.36
Title Sheet w/ Index
1
1
2
$207.13
Project Layout
1
1
2
$207.13
Horizontal Alignment Data
1
1
2
$207.13
Grading Plans
36
4
40
$4,402.28
Misc. Details
8
8
$893.44
Demolition Layout
24
6
30
$3,253.02
Estimate
4
4
$446.72
Specifications & General
Notes
16
16
$1,786.88
Quality Assurance/ Quality
Control
4
4
$586.52
SUBTOTAL
4
93
13
0
110
$12,213.61
RETAINING WALLS
Retaining Wall Plan &
Profiles
36
4
40
$4,402.28
Retaining Wall Standards
1
1
$95.45
Summary of Quantities
1
1
$95.45
SUBTOTAL
0
36
6
0
42
$4,593.18
Temporary Erosion Controls
Temporary Erosion Control
Plan Layout
8
8
$893.44
Erosion Control Standards
1
1
$95.45
SUBTOTAL
0
8
1
0
9
$988.89
TOTAL LABOR
18
282
47
0
347
$38,619.25
TOTAL
$38,619.25
The above rates are the average rate in each classification of employee.
Invoices will be based on actual salaries for the individuals who worked on the project
Non - exempt employees may be invoiced at time and a half based on actual costs.
Direct Labor Rates $49.13 $37.42 $31.98 $18.09
Overhead Rate 1.5953
Fixed Fee Rate 15%
21
Rev. 4/1/03
Task Description
Field
(3 -man)
RPLS
Field Coord.
Sr. Tech
Tech
Hours
Total
Labor Rates
w /overhead & fixed
fee
$116.00
$90.00
$70.00
$70.00
$60.00
Field Surveying
Field Surveying
64
2
2
3
40
111
$10,354.00
Subtotal
64
2
2
3
40
111
$10,354.00
Boundry Suveying
Services
Plats and Legal
Descriptions
28
10
2
2
24
66
$5,868.00
Subtotal
28
10
2
2
24
66
$5,868.00
Direct Expenses
Quantity
Unit
Rate
Plats, Deeds, etc.
1
LS
50
$50.00
Total
92
12
4
5
64
177
$16,272.00
Exhibit D
Fee Schedule
McGray & McGray Surveying
22
Rev. 4/1/03
Task Description
Earth Tech
McGray &
McGray
Total
PROJECT MANAGEMENT
$2,066.48
$2,066.48
FIELD SURVEYING
$928.39
$10,354.00
$11,282.39
BOUNDRY SURVEYING SERVICES
$5,868.00
ROADWAY DESIGN CONTROLS
$7,090.07
$7,090.07
DRAINAGE
$6,177.91
$6,177.91
SIGNING AND PAVEMENT MARKING
$4,560.72
$4,560.72
MISCELLANEOUS
$12,213.61
$12,213.61
RETAINING WALLS
$4,593.18
$4,593.18
TEMPORARY EROSION CONTROLS
$988.89
$988.89
TOTAL LABOR
$38,619.25
$16,222.00
$48,973.25
DIRECT EXPENSES
$50.00
$50.00
Unbilled work to be included
$20,541.11
$20,541.11
from expired Supplemental #7
TOTAL
$59,160.36
$16,272.00
$69,564.36
Exhibit D
Fee Schedule
Summary
23
Rev. 4/1/03
DATE: May 15, 2003
SUBJECT: City Council Meeting — May 22, 2003
ITEM: * 11.D.1. Consider a resolution authorizing the Mayor to execute an
Agreement for Engineering Services with Earth Tech
Transportation Services, Inc. for the Dell Way /South Mays
Extension Project.
Resource: Tom Word, Chief of Public Works Operations
Bill Stablein, Transportation Engineering Associate
History: Earth Tech Transportation, Inc., will perform under this contract,
engineering and plans, specifications, and estimate (PS &E) development
to build a new location bridge behind the Home Depot, adjacent parking
lot improvements, and new location 2 -lane undivided connection from
parking area to Dell Way Boulevard. The intent of this contract, once
approved, is to develop one approved final PS &E for the Home Depot
Bridge at Dell Way.
Funding:
Cost: S69,564.36
Source of funds: Transportation System Development Corporation
Outside Resources:
Impact/Benefit:
Public Comment:
Sponsor:
Earth Tech Transportation Services
The approval of this agreement will allow continuous engineering
services for the Dell Way Project.
N/A
N/A
ROUND ROCK, TEXAS
warms. nmoa raoseram
CITY OF ROUND ROCK AGREEMENT
FOR ENGINEERING SERVICES WITH
Earth Tech, Inc.
FOR
South Mays, Dell Way Boulevard, Gattis School Road Extension Project
THE STATE OF TEXAS
COUNTY OF WILLIAMSON
THIS AGREEMENT FOR ENGINEERING SERVICES ( "Agreement ") is made and entered
into on this the 22 day of the month of May, 2003, by and between the CITY OF ROUND ROCK, a
Texas home -rule municipal corporation, whose offices are located at 221 East Main Street, Round Rock,
Texas 78664 -5299, (hereinafter referred to as "City "), and Earth Tech, Inc., whose principal place of
business is located at 811 Barton Springs Road, Suite 400, Austin, Texas, 78704 -1164, (hereinafter
called "Engineer "), and such Agreement is for the purpose of contracting for professional engineering
services.
RECITALS:
WHEREAS, V.T.C.A., Government Code §2254.002(2)(A)(vii) under Subchapter A entitled
"Professional Services Procurement Act" provides for the procurement by municipalities of services of
professional engineers; and
WHEREAS, City and Engineer desire to contract for such professional engineering services; and
WHEREAS, City and Engineer wish to document their agreement conceming the requirements
and respective obligations of the parties;
NOW, THEREFORE, WITNESSETH:
That for and in consideration of the mutual promises contained herein and other good and
valuable considerations, and the covenants and agreements hereinafter contained to be kept and
performed by the respective parties hereto, it is agreed as follows:
CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement and any exhibits attached hereto (which
exhibits are hereby incorporated into and made a part of this Agreement) and all Supplemental
Engineering Sery Agreement -4 -2003
File name:R:\@cftonk\Projects\Dell Way\Earth Tech Contract.5.22.03.doc Rev.4 /1/03
R- 03_054a -111)!
1
Agreements (as defined herein in Article 13) which are subsequently issued. These form the entire
contract, and all are as fully a part of this Agreement as if attached to this Agreement or repeated herein.
ARTICLE 1
SCOPE OF SERVICES TO BE PERFORMED BY CITY
City shall perform or provide services as identified in Exhibit A entitled "Services to be
Performed by City."
ARTICLE 2
SCOPE OF SERVICES TO BE PERFORMED BY ENGINEER
Engineer shall perform engineering services as identified in Exhibit B entitled "Services to be
Performed by Engineer."
Engineer shall develop a mutually acceptable schedule of work as identified in Exhibit C entitled
"Work Schedule." Such Work Schedule shall contain a complete schedule so that the Engineer's Scope
of Services under this Agreement may be accomplished within the specified time and at the specified
cost. The Work Schedule shall provide specific work sequences and definite review times by City and
Engineer of all work performed. Should the review times take longer than shown on the Work Schedule,
through no fault of Engineer, additional time may be authorized by City through a written Supplemental
Agreement only if same is requested by a timely written request from Engineer which is approved by
City.
ARTICLE 3
CONTRACT TERM
(1) Term. This Agreement shall be from the date hereof and shall terminate at the close of
business on the 31" day of the month of May, 2004, unless extended by written Supplemental
Agreement executed by Engineer and City prior to the date of termination, or as otherwise terminated as
provided in Article 20 entitled "Termination." Any work performed or costs incurred after the date of
termination shall not be eligible for reimbursement.
Engineer shall notify City in writing as soon as possible if he /she /it determines, or reasonably
anticipates, that the work under this Agreement will not be completed before the termination date. In
that event City may, at its sole discretion, extend the contract term by timely written Supplemental
Agreement. Engineer shall allow adequate time for review and approval of his/her /its request for time
extension by City prior to expiration of this Agreement.
(2) Work Schedule. Engineer acknowledges that the Work Schedule is of critical importance,
and agrees to undertake all necessary efforts to expedite the performance of services required herein so
that construction of the project will be commenced and completed as scheduled. In this regard, Engineer
shall proceed with sufficient qualified personnel and consultants necessary to fully and timely
accomplish all services required under this Agreement in the highest professional manner.
2 Rev.4 /1/03
(3) Notice to Proceed. After execution of this Agreement, Engineer shall not proceed with work
delineated in Article 2 entitled "Scope of Services to be Performed by Engineer" and in Exhibit B
entitled "Services to be Performed by Engineer" until authorized in writing by City to proceed as
provided in Article 7 entitled "Notice to Proceed."
ARTICLE 4
COMPENSATION
City shall pay and Engineer agrees to accept the amount shown below as full compensation for
all engineering services performed and to be performed under this Agreement.
The amount payable under this Agreement, without modification of the Agreement as provided
herein, is the sum of Sixty-nine Thousand, Five Hundred Sixty-four Dollars and Thirty -six cents
($69,564.36) as shown in Exhibit D entitled "Fee Schedule." The lump sum amount payable may be
revised only by written Supplemental Agreement in the event of a change in scope, additional
complexity from that originally anticipated, or change in character of work as authorized by City.
Engineer shall prepare and submit to City monthly progress reports in sufficient detail to support
the progress of the work and to support invoices requesting monthly payment. Any preferred format of
City for such monthly progress reports shall be identified in Exhibit B entitled "Services to be
Performed by Engineer." Satisfactory progress of work shall be maintained as an absolute condition of
payment.
The fee herein referenced may be adjusted for additional work requested and performed only if
approved by written Supplemental Agreement.
ARTICLE 5
METHOD OF PAYMENT
Payments to Engineer for services rendered shall be made while work is m progress. Engineer
shall prepare and submit to City, not more frequently than once per month, a progress report as
referenced m Article 4 above. Such progress report shall state the percentage of completion of work
accomplished during that billing period and to date. Simultaneous with submission of such progress
report, Engineer shall prepare and submit one (1) original and one (1) copy of a certified invoice in a
form acceptable to City. This submittal shall also include a progress assessment report in a form
acceptable to City.
Progress payments shall be made in proportion to the percentage of completion of work tasks
identified in Exhibit D entitled "Fee Schedule." Progress payments shall be made by City based upon
work actually provided and performed. Upon timely receipt and approval of each statement, City shall
make a good faith effort to pay the amount which, notwithstanding anything herein to the contrary, is
due and payable within thirty (30) days. City reserves the right to withhold payment pending verification
3
Rev. 4/1 /03
of satisfactory work performed. Engineer has the responsibility to submit proof to City, adequate and
sufficient in its determination, that tasks were completed.
The certified statements shall show the total amount earned to the date of submission and shall
show the amount due and payable as of the date of the current statement. Final payment does not relieve
Engineer of the responsibility of correcting any errors and/or omissions resulting from his/her /its
negligence.
ARTICLE 6
PROMPT PAYMENT POLICY
In accordance with Chapter 2251, V.T.C.A., Texas Government Code, payment to Engineer
will be made within thirty (30) days of the day on which City receives the supplies, materials,
equipment, or within thirty (30) days of the day on which the performance of services was complete, or
within thirty (30) days of the day on which City receives a correct invoice for the supplies, materials,
equipment, or services, whichever is later. Engineer may charge a late fee (fee shall not be greater than
that which is permitted by Texas law) for payments not made in accordance with this prompt payment
policy; however, this policy does not apply to payments made by City in the event:
A. There is a bona fide dispute between City and Engineer concerning the supplies,
materials, or equipment delivered or the services performed that causes the payment to be
late; or
B. The terms of a federal contract, grant, regulation, or statute prevent City from making a
timely payment with federal funds; or
C. There is a bona fide dispute between Engineer and a subcontractor or between a
subcontractor and its supplier concerning supplies, materials, or equipment delivered or
the services performed which causes the payment to be late; or
D. The invoice is not mailed to City in strict accordance with instructions, if any, on the
purchase order, or this Agreement or other such contractual agreement.
City shall document to Engineer the issues related to disputed invoices within ten (10) calendar
days of receipt of such invoice. Any non - disputed invoices shall be considered correct and payable per
the terms of Chapter 2251, V.T.C.A., Texas Government Code.
ARTICLE 7
NOTICE TO PROCEED
City shall issue a written authorization to proceed with work identified in the Scope of Services.
City shall not be responsible for actions by Engineer or any costs incurred by Engineer relating to
additional work not included in Exhibit B entitled "Services to be Performed by Engineer."
4
Rev. 4/1/03
City's Designated Representative for purposes of this Agreement is as follows:
Bill Stablein
2008 Enterprise Drive
Round Rock, Texas
Telephone Number (512) 218 -5562_
Fax Number (512) 218 -3242_
Email Address bstablein @round - rock.tx.us
ARTICLE 8
PROJECT TEAM
City's Designated Representative shall be authorized to act on City's behalf with respect to this
project. City or City's Designated Representative shall render decisions in a timely manner pertaining
to documents submitted by Engineer in order to avoid unreasonable delay in the orderly and sequential
progress of Engineer's services.
Engineer's Designated Representative for purposes of this Agreement is as follows:
Ricardo Zamarripa
811 Barton Springs Road Suite 400
Austin, Texas 78704-1164
Telephone Number (512) 474-550Q
Fax Number (512) 474 -6325
Email Address ricardo.zamarripa @earthtech.com
ARTICLE 9
PROGRESS EVALUATION
Engineer shall, from time to time during the progress of the work, confer with City at City's
election. Engineer shall prepare and present such information as may be pertinent and necessary, or as
may be requested by City, in order for City to evaluate features of the work. At the request of City or
Engineer, conferences shall be provided at Engineer's office, the offices of City, or at other locations
designated by City. When requested by City, such conferences shall also include evaluation of
Engineer's services and work.
Should City determine that the progress in production of work does not satisfy the Work
Schedule, then City shall review the Work Schedule with Engineer to determine corrective action
required.
Engineer shall promptly advise City in writing of events which have or may have a significant
impact upon the progress of the work, including but not limited to the following:
5
Rev. 4/1/03
(1) Problems, delays, adverse conditions which may materially affect the ability to attain
program objectives, prevent the meeting of time schedules and goals, or preclude the
attainment of project work units by established time periods; and such disclosure shall be
accompanied by statement of actions taken or contemplated, and City assistance needed to
resolve the situation, if any; and
(2) Favorable developments or events which enable meeting the work schedule goals sooner
than anticipated.
ARTICLE 10
SUSPENSION
Should City desire to suspend the work, but not to terminate this Agreement, then such
suspension may be effected by City giving Engineer thirty (30) calendar days' verbal notification
followed by written confirmation to that effect. Such thirty -day notice may be waived in writing by
agreement and signature of both parties. The work may be reinstated and resumed in full force and
effect within sixty (60) days of receipt of written notice from City to resume the work. Such sixty -day
notice may be waived in writing by agreement and signature of both parties.
If City suspends the work, the contract period as determined in Article 3 is not affected and this
Agreement will terminate on the date specified unless this Agreement is amended indicating otherwise.
City assumes no liability for work performed or costs incurred prior to the date authorized by
City for Engineer to begin work, and/or during periods when work is suspended, and/or subsequent to
the contract completion date.
ARTICLE 11
ADDITIONAL WORK
If Engineer forms a reasonable opinion that any work he /she /it has been directed to perform is
beyond the scope of this Agreement and as such constitutes extra work, he /she /it shall promptly notify
City in writing. In the event City finds that such work does constitute extra work and exceeds the
maximum amount payable, City shall so advise Engineer and a written Supplemental Agreement will
be executed between the parties as provided in Article 13 entitled "Supplemental Agreements."
Engineer shall not perform any proposed additional work nor incur any additional costs prior to the
execution, by both parties, of a written Supplemental Agreement. City shall not be responsible for
actions by Engineer nor for any costs incurred by Engineer relating to additional work not directly
associated with the performance of the work authorized in this Agreement or any amendments thereto.
ARTICLE 12
CHANGES IN WORK
If City deems it necessary to request changes to previously satisfactorily completed work or
parts thereof which involve changes to the original scope of services or character of work under this
6
Rev. 4/1/03
Agreement, then Engineer shall make such revisions as requested and as directed by City. Such
revisions shall be considered as additional work and paid for as specified under Article 11 entitled
"Additional Work."
Engineer shall make revisions to work authorized hereunder as are necessary to correct errors
appearing therein, when required to do so by City. No additional compensation shall be due for such
work.
ARTICLE 13
SUPPLEMENTAL AGREEMENTS
The terms of this Agreement may be modified by written Supplemental Agreement if City
determines that there has been a significant change in (1) the scope, complexity or character of the
service to be performed, or (2) the duration of the work. Any such Supplemental Agreement must be
duly authorized by City Council Resolution. Where such City Council authorization is required,
Engineer shall not proceed until the appropriate Resolution has been adopted. Additional
compensation, if appropriate, shall be identified as provided in Article 4 entitled "Compensation."
Both parties must execute any written Supplemental Agreement within the contract period
specified in Article 3 entitled "Contract Term."
It is understood and agreed by and between both parties that Engineer shall make no claim for
extra work done or materials furnished until City grants full execution of the written Supplemental
Agreement and authorization to proceed. City reserves the right to withhold payment pending
verification of satisfactory work performed.
ARTICLE 14
OWNERSHIP OF DOCUMENTS
All data, basic sketches, charts, calculations, plans, specifications, and other documents created
or collected under the terms of this Agreement are the exclusive property of City and shall be furnished
to City upon request. All documents prepared by Engineer and all documents furnished to Engineer by
City shall be delivered to City upon completion or termination of this Agreement. Engineer, at
his/her /its own expense, may retain copies of such documents or any other data which he /she /it has
furnished City under this Agreement. Any release of information shall be in conformance with
requirements of the Texas Open Records Act.
ARTICLE 15
PERSONNEL, EQUIPMENT AND MATERIAL
Engineer shall furnish and maintain, at his/her /its own expense, quarters for the performance of
all services, and adequate and sufficient personnel and equipment to perform the services as required.
All employees of Engineer shall have such knowledge and experience as will enable them to perform
the duties assigned to them. Any employee of Engineer who, in the opinion of City, is incompetent or
whose conduct becomes detrimental to the work shall immediately be removed from association with
7
Rev. 4/1/03
the project when so instructed by City. Engineer certifies that he /she /it presently has adequate qualified
personnel in his/her /its employment for performance of the services required under this Agreement, or
will obtain such personnel from sources other than City. Engineer may not change the Project Manager
without prior written consent of City.
ARTICLE 16
SUBCONTRACTING
Engineer shall not assign, subcontract or transfer any portion of the work under this Agreement
without prior written approval from City. All subcontracts shall include the provisions required in this
Agreement and shall be approved as to form, in writing, by City prior to work being performed under
the subcontract. No subcontract shall relieve Engineer of any responsibilities under this Agreement.
ARTICLE 17
EVALUATION OF WORK
City, or any authorized representatives of it, shall have the right at all reasonable times to review
or otherwise evaluate the work performed or being performed hereunder and the premises on which it is
being performed. If any review or evaluation is made on the premises of Engineer or a subcontractor,
then Engineer shall provide and require its subcontractors to provide all reasonable facilities and
assistance for the safety and convenience of City or other representatives in the performance of their
duties.
ARTICLE 18
SUBMISSION OF REPORTS
All applicable study reports shall be submitted in preliminary form for approval by City before
any final report is issued. City's comments on Engineer's preliminary reports shall be addressed in any
final report.
ARTICLE 19
VIOLATION OF CONTRACT TERMS/BREACH OF CONTRACT
Violation of contract terms or breach of contract by Engineer shall be grounds for termination of
this Agreement, and any increased costs arising from Engineer's default, breach of contract, or violation
of contract terms shall be paid by Engineer.
ARTICLE 20
TERMINATION
This Agreement may be terminated before the stated termination date by any of the following
conditions.
(1) By mutual agreement and consent, in writing, of both parties.
8
Rev. 4/1 /03
(2) By City, by notice in writing to Engineer, as a consequence of failure by Engineer to
perform the services set forth herein in a satisfactory manner.
(3) By either party, upon the failure of the other party to fulfill its obligations as set forth
herein.
(4) By City, for reasons of its own and not subject to the mutual consent of Engineer, upon
not less than thirty (30) days' written notice to Engineer.
(5) By satisfactory completion of all services and obligations described herein.
Should City terminate this Agreement as herein provided, no fees other than fees due and
payable at the time of termination shall thereafter be paid to Engineer. In determining the value of the
work performed by Engineer prior to termination, City shall be the sole judge. Compensation for work
at termination will be based on a percentage of the work completed at that time. Should City terminate
this Agreement under Subsection (4) immediately above, then the amount charged during the thirty -day
notice period shall not exceed the amount charged during the preceding thirty (30) days.
If Engineer defaults in the performance of this Agreement or if City terminates this Agreement
for fault on the part of Engineer, then City shall give consideration to the actual costs incurred by
Engineer in performing the work to the date of default, the amount of work required which was
satisfactorily completed to date of default, the value of the work which is usable to City, the cost to City
of employing another firm to complete the work required and the time required to do so, and other
factors which affect the value to City of the work performed at the time of default.
The termination of this Agreement and payment of an amount in settlement as prescribed above
shall extinguish all rights, duties, and obligations of City and Engineer under this Agreement, except
the obligations set forth herein in Article 21 entitled "Compliance with Laws." If the termination of this
Agreement is due to the failure of Engineer to fulfill his/her /its contractual obligations, then City may
take over the project and prosecute the work to completion. In such case, Engineer shall be liable to
City for any additional costs incurred by City.
Engineer shall be responsible for the settlement of all contractual and administrative issues
arising out of any procurements made by Engineer in support of the scope of services under this
Agreement.
ARTICLE 21
COMPLIANCE WITH LAWS
(1) Compliance. Engineer shall comply with all applicable federal, state and local laws,
statutes, codes, ordinances, rules and regulations, and the orders and decrees of any court, or
administrative bodies or tribunals in any manner affecting the performance of this Agreement,
including without limitation, minimum/maximum salary and wage statutes and regulations, and
licensing laws and regulations. Engineer shall furnish City with satisfactory proof of his /her /its
compliance.
9
Rev. 4/1/03
Engineer shall further obtain all permits and licenses required in the performance of the
professional services contracted for herein.
(2) Taxes. Engineer will pay all taxes, if any, required by law arising by virtue of the services
performed hereunder. City is qualified for exemption pursuant to the provisions of Section 151.309 of
the Texas Limited Sales, Excise, and Use Tax Act.
ARTICLE 22
INDEMNIFICATION
Engineer shall save and hold harmless City and its officers and employees from all claims and
liabilities due to activities of his/her /itself and his/her /its agents or employees, performed under this
Agreement, which are caused by or which result from error, omission, or negligent act of Engineer or of
any person employed by Engineer or under Engineer's direction or control.
Engineer shall also save and hold City harmless from any and all expenses, including but not
limited to attorneys fees which may be incurred by City in litigation or otherwise defending claims or
liabilities which may be imposed on City as a result of such activities by Engineer, its agents, or
employees.
ARTICLE 23
ENGINEER'S RESPONSIBILITIES
Engineer shall be responsible for the accuracy of his/her /its work and shall promptly make
necessary revisions or corrections resulting from errors, omissions, or negligent acts, and same shall be
done without compensation. City shall determine Engineer's responsibilities for all questions arising
from design errors and/or omissions. Engineer shall not be relieved of responsibility for subsequent
correction of any such errors or omissions or for clarification of any ambiguities until after the
construction phase of the project has been completed.
ARTICLE 24
ENGINEER'S SEAL
The responsible engineer shall sign, seal and date all appropriate engineering submissions to
City in accordance with the Texas Engineering Practice Act and the rules of the State Board of
Registration for Professional Engineers.
ARTICLE 25
NON - COLLUSION, FINANCIAL INTEREST PROHIBITED
(1) Non - collusion. Engineer warrants that he /she /it has not employed or retained any company
or persons, other than a bona fide employee working solely for Engineer, to solicit or secure this
Agreement, and that he /she /it has not paid or agreed to pay any company or engineer any fee,
commission, percentage, brokerage fee, gifts, or any other consideration, contingent upon or resulting
10
Rev. 4/1/03
from the award or making of this Agreement. For breach or violation of this warranty, City reserves and
shall have the right to annul this Agreement without liability or, in its discretion and at its sole election,
to deduct from the contract price or compensation, or to otherwise recover, the full amount of such fee,
commission, percentage, brokerage fee, gift or contingent fee.
(2) Financial Interest Prohibited. Engineer covenants and represents that Engineer,
his/her /its officers, employees, agents, consultants and subcontractors will have no financial interest,
direct or indirect, m the purchase or sale of any product, materials or equipment that will be
recommended or required for the construction of the project.
ARTICLE 26
INSURANCE
(1) Insurance. Engineer, at Engineer's sole cost, shall purchase and maintain during the entire
term while this Agreement is in effect professional liability insurance coverage in the minimum amount
of One Million Dollars from a company authorized to do insurance business in Texas and otherwise
acceptable to City.
(2) Subconsultant Insurance. Without limiting any of the other obligations or liabilities of
Engineer, Engineer shall require each subconsultant performing work under this Agreement to maintain
during the term of this Agreement, at the subconsultant's own expense, the same stipulated minimum
insurance required in Article 26, Section (1) above, including the required provisions and additional
policy conditions as shown below in Article 26, Section (3).
Engineer shall obtain and monitor the certificates of insurance from each subconsultant in order
to assure compliance with the insurance requirements. Engineer must retain the certificates of insurance
for the duration of this Agreement, and shall have the responsibility of enforcing these insurance
requirements among its subconsultants. City shall be entitled, upon request and without expense, to
receive copies of these certificates of insurance.
(3) Insurance Policy Endorsements. Each insurance policy shall include the following
conditions by endorsement to the policy:
1. Each policy shall require that thirty (30) days prior to the expiration, cancellation, non -
renewal or any change in the limit or scope of coverage, a notice thereof shall be given to
City by certified mail to:
City Manager, City of Round Rock
221 East Main Street
Round Rock, Texas 78664
Engineer shall also notify City, within 24 hours of receipt, of any notices of expiration,
cancellation, non - renewal, or material change in coverage it receives from its insurer.
2. Companies issuing the insurance policies shall have no recourse against City for payment
of any premiums or assessments for any deductibles which are the sole responsibility of
and at the sole risk of Engineer.
11
Rev. 4/1/03
3. The term "City" or "City of Round Rock" shall include all authorities, boards,
commissions, departments, and officers of City and the individual members and
employees thereof in their official capacities, and/or while acting on behalf of the City of
Round Rock.
4. The policy clause "Other Insurance" shall not apply to any insurance coverage currently
held by City, to any such future coverage, or to City's Self - Insured Retentions of
whatever nature.
(4) Cost of Insurance. The cost of all insurance required herein to be secured and maintained by
Engineer shall be borne solely by Engineer, with certificates of insurance evidencing such minimum
coverage in force to be filed with City. Such Certificates of Insurance are evidenced as Exhibit F herein
entitled "Certificates of Insurance."
ARTICLE 27
COPYRIGHTS
City shall have the royalty -free, nonexclusive and irrevocable right to reproduce, publish or
otherwise use, and to authorize others to use, any reports developed by Engineer for governmental
purposes.
ARTICLE 28
SUCCESSORS AND ASSIGNS
This Agreement shall be binding upon and inure to the benefit of the parties hereto, their
successors, lawful assigns, and legal representatives. Engineer may not assign, sublet or transfer any
interest in this Agreement, in whole or in part, by operation of law or otherwise, without obtaining the
prior written consent of City.
ARTICLE 29
SEVERABILITY
In the event any one or more of the provisions contained in this Agreement shall for any reason
be held to be invalid, illegal or unenforceable in any respect, then such invalidity, illegality or
unenforceability shall not affect any other provision thereof and this Agreement shall be construed as if
such invalid, illegal or unenforceable provision had never been contained herein.
ARTICLE 30
PRIOR AGREEMENTS SUPERSEDED
This Agreement constitutes the sole agreement of the parties hereto, and supersedes any prior
understandings or written or oral contracts between the parties respecting the subject matter defined
herein. This Agreement may only be amended or supplemented by mutual agreement of the parties
hereto in writing.
12
Rev. 4/1/03
Records pertaining to the project, and records of accounts between City and Engineer, shall be
kept on a generally recognized accounting basis and shall be available to City or its authorized
representatives at mutually convenient times. The City reserves the right to review all records it deems
relevant which are related to this Agreement.
All notices to either party by the other required under this Agreement shall be personally
delivered or mailed to such party at the following respective addresses:
City:
City of Round Rock
Attention: City Manager
221 East Main Street
Round Rock, TX 78664
and to:
Stephan L. Sheets
City Attorney
309 East Main Street
Round Rock, TX 78664
Engineer:
Ricardo Zamarripa
Earth Tech, Inc.
811 Barton Springs Road Suite 400
Austin, Texas 78704-1164
ARTICLE 31
ENGINEER'S ACCOUNTING RECORDS
ARTICLE 32
NOTICES
ARTICLE 33
GENERAL PROVISIONS
(1) Time is of the Essence. Engineer understands and agrees that time is of the essence and that
any failure of Engineer to complete the services for each phase of this Agreement within the agreed
Work Schedule may constitute a material breach of this Agreement. Engineer shall be fully responsible
for his/her /its delays or for failures to use his/her /its best efforts in accordance with the terms of this
Agreement. Where damage is caused to City due to Engineer's failure to perform in these
circumstances, City may withhold, to the extent of such damage, Engineer's payments hereunder
13
Rev. 4/1/03
without waiver of any of City's additional legal rights or remedies.
(2) Force Majeure. Neither City nor Engineer shall be deemed in violation of this Agreement
if prevented from performing any of their obligations hereunder by reasons for which they are not
responsible or circumstances beyond their control. However, notice of such impediment or delay in
performance must be timely given, and all reasonable efforts undertaken to mitigate its effects.
(3) Enforcement and Venue. This Agreement shall be enforceable in Round Rock,
Williamson County, Texas, and if legal action is necessary by either party with respect to the
enforcement of any or all of the terms or conditions herein, exclusive venue for same shall lie in
Williamson County, Texas. This Agreement shall be governed by and construed in accordance with the
laws and court decisions of the State of Texas.
The undersigned signatory for Engineer hereby represents and warrants that the signatory is an
officer of the organization for which he /she has executed this Agreement and that he /she has full and
complete authority to enter into this Agreement on behalf of the firm. The above - stated representations
and warranties are made for the purpose of inducing City to enter into this Agreement.
IN WITNESS WHEREOF, the City of Round Rock has caused this Agreement to be signed in
it corporate name by its Mayor, duly authorized to execute the same on its behalf by Resolution No.
, approved by the City Council on the 22 day of the month of May, 2003,
and Engineer, Earth Tech, Inc., signing by and through his/her /its duly authorized representative(s),
thereby binding the parties hereto, their successors, assigns and representatives for the faithful and full
performance of the terms and provisions hereof.
ATTEST:
By: Nadi/hi) i
Christine Martinez, City Secretary
ARTICLE 34
SIGNATORY WARRANTY
Signature of Principal
Printed Name: TO] Arid E ATM
14
Rev. 4/1/03
LIST OF EXHIBITS ATTACHED
(1) Exhibit A "Services to be Performed by City"
(2) Exhibit B "Services to be Performed by Engineer"
(3) Exhibit C "Work Schedule"
(4) Exhibit D "Fee Schedule"
(5) Exhibit E "Work Authorizations"
(6) Exhibit F "Certificates of Insurance"
15
Rev. 4/1/03
Exhibit A
Services to be Provided by the City of Round Rock
RM 2769 Schematic
THE City of Round Rock (CORR) is to provide the following services:
1. Project Management
2. Data and/or information owned by CORR necessary for design
3. Provide timely review of all activities /submittals
4. Prompt review of invoices to CORR guidelines
16
Rev. 4/1/03
Introduction
The work to be performed under this contract shall consist of engineering and Plans, Specification and
Estimate (PS &E) development to build a new location bridge behind Home Depot, adjacent parking lot
improvements, and new location 2 -land undivided connection from parking area to Dell Way Blvd. This
bridge design was completed under previous contract and is to be included. The intent of this work
authorization will be to develop one (1) approved final PS &E for the Home Depot Bridge at Dell Way.
The work will be performed by Earth Tech, Inc. and McGray & McGray Land Surveyors, Inc.
SECTION 1: SERVICES TO BE PROVIDED BY EARTH TECH, INC.
The work to be performed by Earth Tech under this work authorization, m general, shall consist of:
1. Providing project management services for the development of horizontal and vertical alignments for
new connection to Dell Way.
2. Providing engineering services for various tasks including cost estimate and drainage analysis.
3. Managing subconsultant efforts.
A detailed description of the services to be provided by Earth Tech is as follows:
Project Management
1. Project Management
2. Provide overall project management services including budget control, schedule control, project
coordination, subconsultant management, resource allocation, and preparation of invoices.
3. Ensure timely delivery of one (1) PS &E, GEOPAK files, electronic files, and hard copies of all
pertinent information, all in American Standard System of Measure format.
4. Perform Quality Control/ Quality Assurance reviews.
5. Project Meetings - Attend meetings with CORR other meetings at the direction of the CORR.
Meetings will be attended and billed only as necessary.
Field Surveying
Exhibit B
Services to be Provided by the Engineer
Home Depot Bridge PS &E
1. The Engineer will coordinate with CORR to identify what information is required from McGray and
McGray. The Engineer will manipulate CADD files to ensure uniformity with other CADD design
files. The Engineer will identify any additional survey data required.
17
Rev. 4/1/03
Roadway Design Controls
1. PS &E. The Engineer will provide PS &E with horizontal and vertical alignment, curve data,
proposed typical sections, proposed curb and gutter, sidewalks, ADA ramps, existing topography,
ROW, existing utilities and proposed drainage. The PS &E will be submitted to CORR for further
processing and ultimately final approval.
Drainage
1. Perform preliminary drainage analysis.
2. Develop drainage area map. Major drainage areas will be identified and hydrologic information will
be calculated.
3. A storm sewer layout will be developed. These maps will depict drainage area boundaries and flow
direction arrows. Each area will be identified with a unique number to be used to find runoff
information for further calculations of the storm sewer systems.
Miscellaneous Roadway
1. Prepare preliminary construction cost estimate. Includes quantity and construction cost estimates.
2. Prepare Project Layout, Horizontal Alignment Data Sheets, Grading Plans, Misc. Details,
Demolition Layout.
18
Rev. 4/1 /03
SECTION 2: SERVICES TO BE PROVIDED BY McGray & McGray, INC.
THE ENGINEER is to provide the following services:
Field Surveying
Design Survey with 1' contours, improvements, visible utilities, and trees 6" or greater.
Boundary Services
Provide plats and descriptions for two areas of land for turning circle adjacent to Home Depot Bridge
and new connection to Dell Way.
19
Rev. 4/1/03
Task Description
Senior
Engineer
Staff
Engineer
Technician
Clerical
Hours
Total
Labor Rates w /overhead
and fixed fee
$146.63
$111.68
895.45
$53.99
PROJECT MANAGEMENT
Project Management
8
8
16
$2,066.48
SUBTOTAL
8
8
16
$2,066.48
FIELD SURVEYING
Manipulate Survey Data
1
7
8
$928.39
SUBTOTAL
1
7
0
0
8
$928.39
ROADWAY DESIGN
CONTROLS
Horizontal & Verticle
1
4
5
$593.35
_Alignment
Typical Sections
1
7
8
$928.39
Determine Cut & Fill
Quantities
8
8
$893.44
Plan & Profile Sheets
1
32
8
41
$4,483.99
Standards
1
1
$95.45
Summary of Quantities
1
1
$95.45
SUBTOTAL
3
51
10
0
64
$7,090.07
DRAINAGE
Drainage Area Map
1
9
10
$1,151.75
Hydraulic Computations
4
4
$446.72
Analyze Storm Sewers
4
4
$446.72
Analyze Cross Drainage
0
$0.00
Storm Sewer Layout
8
4
12
$1,275.24
Storm Sewer Plan & Profile
1
7
4
12
$1,310.19
Storm Sewer Details
8
8
$893.44
Storm Sewer Standards
1
1
$111.68
Hydraulic Data Sheets
4
4
$446.72
Summary of Quantities
1
1
$95.45
SUBTOTAL
2
45
9
0
56
$6,177.91
SIGNING AND
PAVEMENT MARKING
Signing and Pavement
Marking Layout
34
6
40
$4,369.82
Exhibit D
Fee Schedule
Earth Tech Inc.
20
Rev. 4 /1 /03
Sign & Pav Mark Standards
1
1
$95.45
Summary of Quantities
1
1
$95.45
SUBTOTAL
0
34
8
0
42
$4,560.72
MISCELLANEOUS
Furnish Design Data to
Utility Companies
2
2
$223.36
Title Sheet w/ Index
1
1
2
$207.13
Project Layout
1
1
2
$207.13
Horizontal Alignment Data
1
1
2
$207.13
Grading Plans
36
4
40
$4,402.28
Misc. Details
8
8
$893.44
Demolition Layout
24
6
30
$3,253.02
Estimate
4
4
$446.72
Specifications & General
Notes
16
16
$1,786.88
Quality Assurance/ Quality
Control
4
4
$586.52
SUBTOTAL
4
93
13
0
110
$12,213.61
RETAINING WALLS
Retaining Wall Plan &
Profiles
36
4
40
$4,402.28
Retaining Wall Standards
1
1
$95.45
Summary of Quantities
1
1
$95.45
SUBTOTAL
0
36
6
0
42
$4,593.18
Temporary Erosion Controls
Temporary Erosion Control
Plan Layout
8
8
$893.44
Erosion Control Standards
1
1
$95.45
SUBTOTAL
0
8
1
0
9
$988.89
TOTAL LABOR
18
282
47
0
347
$38,619.25
TOTAL
$38,619.25
The above rates are the average rate in each classification of employee.
Invoices will be based on actual salaries for the individuals who worked on the project
Non - exempt employees may be invoiced at time and a half based on actual costs.
Direct Labor Rates $49.13 $37.42 $31.98 $18.09
Overhead Rate 1.5953
Fixed Fee Rate 15%
21
Rev. 4/1/03
Task Description
Field
(3 -man)
RPLS
Field Coord.
Sr. Tech
Tech
Hours
Total
Labor Rates
w /overhead & fixed
fee
$116.00
$90.00
$70.00
$70.00
$60.00
Field Surveying
Field Surveying
64
2
2
3
40
111
$10,354.00
Subtotal
64
2
2
3
40
111
$10,354.00
Boundry Suveying
Services
Plats and Legal
Descriptions
28
10
2
2
24
66
$5,868.00
Subtotal
28
10
2
2
24
66
$5,868.00
Direct Expenses
Quantity
Unit
Rate
Plats, Deeds, etc.
1
LS
50
$50.00
Total
92
12
4
5
64
177
$16,272.00
Exhibit D
Fee Schedule
McGray & McGray Surveying
22
Rev. 4/1 /03
Task Description
Earth Tech
McGray &
McGray
Total
PROJECT MANAGEMENT
$2,066.48
$2,066.48
FIELD SURVEYING
$928.39
$10,354.00
$11,282.39
BOUNDRY SURVEYING SERVICES
$5,868.00
ROADWAY DESIGN CONTROLS
$7,090.07
$7,090.07
DRAINAGE
$6,177.91
$6,177.91
SIGNING AND PAVEMENT MARKING
$4,560.72
$4,560.72
MISCELLANEOUS
$12,213.61
$12,213.61
RETAINING WALLS
$4,593.18
$4,593.18
TEMPORARY EROSION CONTROLS
$988.89
$988.89
TOTAL LABOR
$38,619.25
$16,222.00
$48,973.25
DIRECT EXPENSES
$50.00
$50.00
Unbilled work to be included
$20,541.11
$20,541.11
from expired Supplemental #7
TOTAL
$59,160.36
$16,272.00
$69,564.36
Exhibit D
Fee Schedule
Summary
23
Rev. 4/1/03
Mayor
Nyle Maxwell
Mayor Pro -tem
Tom Nielson
Council Members
Alan McGraw
Carrie Pitt
Scot Knight
Isabel Gallahan
Gary Coe
City Manager
Jim Nuse
City Attorney
Stephan L Sheets
ROUND ROCK, TEXAS
PURPOSE. PASSION. PROSPERITY.
May 29, 2003
Mr. Ricardo Zamarripa
Earth Tech Transportation Services, Inc.
811 Barton Springs Road, Suite 400
Austin, Texas 78704
Dear Mr. Zamarripa:
The Round Rock City Council approved Resolution No. R- 03- 05 -22-
11D1 at their regularly scheduled meeting on May 22, 2003. This
resolution approves an Agreement for Engineering Services for the Dell
Way /South Mays Extension Project.
Enclosed is a copy of the resolution and original agreement for your
files. If you have any questions, please do not hesitate to contact Bill
Stablein at 218 -3237.
Sherri Monroe
Assistant City Secretary
Enclosure
CITY OF ROUND ROCK Administrative Dept., 221 East Main Street Round Rock, Texas 7866.4
Phone: 512.218.5400 • Fax 512 218.7097 • www.ci. round -rock. tx.us