R-03-07-10-10D1 - 7/10/2003RESOLUTION NO. R- 03- 07- 10 -10D1 WHEREAS, §8.610(4) Code of Ordinances (1995 Edition) provides for the reimbursement for the oversizing of water mains, and WHEREAS, Wilshire /Hearthstone Venture I, L.P. and Pulte Homes of Texas, L.P. have submitted a reimbursement request for the oversizing of water mains associated with the Sonoma, Section 6 development, and WHEREAS, the City Council wishes to approve said reimbursement, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the City Council hereby approves of the reimbursement to Wilshire /Hearthstone Venture I, L.P. and Pulte Homes of Texas, L.P. of $3,411.20, which is the cost of oversizing water mains associated with the Sonoma, Section 6 development. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this the 10th day of July, 2003 IL.4'. ii' CHRISTINE R. MARTINEZ, City Secretary ®PPOesk[OP \::OS%M /WORLOOR/O:/ MOOR /ReSOLOTe /R3v...wPS /r2U22Be3/sc NY , ELL, Mayo City of Round Rock, Texas RANDALL JONES ENGINEERING, INC. September 23, 2002 Ms. Vera Massaro JADCO. Inc. 902 W. 9 Street Austin, Texas 78701 RE: Sonoma Section 6 Waterline Reimbursements RJE Project #782 Dear Ms. Massaro, The purpose of this letter is to provide you th information regarding reimbursements from the City of Round Rock that you ma •e eligible for over sizing certain waterlines within the above referenced project. Per e City of Round Rock's Development Code and more specifically the Water and W. ewater Oversize Policy, "If a development is required to oversize utility lines in ex' ess of the developments direct needs, the development will be given credit for e amount oversized." It is the opinion of Randall Jones Engineering, Inc. that the 12" water line located within Paradise Ridge Drive and adjacent to Rusk Road and the 16" aterline within Forest Creek Drive at the intersection of Rusk Road were oversized bey • nd the needs of this development. Typically an 8" would have been sufficient and • - quate to serve the 96 single - family lots within thi t ° 4- section of development. Therefo -, in accordance with the City's policy you m equest reimbursement of $2.60 • , ' 1 iameter oversized per linear foot of line ' tailed. For Section 6 of Sonoma 68 feet of 12" lin .long and feet of 12" along Rusk Road was installed with t is Section of developm t. Additionally. 112 feet of 16" along Forest Cre k rive was constructed. Th, reimbu ment calculation is: $2.60 /inch -foot x 4" x UM feet = $ 1 n - $2.60 /inch -Foot x 8" x 112 feet = $ 2.329.60/ ' �D t� �s° P Total = $ HteASNIr 1,44, Approved construction plans are on tile at the City of Round Rock for this project that show the water line location and sizing. Please let us know itvou need any additional information regarding this reimbursement request. Sincerely J. Keith Collins. P.E. Project Manager File:reimburse 6 Engineering Consultants / Planners / Surveyors ja s 1212 E. Braker Lane • Austin, Texas 78753 • 512 / 836 -4793 • FAX 512 / 836 -4817 10/81/2002 13:54 5124782968 C OO / JadCo Development, Inc. October 1, 2002 Mr. Danny Hales, PE Chief Engineer City of Round Rock Department of Public Works 2008 Enterprise D Round Rock, Toms 78664 Re: Sonoma Sect Six Oversize Water he Rat Mr. Daldetc Please let this letter serve as confirmation that Puke Homes of Texas, L.P., ("Puke") and WilshireiHeartbstoce Venture 1, LP., ("Wilshire") are the current owners of the above referenced subdivision. The mbdvision has not been transferred or conveyed to Puke and W iishire have the right to receive the requested water oversize > Sincerely, James Edward Horne Hart t President Swider Wilshire/Hearthstone Venture 1, L.P. Director of Finance Puke Homes of Texas, L.P. Sonoms o w stursoPointbnisoxixtBakk a JADCO ABCR 602 Willi 9th Street, Austin, Texas 78701 P.O. Box 685229, Austin, Texas 7 8768 -5229 51 2. 478.0017 • Fax: 512 -478 -2968 PAGE 04 Joseph A. DiQuinzio,Jr. 0IM0,LMV MVS 311:1d 9L06 F81' OTZ VV4 ,r ,n rt7r. 1e/91f2802 13:51u '';1;4162.9"673 2968 z ezese acZC.c)_ JadCo Development, I October 1, 2002 Mr. Danny Heiden, PE. ChiefEngineer City ofRound Rock l artme of Public Works 2008 Enterprise Dr. Round Rock, Texas 78664 Re: Sonoma Section Six Oversize Waterline Reimbursement Mr. Halden: Please let this letter serve as confirmation that Puke Homes of Texas, L.P., ("Pulte ") and Wilshire/Hearthstone Venture 1, L.P., ("Wilshire") are the czu owners of the above referenced subdivision. The subdivision has not been transferred or conveyed to any other entity. Therefore, Pulte and Wilshire have die right to receive the requested water oversize reimburse Sincerely, fl ames Edward Home President Bart Swider W17shiretFiearrh Venture I, L.P. Director of Finance Pulte Homes of Texas, L.P. H.LSHIHE HUMES JADCU ABCR 602 West 9th Streal, Asstin, Texas 7870i P.O. Box 685220, Austin, Texas 78768.5229 512.476 -0017 • fax: 512 - 478.2969 11 082 PAGE et Joseph A. DiQuinzio, Jr. 9 � FRICK LN BAREFOOT LN B GK Pk % 1116 Oversized Water Main R FS T cR, N s Oversizing Water Mains Sonoma, Section 6 ROUND POCK TEXAS DATE: July 3, 2003 SUBJECT: City Council Meeting - July 10, 2003 ITEM: *10.D.1. Consider a resolution approving a reimbursement to Wilshire/ Hearthstone Venture I, L.P. and Pulte Homes of Texas, L.P. for the cost of oversizing water mains associated with the Sonoma, Section 6 development. Resource: Tom Word, Chief of Public Works Operations Danny Halden, City Engineer History: 112 feet of 16" water main was installed along Forest Creek Drive in Sonoma Section 6. 104 feet of 12" water main was installed along Rusk Road with Sonoma Section 6. These mains were installed in accordance with the City's water master plan or to provide capacity for other developments in the area. These 16" and 12" water mains were accepted previously and the Sonoma Section 6 plat has been recorded. Funding: Cost: $3,411.20 Source of funds: Oversize account Outside Resources: Randall Jones Engineering, Jadco Development, Wilshire/ Hearthstone I, L.P. and Pulte Homes of Texas, L.P. Impact /Benefit: Minimal. To date, the City has received $133,200.00 in oversize fees from Sonoma Sections 1, 2,3,4,5 and 6. Reimbursements of $61,318.40 and $50,908.00 were made to Wilshire /Pulte on April 26, 2001 and September 27, 2001, respectively, for oversized mains in Sonoma Sections 1, 2 and 3 and Sections 4 and 5. Therefore, with the requested reimbursement included, a total of $115,637.60 will be reimbursed for oversized mains installed with the six subdivisions. Oversized mains installed provide available capacity for other development in the same locale and minimize the possibility of parallel mains having to be constructed in the future. Public Comment: N/A Sponsor: N/A