Loading...
R-03-05-22-11E4 - 5/22/2003RESOLUTION NO. R- 03- 05- 22 -11E4 WHEREAS, the City of Round Rock has previously entered into an Agreement for Engineering Services with Baker - Aicklen & Assoc., Inc. for the G.O. Bond Downtown Streets, Phase 1 Project, and WHEREAS, Baker - Aicklen & Assoc., Inc. has submitted Supplemental Agreement No. 1 to the Agreement for Engineering Services for a change in the scope of services, and WHEREAS,the City Council desires to enter into said Supplemental Agreement No. 1 with Baker - Aicklen & Assoc., Inc. , Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 1 to the Agreement for Engineering Services with Baker - Aicklen & Assoc., Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 22nd day of May, 2003 ATTES CHRISTINE R. MARTINEZ, City Secreta 4PFGesktop \: :OD MA/ WORLD Ox/ 0: /WDOx /RRSOLUTI /R3 052284.WPL /rmc Al7WE Mayor ' City of Round Rock, Texas STATE OF TEXAS THE COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES This Supplemental Agreement No. 1 to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Baker - Aicklen & As- soc., Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinaf- ter called the "Agreement ", on September 12, 2002 to provide Preliminary Engineering Services for the G.O. Bond 2002 - Downtown Streets, Phase I, and WHEREAS, it has become necessary to amend the Agreement to provide for additional engi- neering services, additional compensation, and an extension of the contract period; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. ARTICLE 2, SCOPE OF SERVICES TO BE PERFORMED BY ENGINEER and EXHIBIT B, SERVICES TO BE PERFORMED BY THE ENGINEER shall be amended as set forth in the attached ADDENDUM to EXHIBIT B. 1I. ARTICLE 3, CONTRACT PERIOD, shall be amended to extend the contract period to Novem- ber 30, 2004. m. downtown st - Supp Agr - 1.doc Rev. 4/2/03 Page 1 of 2 • ARTICLE 4, COMPENSATION, shall be amended by the adding $105,264.55 to the original lump sum amount of $63,634.31 to make the amended lump sum payable under this Agreement as $168,898.86. IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. I I EXHIBIT BAKER -AIC . EN & ASSOC., INC. William Waeltz, P.E., Its P.. -AUCI M4. 5 / 3 Date CITY OF ROUND ROCK By: Nyle Maxwell, Mayor downtown st - Supp Agr -I.doc Date Page 2 of 2 Rev. 4/2/03 PROJECT DESCRIPTION Addendum No. 1 to EXHIBIT B SERVICES TO BE PERFORMED BY ENGINEER BAKER - AICKLEN AND ASSOCIATES, INC. SCOPE OF SERVICES Re: G. O. Bond 2002 — Downtown Streets — Phase I Final Street Design, Water and Wastewater Design, submit support documentation and calculations to TCEQ as related to WPAP & SCS, Stormwater Pollution Prevention Plan (SWPPP), Texas Department of Licensing and Regulation (TDLR) Submittal Variances, Additional Topographic Survey, Right -of -Way Field Notes with Sketches, Permitting/Bidding /Approvals, and Construction Phase Administration. Also included in this additional Scope of Services is Preliminary & Final Design of Street, Drainage, Water and Wastewater improvements to Nelson Street from Main Street to East Austin Avenue. Final Design services for Nelson Street are included in Items C — H below. A. Nelson Street Right -of -Way and Topographic Design Surveys 1. Coordinate with Utility Locators. 2. Deed Study and ROW Survey - Perform necessary right -of -way surveys to define existing rights -of -way within project limits. 3. Topographic/Design Survey - Perform topographic/planimetric features survey along the street with sufficient detail necessary to design the proposed improvements. The limits of the survey along the street shall be a minimum of ten feet outside one right -of -way (ROW) line to ten feet outside the opposite ROW line. The survey shall include but not be limited to the following: Location of existing rights -of -way, property comers, pavements, driveways, power /utility poles, utility boxes, valves, fire hydrants, manholes, clean outs, roadside swales /ditches, signs, trees, mail boxes, sidewalks, significant landscaping, meters, walls, etc., and elevations at all abrupt grade changes. The survey shall also provide sufficient data to describe in detail intersections of the streets under consideration with other streets not contemplated herein to be reconstructed. 4. Set two (2) Benchmarks. 5. Provide Topographic Survey Drafting. B. Right -of -Way Acquisition Surveys & Additional Topographic Design Surveys 1. Provide the surveying services to produce certified sketches and metes and bounds descriptions for thirteen (13) separate right -of -way acquisition parcels. Each parcel will also be monumented along the proposed new right -of -way. Downtown Streets Attach -B t1 -supp agr- .doc Rev. 4/2/03 Page 1 of 3 In addition, additional topographic design surveys will be provided along the north side of Pecan Street at two (2) locations. C. Nelson Street Preliminary Engineering Design 1 Coordination of Subconsultants. (Provide geotechnical investigation and recommendation of pavement design.) 2. Collect and review data. 3. Identify Issues. 4. Prepare base maps. 5. Prepare preliminary drainage analysis & schematic. 6. Prepare utility relocation analysis & schematic. 7. Prepare Preliminary Plan & Profile sheets. 8. Prepare Preliminary Engineer's Opinion of Probable Construction Cost and submittal of Preliminary Engineering Documents to City. 9. Meetings with City. D. Project Coordination 1. Attend project coordination meetings with the City to discuss project goals and requirements. (Assumes six (6) meetings.) 2. Attend public meetings, as requested by the City. (Assumes two (2) meetings.) 3. Coordinate with local utility providers for utility relocations. E. Final Design . 1. Prepare overall erosion/sedimentation control and tree protection plan. 2. Prepare overall drainage plan with runoff and inlet calculations, as required. 3. Prepare plan and profile sheets. 4. Prepare Veteran's Park parking lot dimensional control and grading plan. 5. Prepare utility plan. 6. Prepare wastewater profiles. 7. Prepare storm sewer profiles. 8. Prepare cross sections at one hundred foot (100') intervals. 9. Prepare cover sheet, construction notes sheet, construction details and standards in order to relay sufficient detail for contractibility. F. Review — Permitting — Approvals 1. Submit construction plans and support documentation to TDLR for project review and variances, as required. 2. Address review comments /secure City approval. (Two (2) submittals.) 3. Prepare SWPPP and assist the City and Contractor with the submission of the Notice of Intent. 4. Prepare support documentation and calculations, as required by the TCEQ, to secure WPAP exemption approval. Downtown Streets Attach -B #I -supp agr- .doc Rev. 4/2/03 Page 2 of 3 5. Prepare support documentation and calculations for wastewater improvements, as required by the TCEQ, to secure their approval/concurrence. G. Bidding Phase 1. Prepare quantity take -offs. 2. Prepare Engineer's Opinion of Probable Construction Cost. 3. Prepare Final Bidding/Contract documents. 4. Advertise project in local newspapers. 5. Distribute plans and specifications to prospective bidders. (Reproduction/Distribution costs are reimbursable expenses.) 6. Schedule and attend pre -bid conference. Answer contractor questions and issue addenda, if required. 7. Compile and analyze bid tabulations and submit recommendations for award of contract. H. Construction Phase Administration Services Not Included in the Scope of Services 1. Conduct pre - construction conference. 2. Review shop drawings, samples, schedules, and submittals. 3. Interpret drawings and specifications, as related to RFI's. 4. Perform weekly site visits to observe construction for general conformity to the construction documents. - 5. Observe testing of water and wastewater lines. 6. Attend bi- weekly construction progress meetings. (Assumes nine (9) months construction.) 7. Review Contractor's pay estimates. 8. Prepare final punch list. 9. Prepare "Record Drawings" and provide City an electronic computer aided drafting file of final plans. 10. Issue Contractor's Certification of Completion. Walls over three feet in height, structural water quality ponds, detention ponds, phase one environmental site assessments, wetland issues, trench safety design, landscape plans, TIA reports, and fees charged by reviewing agencies. Downtown Streets Attach -B 41-supp agr- .doc Rev. 4/2/03 Page 3 of 3 SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES BAKER AICKLEN AND ASSOCIATES, INC. Re: G. O. Bond 2002 — Downtown Streets — Phase I ADDENDUM #1 TO EXHIBIT C — WORK SCHEDULE (Behind this page) 2 4 5 9 10 Project: DTS Date: Thu 5/1/03 Task Name Duration Start Finish Design 136 days Fri 5123/03 Fri 11/28/03 Notice to Proceed 1 day Fri 5 /23/03 Fri 5/23/03 ._.... ..._.._ -_ Fri8 . Project Coordination 1 Fri 66 days Fri 523703 3 Fri 8122!0 . Additional Topo J 5 days Mon 6/9/03 Fri 6/13/03 J Final Design I 66 days Fri 5/23/03 Fri 8/22/03 Plans Submitted I 1 day Frt 8/8/03 Frl 8/8/03 ROW Discriptlons 25 days Fri 623/03 Thu 626/03 --- --' - on8 /__ - -.. Fn _ 2 / Review/Permitting/Approval ! 25 days Mon 8125103 Fd 9266103 03 Bidding 1 45 days Mon 9729/03 Fri 11/28/03 _.. --- -- I - - -.. . . . -- i2/1-803'.----mail — ConstructionAdmin 196 da Mon 8130%04 Page 1 3rd Quarter ♦ 5/23: %+�� Task Milestone • Split Summary Progress Project Summary External Tasks External Milestone Deadline li t-S.172•A 74=31 SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES BAKER - AICKLEN AND ASSOCIATES, INC. Re: G. O. Bond 2002 — Downtown Streets — Phase I ADDENDUM #1 TO EXHIBIT D — FEE SCHEDULE (Behind this page) DIRECT COSTS: DIRECT LABOR OVERHEAD PERCENTAGE TOTAL LABOR & OH FIXED FEE TOTAL COST LABOR COSTS: * 157 12% SURVEYING SERVICES $3,956.00 $6,210.92 $10,166.92 $1,220.03 $11,386.95 ENGINEERING SERVICES $31,372.50 $49,254.83 $80,627.33 $9,675.28 $90,302.60 TOTAL LABOR COST: $35,328.50 $55,465.75 $90,794.25 $10,895.31 $101,689.55 DIRECT COSTS: RATE QUANTITY TOTAL REPRODUCTION: Copies 8.5" x 11" $0.35 1800 $630.00 Copies 24" x 36" $1.50 600 $900.00 Subtotal 51,530.00 WILLIAMSON COUNTY COURTHOUSE REPRODUCTION: Copies 8.5" x 11" $1.00 50 $50.00 Copies 18" x 24" $3.00 5 $15.00 Subtotal 565.00 TOTAL EXPENSES 51,595.00 51,595.00 SUBCONSULTANTS Geotechnical: Trinity Engineering/Kleinfelder $1,80000 Subconsultant Markup (10 %) $180.00 TOTAL SUBCONSULTANTS 51,980.00 $1,980.00 TOTAL DIRECT COSTS: 53,575.00 Total Labor Cost: $101,689.55 Total Direct Cost: $3,575.00 Total Protect Cost: $105,264.55 • A nutnhour estimate is attached behind this page for reference only. o:\Snppk Agree el Downt Streets G.O. Bond 2002REVISED 4- 17- O3.xls Revised 4/29/03 City of Round Rock Agreement For Engineeering & Surveying Services with Baker- Alckien & Associates, Inc. G. O. Bond 2002 - Downtown Streets - Phase I - Supplemental Agreement #1 MANHOUR SUMMARY G. 0. Bond 2002 — Downtown Streets — Phase I- Supplemental Agreement City of Round Rock o:\Supple Agree N1DowvvStreefs 0.0. Bood 2002RBVISED 4- 17.03.ols Rev. 429 -03 .e • ENGINEERING Manhours Direct Labor Cost Project Engineer 113.5 $38.00 $4,313.00 Project Designer Engineering Assistant 597.5 $25.00 $14,937.50 Senior CAD Tech Engineering CAD Tech Administrative Subtotal 596 $18.00 $10,728.00 82 $17.00 $1,394.00 1389 $31,372.50 SURVEYING Reg Prof Land Surveyor 10 $36.00 $360.00 Senior Survey Tech 90 $20.00 $1,800.00 GPS Operator I GPS Operator 2 Party Chief 43 $15.00 $645.00 Instrument Operator 43 $13.00 $559.00 Rodman 43 $11.00 $473.00 Administrative 7 $17.00 $119.00 Subtotal 236 $3,956.00 ENGINEERING SCOPE OF SERVICES PE PD EA SCT ECT ADM RMADM TOTAL C. Nelson Street Preliminary Engineering Design 1. Coordination of Subconsultants. (Provide geotechnical investigation & recommendation of pavement design.) 2 2 2 3 2 2. Collect & Review Data. 1 2 2 4 4 7 3. Identify Issues. 1 3 2 14 14 14 3 4. Prepare Base Maps. 1 8 1 1 8 5. Prepare Preliminary Drainage Analysis & Schematic. 1 16 8 8 16 6. Prepare Utility Relocation Analysis & Schematic. 5 66 4 8 28 28 12 7. Prepare Preliminary Plan & Profile Sheets. 1 90 8 24 43 43 7 33 8. Prepare Preliminary Engineer's Opinion of Probable Cost & Submittal of Preliminary Engineering documents to City. 1 4 2 2 • 9 9. Meetings with City. 1 2 3 D. Project Coordination 1. Attend project coordination meetings with the City to discuss project goals and requirements. (Assumes six (6) meetings.) 12 12 - 24 2. Attend public meetings, as requested by the City. (Assumes two (2) meetings.) 4 4 8 3. Coordinate with local utility providers for utility relocations. 6 12 4 22 E. Final Design 1. Prepare overall erosion/sedimentation control and tree protection plan. 2 8 16 26 2. Prepare overall drainage plan with runoff and inlet calculations, as required. 2 32 28 62 3. Prepare plan and profile sheets. 2 56 104 1Q 4. Prepare Veteran's Park parking lot dimensional control and grading plan. I 8 16 25 SURVEYING SERVICES SCOPE OF SERVICES RPLS SST GPS1 GPS2 PC IM RMADM TOTAL A. Nelson Street Right -of -way and Topographic Design Surveys I. Coordinate with Utility Locators. 2 2 3 7 2. Deed Study & ROW Survey. 1 2 4 . 7 3. Topographic/Design Survey. 1 3 14 14 14 46 4 Set two (2) Benchmarks. 1 1 1 1 4 5. Provide Topographic Survey Drafting. 1 16 17 B. Right -of-way Acquisition Survey and Additional Topographic Design Surveys 1. Provide the surveying services to produce certified sketches and metes and bounds descriptions for thirteen (13) separate right - - way acquisition parcels. Each parcel will also be monumented along the proposed new right -of -way. In addition, additional topographic design surveys will be provided along the north side of Pecan Street at two (2) locations. 5 66 28 28 28 155 Total Manhours 10 90 43 43 43 7 236 MANIOUR ESTIMATE G. O. Bond 2002 — Downtown Streets — Phase I- Supplemental Agreement #1 City of Rou Rock SCOPE OF SERVICES PE PD EA SCT ECT ADM 'TOTAL 5. Prepare utility plan. 2 40 80 122 6. Prepare wastewater profiles. 2 24 48 74 7. Prepare storm sewer profiles. 1 ITI 48 70 8. Prepare cross sections at one hundred foot (100') intervals. .. 64 90 9. Prepare cover sheet, construction notes sheet, construction details and standards in order to relay sufficient detail for constructibility. 2 32 - , 50 F. Review- Permitting - Approvals 1. Submit construction plans and support documents to TDLR for project review and variances, as required 2 24 4 '30 2. Address review comments/secure City approval. (Two (2) submittals.) N 24 40 7 68 3. Prepare SWPPP and assist the City and Contractor with the submission of the Notice of Intent. 16 2 23 4. Prepare support documentations and calculations, as required by the TCEQ, to secure WPAP exemption approval. 20 2 30 5. Prepare support documentatons and calculations for wastewater improvements, as required by the TCEQ, to secure their approval/concurrence. 2 20 2 6 30 G. Bidding Phase 1. Prepare quantity take -offs. 1 8 28 37 2. Prepare Engineer's Opinion of Probable Construction Cost 1 4 2 7 3. Prepare fmal bidding/contract documents. 1 6 16 23 4. Advertise project in local newspapers. 1 2 3 5. Distribute plans and specifications to prospective bidders. (Reproduction/distribution costs are reimbursable expenses.) Lfl 2 it col floc 11 6. Schedule and attend pre-bid conference. Answer contractor questions and issue addenda, if required. 18 7. Compile and analyze bid tabulations and submit recommendations for award of contract. 17 H. Construction Phase Administration 1. Conduct pre- construction conference. 2 4 _ 2 8 2. Review shop drawings, samples, schedules, and submittals 2 24 26 3. Interpret drawings and specifications, as related to RFPs. 3 20 3 26 4. Perform weekly site visits to observe construction for general conformity to the construction documents. 18 36 54 5. Observe testing of water and wastewater lines. 2 16 18 6. Attend bi- weekly construction progress meetings. (Assumes nine (9) months construction.) 18 18 9 45 7. Review Contractor's pay estimates. 4.5 13.5 18 8. Prepare final punch list. 3 24 3 .30 r 9. Prepare "Record Drawings" and provide City an electronic computer aided drafting file of final plans. 1 8 24 2 35 10. Issue Contractor's Certification of Completion. 1 2 1 4 Total Manhours 113.5 597.5 596 82 1359 r1 role ct ngmeer SCT Senior CAD Tech RPLS Registered Professional Land Surveyor GPS 2 GPS Operator 2 o:\SWppk Agree #I Dowut Streets G.O. Bond 2002rREVISED 417-03.xls Revised 429 -03 PD Project Designer ECT Engineering CAD Tech SST Senior Survey Tech PC Party Chief IM Instrument Operator EA Engineering Assistant ADM Administrative GPS GPS Operator 1 RM Rodman Trailway St. and Shady Loop Determined to be private property - Removed from project litso ste,miptpiboo 11013*-- Nelson Street - Contemplated To be added to project Downtown Street - Phase 1 Baker - Aicklen & Assoc., Inc. Project Scope ROUND ROCK TEXAS • I DATE: May 15, 2003 SUBJECT: City Council Meeting — May 22, 2003 ITEM: * 11.E.4. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 1 with Baker Aicklen & Associates, Inc. for the C.O. Bond 2002 Downtown Streets, Phase I Project. Resource: Tom Word, Chief of P. W. Operations Danny Halden, City Engineer History: The original contract was approved on September 12, 2002 by resolution no. R- 2002- 09- 12 -13C4 for preliminary engineering services including surveying, geotechnical investigation, utilities investigation, preparation of roadway, utility and drainage schematics, and cost estimates. Supplemental Agreement No. 1 is needed to proceed with right -of -way acquisition, final plan preparation and construction. Supplemental Agreement No.1 is for final engineering and construction phase services and will also provide preliminary engineering for Nelson Street for which improvements are being contemplated. Funding: Cost: $ 105,264.55 Source of funds: Capital Project Funds (2001 G. O. Bond) Outside Resources: Baker Aicklen & Assoc., Inc. Impact: Will expend bond funds approved by voters in November, 2001 Benefit: Will provide needed improvements to existing streets in the downtown area. Public Comment: N/A Sponsor: N/A • r STATE OF TEXAS THE COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES This Supplemental Agreement No. 1 to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Baker - Aicklen & As- soc., Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinaf- ter called the "Agreement ", on September 12, 2002 to provide Preliminary Engineering Services for the G.O. Bond 2002- Downtown Streets, Phase I, and WHEREAS, it has become necessary to amend the Agreement to provide for additional engi- neering services, additional compensation, and an extension of the contract period; NOW THEREFORE, premises considered, the City and the Engineer agree that said Contract is amended as follows: I. ARTICLE 2, SCOPE OF SERVICES TO BE PERFORMED BY ENGINEER and EXHIBIT B, SERVICES TO BE PERFORMED BY THE ENGINEER shall be amended as set forth in the attached ADDENDUM to EXHIBIT B. II. ARTICLE 3, CONTRACT PERIOD, shall be amended to extend the contract period to Novem- ber 30, 2004. ARTICLE 4, COMPENSATION, shall be amended by the adding $105,264.55 to the original lump sum amount of $63,634.31 to make the amended lump sum payable under this Agreement as $168,898.86. IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. downtown 0 - Supp Agr -t.doc Rev. 4/2/03 Page 1 of 2 12- 03 -D5 -Z -) i E BAKER-AICKLEN & ASSOC., INC. By: A. William Waeltz . its _ 6,e fo ,JO »eGG 49r /6/03 Date Date 5a -Oa Date downtown st - Supp Agi' -I .doc Rev. 4/2/03 Page 2 of 2 PROJECT DESCRIPTION SCOPE OF SERVICES Addendum No. 1 to EXHIBIT B SERVICES TO BE PERFORMED BY ENGINEER BAKER - AICKLEN AND ASSOCIATES, INC. Re: G. O. Bond 2002 — Downtown Streets — Phase I Final Street Design, Water and Wastewater Design, submit support documentation and calculations to TCEQ as related to WPAP & SCS, Stormwater Pollution Prevention Plan (SWPPP), Texas Department of Licensing and Regulation (TDLR) Submittal Variances, Additional Topographic Survey, Right -of -Way Field Notes with Sketches, Permitting/Bidding /Approvals, and Construction Phase Administration. Also included in this additional Scope of Services is Preliminary & Final Design of Street, Drainage, Water and Wastewater improvements to Nelson Street from Main Street to East Austin Avenue. Final Design services for Nelson Street are included in Items C — H below. A. Nelson Street Right -of -Way and Topographic Design Surveys 1. Coordinate with Utility Locators. 2. Deed Study and ROW Survey - Perform necessary right -of -way surveys to define existing rights -of -way within project limits. 3. Topographic /Design Survey - Perform topographic /planimetric features survey along the street with sufficient detail necessary to design the proposed improvements. The limits of the survey along the street shall be a minimum of ten feet outside one right -of -way (ROW) line to ten feet outside the opposite ROW line. The survey shall include but not be limited to the following: Location of existing rights -of -way, property corners, pavements, driveways, power /utility poles, utility boxes, valves, fire hydrants, manholes, clean outs, roadside swales /ditches, signs, trees, mail boxes, sidewalks, significant landscaping, meters, walls, etc., and elevations at all abrupt grade changes. The survey shall also provide sufficient data to describe in detail intersections of the streets under consideration with other streets not contemplated herein to be reconstructed. 4. Set two (2) Benchmarks. 5. Provide Topographic Survey Drafting. B. Right -of -Way Acquisition Surveys & Additional Topographic Design Surveys 1. Provide the surveying services to produce certified sketches and metes and bounds descriptions for thirteen (13) separate right -of -way acquisition parcels. Each parcel will also be monumented along the proposed new right -of -way. Downtown Streets Attach -B #1 -supp agr- .doc Rev. 4/2/03 Page 1 of 3 D. Project Coordination 1 Coordination of Subconsultants. (Provide geotechnical investigation and recommendation of pavement design.) 2. Collect and review data. 3. Identify Issues. 4. Prepare base maps. 5. Prepare preliminary drainage analysis & schematic. 6. Prepare utility relocation analysis & schematic. 7. Prepare Preliminary Plan & Profile sheets. 8. Prepare Preliminary Engineer's Opinion of Probable Construction Cost and submittal of Preliminary Engineering Documents to City. 9. Meetings with City. C. Nelson Street Preliminary Engineering Design 1. Attend project coordination meetings with the City to discuss project goals and requirements. (Assumes six (6) meetings.) 2. Attend public meetings, as requested by the City. (Assumes two (2) meetings.) 3. Coordinate with local utility providers for utility relocations. E. Final Design In addition, additional topographic design surveys will be provided along the north side of Pecan Street at two (2) locations. 1. Prepare overall erosion/sedimentation control and tree protection plan. 2. Prepare overall drainage plan with runoff and inlet calculations, as required. 3. Prepare plan and profile sheets. 4. Prepare Veteran's Park parking lot dimensional control and grading plan. 5. Prepare utility plan. 6. Prepare wastewater profiles. 7. Prepare storm sewer profiles. 8. Prepare cross sections at one hundred foot (100') intervals. 9. Prepare cover sheet, construction notes sheet, construction details and standards in order to relay sufficient detail for constructibility. F. Review — Permitting — Approvals 1. Submit construction plans and support documentation to TDLR for project review and variances, as required. 2. Address review comments /secure City approval. (Two (2) submittals.) 3. Prepare SWPPP and assist the City and Contractor with the submission of the Notice of Intent. 4. Prepare support documentation and calculations, as required by the TCEQ, to secure WPAP exemption approval. Downtown Streets Attach -B #1 -supp a5r- .doc Rev. 4/2/03 Page 2 of 3 5. Prepare support documentation and calculations for wastewater improvements, as required by the TCEQ, to secure their approval /concurrence. G. Bidding Phase 1. Prepare quantity take -offs. 2. Prepare Engineer's Opinion of Probable Construction Cost. 3. Prepare Final Bidding/Contract documents. 4. Advertise project in local newspapers. 5. Distribute plans and specifications to prospective bidders. (Reproduction/Distribution costs are reimbursable expenses.) 6. Schedule and attend pre -bid conference. Answer contractor questions and issue addenda, if required. 7. Compile and analyze bid tabulations and submit recommendations for award of contract. H. Construction Phase Administration 1. Conduct pre - construction conference. 2. Review shop drawings, samples, schedules, and submittals. 3. Interpret drawings and specifications, as related to RFI's. 4. Perform weekly site visits to observe construction for general conformity to the construction documents. 5. Observe testing of water and wastewater lines. 6. Attend bi- weekly construction progress meetings. (Assumes nine (9) months construction.) 7. Review Contractor's pay estimates. 8. Prepare final punch list. 9. Prepare "Record Drawings" and provide City an electronic computer aided drafting file of final plans. 10. Issue Contractor's Certification of Completion. Services Not Included in the Scope of Services Walls over three feet in height, structural water quality ponds, detention ponds, phase one environmental site assessments, wetland issues, trench safety design, landscape plans, TIA reports, and fees charged by reviewing agencies. Downtown Streets Attach -B #I -supp agr- .doc Rev. 4/2/03 Page 3 of 3 SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES BAKER - AICKLEN AND ASSOCIATES, INC. Re: G. O. Bond 2002 — Downtown Streets — Phase I ADDENDUM #1 TO EXHIBIT C — WORK SCHEDULE (Behind this page) r Ma Jun ID 1 2 Task Name Design Notice to Proceed 3 Project Coordination 4 Additional Topo 5 Final Design 6 Plans Submitted 7 ROW Discriptions 8 Review/Permitting /Approval 9 Bidding 10 Construction Admin Protect: DTS Date: Thu 5/1/03 Duration Start Finish 136 days Fri 5/23103 Fri 11128/03 1 day Fri 5/23/03 Fri 5/23/03 66 days • Fri 5/23/03' Frl 8/22/03 5 days Mon 6/9/03 Fri 6/13/03 66 days Fri 5/23/03 Fri 8/22/03 1 day Fn 8/8/03 Fri 8 /8/03 25 days Fri 523/03 Thu 6/26/03 25 days Mon 8/25/03 Fri 926/03 45 days Mon 9/29/03 Fit 11/20/03 196 days - -- Mon 12/1/03 Mon 8/ 8/30/04 2nd Quarter 13rd Quarter 4th Quarter RZILTIELI • 6/23: M • Task Milestone - :� -- -; i-��� ?3 . External Tasks Split Summary External Milestone Progress - Project Summary OPIMIPINEMIV Deadline L'y Page 1 1st Quarter .2nd Quarter 3rd Quarter; EIMEIRECILIENVICEMEillEMI a SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES BAKER AICKLEN AND ASSOCIATES, INC. Re: G. O. Bond 2002 — Downtown Streets — Phase I ADDENDUM #1 TO EXHIBIT D — FEE SCHEDULE (Behind this page) DIRECT COSTS: DIRECT LABOR OVERHEAD PERCENTAGE TOTAL LABOR & OH FIXED FEE TOTAL COST LABOR COSTS: * 157 12% SURVEYING SERVICES 53,956.00 $6,210.92 $10,166.92 $1,220.03 $11,386.95 ENGINEERING SERVICES $31,372.50 $49,254.83 $80,627.33 $9,675.28 590,302.60 TOTAL LABOR COST: 535,328.50 $55,465.75 $90,794.25 $10,895.31 $101,689.55 DIRECT COSTS: RATE QUANTITY TOTAL REPRODUCTION: Copies 8.5" x 11" $0.35 1800 $630.00 Copies 24" x 36" $1.50 600 $900.00 Subtotal $1,530.00 WILLIAMSON COUNTY COURTHOUSE REPRODUCTION: Copies 8.5" x 11" $1.00 50 $50.00 Copies 18" x 24" $3.00 5 $15.00 Subtotal 565.00 TOTAL EXPENSES 51,595.00 $1,595.00 SUBCONSULTANTS Geotechnical: Trinity Engineering/Kleinfelder $1,800.00 Subconsultant Markup (10 %) $180.00 TOTAL SUBCONSULTANTS $1,980.00 51,980.00 TOTAL DIRECT COSTS: 53,575.00 Total Labor Cost: $101,689.55 Total Direct Cost: $3,575.00 Total Project Cost: $105,264.55 o:VSupple Agree 41Downt Sneers G.O. Bond 2002REVISED 4- 17 -03.als Revised 4/29/03 City of Round Rock Agreement For Engineeering & Surveying Services with Baker - Alcklen & Associates, Inc. G. O. Bond 2002 — Downtown Streets — Phase I- Supplemental Agreement #1 * A manhour estimate is attached behind this page for reference only. MANHOUR SUMMARY G. O. Bond 2002 — Downtown Streets — Phase I- Supplemental Agreement City of Round Rock ENGINEERING Manhours Sala Direct Labor Cost Project Engineer 113.5 $38.00 $4.313.00 Project Designer Engineering Assistant 597.5 $25.00 $14,937.50 Senior CAD Tech Engineering CAD Tech Administrative Subtotal SURVEYING Reg Prof Land Surveyor 10 $36.00 $360.00 Senior Survey Tech 90 $20.00 $1,800.00 GPS Operator I GPS Operator 2 Party Chief 43 $15.00 $645.00 Instrument Operator 43 $13.00 $559.00 Rodman 43 $11.00 $473.00 Administrative 7 $17.00 $119.00 Subtotal 236 $3,956.00 o:VSuppk Agree 7/IDowu4Sneels G.O. Bond 2002REVISED 4-17 -03.xls Rev. 9-29-03 596 $18.00 $10.728.00 82 $17.00 $1,394.00 1389 $31,372.50 ENGINEERING SCOPE OF SERVICES PE PD EA SCT ECT ADM RM 4.DM TOTAL C. Nelson Street Preliminary Engineering Design 1. Coordination of Subconsultants. (Provide geotecbnical investigation & recommendation of pavement design.) 2 2 2 3 2 2. Collect & Review Data. 1 2 2 4 4 7 3. Identify Issues. 1 3 2 14 14 14 3 4. Prepare Base Maps. 1 8 1 1 8 5. Prepare Preliminary Drainage Analysis & Schematic. 1 16 8 8 16 6. Prepare Utility Relocation Analysis & Schematic. 5 66 4 8 28 28 12 7. Prepare Preliminary Plan & Profile Sheets. 1 90 8 24 43 43 7 33 8. Prepare Preliminary Engineer's Opinion of Probable Cost & Submittal of Preliminary Engineering documents to City. 1 4 2 2 9 9. Meetings with City. I 2 3 D. Project Coordination 1. Attend project coordination meetings with the City to discuss project goals and requirements. (Assumes six (6) meetings.) 12 12 24 2. Attend public meetings, as requested by the City. (Assumes two (2) meetings.) 4 4 8 3. Coordinate with local utility providers for utility relocations. 6 12 4 22 E. Final Design 1. Prepare overall erosion/sedimentation control and tree protection plan. 2 8 16 26 2. Prepare overall drainage plan with runoff and inlet calculations, as required. 2 32 28 62 3. Prepare plan and profile sheets. 2 56 104 162 4. Prepare Veteran's Park parking lot dimensional control and grading plan. 1 8 16 25 SURVEYING SERVICES SCOPE OF SERVICES RPLS SST GPS1 GPS2 PC IM RM 4.DM TOTAL A. Nelson Street Right -of -way and Topographic Design Surveys 1. Coordinate with Utility Locators. 2 2 3 7 2. Deed Study & ROW Survey. 1 2 4 7 3. Topographic/Design Survey. 1 3 14 14 14 46 4 Set two (2) Benchmarks. 1 1 1 1 4 5. Provide Topographic Survey Drafting. 1 16 17 B. Right - of-way Acquisition Survey and Additional Topographic Design Surveys 1. Provide the surveying services to produce certified sketches and metes and bounds descriptions for thirteen (13) separate right -of -way acquisition parcels. Each parcel will also be monumented along the proposed new right -of -way. In addition, additional topographic design surveys will be provided along the north side of Pecan Street at two (2) locations. 5 66 28 28 28 155 Total Manhours 10 90 43 43 43 7 236 MANHOUR ESTIMATE G. O. Bond 2002 — Downtown Streets — Phase I- Supplemental Agreement #1 City of Round Rock SCOPE OF SERVICES PE PD EA SCT ECT ADM TOTAL 5. Prepare utility plan. 2 40 80 122 6. Prepare wastewater profiles. 2 24 48 74 7. Prepare storm sewer profiles. 2 20 48 70 8. Prepare cross sections at one hundred foot (100') intervals. 2 24 64 90 9. Prepare cover sheet, construction notes sheet, construction details and standards in order to relay sufficient detail for constructibility. 2 16 32 50 F. Review - Permitting- Approvals 1. Submit construction plans and support documents to TDLR for project review and variances, as required. 2 24 4 30 2. Address review comments /secure City approval. (Two (2) submittals.) 2 24 40 2 68 3. Prepare SWPPP and assist the City and Contractor with the submission of the Notice of Intent. 1 16 2 4 23 4. Prepare support documentations and calculations, as required by the TCEQ, to secure WPAP exemption approval. 2 20 2 6 30 5. Prepare support documentatons and calculations for wastewater improvements, as required by the TCEQ, to secure their approval/concurrence. 2 20 2 6 30 G. Bidding Phase 1. Prepare quantity take -offs. 1 8 28 37 2. Prepare Engineer's Opinion of Probable Construction Cost. 1 4 2 7 3. Prepare final bidding/contract documents. 1 6 16 23 4. Advertise project in local newspapers. 1 2 3 5. Distribute plans and specifications to prospective bidders. (Reproduction/distribution costs are reimbursable expenses.) 1 2 8 11 6. Schedule and attend pre -bid conference. Answer contractor questions and issue addenda, if required. 2 12 4 18 7. Compile and analyze bid tabulations and submit recommendations for award of contract. 1 8 8 17 H. Construction Phase Administration 1. Conduct pre - construction conference. 2 4 2 8 2. Review shop drawings, samples, schedules, and submittals 2 24 26 3. Interpret drawings and specifications, as related to RFrs. 3 20 3 26 4. Perform weekly site visits to observe construction for general conformity to the construction documents. 18 36 54 5. Observe testing of water and wastewater lines. 2 16 18 6. Attend bi- weekly construction progress meetings. (Assumes nine (9) months construction.) 18 18 9 45 7. Review Contractor's pay estimates. 4.5 13.5 18 8. Prepare final punch list. 3 24 3 30 9. Prepare "Record Drawings" and provide City an electronic computer aided drafting file of final plans. 1 8 24 2 35 10. Issue Contractor's Certification of Completion. 1 2 1 4 Total Manhours 113.5 597.5 596 82 1389 PE Project Engineer SCT Senior CAD Tech RPLS Registered Professional Land Surveyor GPS 2 GPS Operator 2 o:\Suppk Agree #IDowot Streets G.O. Rood 2002rREVISED 417-03.xts Revised 429 -03 PD Project Designer ECT Engineering CAD Tech SST Senior Survey Tech PC Party Chief IM Instrumment Operator EA Engineering Assistant ADM Administrative GPS GPS Operator 1 RDA Rodman Mayor Nyle Maxwell Mayor Pro-tem Tom Nielson Council Members Alan McGraw Carrie Pitt Scot Knight Isabel Gallahan Gary Coe City Manager Jim Nose City Attorney Stephan L. Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. May 29, 2003 Mr. Bill Waeltz, P.E. Baker - Aicklen & Associates, Inc, 203 E. Main Street, Suite 201 Round Rock, TX 78664 Dear Mr. Waeltz: The Round Rock City Council approved Resolution No. R- 03- 05 -22- 11E4 at their regularly scheduled meeting on May 22, 2003. This resolution approves the Supplemental Agreement No. 1 to the Agreement for Engineering Services for the G.O. Bond Downtown Streets, Phase 1 Project. Enclosed is a copy of the resolution and original agreement for your files. If you have any questions, please do not hesitate to contact Tom Word at 218 -5540. Sherri Monroe Assistant City Secretary Enclosure CITY OF ROUND ROCK Administrative Dept., zzt East Main Street • Round Rock, Texas 78664 Phone: 512.218.5400 • Fax: 51z.2187097 • www.ci.round-roclux.us