Loading...
R-03-06-12-10E2 - 6/12/2003WPFDesktop \::o➢MA /W ORLDOX /O: /WOOX /RESOLUfI /R30612S2, WPO /sc RESOLUTION NO. R -03- 06- 12 -10E2 WHEREAS, the City of Round Rock has previously entered into a contract for engineering services ( "Contract ") with WHM Transportation Engineering Consultants, Inc. for the development of a model to study traffic conditions at Hesters Crossing and IH 35, and WHEREAS, WHM Transportation Engineering Consultants, Inc. has submitted Supplemental Agreement No. 1 to the Contract for Engineering Services for a change in the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 1 with WHM Transportation Engineering Consultants, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 1 to the Contract for Engineering Services with WHM Transportation Engineering Consultants, Inc., a copy of said Supplemental Agreement No. 1 being attached hereto as Exhibit "A" and incorporated herein. The City. Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 12 day of June, 2003. ATTEST: CHRISTINE R. MARTINEZ, City Secre 2 LL, Mayor ty of Round Rock, Texas STATE OF TEXAS § COUNTY OF WILLIAMSON This Supplemental Agreement No 1, to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and WHM Transportation Engineering Consultants, Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinafter called the "Agreement ", on the 14 of November 2002 to develop a model to study traffic conditions at Hesters Crossing and IH 35; and WHEREAS, it has become necessary to amend the Agreement to provide for a modification in the scope of services, and to increase the lump sum fee; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: ARTICLE 2, SCOPE OF SERVICES TO BE PERFORMED BY ENGINEER and EXHIBIT B, SERVICES TO BE PERFORMED BY THE ENGINEER shall be amended as set forth in the attached ADDENDUM to EXHIBIT B. ARTICLE 4, COMPENSATION and EXHIBIT D, FEE SCHEDULE shall be amended by adding $6,500.00 to the lump sum amount payable under the Agreement for a total of $36,500.00 and as reflected in the attached ADDENDUM to EXHIBIT D. Supplemental Agreement WHM Agreement.Hesters SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES I. II. Page 1 of 4 EXHIBIT Rev. 4/2/03 IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. THE ENGINEER By: L ai 01,1 (,l Platt-- Heidi Ross, P.E., Principal Date CITY OF ROUND ROCK By: Nyle Maxwell, Mayor Date Supplemental Agreement Rev. 4/2/03 WHM Agreement.Hesters Page 2 of 4 Addendum to Exhibit B Addendum to Services to be Performed by the Engineer 1. Present study results to the City Council. 2. Meet with the Texas Department of Transportation (TxDOT) to obtain their comments on the study results. 3. Meet and coordinate with TxDOT to verify model calibration and queue by- pass values. Two additional meetings have been assumed for budget purposes. 4. Revise 2006 demand scenario to account for queue by -pass traffic. 5. Revise CORSIM model runs for 2006 scenario to account for queue by -pass issues. 6. Revise CORSIM model runs for 2025 scenario to account for lane use changes. 7. Prepare letter report based on revised analysis results. Supplemental Agreement Rev. 4!2!03 WHM AgreementHesters Page 3 of 4 Addendum to Exhibit D Fee Schedule The lump sum payable under this Contract without modification of the Contract is $36,500.00. Supplemental Agreement Rev. 4/2/03 WHM Agreement.Hesters Page 4 of 4 DATE: June 6, 2003 SUBJECT: City Council Meeting —June 12, 2003 ITEM: 10.E.2. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 1 to the Agreement for Engineering Services with WHM Transportation Engineering Consultants, Inc. for the development of a model to study traffic conditions at Nesters Crossing and IH 35. Resource: Tom Word, Chief of Public Works Operations Bill Stablein, Transportation Engineering Associate History: WHM Transportation Engineering Consultants, Inc., has been requested to continue to provide services in the development of a CORSIM model. This model is to simulate traffic conditions related to the proposed intersection by -pass near Hesters Crossing and IH -35 and will include IH 35 main lane and frontage road operations between McNeil Road and SH 45. Further work is needed to meet and coordinate with TxDOT to verify model calibration and queue bypass values. WHM has agreed to perform the additional work for $6,500.00. Funding: Cost: $6,500.00 Source of funds: Transportation System Development Corporation Outside Resources: WHM Transportation Engineering Consultants, Inc. Impact/Benefit: This model will identify the impact of the ramp closure on the IH 35 and Hesters Crossing interchange without and without the construction of the proposed collector- distributor road. Public Comment: N/A Sponsor: N/A STATE OF TEXAS § COUNTY OF WILLIAMSON § SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES This Supplemental Agreement No 1, to Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and WHM Transportation Engineering Consultants, Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinafter called the "Agreement ", on the 14 of November 2002 to develop a model to study traffic conditions at Hesters Crossing and IH 35; and WHEREAS, it has become necessary to amend the Agreement to provide for a modification in the scope of services, and to increase the lump sum fee; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: R- 03- O69-1Q- )0L9_, I. ARTICLE 2, SCOPE OF SERVICES TO BE PERFORMED BY ENGINEER and EXHIBIT B, SERVICES TO BE PERFORMED BY THE ENGINEER shall be amended as set forth in the attached ADDENDUM to EXHIBIT B. II. ARTICLE 4, COMPENSATION and EXHIBIT D, FEE SCHEDULE shall be amended by adding $6,500.00 to the lump sum amount payable under the Agreement for a total of $36,500.00 and as reflected in the attached ADDENDUM to EXHIBIT D. Supplemental Agreement Rev, 4/2/03 WHM Agreement.Hesters Page 1 of 4 IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. THE rr ENGINE ENGINEER By: `ir Heidi Ross, P.E., Principal Date CITY OF RO ./ i RO By: !``���� • s 'xwe , Mayor Date Supplemental Agreement Rev. 4/2/03 WHM AgeementHesters Page 2 of 4 Addendum to Exhibit B Addendum to Services to be Performed by the Engineer 1. Present study results to the City Council. 2. Meet with the Texas Department of Transportation (TxDOT) to obtain their comments on the study results. 3. Meet and coordinate with TxDOT to verify model calibration and queue by- pass values. Two additional meetings have been assumed for budget purposes. 4. Revise 2006 demand scenario to account for queue by -pass traffic. 5. Revise CORSIM model runs for 2006 scenario to account for queue by -pass issues. 6. Revise CORSIM model runs for 2025 scenario to account for lane use changes. 7. Prepare letter report based on revised analysis results. Supplemental Agreement Rev. 4/2/03 WHM Agreement.Hesters Page 3 of 4 Addendum to Exhibit D Fee Schedule The lump sum payable under this Contract without modification of the Contract is $36,500.00. Supplemental Agreement Rev, 4/2/03 WHM Agreement.Hesters Page 4 of 4 City Manager Jim Nuse City Attorney Stephan L Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. June 30, 2003 Council Members Alan McGraw Carrie Pit Enclosure Scot Knight Isabel Gallahan Gary Coe Ms. Heidi Ross, P.E., Principal WHM Transportation Engineering Consultants, Inc. 2717 Rio Grande Street Austin, TX 78705 Dear Ms. Ross: The Round Rock City Council approved Resolution No. R- 03- 06 -12- 10E2 at their regularly scheduled meeting on June 12, 2003. This resolution approves Supplemental Agreement No. 1 to the Contract for Engineering Services for the development of a model to study traffic conditions at Hesters Crossing and IH 35. Enclosed is a copy of the resolution and original agreement for your files. If you have any questions, please do not hesitate to contact Tom Word at 218 -5555. S cerely, Mayor Nyle Maxwell Mayor Pro -tem Christine R. Martinez Toni Nielson City Secretary CITY OF ROUND ROCK Administrative Dept., 221 East Main Street • Round Rock, Texas 78664 Phone: 5i2.218.5400 • Fax: 512.218.7097 • www. ci. round- rocktx_us