Loading...
R-03-07-10-10A2 - 7/10/2003® PFDesktop \::ODMA /WORLDOX /O, /WDOR /RESOLUTI /R70710A2.WPD /ec RESOLUTION NO. R -03- 07- 10 -10A2 WHEREAS, the City of Round Rock has previously entered into an Agreement for Engineering Services with Chiang, Patel & Yerby, Inc. for the preparation of schematics, environmental documents, plans specifications, and estimates (PS &E) for the reconstruction of Kiphen Road from the old MKT Railroad Right of Way to CR 122 (Kiphen Road Phase II Project), and WHEREAS, Chiang, Patel & Yerby, Inc. has submitted Supplemental Agreement No. 1 to the Agreement for Engineering Services to provide for revisions to accommodate the addition of an 8" wastewater line along Kiphen Road, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 1 with Chiang, Patel & Yerby, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 1 to the Agreement for Engineering Services with Chiang, Patel & Yerby, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. AT RESOLVED this 10th day of July, 2003. CHRISTINE R. MARTINEZ, City Secr tary 2 MAXWELL, Mayor ty of Round Rock, Texas STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES WITH CHIANG, PATEL & YERBY, INC. FOR THE KIPHEN ROAD PHASE 2, PROJECT This Amendment to the Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Chiang, Patel, & Yerby, Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinaf- ter called the "Agreement ", on the 26 of September 2002 for the Kiphen Road Phase 2, Project; and WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the scope of services, and to modify the compensation; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agree- ment is amended as follows: I. ARTICLE 1, Scope of Services To Be Performed By City and Exhibit A, Services To Be Per- formed By City shall be amended as set forth in the attached Exhibit A. II. ARTICLE 2, Scope of Services To Be Performed By Engineer and Exhibit B, Services to be Provided by the Engineer shall be amended as set forth in the attached Exhibit B. III. ARTICLE 4 Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $51,582.00 the lump sum payable under the Agreement for a total of $893,891.00, as set forth in the attached Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. Supplemental Agreement 00051540 Page 1 of 6 EXHIBIT Rev. 06/09/03 CHIANG,J_ TEL & : Y, INC. By: f� i.. David A. achma , Vice - President .TvAtc /7, Zo03 Date CITY OF ROUND ROCK By: Nyle Maxwell, Mayor Date Supplemental Agreement 00051540 Rev. 06/09/03 Page 2 of 6 SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES WITH CHIANG, PATEL & YERBY, INC FOR THE IQPIIEN ROAD, PHASE 2 PROJECT EXHIBIT A Services To Be Performed by City The City will furnish to the Engineer the following information and/or perform the following tasks: 1) The City will provide reviews and coordination of the work performed by the Engineer under this Contract. 2) The City will provide the City of Round Rock's water and wastewater design criteria and standards. 3) Provide existing plans as available within and adjacent to the project limits. 4) Provide field locations of water and sanitary sewer facilities if necessary. Supplemental Agreement 00051540 Rev. 06/09/03 Page 3 of 6 The Engineer shall provide the necessary engineering and technical services required for the re- visions of the preparation of plans, specifications and estimates (PS &E) for the addition of an 8" wastewater line along Kiphen Road from approximately Arterial A to Fairview Drive (approxi- mately 1700 feet), as well as the adjustment (lowering) of the 24" water line at Rockin' J Road to allow for the proposed culvert structure. These additional services are described in the TASK OUTLINE shown below. TASK OUTLINE I. UTILITY DESIGN AND ADJUSTMENTS (Function Code 130) A. Wastewater Line Design 1. Prepare construction plan and profile sheets for an 8" wastewater line along Kiphen Road from approximately Arterial A to Fairview Drive. These construction drawings will be prepared at a scale of 1 " =50' horizontally and 1 " =5' vertically. Wastewater line will be located 24 feet from south right -of -way line to centerline of pipe. Draw- ings will show existing and proposed topographical features and improvements within the right -of -way for the design of the project. Also, the drawings will show approxi- mate locations of the existing utilities within the project corridor. 2. Applicable City wastewater details will be included in the plan set. The City of Aus- tin details will be utilized in instances where the City of Round Rock details do not apply. 3. The Engineer will prepare non - standard details for items that are not covered by ei- ther the City of Round Rock or City of Austin Standard Construction Details. B. Water Line Adjustment SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES WITH CHIANG, PATEL & YERBY, INC FOR THE I{IPHEN ROAD, PHASE 2 PROJECT EXIIIBIT B Services To Be Peformed by Engineer The changes to the scope of this project are as follows: 1. Prepare construction plan and profile sheets for the adjustment of the existing 24" water line to lower it to clear the culvert proposed at Rockin' J Road. This construc- tion drawing will be prepared at a scale of 1 " =50' horizontally and 1 " =5' vertically. The water line will remain in approximately the same horizontal location, but will be lowered for clearance purposes. Drawings will show existing and proposed topog- raphical features and improvements within the right -of -way for the design of the proj Supplemental Agreement 00051540 Rev. 06/09/03 Page 4 of 6 ect. Also, the drawings will show approximate locations of the existing utilities within the project corridor. 2. Applicable City water details will be included in the plan set. The City of Austin de- tails will be utilized in instances where the City of Round Rock details do not apply. 3. The Engineer will prepare non - standard details for items that are not covered by ei- ther the City of Round Rock or the City of Austin Standard Construction Details. C. Utility Quantities and Summaries 1. The Engineer will calculate quantities and prepare summary sheets for the water and wastewater utility addition to the construction plan set. II. DRAINAGE (Function Code 161) A. Drainage Design 1. Storm sewer profiles will be revised to allow for the proposed wastewater location. 2. Wastewater line crossings will be shown in storm sewer profiles for contractor clar- ity, as well as for ease of review by the City. 111. MISCELLANEOUS ROADWAY (Function Code 163) A. Project Management 1. The Engineer will coordinate with the adjacent developers and the City to determine wastewater and water utility assignments, as well as how utility service will continue throughout construction. B. Traffic Control 1. The Engineer will revise the prepared traffic control plans to ensure that the traffic sequencing will allow for the proper phasing of utility construction. C. Specifications and General Notes 1. The Engineer will prepare specifications for the wastewater and water line construc- tion. The specifications will be prepared for inclusion in the project specifications. 2. The Engineer will prepare general notes for inclusion in the plans for the above de- scribed utility construction. Supplemental Agreement 00051540 Rev. 06/09/03 Page 5 of 6 SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES WITH CHIANG, PATEL & YERBY, INC FOR THE KIPHEN ROAD, PHASE 2 PROJECT EXHIBIT D Fee Schedule For the services described under Attachment B, we request compensation on a lump sum basis. The estimated hours and dollars to accomplish this work are shown below. The breakdowns for man -hours and costs are shown on the following pages. ESTIMATE OF COMPENSATION Direct Salary Cost (See attached summary) Project Manager 39 Hrs. @ $50.40 = $ 1,965.60 Senior Engineer 94 Hrs. @ $38.85 = $ 3,651.90 Design Engineer 200 Hrs. @ $32.55 = $ 6,510.00 Engineer -in- Training/Tech. 188 Hrs. @ $25.20 $ 4,737.60 Clerical 0 Hrs. @ $15.75 = $ 0.00 TOTAL DIRECT SALARY $ 16,865.10 SALARY RELATED COST (173.08 %) $ 29,190.12 TOTAL LABOR COSTS $ 46,055.00 FEE (12 %) $ 5,527.00 EXPENSES TOTAL EXPENSES $ 0.00 LUMP SUM AMOUNT PAYABLE $ 51,582.00 Supplemental Agreement 00051540 Rev. 06/09/03 Page 6 of 6 PROJECT NAME: Iaphen Rood PROVIDER NAME Chiang. Patel Yo by EXHIBIT D - Supplemental Agreement #1 Klphen Road - From MKT Railroad ROW to CR 122 City of Round Rock, Texas Fee Schedule/Budget for Chiang, Patel & Yerby, Inc. 1.100 iti5 "_ • a1u1a.11 ='l: Task Description A Wastewater Line Design ; :. Al aetew6ter P&P :Sheets :!. -. A2 City Wastewater Details S T: r Line Adustment B1 Water P&P Shoals; - .> FC 130 - SUBTOTALS HOURS SUBTOTALS DIRECT LABOR COSTS OVERHEAD AT PROVISIONAL RATE (173.08%) TOTAL LABOR COSTS FIXED FEE SUBTOTAL (FC 130) No. of PS&E Mots B2 Ctty Water Detena' ' _ B3 Non - standard Deter'_ C utility ouenrtttles and Summaries ,: Calculate Quantities! Prepare Summaries , Project for fancier Design Engineer EnlifIcesc $60.40 $38.86 $32.86 0 16 8 24 13 38 138 8 88820 $ 1,478.30 $ 4,428.80 $ 1,134.02 8 2,888.18 $ 7,881.91 $ 1,789.22 $ 4,031.48 $ 12,088.71 $ 214.71 $ 483.78 $ 1,480.88 $ 2.003.93 $ 4,81628 $ 13,539.38 Err $2620 12 132 $ 3,328.40 $ 5,757.33 $ 9,083.73 $ 1,090.06 kakea9ABa Clerical 915.75 Total Labor Total labor Howe Coale $ 1,417.60' 8 ,3 $' .0281.80 I , ,:.:19 $ -. " 690.10' 1,391.880 �JPFi.L 887.80 319 $ 8,884.70 $ 30232.33 CORK COPY_Fee- CPYI FEE SCHEDULE 6/10103 Page 2 of PROJECT NAME: Mahon Road PROVIDER NAME: Cram. Food verb/ EXHIBIT D - Supplemental Agreement #1 CORR_COPY - cPV1 FEE SCHEDULE Fee SchedutelBud: at for Chian :, Patel & Yr • , Ino. Al Revise Storm Sewer L4Catlons A2 - Show UtW4os 10 Profiles FC 181 • SIIBTOTALB HOURS SUB- TOTALS DIRECT LABOR COSTS OVERHEAD AT PROVISIONAL RATE (173.08%) TOTAL LABOR COSTS FIXED FEE SUBTOTAL (FC 161) Klphen Road - From MKT Railroad ROW to CR 122 City of Round Rock, Texas No. of P882 Sleets 6 PTO Mannar $50.40 3 4 $ 201.60 $ 348.63 $ 660.53 $ 66.06 $ 616.59 Senior Design Engineer $36.85 4 $ 165.40 $ 288.97 $ 424.37 $ 60.92 $ 475.29 Design Engineer $32.66 16 24 $ 761.20 $ 1.36210 $ 2.133.30 $ 258.00 $ 2,38930 ER $2520 8 16 $ 403.20 $ 697.66 $ 1,101.06 $ 13213 $ 1233.19 Clerical $16.75 $ 0 $ Total Labor Howe 48 Total Labor Coen $ 1.541.40 $ 4,71437 6/38/03 Page 3 of 5 PROJECT NAME Mohan Road PROVIDER NAME Chdaig. Patel Yero5 FEE SCHEDULE L Pro tot Marta :ement EXHIBIT D - Supplemental Agreement #1 Fee Schedule/Bud, for Chiang, Patel & Ye Traffic Control Klphen Road - From MKT Railroad ROW to CR 122 $32.55 925.20 915.75 0 Total Labor Costs 51 Revile: S•= cflcations and Senora! rotes C1. Sp5cItcatlons C2 General Notes CORR_COPY_Fee - CPY1.xls FC 183 - SUBTOTALS City of Round Rock, Texas HOURS SUB- TOTALS 8 22 52 40 40 0 DIRECT LABOR COSTS $ 1,108.80 $ 2,020.20 $ 1$02.00 $ 1408.00 $ OVERHEAD AT PROVISIONAL RATE (173.08%) $ 1,919.11 $ 3498.58 $ 2,253.50 $ 1,744.85 $ TOTAL LABOR COSTS $ 3,027.91 $ 5,518.78 $ 3,555.50 $ 2,752.65 $ FIXED FEE $ 383.35 $ 882.01 $ 42$.86 $ 330.32 $ SUBTOTAL (FC 183) 9 3,38128 $ 8,178.77 $ 3,982.18 $ 308227 $ - 1,428.00 $ - - ..722.40 72240 154 $ 5,439.00 $ 18,835.18 Page 4 of 5 PROJECT NAME: Kiphen Road PROVIDER NAME: Chiang, Patel Yerby FEE SCHEDULE EXHIBIT D - Supplemental Agreement #1 Kiphen Road - From MKT Railroad ROW to CR 122 City of Round Rock, Texas Task Description RIGHT -OF -WAY AND UTILITY ADJUSTMENTS (FC 130) DRAINAGE (FC 161) MISCELLANEOUS ROADWAY (FC 163) SUB -TOTAL LABOR EXPENSES GRAND TOTAL TOTAL LABOR COSTS TOTAL CP &Y FEE Total Cost S 30,232.33 S 4,714.37 S 16,635.16 S 51,582.00 S 51,582.00 $ 51,582.00 Is 51,582.00 6/20/03 CORR_COPY_Fee - CPY1 Page 5 of 5 N N I- N w+E Kiphen Road Phase 11S et DATE: July 3, 2003 SUBJECT: City Council Meeting - July 10, 2003 ITEM: *10.A.2. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 1 Chiang, Patel & Yerby, Inc. for the reconstruction of Kiphen Road from the old MKT Railroad right -of -way to CR 122. (Kiphen Road, Phase II Project) Resource: Tom Word, Chief of Public Works Operations Bill Stablein, Transportation Engineering Associate History: The Round Rock Transportation System Development Corporation TCIP includes a project for the reconstruction and expansion of Kiphen Road to a 4 -lane divided arterial. The original contract provided for the preparation of schematics, environmental documents, plans, specifications, and estimates (PS &E) for the widening and reconstruction of Kiphen Road from the old MoKan right -of -way to CR 122. Approval of Supplemental Agreement No. 1 will be to prepare revisions to the schematics, environmental documents, plans specifications, and estimates (PS &E). These revisions will be made to accommodate the addition of an 8" wastewater line along Kiphen Road from approximately Arterial A to Fairview Drive (about 1,700 feet) as well as the adjustment of the 24" water line at Rockin' 3 Road to allow for the proposed culvert structure. The Engineer, Chiang, Patel, & Yerby, Inc., has agreed to perform the additional work for $51,582.00 bringing the total contract to $893, 891.00. Funding: Cost: $51,582.00 Source of funds: Capital Project Funds (self financed utility) Outside Resources: Chiang, Patel, & Yerby, Inc. Impact /Benefit: The addition of the waste water line to this project will provide for future development on the north side of Kiphen Road. Public Comment: N/A Sponsor: N/A STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES WITH CHIANG, PATEL & YERBY, INC. FOR THE KIPHEN ROAD PHASE 2, PROJECT This Amendment to the Agreement for Engineering Services is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Chiang, Patel, & Yerby, Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed an Agreement for Engineering Services, hereinaf- ter called the "Agreement ", on the 26 of September 2002 for the Kiphen Road Phase 2, Project; and WHEREAS, it has become necessary to amend the Agreement to modify the provisions for the scope of services, and to modify the compensation; and NOW THEREFORE, premises considered, the City and the Engineer agree that said Agree- ment is amended as follows: I. ARTICLE 1, Scope of Services To Be Performed By City and Exhibit A, Services To Be Per- formed By City shall be amended as set forth in the attached Exhibit A. II. ARTICLE 2, Scope of Services To Be Performed By Engineer and Exhibit B Services to be Provided by the Engineer shall be amended as set forth in the attached Exhibit B. ARTICLE 4, Compensation and Exhibit D, Fee Schedule shall be amended by increasing by $51,582.00 the lump sum payable under the Agreement for a total of $893,891.00, as set forth in the attached Exhibit D. IN WITNESS WHEREOF, the City and the Engineer have executed Supplemental Agreement in duplicate. u pp 1 ez p 00051540 Rev. 06/09/03 Page 1 of 6 By: CHIANG, J TEL & E !IiL, i 1,4• Dwid A. achma CITY OF R , By: " rayor Supplemental Agreement 00051540 Date Date Y, INC. c uAJ /7, Z003 Vice - President Page 2 of 6 Rev. 06/09/03 SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES WITH CHIANG, PATEL & YERBY, INC FOR THE KIPHEN ROAD, PHASE 2 PROJECT EXHIBIT A Services To Be Performed by City The City will furnish to the Engineer the following information and/or perform the following tasks: 1) The City will provide reviews and coordination of the work performed by the Engineer under this Contract. 2) The City will provide the City of Round Rock's water and wastewater design criteria and standards. 3) Provide existing plans as available within and adjacent to the project limits, 4) Provide field locations of water and sanitary sewer facilities if necessary. Supplemental Agreement 00051540 Rev. 06 /09/03 Page 3 of 6 B. Water Line Adjustment SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES WITH CHIANG, PATEL & YERBY, INC FOR THE KIPHEN ROAD, PHASE 2 PROJECT EXHIBIT B Services To Be Peformed by Engineer The changes to the scope of this project are as follows: The Engineer shall provide the necessary engineering and technical services required for the re- visions of the preparation of plans, specifications and estimates (PS &E) for the addition of an 8" wastewater line along Kiphen Road from approximately Arterial A to Fairview Drive (approxi- mately 1700 feet), as well as the adjustment (lowering) of the 24" water line at Rockin' J Road to allow for the proposed culvert structure. These additional services are described in the TASK OUTLINE shown below. TASK OUTLINE I. UTILITY DESIGN AND ADJUSTMENTS (Function Code 130) A. Wastewater Line Design 1. Prepare construction plan and profile sheets for an 8" wastewater line along Kiphen Road from approximately Arterial A to Fairview Drive. These construction drawings will be prepared at a scale of 1 " =50' horizontally and 1"=5' vertically. Wastewater line will be located 24 feet from south right -of -way line to centerline of pipe. Draw- ings will show existing and proposed topographical features and improvements within the right -of -way for the design of the project. Also, the drawings will show approxi- mate locations of the existing utilities within the project corridor. 2. Applicable City wastewater details will be included in the plan set. The City of Aus- tin details will be utilized in instances where the City of Round Rock details do not apply. 3. The Engineer will prepare non - standard details for items that are not covered by ei- ther the City of Round Rock or City of Austin Standard Construction Details. 1. Prepare construction plan and profile sheets for the adjustment of the existing 24" water line to lower it to clear the culvert proposed at Rockin' J Road. This construc- tion drawing will be prepared at a scale of 1 " =50' horizontally and 1 " =5' vertically. The water line will remain in approximately the same horizontal location, but will be lowered for clearance purposes. Drawings will show existing and proposed topog- raphical features and improvements within the right -of -way for the design of the proj Supplemental Agreement 00051540 Rev, 06/09/03 Page 4 of 6 ect. Also, the drawings will show approximate locations of the existing utilities within the project corridor. 2. Applicable City water details will be included in the plan set. The City of Austin de- tails will be utilized in instances where the City of Round Rock details do not apply. 3. The Engineer will prepare non - standard details for items that are not covered by ei- ther the City of Round Rock or the City of Austin Standard Construction Details. C. Utility Quantities and Summaries 1. The Engineer will calculate quantities and prepare summary sheets for the water and wastewater utility addition to the construction plan set. II. DRAINAGE (Function Code 161) A. Drainage Design 1. Storm sewer profiles will be revised to allow for the proposed wastewater location. 2. Wastewater line crossings will be shown in storm sewer profiles for contractor clar- ity, as well as for ease of review by the City. III. MISCELLANEOUS ROADWAY (Function Code 163) A. Project Management 1. The Engineer will coordinate with the adjacent developers and the City to determine wastewater and water utility assignments, as well as how utility service will continue throughout construction. B. Traffic Control 1. The Engineer will revise the prepared traffic control plans to ensure that the traffic sequencing will allow for the proper phasing of utility construction. C. Specifications and General Notes 1. The Engineer will prepare specifications for the wastewater and water line construc- tion. The specifications will be prepared for inclusion in the project specifications. 2. The Engineer will prepare general notes for inclusion in the plans for the above de- scribed utility construction. Supplemental Agreement 00051540 Rev. 06 /09/03 Page 5 of 6 SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES WITH CHIANG, PATEL & YERBY, INC FOR THE KIPHEN ROAD, PHASE 2 PROJECT EXHIBIT D Fee Schedule For the services described under Attachment B, we request compensation on a lump sum basis. The estimated hours and dollars to accomplish this work are shown below. The breakdowns for man-hours and costs are shown on the following pages. ESTIMATE OF COMPENSATION Direct Salary Cost (See attached summary) Project Manager 39 Hrs. @ $50.40 = $ 1,965.60 Senior Engineer 94 Hrs. @ $38.85 = $ 3,651.90 Design Engineer 200Hrs. @ $32.55 = $ 6,510.00 Engineer -in- Training/Tech. 188Hrs. @ $25.20 = $ 4,737.60 Clerical 0 Hrs. @ $15.75 = $ 0.00 TOTAL DIRECT SALARY $ 16,865.10 SALARY RELATED COST (173.08 %) $ 29,190.12 TOTAL LABOR COSTS $ 46,055.00 FEE (12 %) $ 5,527.00 EXPENSES TOTAL EXPENSES $ 0.00 LUMP SUM AMOUNT PAYABLE $ 51,582.00 Supplemental Agreement 00051540 Rev. 06/09/03 Page 6 of 6 PROJECT NAME: I4phen Rood PROVIDER NAME: Chbfg. Pole) Velby EXHIBIT D - Supplemental Agreement #1 Fee Schedule/Bud • et for Chian. , Patel & Yerb , Inc. t FEME : J HOURS SUB - TOTALS DIRECT LABOR COSTS OVERHEAD AT PROVISIONAL RATE (173.08%) TOTAL LABOR COSTS FIXED FEE SUBTOTAL (FC 130) 7,4 abingili; 13 $ 655.20 $ 1.134.02 $ 1,789.22 $ 214.71 $ 1,476.30 $ 2,555.18 $ 4,031.48 $ 483.78 $ 4,51526 136 $ 4,426.80 $ 7,661.91 $ 12,088.71 $ _ 1,450 -65 $ 13,539.36 319 CORR_COPV_Fee - CPV 1 XIS FEE SCHEDULE 5 Page 2 of 5 Klphen Road - From MKT Railroad ROW to CR 122 City of Round Rock, Texas Fee Schedule/Budget for Chiang, Patel & Yerby. Inc. Teak Description sI Fro led Senior Design Design Fsglrmer DT Clerical Labor T H ours T Labor Costs 050.40 58.85 132.55 575.20 015.75 R SIGHT-OFWAYAND UTILITY ADJUSTMENTS 1 C 130) Li ne e A Wastewater ne Design Al Wastewater P&P Sheets _ 3 4 16 58 48 0 124 S 3.855.50 A2 City Wastewater Details 2 1 2 8 0 0 19 S 590.10 A3 Non - standard Defogs 1 2 4 18 24 0 46 S 1.381.80 B Water Line Adlustnent B1 Water P &P Sheets 1 2 6 24 12 0 44 S 1,41780 B2 City Water Details 2 1 2 8 0 19 $ 590.10 03 Non- standard Details 1 2 16 24 0 46 $ 1,381.80 C Way Ouannitles and Sunanades Cl Calculate Quantities / Prepare Summaries 1 1 4 8 8 0 21 $ 667.80 FC 130 - SUBTOTALS HOURS SUBTOTALS DIRECT LABOR COSTS OVERHEAD AT PROVISIONAL RATE (173.08%) TOTAL LABOR COSTS FIXED FEE 11 13 $ 655.20 $ 1,134.02 $ 1,789.22 $ 214.71 36 $ 1,476.30 $ 2555.18 0 4.031.48 $ 483.78 138 $ 4,426.80 $ 7,681.91 $ 12.088.71 $ 1.450.65 132 $ 3,326.40 $ 5.757.33 $ 9,083.73 $ 1.090.05 O CO f9 CO va 319 $ 9.884.70 _ SUBTOTAL (FC 130) $ 2.063,93 $ 4,515.26 $ 13 539.38 666666668 666666668 $ - 0 30.232.33 Yet" PROJECT NAME: Itlphen Ro PROVIDER NAME: Chiang. Patel Ye - Supplemental reement #1 CORR_COPV - CP /1 xis FEE SCHEDULE 640/03 Page 2 015 PROJECT' NAME Kphon Rood PROVECER NAME Mona N3elY&W EXHIBIT D - Supplemental Agreement #1 CORR_COPYJee - CPVI.xls FEE SCHEDULE Klphen Road - From MKT Railroad ROW to CR 122 City of Round Rock, Texas Fee Schedule/Budget for Chiang, Patel & Yrby, Inc. Task Description DRA8ADF 1FC161) A Drainage Design Al Revise Storm Sewer Locations A2 Show Unties In Profiles FC 161- SUBTOTALS HOURS SUB-TOTALS D IRECT LABOR COSTS OVERHEAD AT PROVISIONAL RATE (173.08%) TOTAL LABOR COSTS FIXED FEE SUBTOTAL (FC 1131) No. of PS&E S11eeta 3 3 e Project Manager $50.40 3 3 4 $ 201.60 $ 348.93 $ 550.53 $ 66.06 $ 616.59 Senior Design Enghieer $38.85 24 $ 781.20 $ 1352.10 5 2,133.30 $ 256.00 $ 2,389.30 4 $ 155.40 $ 268.97 $ 424.37 $ 50.92 $ 475.29 Design Engineer $32.55 16 ET $2520 8 Clerical $16.75 6 16 $ 403.20 $ 697.86 $ 1,101.06 $ 132.13 $ 1,233.19 Total Laser Hours 22 25 48 Total Labor Coals $ 729.75 $ 811.65 $ 1,541.40 $ 4,714.37 Page 3 01 5 Klphen Road - From MKT Railroad ROW to CR 122 City of Round Rock, Texas Fee Schedule/Budget for Chiang, Patel & Yerby, Inc. Task Dwerlptton Project Manager Senior Dealgn Engineer Design Engineer DT Clerical Total Labor Howe Total Labor Costs $50.40 $38.85 63255 $25.20 $15.75 yg MISCELLANEOUS ROADWAYYFC 169) - - A Project Management Al Coordinate wih Oily 0 18 16 0 0 0 32 $ 1,428.00 ' S Traffic Control 61 Revise TCP 6 4 40 40 0 88 $ 2,566.20 C Specel6ralons and General Notes — .._ 1 2 18 0 0 - -- 0 18 $ 722.40 C1 Specifications C2 General Notes 1 2 -- 0 0 -_ 0 18 $ . 72240 FC 183- SUBTOTALS HOURS HOU SUB- TOTALS DIRECT LABOR COSTS OVERHEAD AT PROVISIONAL RATE (173.08%) TOTAL LABOR COSTS FIXED FEE 8 22 $ 1,108.80 $ 1,919.11 $ 3027.91 $ 363.35 52 $ 2,020.20 $ 3496.56 $ 5,516.76 $ 662.01 82281 Cl N N 03 0) 03 69 r 0 u, to (n0. O 03 fa CO 69 30 154 _ -- $ 5.439.00 SUBTOTAL (FC 183) 5 3,391.26 $ 6,176.77 $ 3962.16 $ 16,635.16 PROJECT NAME aphen Rood PROVIDER NAME Chiang. Patel Yerby - Supplemental reement FEE SCHEDULE CORR_COPY_Fee - CPV1.43 6/6203 Page 4 of 5 Task Description Total Cost TOTAL LABOR COSTS 3Q 232.33 RIGHT -OF -WAY AND UTILITY ADJUSTMENTS (FC 130) S DRAINAGE (FC 161) S 4,714.37 MISCELLANEOUS ROADWAY (FC 163) S 16635.16 SUB-TOTAL LABOR EXPENSES S 51,582.00 SUMMARY TOTAL LABOR COSTS S 51,582.00 TOTAL CP &Y FEE $ 51,582.00 GRAND TOTAL 1 $ 51,582.00 PROJECT NAME: Klphen Road PROVIDER NAME: Chiang, Patel Yerby FEE SCHEDULE EXHIBIT D - Supplemental Agreement #1 Kiphen Road - From MKT Railroad ROW to CR 122 City of Round Rock, Texas 6/20/03 CORR_COPY_Fee - CPY1.xls Page 5 of 5 Mayor Nyle Maxwell City Manager Jim Nuse City Attorney Stephan L. Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. July 14, 2003 Council Members Alan McGraw Carne Pitt Enclosure Scot Knight Isabel Gallahan Gary Coe David A. Nachman, P.E. Vice President Chiang, Patel & Yerby, Inc. 11149 Research Blvd., Suite 330 Austin, TX 78759 Dear Mr. Nachman: The Round Rock City Council approved Resolution No. R- 03- 07 -10- 10A2 at their regularly scheduled meeting on July 10, 2003. This resolution approves Supplemental Agreement No. 1 for the preparation of schematics, environmental documents, plans, specifications, and estimates (PS &E) for the reconstruction of Kiphen Road from the old MKT Railroad Right of Way to CR 122 (Kiphen Road Phase II Project). Enclosed is a copy of the resolution and original agreement for your files. If you have any questions, please do not hesitate to contact Tom Word at 218 -5555. Sincerely, Mayor Pro-tem ern Monroe Tom Nielson Assistant City Secretary CITY OF ROUND ROCK Administrative Dept., ant East Main Street • Round Rock, Texas 78664 Phone: 512.218.5400 • Fax: 5¢.2187097 • www.ci.round-rock.tx.us