R-03-06-12-10E1 - 6/12/2003RESOLUTION NO. R- 03- 06- 12 -10E1
WHEREAS, the City of Round Rock desires to retain engineering
services for additional surveying on the A.W. Grimes Boulevard Project,
and
WHEREAS, SAM, Inc has submitted an Agreement for Engineering
Services to provide said services, and
WHEREAS, the City Council desires to enter into said agreement
with SAM, Inc., Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS,
That the Mayor is hereby authorized and directed to execute on
behalf of the City an Agreement for Engineering Services with SAM, Inc.
for additional surveying on the A.W. Grimes Boulevard Project, a copy of
said agreement being attached hereto as Exhibit "A" and incorporated
herein for all purposes.
The City Council hereby finds and declares that written notice of the
date, hour, place and subject of the meeting at which this Resolution was
adopted was posted and that such meeting was open to the public as required
by law at all times during which this Resolution and the subject matter
hereof were discussed, considered and formally acted upon, all as required
by the Open Meetings Act, Chapter 551, Texas Government Code, as amended.
RESOLVED this 12th day of June, 2003.
ST:
A 14 ie 4)1(lAt
CHRISTINE R. MARTINEZ, City Secr
® PFDesktop\:. OOMA WOR LDOX/ O :JWDOX /RESOLUrS /R30613E1.WPD /sc
Cit
, Mayor
of Round Rock, Texas
' N D ROCK. TEXAS
PURPOSE PASSION. PROSPERITY.
THE STATE OF TEXAS
COUNTY OF WILLIAMSON
CITY OF ROUND ROCK AGREEMENT
FOR ENGINEERING SERVICES WITH
SAM, Inc.
FOR
A.W. Grimes Boulevard Project
§
THIS AGREEMENT FOR ENGINEERING SERVICES ( "Agreement ") is made and entered
into on this the 12 day of the month of June, 2003, by and between the CITY OF ROUND ROCK, a
Texas home -rule municipal corporation, whose offices are located at 221 East Main Street, Round Rock,
Texas 78664 -5299, (hereinafter referred to as "City "), and SAM, Inc., whose principal place of business
is located at 5508 West Highway 290, Building B, Austin, Texas, 78735, (hereinafter called
"Engineer"), and such Agreement is for the purpose of contracting for professional engineering services.
RECITALS:
WHEREAS, V.T.C.A., Government Code §2254.002(2)(A)(vii) under Subchapter A entitled
"Professional Services Procurement Act" provides for the procurement by municipalities of services of
professional engineers; and
WHEREAS, City and Engineer desire to contract for such professional engineering services; and
WHEREAS, City and Engineer wish to document their agreement concerning the requirements
and respective obligations of the parties;
NOW, THEREFORE, WITNESSETH:
That for and in consideration of the mutual promises contained herein and other good and
valuable considerations, and the covenants and agreements hereinafter contained to be kept and
performed by the respective parties hereto, it is agreed as follows:
The Contract Documents consist of this Agreement and any exhibits attached hereto (which
exhibits are hereby incorporated into and made a part of this Agreement) and all Supplemental
Engineering Sery Agreement -4 -2003
File name:R: \ @cfronk\Projects\Arterial B \SAM Inc.doc
CONTRACT DOCUMENTS
1
EXHIBIT
Rev.4 /1/03
Agreements (as defined herein in Article 13) which are subsequently issued. These form the entire
contract, and all are as fully a part of this Agreement as if attached to this Agreement or repeated herein.
ARTICLE 1
SCOPE OF SERVICES TO BE PERFORMED BY CITY
City shall perform or provide services as identified in Exhibit A entitled "Services to be
Performed by City."
ARTICLE 2
SCOPE OF SERVICES TO BE PERFORMED BY ENGINEER
Engineer shall perform engineering services as identified in Exhibit B entitled "Services to be
Performed by Engineer."
Engineer shall develop a mutually acceptable schedule of work as identified in Exhibit C entitled
"Work Schedule." Such Work Schedule shall contain a complete schedule so that the Engineer's Scope
of Services under this Agreement may be accomplished within the specified time and at the specified
cost. The Work Schedule shall provide specific work sequences and definite review times by City and
Engineer of all work performed. Should the review times take longer than shown on the Work Schedule,
through no fault of Engineer, additional time may be authorized by City through a written Supplemental
Agreement only if same is requested by a timely written request from Engineer which is approved by
City.
ARTICLE 3
CONTRACT TERM
(1) Term. This Agreement shall be from the date hereof and shall terminate at the close of
business on the 30`" day of the month of September 2003, unless extended by written Supplemental
Agreement executed by Engineer and City prior to the date of termination, or as otherwise terminated as
provided in Article 20 entitled "Termination." Any work performed or costs incurred after the date of
termination shall not be eligible for reimbursement.
Engineer shall notify City in writing as soon as possible if he /she /it determines, or reasonably
anticipates, that the work under this Agreement will not be completed before the termination date. In
that event City may, at its sole discretion, extend the contract term by timely written Supplemental
Agreement. Engineer shall allow adequate time for review and approval of his/her /its request for time
extension by City prior to expiration of this Agreement.
(2) Work Schedule. Engineer acknowledges that the Work Schedule is of critical importance,
and agrees to undertake all necessary efforts to expedite the performance of services required herein so
that construction of the project will be commenced and completed as scheduled. In this regard, Engineer
shall proceed with sufficient qualified personnel and consultants necessary to fully and timely
accomplish all services required under this Agreement in the highest professional manner.
2 Rev.4 /1/03
(3) Notice to Proceed. After execution of this Agreement, Engineer shall not proceed with work
delineated in Article 2 entitled "Scope of Services to be Performed by Engineer" and in Exhibit B
entitled "Services to be Performed by Engineer" until authorized in writing by City to proceed as
provided in Article 7 entitled "Notice to Proceed."
ARTICLE 4
COMPENSATION
City shall pay and Engineer agrees to accept the amount shown below as full compensation for
all engineering services performed and to be performed under this Agreement.
The amount payable under this Agreement, without modification of the Agreement as provided
herein, is the sum of Twenty-five Thousand, Seven Hundred Eighty Dollars and No Cents
($25,780.00) as shown in Exhibit D entitled "Fee Schedule." The lump sum amount payable may be
revised only by written Supplemental Agreement in the event of a change in scope, additional
complexity from that originally anticipated, or change in character of work as authorized by City.
Engineer shall prepare and submit to City monthly progress reports in sufficient detail to support
the progress of the work and to support invoices requesting monthly payment. Any preferred format of
City for such monthly progress reports shall be identified in Exhibit 13 entitled "Services to be
Performed by Engineer." Satisfactory progress of work shall be maintained as an absolute condition of
payment.
The fee herein referenced may be adjusted for additional work requested and performed only if
approved by written Supplemental Agreement.
ARTICLE 5
METHOD OF PAYMENT
Payments to Engineer for services rendered shall be made while work is in progress. Engineer
shall prepare and submit to City, not more frequently than once per month, a progress report as
referenced in Article 4 above. Such progress report shall state the percentage of completion of work
accomplished during that billing period and to date. Simultaneous with submission of such progress
report, Engineer shall prepare and submit one (1) original and one (1) copy of a certified invoice in a
form acceptable to City. This submittal shall also include a progress assessment report in a form
acceptable to City.
Progress payments shall be made in proportion to the percentage of completion of work tasks
identified in Exhibit D entitled "Fee Schedule." Progress payments shall be made by City based upon
work actually provided and performed. Upon timely receipt and approval of each statement, City shall
make a good faith effort to pay the amount which, notwithstanding anything herein to the contrary, is
due and payable within thirty (30) days. City reserves the right to withhold payment pending verification
3
Rev. 4/1/03
of satisfactory work performed. Engineer has the responsibility to submit proof to City, adequate and
sufficient in its determination, that tasks were completed.
The certified statements shall show the total amount earned to the date of submission and shall
show the amount due and payable as of the date of the current statement. Final payment does not relieve
Engineer of the responsibility of correcting any errors and/or omissions resulting from his/her /its
negligence.
ARTICLE 6
PROMPT PAYMENT POLICY
In accordance with Chapter 2251, V.T.C.A., Texas Government Code, payment to Engineer
will be made within thirty (30) days of the day on which City receives the supplies, materials,
equipment, or within thirty (30) days of the day on which the performance of services was complete, or
within thirty (30) days of the day on which City receives a correct invoice for the supplies, materials,
equipment, or services, whichever is later. Engineer may charge a late fee (fee shall not be greater than
that which is permitted by Texas law) for payments not made in accordance with this prompt payment
policy; however, this policy does not apply to payments made by City in the event:
A. There is a bona fide dispute between City and Engineer conceming the supplies,
materials, or equipment delivered or the services performed that causes the payment to be
late; or
B. The terms of a federal contract, grant, regulation, or statute prevent City from making a
timely payment with federal funds; or
C. There is a bona fide dispute between Engineer and a subcontractor or between a
subcontractor and its supplier concerning supplies, materials, or equipment delivered or
the services performed which causes the payment to be late; or
D. The invoice is not mailed to City in strict accordance with instructions, if any, on the
purchase order, or this Agreement or other such contractual agreement.
City shall document to Engineer the issues related to disputed invoices within ten (10) calendar
days of receipt of such invoice. Any non - disputed invoices shall be considered correct and payable per
the terms of Chapter 2251, V.T.C.A., Texas Government Code.
ARTICLE 7
NOTICE TO PROCEED
City shall issue a written authorization to proceed with work identified in the Scope of Services.
City shall not be responsible for actions by Engineer or any costs incurred by Engineer relating to
additional work not included in Exhibit B entitled "Services to be Performed by Engineer."
4
Rev. 4/1/03
City's Designated Representative for purposes of this Agreement is as follows:
Bill Stablein
2008 Enterprise Drive
Round Rock, Texas 78664
Telephone Number (512) 218 -5562_
Fax Number (512) 218 -3242
Email Address bstablein @round- rock.tx.us
ARTICLE 8
PROJECT TEAM
City's Designated Representative shall be authorized to act on City's behalf with respect to this
project. City or City's Designated Representative shall render decisions in a timely manner pertaining
to documents submitted by Engineer in order to avoid unreasonable delay in the orderly and sequential
progress of Engineer's services,
Engineer's Designated Representative for purposes of this Agreement is as follows:
Christopher M. Solomon, S.I.T.
SAM, Inc.
5508 West Highway 290, Building B, Austin, Texas 78735
Telephone Number (512) 447 -0575_
Fax Number (512) 326 -3029_
Email Address Csolomon @samincaus.com
ARTICLE 9
PROGRESS EVALUATION
Engineer shall, from time to time during the progress of the work, confer with City at City's
election. Engineer shall prepare and present such information as may be pertinent and necessary, or as
may be requested by City, in order for City to evaluate features of the work. At the request of City or
Engineer, conferences shall be provided at Engineer's office, the offices of City, or at other locations
designated by City. When requested by City, such conferences shall also include evaluation of
Engineer's services and work.
Should City determine that the progress in production of work does not satisfy the Work
Schedule, then City shall review the Work Schedule with Engineer to determine corrective action
required.
Engineer shall promptly advise City in writing of events which have or may have a significant
impact upon the progress of the work, including but not limited to the following:
5
Rev. 4/1/03
(1) Problems, delays, adverse conditions which may materially affect the ability to attain
program objectives, prevent the meeting of time schedules and goals, or preclude the
attainment of project work units by established time periods; and such disclosure shall be
accompanied by statement of actions taken or contemplated, and City assistance needed to
resolve the situation, if any; and
(2) Favorable developments or events which enable meeting the work schedule goals sooner
than anticipated.
ARTICLE 10
SUSPENSION
Should City desire to suspend the work, but not to terminate this Agreement, then such
suspension may be effected by City giving Engineer thirty (30) calendar days' verbal notification
followed by written confirmation to that effect. Such thirty-day notice may be waived in writing by
agreement and signature of both parties. The work may be reinstated and resumed in full force and
effect within sixty (60) days of receipt of written notice from City to resume the work. Such sixty -day
notice may be waived in writing by agreement and signature of both parties.
If City suspends the work, the contract period as determined in Article 3 is not affected and this
Agreement will terminate on the date specified unless this Agreement is amended indicating otherwise.
City assumes no liability for work performed or costs incurred prior to the date authorized by
City for Engineer to begin work, and/or during periods when work is suspended, and/or subsequent to
the contract completion date.
ARTICLE 11
ADDITIONAL WORK
If Engineer forms a reasonable opinion that any work he/she /it has been directed to perform is
beyond the scope of this Agreement and as such constitutes extra work, he/she /it shall promptly notify
City in writing. In the event City finds that such work does constitute extra work and exceeds the
maximum amount payable, City shall so advise Engineer and a written Supplemental Agreement will
be executed between the parties as provided in Article 13 entitled "Supplemental Agreements."
Engineer shall not perform any proposed additional work nor incur any additional costs prior to the
execution, by both parties, of a written Supplemental Agreement. City shall not be responsible for
actions by Engineer nor for any costs incurred by Engineer relating to additional work not directly
associated with the performance of the work authorized in this Agreement or any amendments thereto.
ARTICLE 12
CHANGES IN WORK
If City deems it necessary to request changes to previously satisfactorily completed work or
parts thereof which involve changes to the original scope of services or character of work under this
Agreement, then Engineer shall make such revisions as requested and as directed by City. Such
6
Rev. 4/1/03
revisions shall be considered as additional work and paid for as specified under Article 11 entitled
"Additional Work."
Engineer shall make revisions to work authorized hereunder as are necessary to correct errors
appearing therein, when required to do so by City. No additional compensation shall be due for such
work.
ARTICLE 13
SUPPLEMENTAL AGREEMENTS
The terms of this Agreement may be modified by written Supplemental Agreement if City
determines that there has been a significant change in (1) the scope, complexity or character of the
service to be performed, or (2) the duration of the work. Any such Supplemental Agreement must be
duly authorized by City Council Resolution. Where such City Council authorization is required,
Engineer shall not proceed until the appropriate Resolution has been adopted. Additional
compensation, if appropriate, shall be identified as provided in Article 4 entitled "Compensation."
Both parties must execute any written Supplemental Agreement within the contract period
specified in Article 3 entitled "Contract Term."
It is understood and agreed by and between both parties that Engineer shall make no claim for
extra work done or materials furnished until City grants full execution of the written Supplemental
Agreement and authorization to proceed. City reserves the right to withhold payment pending
verification of satisfactory work performed.
ARTICLE 14
OWNERSHIP OF DOCUMENTS
All data, basic sketches, charts, calculations, plans, specifications, and other documents created
or collected under the teens of this Agreement are the exclusive property of City and shall be furnished
to City upon request. All documents prepared by Engineer and all documents furnished to Engineer by
City shall be delivered to City upon completion or termination of this Agreement. Engineer, at
his/her /its own expense, may retain copies of such documents or any other data which he /she/it has
furnished City under this Agreement. Any release of information shall be in conformance with
requirements of the Texas Open Records Act.
ARTICLE 15
PERSONNEL, EOUIPMENT AND MATERIAL
Engineer shall furnish and maintain, at his/her /its own expense, quarters for the performance of
all services, and adequate and sufficient personnel and equipment to perform the services as required.
All employees of Engineer shall have such knowledge and experience as will enable them to perform
the duties assigned to them. Any employee of Engineer who, in the opinion of City, is incompetent or
whose conduct becomes detrimental to the work shall immediately be removed from association with
7
Rev. 4/1/03
the project when so instructed by City. Engineer certifies that he /she /it presently has adequate qualified
personnel in his /her /its employment for performance of the services required under this Agreement, or
will obtain such personnel from sources other than City. Engineer may not change the Project Manager
without prior written consent of City.
ARTICLE 16
SUBCONTRACTING
Engineer shall not assign, subcontract or transfer any portion of the work under this Agreement
without prior written approval from City. All subcontracts shall include the provisions required m this
Agreement and shall be approved as to form, in writing, by City prior to work being performed under
the subcontract. No subcontract shall relieve Engineer of any responsibilities under this Agreement.
ARTICLE 17
EVALUATION OF WORK
City, or any authorized representatives of it, shall have the right at all reasonable times to review
or otherwise evaluate the work performed or being performed hereunder and the premises on which it is
being performed. If any review or evaluation is made on the premises of Engineer or a subcontractor,
then Engineer shall provide and require its subcontractors to provide all reasonable facilities and
assistance for the safety and convenience of City or other representatives in the performance of their
duties.
ARTICLE 18
SUBMISSION OF REPORTS
All applicable study reports shall be submitted in preliminary form for approval by City before
any final report is issued. City's comments on Engineer's preliminary reports shall be addressed in any
final report.
ARTICLE 19
VIOLATION OF CONTRACT TERMS/BREACH OF CONTRACT
Violation of contract terms or breach of contract by Engineer shall be grounds for termination of
this Agreement, and any increased costs arising from Engineer's default, breach of contract, or violation
of contract terms shall be paid by Engineer.
ARTICLE 20
TERMINATION
This Agreement may be terminated before the stated termination date by any of the following
conditions.
(1) By mutual agreement and consent, in writing, of both parties.
8
Rev. 4/1/03
(2) By City, by notice in writing to Engineer, as a consequence of failure by Engineer to
perform the services set forth herein in a satisfactory manner.
(3) By either party, upon the failure of the other party to fulfill its obligations as set forth
herein.
(4) By City, for reasons of its own and not subject to the mutual consent of Engineer, upon
not less than thirty (30) days' written notice to Engineer.
(5) By satisfactory completion of all services and obligations described herein.
Should City terminate this Agreement as herein provided, no fees other than fees due and
payable at the time of termination shall thereafter be paid to Engineer. In determining the value of the
work performed by Engineer prior to termination, City shall be the sole judge. Compensation for work
at termination will be based on a percentage of the work completed at that time. Should City terminate
this Agreement under Subsection (4) immediately above, then the amount charged during the thirty -day
notice period shall not exceed the amount charged during the preceding thirty (30) days.
If Engineer defaults in the performance of this Agreement or if City terminates this Agreement
for fault on the part of Engineer, then City shall give consideration to the actual costs incurred by
Engineer in performing the work to the date of default, the amount of work required which was
satisfactorily completed to date of default, the value of the work which is usable to City, the cost to City
of employing another firm to complete the work required and the time required to do so, and other
factors which affect the value to City of the work performed at the time of default.
The termination of this Agreement and payment of an amount in settlement as prescribed above
shall extinguish all rights, duties, and obligations of City and Engineer under this Agreement, except
the obligations set forth herein in Article 21 entitled "Compliance with Laws." If the termination of this
Agreement is due to the failure of Engineer to fulfill his/her /its contractual obligations, then City may
take over the project and prosecute the work to completion. In such case, Engineer shall be liable to
City for any additional costs incurred by City.
Engineer shall be responsible for the settlement of all contractual and administrative issues
arising out of any procurements made by Engineer in support of the scope of services under this
Agreement.
ARTICLE 21
COMPLIANCE WITH LAWS
(1) Compliance. Engineer shall comply with all applicable federal, state and local laws,
statutes, codes, ordinances, rules and regulations, and the orders and decrees of any court, or
administrative bodies or tribunals in any manner affecting the performance of this Agreement,
including without limitation, minimum/maximum salary and wage statutes and regulations, and
licensing laws and regulations. Engineer shall fumish City with satisfactory proof of his/her /its
compliance.
9
Rev. 4/1/03
Engineer shall further obtain all permits and licenses required in the performance of the
professional services contracted for herein.
(2) Taxes. Engineer will pay all taxes, if any, required by law arising by virtue of the services
performed hereunder. City is qualified for exemption pursuant to the provisions of Section 151.309 of
the Texas Limited Sales, Excise, and Use Tax Act.
ARTICLE 22
INDEMNIFICATION
Engineer shall save and hold harmless City and its officers and employees from all claims and
liabilities due to activities of his/her /itself and his/her /its agents or employees, performed under this
Agreement, which are caused by or which result from error, omission, or negligent act of Engineer or of
any person employed by Engineer or under Engineer's direction or control.
Engineer shall also save and hold City harmless from any and all expenses, including but not
limited to attomeys fees which may be incurred by City in litigation or otherwise defending claims or
liabilities which may be imposed on City as a result of such activities by Engineer, its agents, or
employees.
ARTICLE 23
ENGINEER'S RESPONSIBILITIES
Engineer shall be responsible for the accuracy of his/her /its work and shall promptly make
necessary revisions or corrections resulting from errors, omissions, or negligent acts, and same shall be
done without compensation. City shall determine Engineer's responsibilities for all questions arising
from design errors and/or omissions. Engineer shall not be relieved of responsibility for subsequent
correction of any such errors or omissions or for clarification of any ambiguities until after the
construction phase of the project has been completed.
ARTICLE 24
ENGINEER'S SEAL
The responsible engineer shall sign, seal and date all appropriate engineering submissions to
City in accordance with the Texas Engineering Practice Act and the rules of the State Board of
Registration for Professional Engineers.
ARTICLE 25
NON - COLLUSION. FINANCIAL INTEREST PROHIBITED
(1) Non - collusion. Engineer warrants that he/she /it has not employed or retained any company
or persons, other than a bona fide employee working solely for Engineer, to solicit or secure this
Agreement, and that he/she /it has not paid or agreed to pay any company or engineer any fee,
commission, percentage, brokerage fee, gifts, or any other consideration, contingent upon or resulting
10
Rev. 4/1 /03
from the award or making of this Agreement. For breach or violation of this warranty, City reserves and
shall have the right to annul this Agreement without liability or, in its discretion and at its sole election,
to deduct from the contract price or compensation, or to otherwise recover, the full amount of such fee,
commission, percentage, brokerage fee, gift or contingent fee.
(2) Financial Interest Prohibited. Engineer covenants and represents that Engineer,
his/her /its officers, employees, agents, consultants and subcontractors will have no financial interest,
direct or indirect, in the purchase or sale of any product, materials or equipment that will be
recommended or required for the construction of the project.
ARTICLE 26
INSURANCE
(1) Insurance. Engineer, at Engineer's sole cost, shall purchase and maintain during the entire
term while this Agreement is in effect professional liability insurance coverage in the minimum amount
of One Million Dollars from a company authorized to do insurance business in Texas and otherwise
acceptable to City.
(2) Subconsultant Insurance. Without limiting any of the other obligations or liabilities of
Engineer, Engineer shall require each subconsultant performing work under this Agreement to maintain
during the term of this Agreement, at the subconsultant's own expense, the same stipulated minimum
insurance required in Article 26, Section (1) above, including the required provisions and additional
policy conditions as shown below in Article 26, Section (3).
Engineer shall obtain and monitor the certificates of insurance from each subconsultant in order
to assure compliance with the insurance requirements. Engineer must retain the certificates of insurance
for the duration of this Agreement, and shall have the responsibility of enforcing these insurance
requirements among its subconsultants. City shall be entitled, upon request and without expense, to
receive copies of these certificates of insurance.
(3) Insurance Policy Endorsements. Each insurance policy shall include the following
conditions by endorsement to the policy:
1. Each policy shall require that thirty (30) days prior to the expiration, cancellation, non-
renewal or any change in the limit or scope of coverage, a notice thereof shall be given to
City by certified mail to:
City Manager, City of Round Rock
221 East Main Street
Round Rock, Texas 78664
Engineer shall also notify City, within 24 hours of receipt, of any notices of expiration,
cancellation, non - renewal, or material change m coverage it receives from its insurer.
2. Companies issuing the insurance policies shall have no recourse against City for payment
of any premiums or assessments for any deductibles which are the sole responsibility of
and at the sole risk of Engineer.
11
Rev. 4/1/03
3. The term "City" or "City of Round Rock" shall include all authorities, boards,
commissions, departments, and officers of City and the individual members and
employees thereof in their official capacities, and/or while acting on behalf of the City of
Round Rock.
4. The policy clause "Other Insurance" shall not apply to any insurance coverage currently
held by City, to any such future coverage, or to City's Self- Insured Retentions of
whatever nature.
(4) Cost of Insurance. The cost of all insurance required herein to be secured and maintained by
Engineer shall be borne solely by Engineer, with certificates of insurance evidencing such minimum
coverage in force to be filed with City. Such Certificates of Insurance are evidenced as Exhibit F herein
entitled "Certificates of Insurance."
ARTICLE 27
COPYRIGHTS
City shall have the royalty-free, nonexclusive and irrevocable right to reproduce, publish or
otherwise use, and to authorize others to use, any reports developed by Engineer for governmental
purposes.
ARTICLE 28
SUCCESSORS AND ASSIGNS
This Agreement shall be binding upon and inure to the benefit of the parties hereto, their
successors, lawful assigns, and legal representatives. Engineer may not assign, sublet or transfer any
interest in this Agreement, in whole or in part, by operation of law or otherwise, without obtaining the
prior written consent of City.
ARTICLE 29
SEVERABILITY
In the event any one or more of the provisions contained in this Agreement shall for any reason
be held to be invalid, illegal or unenforceable in any respect, then such invalidity, illegality or
unenforceability shall not affect any other provision thereof and this Agreement shall be construed as if
such invalid, illegal or unenforceable provision had never been contained herein.
ARTICLE 30
PRIOR AGREEMENTS SUPERSEDED
This Agreement constitutes the sole agreement of the parties hereto, and supersedes any prior
understandings or written or oral contracts between the parties respecting the subject matter defined
herein. This Agreement may only be amended or supplemented by mutual agreement of the parties
hereto in writing.
12
Rev. 4/1/03
ARTICLE 31
ENGINEER'S ACCOUNTING RECORDS
Records pertaining to the project, and records of accounts between City and Engineer, shall be
kept on a generally recognized accounting basis and shall be available to City or its authorized
representatives at mutually convenient times. The City reserves the right to review all records it deems
relevant which are related to this Agreement.
City:
City of Round Rock
Attention: City Manager
221 East Main Street
Round Rock, TX 78664
and to:
Stephan L. Sheets
City Attomey
309 East Main Street
Round Rock, TX 78664
Engineer:
Christoper M. Solomon, S.I.T.,
SAM, Inc.
5508 West Highway 290, Building B
Austin, Texas 78735
ARTICLE 32
NOTICES
All notices to either party by the other required under this Agreement shall be personally
delivered or mailed to such party at the following respective addresses:
ARTICLE 33
GENERAL PROVISIONS
(1) Time is of the Essence. Engineer understands and agrees that time is of the essence and that
any failure of Engineer to complete the services for each phase of this Agreement within the agreed
Work Schedule may constitute a material breach of this Agreement. Engineer shall be fully responsible
for his/her /its delays or for failures to use his/her /its best efforts in accordance with the terms of this
Agreement. Where damage is caused to City due to Engineer's failure to perform in these
circumstances, City may withhold, to the extent of such damage, Engineer's payments hereunder
without waiver of any of City's additional legal rights or remedies.
13
Rev. 4/1/03
(2) Force Majeure. Neither City nor Engineer shall be deemed in violation of this Agreement
if prevented from performing any of their obligations hereunder by reasons for which they are not
responsible or circumstances beyond their control. However, notice of such impediment or delay in
performance must be timely given, and all reasonable efforts undertaken to mitigate its effects.
(3) Enforcement and Venue. This Agreement shall be enforceable in Round Rock,
Williamson County, Texas, and if legal action is necessary by either party with respect to the
enforcement of any or all of the terms or conditions herein, exclusive venue for same shall lie in
Williamson County, Texas. This Agreement shall be governed by and construed in accordance with the
laws and court decisions of the State of Texas.
The undersigned signatory for Engineer hereby represents and warrants that the signatory is an
officer of the organization for which he/she has executed this Agreement and that he/she has full and
complete authority to enter into this Agreement on behalf of the firm. The above - stated representations
and warranties are made for the purpose of inducing City to enter into this Agreement.
IN WITNESS WHEREOF, the City of Round Rock has caused this Agreement to be signed in
its corporate name by its Mayor, duly authorized to execute the same on its behalf by Resolution No.
, approved by the City Council on the 12 day of the month of June 2003,
and Engineer, SAM, Inc., signing by and through his/her /its duly authorized representative(s), thereby
binding the parties hereto, their successors, assigns and representatives for the faithful and full
performance of the terms and provisions hereof.
CITY OF ROUND ROCK, TEXAS:
By:
Nyle Maxwell, Mayor
ATTEST:
By:
Christine Martinez, City Secretary
ENGINEER:
By:
Signa a of Principal
ARTICLE 34
SIGNATORY WARRANTY
Printed Name: Michael R. Hatcher, Vice President
14
Rev. 4/1/03
LIST OF EXHIBITS ATTACHED
(1) Exhibit A "Services to be Performed by City"
(2) Exhibit B "Services to be Performed by Engineer"
(3) Exhibit C "Work Schedule"
(4) Exhibit D "Fee Schedule"
(5) Exhibit E "Work Authorizations"
(6) Exhibit F "Certificates of Insurance"
15
Rev. 4/1/03
Exhibit A
Services to be Performed by the City of Round Rock
16
Rev. 4/1/03
Right -of —Way Documentation and Staking
Exhibit B
Services to be Performed by the Engineer
I. SAM, Inc. will revise the following ROW Documents and set the associated ROW
monumentation for the following tracts: Carlin, Cirkiel, M &M Equities north of the
railroad, M &M Equities south of the railroad, and Sycamore Trail
a. Set approximately 26 concrete monuments at ROW PC's, PT's & PI's and 18 iron
rods with caps at property line intersections.
1I. Due to the ROW alignment changes SAM, Inc. will have to create an 8 -1/2 "x11" ROW
Document and set the associated ROW monumentation for the Grace Warner tract north
of the railroad. The original ROW alignment did not cross this tract.
a. Set approximately 2 concrete monuments at ROW PC's, PT's & PI's and 4 iron rods
with caps at property line intersections.
III. SAM, Inc. will create an 8 -1/2 "x11" ROW Document and set the associated ROW
monumentation for the City of Round Rock tract on Lake Creek. A ROW Document
was not prepared for the original ROW alignment.
a. Set approximately 2 concrete monuments at ROW PC's, PT's & PI's and 1 iron rod
with cap at property line intersections.
IV. SAM, Inc. will remove approximately 20 concrete monuments and 8 iron rods that were
set for the original ROW alignment.
V. SAM, Inc. will prepare a 24 "x36" Right -of -Way plan sheet. The sheet will show
existing property lines, proposed right -of -way, right -of -way parcel numbers, current
tract ownership and deed references, right -of -way acquisition table, survey names and
the set and found monumentation.
17
Rev. 4/1/03
I.
Revise ROW Documents and set monumentation:
$17,280.00
Project Manager /RPLS @ $115.00/hour— 9 hours
3 -man Fieldcrew @ $130.00/hour — 72 hours
2 -man Fieldcrew @ $110.00/hour — 36 hours
Survey Technician @ $65.00/hour — 45 hours
II.
Grace Warner ROW documents and set monumentation:
$1,805.00
Project Manager/RPLS @ $115.00/hour — 2 hours
2 -man Fieldcrew @ $110.00/hour — 9 hours
Survey Technician @ $65.00/hour — 9 hours
III.
City of Round Rock ROW document and set
monumentation:
$1,695.00
Project Manager /RPLS @ $115.00/hour — 2 hours
2 -man Fieldcrew @ $110.00/hour — 8 hours
Survey Technician @ $65.00/hour — 9 hours
IV.
Remove original ROW alignment monumentation:
$2,210.00
Project Manager/RPLS @ $115.00/hour — 2 hours
2 -man Fieldcrew @ $110.00/hour — 18 hours
V.
Right -of -Way Plan Sheet
Project Manager/RPLS @$115.00 /hour — 9 hours
$2,790.00
Survey Technician @ $65.00/hour — 27 hours
TOTAL
$25,780.00
FIELD CREW SERVICES:
Exhibit D
Fee Schedule
TIME AND MATERIALS FEE ESTIMATE & MANHOUR BREAKDOWN
Survey Field Crews:
Two (2) Person Field Crew
Three (3) Person Field Crew
Additional Rodperson, Chainperson, or Flagperson
GPS Field Operator & Vehicle & GPS Receiver
GPS Receiver (Unmanned)
18
$110.00 per hour
$130.00 per hour
$30.00 per hour
$90.00 per hour
$25.00 per hour
Crew Rates include one four -wheel drive vehicle. There is no mileage charge for fully equipped
Rev. 4/1/03
Terms:
Taxes:
field vehicles when the job site is within fifty (50) miles of the office from which the survey
crew originates.
OFFICE PERSONNEL SERVICES:
Office personnel are available at fixed hourly rates:
Associate /Senior Project Manager $130.00 per hour
Project Manager $115.00 per hour
Staff Surveyor $100.00 per hour
Senior Technician $72.50 per hour
Survey Technician $65.00 per hour
Clerical Support $50.00 per hour
Travel & Subsistence
All lodging expenses are invoiced at actual cost including taxes. Per diem for out -of -town work
is invoiced at $35.00 per person. Cost of mileage on company -owned vehicles is computed at
the current I.R.S. mileage allowance. Cost of company -owned four -wheel drive vehicles is
computed at the cm I.R.S. mileage allowance plus $30.00 per day.
Purchased Services:
All purchased services are invoiced at actual cost plus 10% handling. These include but are not
limited to reproduction, computer time, long distance telephone, consultants, subcontract
services, rented or leased equipment, and expendable supplies.
The Client shall promptly review invoice statements and notify SAM, Inc. of any objection
thereto; absent such objection in writing within fifteen (15) days of the date of the invoice, the
invoice shall be deemed proper and acceptable. Invoices are submitted monthly for all services
rendered and are payable upon receipt. Late payments will incur a late charge of one and one-
half percent (1 -1/2 %) per month from the original date of invoice. SAM, Inc. reserves the right
to stop work should invoices not be paid within the stated terms.
Boundary surveying services and fees are subject to State and Local sales tax. 8.25% sales tax,
when applicable, will be collected.
19
Rev. 4/1/03
05/16/03 10:39 12512 440 0989 TIME INSURANCE to 0002/0002
CERTIFICATE OF LIABILITY INSURANCE
PRODUCER : COMPANIES AFFORDING COVERAGE
Time Insurance Agency
1405 E. Riverside Drive A The Hartford
Austin, Texas 78741
S
INSURED : C
Surveying and Mapping, The. DBA SAM, Inc
5508 W. Hwy. 290, Bldg B. D
Austin, Texan 78
THIS IS TO CERTIFY THAT the Insured named above is insured by the Companies listed-shove with respect to the
business operations hereinafter described, for the types of insurance and in accordance with the provisions of the
standard policies used by the companies, and further hereinafter described. Exceptions to the policies are noted
below.
CO TYPE OF INSURANCE POLICY EFFECTIVE EXPIRATION LIMITS
LTR NUMBER DATE, DATE
A GENERAL LIABILITY
A AUTOMOBILEIIABII2IY 6513SNUY5890
4/29/03 4/29/04
A IDCCESS LIABILITY EACH OCCURRENCE $ 5,000,000
65XHUU27680
4129/03 4/29/04 AGGREGATE $ 5,000,000
A WORKERS' COMPENSATION STATUTORY LIINr15 S
AND EMPLOYERS' LIABILITY EACH ACCIDENT S 1,000 , 0.00
65WBDQ2484 DISEASE - POLICY LIMIT s 1,000.,000
4/29/03 4/29/04 DISEASE -EACH EMPLOYEE $ 1,000,000
PROFESSIONAL LIABILITY
650080E8773
4/29/03 4/29/04
DESCR1P11ON OF OPERATIONS /LOCATIONS IEHICLE$ISPECIAI, !TEMSIEXCEFT10NS
CERTIFICATE HOLDER: City Manager
City of Round Rack
221 E. Main Street
Round Rock, Texan 78664
Cart of rasur CORR/spxrs maser •
Date: May 16_ 'nn
GENERAL AGGREGATE 5 2,000,000
PRODUCrSCOMPA)P AGG. S 2 ,000,000
PERSONA dt ADV. INJURY S 1 , 000, 000
EACH OCCURRENCE S 1,000, 000
FIRE DAMAGE (Any one tire) s 300.000
MED. EXPENSE (Anyy one eaaoe) $ 10,000
COMBINED SINGLE UMrr s1.000,000
BODI INJURY (Pa person) S _
BODILY INJURY (Per eccidor0 S
PROPERTY DAMAGE S
The City of Round Rook is named as additional insured with respect To all policies except 'Workers' Compensation and Employers' Liability'
and 'Professional Liability'. Should any of the above described policies be cancelled or changed before the expiration date thereof the issuing
company will mail thirty (30) days wtiuea notice to the cenifiWe holder named below.
SIGMA OF UTHO REP ATIVE
Typed N John W. Schuler •
Tide: President
EXHIBIT "A" Revised 1011002
05/19/2003 14:59' 00000000000
CERTIFICATE OF LIABILITY INSURANCE
PRODUCER
USI hour Services of TX
1946 S. IH -35, Suite 301
Austin, Texas 78704
INSURED
Surveying & Mapping, Inc.
5508 W. Hwy 290, Building B
Austin, Texas 78735
GENERAL LIABILITY
AUTOMOBILE LIABILITY
EXCESS LIABILITY
WORKERS' COMPENSATION
AND EMPLOYERS' LIABILITY
DESCRIPTION OF OPERATIONS /LOCATIONS/VEHICLES /SPECIAL ITEMS /EXCEPTIONS
11.1 1111111111
Date: 05/16/03
COMPANIES AFFORDING COVERAGE
A Security Insurance Co. of Hartford
C
GENERAL - AGGREGATE 8
PRODUCTS- COMP /OP AGG. .F
PERSONAL & ADV. INJURY $
EACH OCCURRENCE 8
FIRE DAMAGE (Any one fire) $
MED. EXPENSE (Any one person)$
COMBINED SINGLE LIMIT 8
BODILY INJURY (Per person I 1
BODILY INJURY (Per accident) $
PROPERTY DAMAGE 5
EACH OCCURRENCE 6
AGGREGATE. 8
STATUTORY LIMITS E
EACIE ACCIDENT .8
DISEASE - POLICY LIMIT $
DISEASE,. - EACH EMPLOYEE E
PAGE 01 /01
THIS IS TO CERTIFY THAT the Insured named above is insured by the Companies listed above with respect to the
business operations hereinafter described, for the types of insurance and in accordance with the provisions of the
standard policies used by the companies, and further hereinafter described. Exceptions to the policies are noted
below.
CO TYPE OF INSURANCE POLICY EFFECTIVE EXPIRATION LIMITS
LTR NUMBER DATE DATE
A PROFESSIONAL LIABILITY AERA3039 -i5 06/27/02 06(27103 Limits:82, 000 ,000 / Claim.$2,000.000/Aggragate
Deductible: 5100,000
The City of Round Rock is named as additional insured with respect to all policies except 'Workers' Compensation and Employers' Liability'
and 'Professional Liability'. Should any of the above described policies be cancelled or changed before the expiration date thereof, the issuing
company will mail thirty (30) days written notice to the certificate holder named below.
CERTIFICATE HOLDER: City Manager
City of Round Rock
221 E. Main Street
Round Rock, Texas 78664
o ' Sall
Typed Na r Jan Simmers°
Title: Executive Aaent
Cert of Instil' CORR.doc/epecs master EXI "A" Reciiaed 10/2002
SIGNATURE OF AUTHORIZED REPRESENTATIVE
_
1 &■
A. W. Grimes Blvd
a
AO
DATE: June 6, 2003
SUBJECT: City Council Meeting — June 12, 2003
ITEM: *10.E.1. Consider a resolution authorizing the Mayor to execute an
Engineering Services Agreement with SAM, Inc. for additional
surveying services on the A.W. Grimes Boulevard project.
Resource: Tom Word, Chief of Public Works Operations
Bill Stablein, Transportation Engineer Associate
History: SAM, Inc. has been providing surveying and monumentation work for A.W. Grimes
Boulevard since the beginning of the project. Staff would like to retain their services
for this additional work. The firm has agreed to provide additional surveying for
$25,780.00.
Funding:
Cost: $25,780.00
Source of funds: Transportation System Development Corporation
Outside Resources: SAM, Inc.
Impact/Benefit: This surveying work will provide the right of way surveying and
documents necessary to finish the AW Grimes project.
Public Comment: N/A
Sponsor: N/A
ROUND ROCK, TEXAS
THE STATE OF TEXAS
COUNTY OF WILLIAMSON
CITY OF ROUND ROCK AGREEMENT
FOR ENGINEERING SERVICES WITH
SAM, Inc.
FOR
A.W. Grimes Boulevard Project
THIS AGREEMENT FOR ENGINEERING SERVICES ( "Agreement ") is made and entered
into on this the 12 day of the month of June, 2003, by and between the CITY OF ROUND ROCK, a
Texas home -rule municipal corporation, whose offices are located at 221 East Main Street, Round Rock,
Texas 78664 -5299, (hereinafter referred to as "City"), and SAM, Inc., whose principal place of business
is located at 5508 West Highway 290, Building B, Austin, Texas, 78735, (hereinafter called
"Engineer "), and such Agreement is for the purpose of contracting for professional engineering services.
RECITALS:
WHEREAS, V.T.C.A., Government Code §2254.002(2)(A)(vii) under Subchapter A entitled
"Professional Services Procurement Act" provides for the procurement by municipalities of services of
professional engineers; and
WHEREAS, City and Engineer desire to contract for such professional engineering services; and
WHEREAS, City and Engineer wish to document their agreement concerning the requirements
and respective obligations of the parties;
NOW, THEREFORE, WITNESSETH:
That for and in consideration of the mutual promises contained herein and other good and
valuable considerations, and the covenants and agreements hereinafter contained to be kept and
performed by the respective parties hereto, it is agreed as follows:
CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement and any exhibits attached hereto (which
exhibits are hereby incorporated into and made a part of this Agreement) and all Supplemental
Engineering Sery Agreement -4 -2003
File name:R: \ @cfronk\Projects\Arterial B \SAM Inc.doc Rev.4 /1/03
03 "c d
1
Agreements (as defined herein in Article 13) which are subsequently issued. These form the entire
contract, and all are as fully a part of this Agreement as if attached to this Agreement or repeated herein.
ARTICLE 1
SCOPE OF SERVICES TO BE PERFORMED BY CITY
City shall perform or provide services as identified in Exhibit A entitled "Services to be
Performed by City."
ARTICLE 2
SCOPE OF SERVICES TO BE PERFORMED BY ENGINEER
Engineer shall perform engineering services as identified in Exhibit B entitled "Services to be
Performed by Engineer."
Engineer shall develop a mutually acceptable schedule of work as identified in Exhibit C entitled
"Work Schedule." Such Work Schedule shall contain a complete schedule so that the Engineer's Scope
of Services under this Agreement may be accomplished within the specified time and at the specified
cost. The Work Schedule shall provide specific work sequences and definite review times by City and
Engineer of all work performed. Should the review times take longer than shown on the Work Schedule,
through no fault of Engineer, additional time may be authorized by City through a written Supplemental
Agreement only if same is requested by a timely written request from Engineer which is approved by
City.
ARTICLE 3
CONTRACT TERM
(1) Term. This Agreement shall be from the date hereof and shall terminate at the close of
business on the 30 day of the month of September 2003, unless extended by written Supplemental
Agreement executed by Engineer and City prior to the date of termination, or as otherwise terminated as
provided in Article 20 entitled "Termination." Any work performed or costs incurred after the date of
termination shall not be eligible for reimbursement.
Engineer shall notify City in writing as soon as possible if he /she /it determines, or reasonably
anticipates, that the work under this Agreement will not be completed before the termination date. In
that event City may, at its sole discretion, extend the contract term by timely written Supplemental
Agreement. Engineer shall allow adequate time for review and approval of his/her /its request for time
extension by City prior to expiration of this Agreement.
(2) Work Schedule. Engineer acknowledges that the Work Schedule is of critical importance,
and agrees to undertake all necessary efforts to expedite the performance of services required herein so
that construction of the project will be commenced and completed as scheduled. In this regard, Engineer
shall proceed with sufficient qualified personnel and consultants necessary to fully and timely
accomplish all services required under this Agreement in the highest professional manner.
2 Rev.4 /1 /03
(3) Notice to Proceed. After execution of this Agreement, Engineer shall not proceed with work
delineated in Article 2 entitled "Scope of Services to be Performed by Engineer" and in Exhibit B
entitled "Services to be Performed by Engineer" until authorized in writing by City to proceed as
provided in Article 7 entitled "Notice to Proceed."
ARTICLE 4
COMPENSATION
City shall pay and Engineer agrees to accept the amount shown below as full compensation for
all engineering services performed and to be performed under this Agreement.
The amount payable under this Agreement, without modification of the Agreement as provided
herein, is the sum of Twenty -five Thousand, Seven Hundred Eighty Dollars and No Cents
($25,780.00) as shown in Exhibit D entitled "Fee Schedule." The lump sum amount payable may be
revised only by written Supplemental Agreement in the event of a change in scope, additional
complexity from that originally anticipated, or change in character of work as authorized by City.
Engineer shall prepare and submit to City monthly progress reports in sufficient detail to support
the progress of the work and to support invoices requesting monthly payment. Any preferred format of
City for such monthly progress reports shall be identified in Exhibit B entitled "Services to be
Performed by Engineer." Satisfactory progress of work shall be maintained as an absolute condition of
payment.
The fee herein referenced may be adjusted for additional work requested and performed only if
approved by written Supplemental Agreement.
ARTICLE 5
METHOD OF PAYMENT
Payments to Engineer for services rendered shall be made while work is in progress. Engineer
shall prepare and submit to City, not more frequently than once per month, a progress report as
referenced in Article 4 above. Such progress report shall state the percentage of completion of work
accomplished during that billing period and to date. Simultaneous with submission of such progress
report, Engineer shall prepare and submit one (1) original and one (1) copy of a certified invoice in a
form acceptable to City. This submittal shall also include a progress assessment report in a form
acceptable to City.
Progress payments shall be made in proportion to the percentage of completion of work tasks
identified in Exhibit D entitled "Fee Schedule." Progress payments shall be made by City based upon
work actually provided and performed. Upon timely receipt and approval of each statement, City shall
make a good faith effort to pay the amount which, notwithstanding anything herein to the contrary, is
due and payable within thirty (30) days. City reserves the right to withhold payment pending verification
3
Rev. 4/1 /03
of satisfactory work performed. Engineer has the responsibility to submit proof to City, adequate and
sufficient in its determination, that tasks were completed.
The certified statements shall show the total amount earned to the date of submission and shall
show the amount due and payable as of the date of the current statement. Final payment does not relieve
Engineer of the responsibility of correcting any errors and/or omissions resulting from his/her /its
negligence.
ARTICLE 6
PROMPT PAYMENT POLICY
In accordance with Chapter 2251, V.T.C.A., Texas Government Code, payment to Engineer
will be made within thirty (30) days of the day on which City receives the supplies, materials,
equipment, or within thirty (30) days of the day on which the performance of services was complete, or
within thirty (30) days of the day on which City receives a correct invoice for the supplies, materials,
equipment, or services, whichever is later. Engineer may charge a late fee (fee shall not be greater than
that which is permitted by Texas law) for payments not made in accordance with this prompt payment
policy; however, this policy does not apply to payments made by City m the event:
A. There is a bona fide dispute between City and Engineer concerning the supplies,
materials, or equipment delivered or the services performed that causes the payment to be
late; or
B. The terms of a federal contract, grant, regulation, or statute prevent City from making a
timely payment with federal funds; or
C, There is a bona fide dispute between Engineer and a subcontractor or between a
subcontractor and its supplier concerning supplies, materials, or equipment delivered or
the services performed which causes the payment to be late; or
D. The invoice is not mailed to City in strict accordance with instructions, if any, on the
purchase order, or this Agreement or other such contractual agreement.
City shall document to Engineer the issues related to disputed invoices within ten (10) calendar
days of receipt of such invoice. Any non - disputed invoices shall be considered correct and payable per
the terms of Chapter 2251, V.T.C.A., Texas Government Code.
ARTICLE 7
NOTICE TO PROCEED
City shall issue a written authorization to proceed with work identified in the Scope of Services.
City shall not be responsible for actions by Engineer or any costs incurred by Engineer relating to
additional work not included in Exhibit B entitled "Services to be Performed by Engineer."
4
Rev. 4/1/03
ARTICLE 8
PROJECT TEAM
City's Designated Representative for purposes of this Agreement is as follows:
Bill Stablein
2008 Enterprise Drive
Round Rock, Texas 78664
Telephone Number (512) 218 -5562_
Fax Number (512) 218 -3242
Email Address bstablein @round- rock.tx.us
City's Designated Representative shall be authorized to act on City's behalf with respect to this
project. City or City's Designated Representative shall render decisions m a timely manner pertaining
to documents submitted by Engineer in order to avoid unreasonable delay in the orderly and sequential
progress of Engineer's services.
Engineer's Designated Representative for purposes of this Agreement is as follows:
Christopher M. Solomon, S.I.T.
SAM, Inc.
5508 West Highway 290, Building B, Austin, Texas 78735
Telephone Number (512) 447 -0575_
Fax Number (512) 326 -3029_
Email Address Csolomon @samincaus.com
ARTICLE 9
PROGRESS EVALUATION
Engineer shall, from time to time during the progress of the work, confer with City at City's
election. Engineer shall prepare and present such information as may be pertinent and necessary, or as
may be requested by City, in order for City to evaluate features of the work. At the request of City or
Engineer, conferences shall be provided at Engineer's office, the offices of City, or at other locations
designated by City. When requested by City, such conferences shall also include evaluation of
Engineer's services and work.
Should City determine that the progress in production of work does not satisfy the Work
Schedule, then City shall review the Work Schedule with Engineer to determine corrective action
required.
Engineer shall promptly advise City in writing of events which have or may have a significant
impact upon the progress of the work, including but not limited to the following:
5
Rev. 4/1 /03
(1) Problems, delays, adverse conditions which may materially affect the ability to attain
program objectives, prevent the meeting of time schedules and goals, or preclude the
attainment of project work units by established time periods; and such disclosure shall be
accompanied by statement of actions taken or contemplated, and City assistance needed to
resolve the situation, if any; and
(2) Favorable developments or events which enable meeting the work schedule goals sooner
than anticipated.
ARTICLE 10
SUSPENSION
Should City desire to suspend the work, but not to terminate this Agreement, then such
suspension may be effected by City giving Engineer thirty (30) calendar days' verbal notification
followed by written confirmation to that effect. Such thirty-day notice may be waived in writing by
agreement and signature of both parties. The work may be reinstated and resumed in full force and
effect within sixty (60) days of receipt of written notice from City to resume the work. Such sixty -day
notice may be waived in writing by agreement and signature of both parties.
If City suspends the work, the contract period as determined in Article 3 is not affected and this
Agreement will terminate on the date specified unless this Agreement is amended indicating otherwise.
City assumes no liability for work performed or costs incurred prior to the date authorized by
City for Engineer to begin work, and/or during periods when work is suspended, and/or subsequent to
the contract completion date.
ARTICLE 11
ADDITIONAL WORK
If Engineer forms a reasonable opinion that any work he /she /it has been directed to perform is
beyond the scope of this Agreement and as such constitutes extra work, he /she /it shall promptly notify
City in writing. In the event City finds that such work does constitute extra work and exceeds the
maximum amount payable, City shall so advise Engineer and a written Supplemental Agreement will
be executed between the parties as provided in Article 13 entitled "Supplemental Agreements."
Engineer shall not perform any proposed additional work nor incur any additional costs prior to the
execution, by both parties, of a written Supplemental Agreement. City shall not be responsible for
actions by Engineer nor for any costs incurred by Engineer relating to additional work not directly
associated with the performance of the work authorized in this Agreement or any amendments thereto.
ARTICLE 12
CHANGES IN WORK
If City deems it necessary to request changes to previously satisfactorily completed work or
parts thereof which involve changes to the original scope of services or character of work under this
Agreement, then Engineer shall make such revisions as requested and as directed by City. Such
6
Rev. 4/1/03
revisions shall be considered as additional work and paid for as specified under Article 11 entitled
"Additional Work."
Engineer shall make revisions to work authorized hereunder as are necessary to correct errors
appearing therein, when required to do so by City. No additional compensation shall be due for such
work.
ARTICLE 13
SUPPLEMENTAL AGREEMENTS
The terms of this Agreement may be modified by written Supplemental Agreement if City
determines that there has been a significant change in (1) the scope, complexity or character of the
service to be performed, or (2) the duration of the work. Any such Supplemental Agreement must be
duly authorized by City Council Resolution. Where such City Council authorization is required,
Engineer shall not proceed until the appropriate Resolution has been adopted. Additional
compensation, if appropriate, shall be identified as provided in Article 4 entitled "Compensation."
Both parties must execute any written Supplemental Agreement within the contract period
specified in Article 3 entitled "Contract Term."
It is understood and agreed by and between both parties that Engineer shall make no claim for
extra work done or materials furnished until City grants full execution of the written Supplemental
Agreement and authorization to proceed. City reserves the right to withhold payment pending
verification of satisfactory work performed.
ARTICLE 14
OWNERSHIP OF DOCUMENTS
All data, basic sketches, charts, calculations, plans, specifications, and other documents created
or collected under the terms of this Agreement are the exclusive property of City and shall be furnished
to City upon request. All documents prepared by Engineer and all documents furnished to Engineer by
City shall be delivered to City upon completion or termination of this Agreement. Engineer, at
his/her /its own expense, may retain copies of such documents or any other data which he /she /it has
furnished City under this Agreement. Any release of information shall be in conformance with
requirements of the Texas Open Records Act.
ARTICLE 15
PERSONNEL, EQUIPMENT AND MATERIAL
Engineer shall furnish and maintain, at his/her /its own expense, quarters for the performance of
all services, and adequate and sufficient personnel and equipment to perform the services as required.
All employees of Engineer shall have such knowledge and experience as will enable them to perform
the duties assigned to them. Any employee of Engineer who, in the opinion of City, is incompetent or
whose conduct becomes detrimental to the work shall immediately be removed from association with
7
Rev. 4/1/03
the project when so instructed by City. Engineer certifies that he /she /it presently has adequate qualified
personnel in his /her /its employment for performance of the services required under this Agreement, or
will obtain such personnel from sources other than City. Engineer may not change the Project Manager
without prior written consent of City.
ARTICLE 16
SUBCONTRACTING
Engineer shall not assign, subcontract or transfer any portion of the work under this Agreement
without prior written approval from City. All subcontracts shall include the provisions required in this
Agreement and shall be approved as to form, in writing, by City prior to work being performed under
the subcontract. No subcontract shall relieve Engineer of any responsibilities under this Agreement.
ARTICLE 17
EVALUATION OF WORK
City, or any authorized representatives of it, shall have the right at all reasonable times to review
or otherwise evaluate the work performed or being performed hereunder and the premises on which it is
being performed. If any review or evaluation is made on the premises of Engineer or a subcontractor,
then Engineer shall provide and require its subcontractors to provide all reasonable facilities and
assistance for the safety and convenience of City or other representatives m the performance of their
duties.
ARTICLE 18
SUBMISSION OF REPORTS
All applicable study reports shall be submitted in preliminary form for approval by City before
any final report is issued. City's comments on Engineer's preliminary reports shall be addressed in any
final report.
ARTICLE 19
VIOLATION OF CONTRACT TERMS /BREACH OF CONTRACT
Violation of contract terms or breach of contract by Engineer shall be grounds for termination of
this Agreement, and any increased costs arising from Engineer's default, breach of contract, or violation
of contract terms shall be paid by Engineer.
ARTICLE 20
TERMINATION
This Agreement may be terminated before the stated termination date by any of the following
conditions.
(1) By mutual agreement and consent, in writing, of both parties.
8
Rev. 4/1/03
(2) By City, by notice in writing to Engineer, as a consequence of failure by Engineer to
perform the services set forth herein in a satisfactory manner.
(3) By either party, upon the failure of the other party to fulfill its obligations as set forth
herein.
(4) By City, for reasons of its own and not subject to the mutual consent of Engineer, upon
not less than thirty (30) days' written notice to Engineer.
(5) By satisfactory completion of all services and obligations described herein.
Should City terminate this Agreement as herein provided, no fees other than fees due and
payable at the time of termination shall thereafter be paid to Engineer. In determining the value of the
work performed by Engineer prior to termination, City shall be the sole judge. Compensation for work
at termination will be based on a percentage of the work completed at that time. Should City terminate
this Agreement under Subsection (4) immediately above, then the amount charged during the thirty-day
notice period shall not exceed the amount charged during the preceding thirty (30) days.
If Engineer defaults in the performance of this Agreement or if City terminates this Agreement
for fault on the part of Engineer, then City shall give consideration to the actual costs incurred by
Engineer in performing the work to the date of default, the amount of work required which was
satisfactorily completed to date of default, the value of the work which is usable to City, the cost to City
of employing another firm to complete the work required and the time required to do so, and other
factors which affect the value to City of the work performed at the time of default.
The termination of this Agreement and payment of an amount m settlement as prescribed above
shall extinguish all rights, duties, and obligations of City and Engineer under this Agreement, except
the obligations set forth herein in Article 21 entitled "Compliance with Laws." If the termination of this
Agreement is due to the failure of Engineer to fulfill his/her /its contractual obligations, then City may
take over the project and prosecute the work to completion. In such case, Engineer shall be liable to
City for any additional costs incurred by City.
Engineer shall be responsible for the settlement of all contractual and administrative issues
arising out of any procurements made by Engineer in support of the scope of services under this
Agreement.
ARTICLE 21
COMPLIANCE WITH LAWS
(1) Compliance. Engineer shall comply with all applicable federal, state and local laws,
statutes, codes, ordinances, rules and regulations, and the orders and decrees of any court, or
administrative bodies or tribunals in any manner affecting the performance of this Agreement,
including without limitation, minimum/maximum salary and wage statutes and regulations, and
licensing laws and regulations. Engineer shall furnish City with satisfactory proof of his/her /its
compliance.
9
Rev. 4/1/03
Engineer shall further obtain all permits and licenses required in the performance of the
professional services contracted for herein.
(2) Taxes. Engineer will pay all taxes, if any, required by law arising by virtue of the services
performed hereunder. City is qualified for exemption pursuant to the provisions of Section 151.309 of
the Texas Limited Sales, Excise, and Use Tax Act.
ARTICLE 22
INDEMNIFICATION
Engineer shall save and hold harmless City and its officers and employees from all claims and
liabilities due to activities of his/her /itself and his/her /its agents or employees, performed under this
Agreement, which are caused by or which result from error, omission, or negligent act of Engineer or of
any person employed by Engineer or under Engineer's direction or control.
Engineer shall also save and hold City harmless from any and all expenses, including but not
limited to attorneys fees which may be incurred by City in litigation or otherwise defending claims or
liabilities which may be imposed on City as a result of such activities by Engineer, its agents, or
employees.
ARTICLE 23
ENGINEER'S RESPONSIBILITIES
Engineer shall be responsible for the accuracy of his/her /its work and shall promptly make
necessary revisions or corrections resulting from errors, omissions, or negligent acts, and same shall be
done without compensation. City shall determine Engineer's responsibilities for all questions arising
from design errors and/or omissions. Engineer shall not be relieved of responsibility for subsequent
correction of any such errors or omissions or for clarification of any ambiguities until after the
construction phase of the project has been completed.
ARTICLE 24
ENGINEER'S SEAL
The responsible engineer shall sign, seal and date all appropriate engineering submissions to
City in accordance with the Texas Engineering Practice Act and the rules of the State Board of
Registration for Professional Engineers.
ARTICLE 25
NON - COLLUSION, FINANCIAL INTEREST PROHIBITED
(1) Non - collusion. Engineer warrants that he /she /it has not employed or retained any company
or persons, other than a bona fide employee working solely for Engineer, to solicit or secure this
Agreement, and that he /she /it has not paid or agreed to pay any company or engineer any fee,
commission, percentage, brokerage fee, gifts, or any other consideration, contingent upon or resulting
10
Rev. 4/1/03
from the award or making of this Agreement. For breach or violation of this warranty, City reserves and
shall have the right to annul this Agreement without liability or, in its discretion and at its sole election,
to deduct from the contract price or compensation, or to otherwise recover, the full amount of such fee,
commission, percentage, brokerage fee, gift or contingent fee.
(2) Financial Interest Prohibited. Engineer covenants and represents that Engineer,
his/her /its officers, employees, agents, consultants and subcontractors will have no financial interest,
direct or indirect, in the purchase or sale of any product, materials or equipment that will be
recommended or required for the construction of the project.
ARTICLE 26
INSURANCE
(1) Insurance. Engineer, at Engineer's sole cost, shall purchase and maintain during the entire
term while this Agreement is in effect professional liability insurance coverage in the minimum amount
of One Million Dollars from a company authorized to do insurance business in Texas and otherwise
acceptable to City.
(2) Subconsultant Insurance. Without limiting any of the other obligations or liabilities of
Engineer, Engineer shall require each subconsultant performing work under this Agreement to maintain
during the term of this Agreement, at the subconsultant's own expense, the same stipulated minimum
insurance required in Article 26, Section (1) above, including the required provisions and additional
policy conditions as shown below in Article 26, Section (3).
Engineer shall obtain and monitor the certificates of insurance from each subconsultant in order
to assure compliance with the insurance requirements. Engineer must retain the certificates of insurance
for the duration of this Agreement, and shall have the responsibility of enforcing these insurance
requirements among its subconsultants. City shall be entitled, upon request and without expense, to
receive copies of these certificates of insurance.
(3) Insurance Policy Endorsements. Each insurance policy shall include the following
conditions by endorsement to the policy:
1. Each policy shall require that thirty (30) days prior to the expiration, cancellation, non-
renewal or any change in the limit or scope of coverage, a notice thereof shall be given to
City by certified mail to:
City Manager, City of Round Rock
221 East Main Street
Round Rock, Texas 78664
Engineer shall also notify City, within 24 hours of receipt, of any notices of expiration,
cancellation, non - renewal, or material change in coverage it receives from its insurer.
2. Companies issuing the insurance policies shall have no recourse against City for payment
of any premiums or assessments for any deductibles which are the sole responsibility of
and at the sole risk of Engineer.
11
Rev. 4/1/03
3. The term "City" or "City of Round Rock" shall include all authorities, boards,
commissions, departments, and officers of City and the individual members and
employees thereof in their official capacities, and/or while acting on behalf of the City of
Round Rock.
4. The policy clause "Other Insurance" shall not apply to any insurance coverage currently
held by City, to any such future coverage, or to City's Self- Insured Retentions of
whatever nature.
(4) Cost of Insurance. The cost of all insurance required herein to be secured and maintained by
Engineer shall be borne solely by Engineer, with certificates of insurance evidencing such minimum
coverage in force to be filed with City. Such Certificates of Insurance are evidenced as Exhibit F herein
entitled "Certificates of Insurance."
ARTICLE 27
COPYRIGHTS
City shall have the royalty -free, nonexclusive and irrevocable right to reproduce, publish or
otherwise use, and to authorize others to use, any reports developed by Engineer for governmental
purposes.
ARTICLE 28
SUCCESSORS AND ASSIGNS
This Agreement shall be binding upon and inure to the benefit of the parties hereto, their
successors, lawful assigns, and legal representatives. Engineer may not assign, sublet or transfer any
interest in this Agreement, in whole or in part, by operation of law or otherwise, without obtaining the
prior written consent of City.
ARTICLE 29
SEVERABILITY
In the event any one or more of the provisions contained in this Agreement shall for any reason
be held to be invalid, illegal or unenforceable in any respect, then such invalidity, illegality or
unenforceability shall not affect any other provision thereof and this Agreement shall be construed as if
such invalid, illegal or unenforceable provision had never been contained herein.
ARTICLE 30
PRIOR AGREEMENTS SUPERSEDED
This Agreement constitutes the sole agreement of the parties hereto, and supersedes any prior
understandings or written or oral contracts between the parties respecting the subject matter defined
herein. This Agreement may only be amended or supplemented by mutual agreement of the parties
hereto in writing.
12
Rev. 4/1/03
Records pertaining to the project, and records of accounts between City and Engineer, shall be
kept on a generally recognized accounting basis and shall be available to City or its authorized
representatives at mutually convenient times. The City reserves the right to review all records it deems
relevant which are related to this Agreement.
All notices to either party by the other required under this Agreement shall be personally
delivered or mailed to such party at the following respective addresses:
City:
City of Round Rock
Attention: City Manager
221 East Main Street
Round Rock, TX 78664
and to:
Stephan L. Sheets
City Attorney
309 East Main Street
Round Rock, TX 78664
Engineer:
Christoper M. Solomon, S.I.T.,
SAM, Inc.
5508 West Highway 290, Building B
Austin, Texas 78735
ARTICLE 31
ENGINEER'S ACCOUNTING RECORDS
ARTICLE 32
NOTICES
ARTICLE 33
GENERAL PROVISIONS
(1) Time is of the Essence. Engineer understands and agrees that time is of the essence and that
any failure of Engineer to complete the services for each phase of this Agreement within the agreed
Work Schedule may constitute a material breach of this Agreement. Engineer shall be fully responsible
for his/her /its delays or for failures to use his/her /its best efforts in accordance with the terms of this
Agreement. Where damage is caused to City due to Engineer's failure to perform in these
circumstances, City may withhold, to the extent of such damage, Engineer's payments hereunder
without waiver of any of City's additional legal rights or remedies.
13
Rev. 4/1/03
(2) Force Majeure. Neither City nor Engineer shall be deemed in violation of this Agreement
if prevented from performing any of their obligations hereunder by reasons for which they are not
responsible or circumstances beyond their control. However, notice of such impediment or delay in
performance must be timely given, and all reasonable efforts undertaken to mitigate its effects.
(3) Enforcement and Venue. This Agreement shall be enforceable in Round Rock,
Williamson County, Texas, and if legal action is necessary by either party with respect to the
enforcement of any or all of the terms or conditions herein, exclusive venue for same shall lie in
Williamson County, Texas. This Agreement shall be governed by and construed in accordance with the
laws and court decisions of the State of Texas.
The undersigned signatory for Engineer hereby represents and warrants that the signatory is an
officer of the organization for which he /she has executed this Agreement and that he /she has full and
complete authority to enter into this Agreement on behalf of the firm. The above - stated representations
and warranties are made for the purpose of inducing City to enter into this Agreement.
IN WITNESS WHEREOF, the City of Round Rock has caused this Agreement to be signed in
it corporate name b its Mayor, duly authorized to execute the same on its behalf by Resolution No.
K-03- �-�0 - / , approved by the City Council on the 12 day of the month of June 2003,
and Engineer, SAM, Inc., signing by and through his/her /its duly authorized representative(s), thereby
binding the parties hereto, their successors, assigns and representatives for the faithful and full
performance of the terms and provisions hereof.
CITY OF ROUND ROCK, TE
ATTEST:
By:
By:
. /L
Christine Martinez, City Secretary
ENGINEER:
ARTICLE 34
SIGNATORY WARRANTY
Si: a of Principa
Printed Name: Michael R. Hatcher, Vice President
14
Rev. 4/1/03
LIST OF EXHIBITS ATTACHED
(1) Exhibit A "Services to be Performed by City"
(2) Exhibit B "Services to be Performed by Engineer"
(3) Exhibit C "Work Schedule"
(4) Exhibit D "Fee Schedule"
(5) Exhibit E "Work Authorizations"
(6) Exhibit F "Certificates of Insurance"
15
Rev. 4/1 /03
Exhibit A
Services to be Performed by the City of Round Rock
16
Rev. 4/1/03
Right -of —Way Documentation and Staking
Exhibit B
Services to be Performed by the Engineer
I. SAM, Inc. will revise the following ROW Documents and set the associated ROW
monumentation for the following tracts: Carlin, Cirkiel, M &M Equities north of the
railroad, M &M Equities south of the railroad, and Sycamore Trail
a. Set approximately 26 concrete monuments at ROW PC's, PT's & PI's and 18 iron
rods with caps at property line intersections.
II. Due to the ROW alignment changes SAM, Inc. will have to create an 8- 1 /2 "xl 1" ROW
Document and set the associated ROW monumentation for the Grace Warner tract north
of the railroad. The original ROW alignment did not cross this tract.
a. Set approximately 2 concrete monuments at ROW PC's, PT's & PI's and 4 iron rods
with caps at property line intersections.
III. SAM, Inc. will create an 8 -1/2 "x11" ROW Document and set the associated ROW
monumentation for the City of Round Rock tract on Lake Creek. A ROW Document
was not prepared for the original ROW alignment.
a. Set approximately 2 concrete monuments at ROW PC's, PT's & PI's and 1 iron rod
with cap at property line intersections.
IV. SAM, Inc. will remove approximately 20 concrete monuments and 8 iron rods that were
set for the original ROW alignment.
V. SAM, Inc. will prepare a 24 "x36" Right -of -Way plan sheet. The sheet will show
existing property lines, proposed right -of -way, right -of -way parcel numbers, current
tract ownership and deed references, right -of -way acquisition table, survey names and
the set and found monumentation.
17
Rev. 4/1 /03
I.
Revise ROW Documents and set monumentation:
$17,280.00
Project Manager /RPLS @ $115.00/hour — 9 hours
3 -man Fieldcrew @ $130.00/hour — 72 hours
2 -man Fieldcrew @ $110.00/hour — 36 hours
Survey Technician @ $65.00/hour — 45 hours
II.
Grace Warner ROW documents and set monumentation:
$1,805.00
Project Mana• er /RPLS •, $115.00/hour — 2 hours
2 -man Fieldcrew @ $110.00/hour — 9 hours
Survey Technician @ $65.00/hour — 9 hours
III.
City of Round Rock ROW document and set
monumentation:
$1,695.00
Project Manager /RPLS @ $115.00/hour— 2 hours
2 -man Fieldcrew @ $110.00/hour — 8 hours
Survey Technician @ $65.00/hour — 9 hours
IV.
Remove original ROW alignment monumentation:
$2,210.00
Project Manager /RPLS @ $115.00/hour — 2 hours
2 -man Fieldcrew @ $110.00/hour — 18 hours
V.
Right -of -Way Plan Sheet
$2,790.00
Project Manager/RPLS @$115.00 /hour — 9 hours
Survey Technician @ $65.00/hour — 27 hours
TOTAL
$25,780.00
FIELD CREW SERVICES:
Exhibit D
Fee Schedule
TIME AND MATERIALS FEE ESTIMATE & MANHOUR BREAKDOWN
Survey Field Crews:
Two (2) Person Field Crew
Three (3) Person Field Crew
Additional Rodperson, Chainperson, or Flagperson
GPS Field Operator & Vehicle & GPS Receiver
GPS Receiver (Unmanned)
Crew Rates include one four -wheel drive vehicle. There is no mileage charge for fully equipped
18
$110.00 per hour
$130.00 per hour
$30.00 per hour
$90.00 per hour
$25.00 per hour
Rev. 4/1/03
OFFICE PERSONNEL SERVICES:
Associate /Senior Project Manager $130.00 per hour
Project Manager $115.00 per hour
Staff Surveyor $100.00 per hour
Senior Technician $72.50 per hour
Survey Technician $65.00 per hour
Clerical Support $50.00 per hour
Travel & Subsistence
Purchased Services:
Terms:
Taxes:
field vehicles when the job site is within fifty (50) miles of the office from which the survey
crew originates.
Office personnel are available at fixed hourly rates:
All lodging expenses are invoiced at actual cost including taxes. Per diem for out -of -town work
is invoiced at $35.00 per person. Cost of mileage on company -owned vehicles is computed at
the current I.R.S. mileage allowance. Cost of company -owned four -wheel drive vehicles is
computed at the current I.R.S. mileage allowance plus $30.00 per day.
All purchased services are invoiced at actual cost plus 10% handling. These include but are not
limited to reproduction, computer time, long distance telephone, consultants, subcontract
services, rented or leased equipment, and expendable supplies.
The Client shall promptly review invoice statements and notify SAM, Inc. of any objection
thereto; absent such objection in writing within fifteen (15) days of the date of the invoice, the
invoice shall be deemed proper and acceptable. Invoices are submitted monthly for all services
rendered and are payable upon receipt. Late payments will incur a late charge of one and one-
half percent (1 -1/2 %) per month from the original date of invoice. SAM, Inc. reserves the right
to stop work should invoices not be paid within the stated terms.
Boundary surveying services and fees are subject to State and Local sales tax. 8.25% sales tax,
when applicable, will be collected.
19
Rev. 4/1/03
05/16/03 10:33 8'512 440 0989 TIME INSURANCE 40002/0002
CERTIFICATE OF LIABILITY INSURANCE
PRODUCER:
Time Insurance Agency
1405 E. Riverside Drive
Austin, Texas 78741
CO TYPE OF INSURANCE POLICY EFFECTIVE EXPIRATION
LTR NUMBER DATE, DATE
A GENERAL LIABILITY
65UUNOY8773
4/29/03 4/29/04
A AUTOMOBILE LIABILITY 650ENUY5890
4/29/03 4/29/04
A ECESS LIABILITY
IsY
PROFESSIONAL LIABILITY
65XEUOY7680
4/29/03 4/29/04
DESCRIPTION OF OPER ATTONSILOCATIONSNEFBCLES /SPECL&L ITEMS/EXCEPTIONS
CERTIFICATE HOLDER: City Manager
City of Round Rock
221 E. Main Street
Round Rack, Texas 78664
Cart of laser C0RR/apera mass
EXHIBIT "A"
Date_ May 1(,_ 2fN11
COMPANIES AFFORDING COVERAGE
A The Hartford
B
INSURED : C
Surveying and Mapping, Inc. DBA SAM-, Inc.
5508 W. Hwy. 290, Bldg B.
Austin, Texas 78735
THIS IS TO CERTIFY THAT the Insured named above is insured by the Companies listed-above with respect to the
business operations hereinafter described, for the types of insurance and in accordance with the provisions of the
standard policies used by the companies, and further hereinafter described. Exceptions to the policies are noted
below.
D
LIMITS
GENERAL AGGREGATE $ 2,000,000
PRODUCTS-COMP/OP AGO. 12,000,000
PERSONAL & Awn/rum, s 1,000, 000
EACH OCCURRENCE 51,000,000
ram DAMAGE (Any one the) 9 300,000
MED. EXPENSE (Any anc pavan) $ 1 0 , 000
COMBINED SINGLE UMrF 9 1, 000 .000
BODILY INJURY (Per person) S
BODILY INJURY (Per accident) S _.
PROPERTY DAMAGE $
EACH OCCURRENCE S 5 , 000 , 000
AGGREGATE $ 5,000,000
A WORKERS' COMPENSATION STATUTORY WHITS S
AND EMPLOYERS' LIABILITY EACH ACCIDENT S 1,000,000
65WBDQ2484 DISEASE - POLICY LIHTT 5 1,000.000
4/29/03 4/29/04 DISEASE . EACH EMPLOYEE s 1,000,000
The City of Round Rock is named as additional insured with respect TO all policies except 'Workers' Compensation and Employers' Liability'
and 'Professional Liability'. Should any of the above desaibed policies be cancelled or changed before the expiration dare thereat the ruing
company will mail thirty (30) days wrined noden To the certificate holder named below.
SIGNATZ7[q OR UTHORIZ REP ATM
Typed John W. Schuler
Tide: President
Revised 102002
05/19/2007 14:59 000000001300
CERTIFICATE OF LIABILITY INSURANCE
PRODUCER.
USI Insurance Services of TX
1946 S. i11 -35. Suite 301
Austin, Texas 78704
INSURED
Surveying & Mapping, Inc.
5508 W. Hwy 290, Building B
Austin, Texas 78735
THIS IS TO CERTIFY THAT the Insured named above is insured by the Companies listed above with respect to tire.
business operations hereinafter described, for the types of insurance and in accordance with the provisions of the
standard policies used by the companies, and further hereinafter described. Exceptions to the policies are noted
below.
CO TYPE OF INSURANCE POLICY EFFECTIVE EXPIRATION
LTR NUMBER DATE DATE
GENERAL. LIABILITY
AUTOMOBILE LIABi1. ITV COMBINED SINGLE LIMIT $
BODILY INJURY (Per person) $
BODILY INJURY t,Pcr accident) $
PROPERTY DAMAGE $
EXCESS LIABILITY
WORKERS' COMPENSATION
AND EMPLOYERS' LIABILITY
A PROFESSIONAL LIABILITY AE80303955
06/27/02 06/27/03
111 11 1 11111111 1111
DESCRIPTION OP OPERATIONS /LC./CATIONS/VEHICLES/SPEC TA L ITEMS/EXCEPTIONS
Cart of lesur CORR,dodepecs master
COMPANIES AFFORDING COVERAGE
A Security Insurance Co. of Hartford
B
C'
LIMITS
Date; 05/16/03
GENERAL. AGGREGATE 1
PRODUCTS- COMP/OP. 60G. T
PERSONAL & ADV. INJURY 6
EACH OCCURRENCE $
FIRE DAMAGE (Any one feral $
MED. FXPENSIS (A ay one person I 1
EACH OCCURRENCE 8
AGGREGATE $
STATUTORY LIMITS 1
EACH ACCIDENT $
DISEASE • POLICY LIMIT $
DISEASE. - EACH EMPLOYEE $
Limits: $2,000.000/ Claim 82,000.000!Aggregale
Deductible: $100,000
The City of Round Rork is named as additional insured with respect to all policies except 'Workers' Compensation and Employers' Liability
and - Processional Liability'. Should any of the above described policies he cancelled or changed before the expiration date thereof, the issuing
ars parry will mail thirty 130) days written notice to the certificate holder named below.
CERTIFICATE HOLDER: City Manager
Ci ty of Round Rock
221 E. Main Straer
Round Rock, Texas 78664
SIGNATURE OF AUTHORIZED REPRESENTATIVE
Typod Narn nun .iimme
Aso
FAIL
Tttle, Executive Arrant
EXHIBIT "A" Revirad 10/2002
PAGE 131/01
Nyle Maxwell
Mayor Pro -tem
Tom Nielson
Council Members
Alan McGraw
Carrie Pin
Scot Knight
Isabel Gallahan
Gary Coe
City Manager
Jim Nuse
City Attorney
Stephan L Sheets
ROUND ROCK, TEXAS
PURPOSE. PASSION. PROSPERITY.
June 30, 2003
Mr. Christopher Solomon, S.I.T.
SAM, Inc.
5508 West Highway 290, Building B
Austin, TX 78735
Dear Mr. Solomon:
The Round Rock City Council approved Resolution No. R- 03- 06 -12-
10E1 at their fegularly scheduled meeting on June 12, 2003. This
resolution approves the agreement for Engineering Services for
additional surveying on the A.W. Grimes Boulevard Project.
Enclosed is a copy of the resolution and original agreement for your
files. If you have any questions, please do not hesitate to contact Tom
Word at 218 -5555.
Mayor Christine R. Martinez
City Secretary
Enclosure
CITY OF ROUND ROCK Administrative Dept. 221 East Main Street • Round Rock, Texas 78664
Phone: 512.218.5400 • Fax. 512218.7097 • www.ci.round- rock.tx.us