R-03-06-26-11F1 - 6/26/2003RESOLUTION NO. R -03- 06- 26 -11F1 WHEREAS, the City of Round Rock has previously entered into a contract ( "Contract ") with Commercial Consolidated Inc. for the construction of the East Water Transmission Line (Phase I) Improvements, and WHEREAS, the Council has determined that it is necessary to make changes to the plans or specifications of the Contract due to unforeseen circumstances, and WHEREAS, it has been determined that it is necessary to change said Contract in accordance with the attached Contract Change Order No. 3, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Contract Change Order No. 3 to the Contract with Commercial Consolidated Inc. for the construction of the East Water Transmission Line (Phase I) Improvements, a copy of said change order being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. ® PFOeskt op\:: OII+ IR NORL00%/ O : / NOO % /RESOLOTI /R306]6F1.NP0 /sc RESOLVED this 26th day of Ju ne, 2003. CHRISTINE R. MARTINEZ, City Secretary . LE it ELL, ayor City of Round Rock, Texas 2 n tip agreed to modify the Contract referred to above os follows: dens No. Item end Detecription et'Cleuves Contract Wise Canna Tem Decrease Increase Decrease Increase 1 (CPR #3) Credit for installing Class 150B butterfly valves Instead of Class 250B valves. $24,000.00 0 0 0 2 (CPR #5) 42 -inch ductile Iron pipe with adaptors to facilitate the 42 -inch connection. 0 $10,198.31 0 23 3 (CPR #6) 30" wet tap of existing 42e line, with tapping valve, sleeve and accessories. 0 $41,739.85 0 42 4 (CPR #8) Exposing the existing 16 -inch tapping valve near the water plant for inspection and installing a concrete block beneath the valve. 0 $2,262.46 0 0 Sub -Total Difference Net $24,000.00 $54,200.62 0 65 0 $30,200.62 0 65 Z0012 Project Name: East Water Transmission Line - Phase 1 .reject Owrnr. (Name, Address) City of Round Rock 2008 Enterprise Drive Round Rock, TX 78664 Prelm Contractor: Mane, Addles,) carers Dare Date Commercial Consolidated, Inc. P.O. Box 1090 Liberty Hill, Texas 78642 Summary: It Is agreed to modify the Contract referred to above as follows: Contract Price prior to this Change Order Contract Time prior to this Change Order 1$2,343,340.50 Substantial Completion: 226 calendar days (Final Completion: 256 calendar days Net Increase (decease) of this Change Order 165 days Net Increase (decrease) of this Charge Order $30,200.62 Revised Contract Pdce with at approved Change Orders j$2,373,541.12 The changes Included in this Change Order are re be accomplished In accordance with the terms. stipulations and condhlons of the grtglnal Contract - thou • h Included therein. 1 6 -9 -03 coreau.ud.Iw.)ei Date 1 1 6- /a- a 3 Recommended for Approver By MDR Egirearing. he) Date Aperoued for owner (Cry of Rani Redd try: FORM ms020- 2(Wake IA Da 90) Copyright 1991 NOR Engineering, roc. EXHIBIT 1 rrArr HDR Pram Ne.: 07225- 058 -036 Project No.: NA el rsam c r June 5, 2003 Aaesa Dare Change Order No.3 of Contract. October 10, 2002 Contract Period: Substantial Completion: 226 calendar days Final Completion: 256 calendar days (Notice to Proceed: November 4, 2002) ubstantial Completion: 291 calendar days Fnal Completion: 321 calendar days Approved: (Oiler -when ieaulred) Daly DiekibAOn: 1 1 r— rvaemr 1 r— L_rard I 1 or Task 5020 105020-2 XVtt OS:SI I6d C0/90/90 a June 10, 2003 Re: Dear Mr.:Rundell, ONE COMPANY Many Snlntions Mr. Don Rundell, P.E. Chief Utility Engineer City of Round Rock 2008 Enterprise Drive Round Rock, Texas 78664 . East Water Transmission Line - Phase 1 Change Order No. 3 We have forwarded Change Order No. 3 for the above referenced project to be considered for approval by the City of Round Rock. The change order was prepared,, primarily to address changes that are necessary to complete the connection of the new 48- inch transmission line to the existing 42 -inch transmission main near the City's water . treatment plant The proposed changes are needed because the 'existing 42 -inch pipeline material was different than identified by record drawings and a different connection method is required,. The changes are also needed to minimize impacts to the distribution system operation dining the higher demand period of the summer months, This connection was originally planned to be made by "cutting" a tee and valve into the 42 -inch line, which according_to the City's record drawings was made of ductile iron: In order to cut in the tee, the 42 -inch transmission main would have to be out of service and the City's water treatment plant would have to be shutdown. The operation was not expected to require an extended shutdown period and water service was anticipated to be provided from other sources within the distribution system Also, the connection was initially planned to be made during the winter, .which is the City's Lower demand period. Delays in acquiring easements for the pipeline changed the overall project schedule and put the connection work in the higher demand period, making a shutdown more critical and limiting the time any shutdown can be allowed. During construction of the 48 -inch transmission line, the existing 42 -inch line was found to be concrete cylinder pipe, which requires modifications to the connection method and different materials than those being anticipated by the contractor for a ductile iron HDR Engineering; Inc. 2211 South18 -35. Suite 300 Austin. TK 79741 -3942- Phone: 1512)912 -5100 • Fax: X512)910 -5156 wWw.hdrins corn • June 10, 2003 Mr. Don Rundell. Re:. Change Order No. 3 Page2of2 connection. The pipeline would have to be shutdown for an extended period of time in order to make the connection to the concrete pipe. • In preparation to make the connection, a live shutdown.of the City's water treatment . plant was conducted prior to making the connection to determine if distribution system operation would be impacted. The test indicated the City could take the water plant offline for only about two hours, which is about 1/4'" of the estimated time that would be needed to make a connection with the concrete line. A fully functioning model of the City's distribution system was not available at the time the plans were prepared that could have been used to identify this situation. - A model has since been developed and has • . • confirmed the limited time the water plant could be taken offline. In light of the extended time required to make the connection to the concrete line and the higher demands that are now being experienced, we recommend making the connection by a wet tap method.' With this method the water line will remain in service and the potential for interrupting water service due to problems that could arise by cutting a tee into the existing 42 -inch transmission main will be eliminated: The additional costs associated with the wet tap connection are reasonable and we believe are about what would have been expected if this had been included in the original bid. As such, we recommend acceptance of Change Order No 3 Please call if you have any questions.. Sincerely, HDR Engineering, Inc. Richard A. Shoemaker, P.E. Vice President/Project Manager CC: Troy St.Tours, HDR NON Engineering, Inc. W ��, E LOCATION OF CHANGE ORDER NO. 3 WATER TREATMENT PLANT SITE N EAST WATER TRANSMISSION LINE PHASE I BARTON HELL TANK SITE &GRAPHIC&COUNCIL AGEIDA REM&ENGINEERNGIE NWTER TRANS UNE/PHASE 1 RLR 127141 DATE: SUBJECT: ITEM: Resource: June 9, 2003 Funding: Cost: Source of funds: Outside Resources: Impact /Benefit: Public Comment: Sponsor: City Council Meeting -June 26, 2003 *11.F.1. Consider a resolution authorizing the Mayor to execute Change Order No. 3 with Commercial Consolidated for the construction of the East Water Transmission Line (Phase I) Improvements. Tom Word, Chief of P. W. Operations Tom Clark, Director of Utilities History: The scope of work under this Change Order No. 3 will be to provide a 30" Wet Tap to the existing 42" Water line at the City's Water Treatment Plant (WTP). Initial plans and specifications called for the WTP to be shut down for several hours to accommodate replacing portions of the pipe to make this connection. Additionally, as -built plans showed ductile iron pipe and existing pipe is concrete cylinder requiring different materials and tapping methods and because of increased demands on the City's water system, the water plant can not be shut down for the 6 to 8 hours required. A credit of $24,000.00 associated with the change in cost of three - 48" butterfly valves on this project brings the net cost of the change order to $30,300.62. Staff has reviewed this Change Order and recommends approval with this resolution in the amount of $30,200.62. $30,200.62 Capital Project Funds (Self- Financed Utility) Commercial Consolidated, Inc. The successful completion of this project and approval of this Change Order will allow us to make the tie -in to the existing 42" water line without having to shut down the WTP. N/A N/A It Is agreed to modify the Contract referred to above as renown: Item NO. Remand Dacblha 00 Chimes Contract Price Cameo Time Decrease Increase Decrease Increase 1 (CPR #3) Credit for installing Class 150B butterfly valves Instead of Class 250B valves. $24,000.00 0 0 0 2 (CPR #5) 42 -Inch ductile iron pipe with adaptors to facilitate the 42 -inch connection. 0 $10,198.31 0 23 3 (CPR #8) 30" wet tap of existing 42' line, with tapping valve, sleeve and accessories. 0 $41,739.85 0 42 4 (CPR #8) Exposing the existing 16 -inch tapping valve near the water plant for inspection and installing a concrete block beneath the valve. 0 $2,262.46 0 0 Sub -Total Difference Net $24,000.00 $54,200.62 0 65 0 $30,200.62 0 65 zoo IA Project Name: East Water Transmission Line - Phase 1 Prated Owner. (Name. Address) City of Round Rock 2008 Enterprise Drive Round Rock, TX 78664 Project Contractor (Name, Adren) Ownerk ogre Date Commercial Consolidated, Inc. P.O. Box 1090 Liberty Hill, Texas 78642 Summary: It Is agreed to modify the Contract referred to above as follows: Contract Rice prior to this Change Order Contract Time prior to this Change Order 1 $2,343,340.50 Net Increase (decrease) of this Change Owner $30,200.62 Revised Contract Price with all approved Change Orders 1 $2.373,541.12 The changes Included in this Change Order are to be accomplished in accordance with the terms, stipulations and conditions of the mistrial Contract Accepted i . thou • Included therein. f rw Cont Coredidabd. Inc Approved: (Omer -when required) Diohibutian: —n3- oho —a (0-1 FORM m -5020 -2 (Version 1.0 Oct 90) Cop9rigpt 1991 11D Engi eery , toe. Rockj by Ten 5020 HDR Project No.: 07225- 058 -036 Proles No.: NA of Issuance: June 5, 2003 Change Order No.3 orcanrrea October 10, 2002 Contrail Period. Substantial Completion: 226 calendar days Final Completion: 256 calendar days (Notice to Proceed: November 4, 2002) ( Substantial Completion: 226 calendar days Final Completion: 256 calendar days Net Increase (decease) of this Change Order 165 days ) substantial Completion: 291 calendar days Final Completion: 321 calendar days 6 -9 -03 Date 1 6 - /v — o 3 Date 09055 Yiiia Lnaa k-,710-03 Date 1 I°0` L ► conamador I �Oco U red l ane 111-5020 -2 Yytl O5:59 I82I C0/90/90 Mayor Nyle Maxwell Council Members Alan McGraw Carrie Pitt Scot Knight Isabel Gallahan Gary Coe City Manager Jim Nuse City Attorney Stephan L. Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. June 30, 2003 Ms. Carol Lewis Commercial Consolidated, Inc. P.O. Box 1090 Liberty Hill, TX 78642 Dear Ms. Lewis: The Round Rock City Council approved Resolution No. R- 03- 06 -26- 11F1 at their regularly scheduled meeting on June 26, 2003. This resolution approves Change Order No. 3 for the construction of the East Water Transmission Line (Phase I) Improvements. Enclosed is a copy of the resolutions and agreement for your files. If you have any questions, please do not hesitate to contact Tom Clark at 341 -3146. S' cerely, Mayor Pro -tem Tom Nielson Enclosure Christine R. Martinez City Secretary CITY OF ROUND ROCK Administrative Dept., 221 East Main Street • Round Rock. Texas 78664 Phone: 512.218.540o • Fax: 5l2.zt8.7o97 • www.ci.round-rock.tx.us Mayor Nyle Maxwell Mayor Pro -tem Tom Nielson Council Members Alan McGraw Carrie Pitt Scot Knight Isabel Gallahan Gary Coe City Manager Jim Nuse City Attorney Stephan L. Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. June 30, 2003 Mr. Richard Shoemaker, P.E. Vice President /Project Manager HDR Engineering, Inc. 2211 South IH 35, Suite 300 Austin, TX 78741 -3842 Dear Mr. Shoemaker: The Round Rock City Council approved Resolution No. R- 03- 06 -26- 11F1 at their regularly scheduled meeting on June 26, 2003. This resolution approves Change Order No. 3 for the construction of the East Water Transmission Line (Phase I) Improvements. Enclosed is a copy of the resolutions and agreement for your files. If you have any questions, please do not hesitate to contact Tom Clark at 341 -3146. Sincerely, Sherri Monroe Assistant City Secretary Enclosure CITY OF ROUND ROCK Administrative Dept, 221 East Main Street • Round Rock, Texas 78664 Phone: 512.218.50o - Fax: 512.218.7097 ' www.ci. round -rock. tx. us Council Members Alan McGraw Carrie Pitt Scot Knight Isabel Gallahan Gary Coe City Manager Jim Nuse City Attorney Stephan L. Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. June 30, 2003 Ms. Carol Lewis Commercial Consolidated, Inc. P.O. Box 1090 Liberty Hill, TX 78642 Dear Ms. Lewis: The Round Rock City Council approved Resolution No. R- 03- 06 -26- 11F1 at their regularly scheduled meeting on June 26, 2003. This resolution approves Change Order No. 3 for the construction of the East Water Transmission Line (Phase I) Improvements. Enclosed is a copy of the resolutions and agreement for your files. If you have any questions, please do not hesitate to contact Tom Clark at 341 -3146. S' cerely, Christine R. Martinez oado Ma City Secretary Nyle Maxwell Mayor Pro -tem Tom Nielson Enclosure CITY OF ROUND ROCK Administrative Dept., 221 East Main Street • Round Rock. Texas 78664 Phone: 512.2,8.5400 • Fax, 512,218.7097 • www.ci round- rock.tx.us