R-03-07-10-10D2 - 7/10/2003WHEREAS, the City of Round Rock has previously entered into an Agreement for Engineering Services with Espey Consultants, Inc. for the Study of Onion Branch stormwater drainage in the vicinity of The Hermitage, and WHEREAS, Espey Consultants, Inc. has submitted Supplemental Agreement No. 1 to the Agreement for Engineering Services for a change in the scope of services, and WHEREAS, the City Council desires to enter into said Supplemental Agreement No. 1 with Espey Consultants, Inc., Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS, That the Mayor is hereby authorized and directed to execute on behalf of the City Supplemental Agreement No. 1 to the Agreement for Engineering Services with Espey Consultants, Inc., a copy of same being attached hereto as Exhibit "A" and incorporated herein for all purposes. The City Council hereby finds and declares that written notice of the date, hour, place and subject of the meeting at which this Resolution was adopted was posted and that such meeting was open to the public as required by law at all times during which this Resolution and the subject matter hereof were discussed, considered and formally acted upon, all as required by the Open Meetings Act, Chapter 551, Texas Government Code, as amended. RESOLVED this 10th day of July, 2003 CHRISTINE R. MARTINEZ, City Se etary PPOe,ktOp \::DOHA /HORLOOX /O:/ W00% /RESOLVRI /R3071002- MPO /amc RESOLUTION NO. R- 03- 07- 10 -10D2 NYL City o L , ayor Round Rock, Texas STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES WITH ESPEY CONSULTANTS, INC., FOR THE STUDY OF ONION BRANCH IN THE VICINITY OF THE HERMITAGE PROJECT This Amendment to the Agreement For Engineering Services For The Study Of Onion Branch In The Vicinity Of The Hermitage Project is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Espey Consultants, Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed an Agreement For Engineering Services For The Study Of Onion Branch In The Vicinity Of The Hermitage Project, hereinafter called the "Agreement ", on the 26`s day of September, 2002; and WHEREAS, it has become necessary to amend the Agreement to provide for additional work in the scope of services, additional compensation to the Engineer, and an extension in the contract period; NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: I. Article 2, Scope of Services to be Performed by Engineer, and Attachment `B ". Services to be Provided by the Engineer shall be amended as set forth in the attached Addendum To Exhibit B. II. Article 3. Agreement Period, shall be amended to extend the contract period May 26, 2003 to January 1, 2004. Article 4, Compensation, shall be amended by adding $39,150.00 to the lump sum amount payable under this Agreement for a total of $54,193.00. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement No 1 in duplicate. Supplemental Agreement - Rev. 4/2/03 Onion branch -suppl agr.doc/dh/lk Page 1 of 2 EXHIBIT 1 nAn ESPEY CONSULT T- . A or B y. Print Name: 6 he 03 Date CITY OF ROUND ROCK By. Nyle Maxwell, Mayor Date Page 2 of 2 Culvert Upgrade on Onion Branch at the Georgetown Railroad Contract Agreement EXHIBIT A "Services to be Performed by City" The scope of Services to be performed by the City is to facilitate the engineering, permitting and design of culvert improvements described in Exhibit B, by administering this contract and reviewing the work performed by the engineer. The City shall: 1. provide to the engineer, without charge, copies as needed of all available maps, plans, as -built drawings and any other information relevant to the project. 2. provide "Right of Entry" (landowner permission) if necessary for the engineer or his subconsultants to access private property in order to perform the work. 3. shall meet with the engineer on a periodic basis to review the progress of the work, to answer questions from the engineer, and for the purpose of commenting on the work. C. and Settings1C0101Loca! Settings1Temporary Internet FfesIOLK15Montract attachments.doc April 2003 Culvert Upgrade on Onion Branch at the Georgetown Railroad Contract Agreement EXHIBIT B "Services to be Performed by the Engineer" The project site includes the immediate area on Onion Branch where the Georgetown Railroad crosses. This proposed culvert upgrade is necessary to alleviate the frequent backwater flooding on Onion Branch and the Hermitage Subdivision that is the result of existing culverts crossing under the Georgetown Railroad (Figure 1). The proposed improvements will provide conveyance of stormwater runoff for a design storm that is between a 2 -year and a 10 -year storm event based on economics and physical constraints related to the crossing. Runoff flow rates that exceed the design storm will still continue to overtop the Georgetown Railroad. Figure 1 Onion Branch Creek and Georgetown Railroad Crossing (looking downstream) The scope of this project includes the development of construction plans for the design of as many as 8 box culverts with associated channel improvements for transitioning. Espey Consultants, Inc. (EC) will solicit the support of subconsultants to provide survey and geotechnical services necessary to complete this project. I. Coordination with USACE and Notification — EC will coordinate and submit necessary documents to the USACE for compliance with Section 404 of the Clean Water Act. At this time it is anticipated that the activity will be covered under a "nationwide" permit and will not require an "individual" permit. A nationwide permit will require approximately 45 day review / approval time front the Corps. 2. Preparation of Construction Plans — Based on design criteria from the American Railway Engineering & Maintenance of Way Assoc., cost, input from the City of Round Rock and USACE, availability of materials, etc., EC will adjust the proposed design as necessary and develop construction plans of the proposed improvements. Construction plans will include appropriate general notes to contractor, erosion / sedimentation control measures, provisions for C:IDocuments and SettingslC0101Loca1 SettingslTemporary Internet FilesIOLK151contrnct anachments.doc April 2003 Culvert Upgrade on Onion Branch at the Georgetown Railroad Contract Agreement securing existing utilities (manholes, wastewater laterals, etc.), plan and profiles of the channel and box culverts, necessary cross - sections, details, etc. as required for construction by the contractor. EC will coordinate with the Georgetown railroad for "sign oft" of a phasing plan and construction documents. EC will prepare one draft set construction plans and one final mylar set of construction plans with incorporated draft comments. 3. Preparation of Bid Documents and Specifications — EC will prepare bid documents that will include contract documents and technical specifications using format and standard documents provided by the City of Round Rock. 4. Bid Phase Services (limited) — EC will prepare a master copy of the bid documents for reproduction at the CoRR's expense. EC will provide assistance at a pre -bid conference, the bid opening, and tabulating bids, and will make a recommendation of award following review of bid results. CORR will be primarily responsible for scheduling, conducting and holding meetings. 5. Water Pollution Abatement Plan — EC will prepare a water pollution abatement plan (WPAP) for submittal and review by the TCEQ. EC will work with the TCEQ and modify the WPAP as necessary for compliance with the Edwards Aquifer rules and approval by the TCEQ. The scope of the project does not include: 1. bid phase services; 2. utility adjustments or relocations; 3. significant channel improvements other than that necessary to transition back to the existing channel; 4. construction phase services; or 5. preparation of SW3P for compliance with TPDES. C. and Settiags1C0101Locai Settingstremporary Internet F les1OLK15comract attachments.doc April 2003 Culvert Upgrade on Onion Branch at the Georgetown Railroad Contract Agreement EXHIBIT C "Work Schedule" The following schedule is the time required upon receipt of all field survey information: Survey / Geotechnical Borings / Design / WPAP / Draft Construction Plans 4 months Preparation of Final Construction Plans and Contract Documents 2 month (includes approximately 5 working day review from CORR) The "typical' time required for a nationwide permit is 45 days from the time complete documentation is submitted for review and approved by the Corps. For scheduling purposes, it is assumed that this time period would begin once the plans have been finalized. 1.5 months Total Project Duration 5 months ClDocumenls and SemngslC0101Loca1 SettingslTemporory Internet Fries1OLKJ51ca ,,i, l altachments.doc April 2003 Culvert Upgrade on Onion Branch at the Georgetown Railroad Contract Agreement EXHIBIT D "Fee Schedule" C: Docarnents and SetnngslC010(Locai Setlingsgemporary Internet F les1OLK151conlracl almchments.doc April 2003 Description Man -Hour Estimate by Labor Classification Subtotals Time Cost (hrs) ($) Principal Engineering Prq, M. Staff Technician Clerical 1 Coordination with USACE 8 16 24 $ 2,080 2 Preparation of Construction Plans 28 108 160 2 298 $ 19,000 3 Hid Documents and Specification 10 36 16 16 78 $ 5,160 4 Hid Phase Services (limited) 8 12 8 28 $ 2,200 5 Water Pollution Abatement Plan 4 24 16 44 $ 2,960 subtotals: 0 58 196 200 18 472 S 31,400 approximate billing rate: $ 140 $ 120 $ 70 $ 50 $ 40 subtotal by labor classification: S - $ 6,960 $ 13,720 $ 10,000 $ 720 mileage: $ 200 courier: $ 50 reproduction: $ 500 subconsultant services (survey, geoteclmical) $ 7,000 TOTAL $ 39,150 Culvert Upgrade on Onion Branch at the Georgetown Railroad Contract Agreement EXHIBIT D "Fee Schedule" C: Docarnents and SetnngslC010(Locai Setlingsgemporary Internet F les1OLK151conlracl almchments.doc April 2003 IMPROVEMENTS AREA N Study of Onion Branch in the Vicinity of The Hermitage R OUND.( TEXAS DATE: July 3, 2003 SUBJECT: City Council Meeting - July 10, 2003 ITEM: *10.D.2. Consider a resolution authorizing the Mayor to execute Supplemental Agreement No. 1 with Espey Consultants, Inc. for the study of Onion Branch stormwater drainage in the vicinity of The Hermitage. Resource: Tom Word, Chief of Public Works Operations Danny Halden, City Engineer History: The eastern edge of The Hermitage subdivision is within the 100 -year flood plain. Even though the houses in the subdivision are somewhat elevated and haven't experienced flooding, the streets will become inundated during intense rainfall events. An analysis of the area was recently performed under the original Professional services agreement approved by the Council on 9/26/02. The analysis indicates that houses in the area are relatively safe from flooding even during intense rainfall events. This Supplemental Agreement will provide engineering services to design culvert improvements to decrease the frequency in which streets in the area are inundated. Funding: Cost: $39,150 Source of funds: Regional Stormwater Detention Program Outside Resources: Espey Consultants, Inc. Impact /Benefit: Design of culverts to reduce frequency of flood inundation of Hermitage Drive. Public Comment: N/A Sponsor: N/A STATE OF TEXAS COUNTY OF WILLIAMSON SUPPLEMENTAL AGREEMENT NO. 1 TO AGREEMENT FOR ENGINEERING SERVICES WITH ESPEY CONSULTANTS, INC., FOR THE STUDY OF ONION BRANCH IN THE VICINITY OF THE HERMITAGE PROJECT This Amendment to the Agreement For Engineering Services For The Study Of Onion Branch In The Vicinity Of The Hermitage Project is made by and between the City of Round Rock, Texas, hereinafter called the "City" and Espey Consultants, Inc., hereinafter called the "Engineer ". WHEREAS, the City and Engineer executed an Agreement For Engineering Services For The Study Of Onion Branch In The Vicinity Of The Hermitage Project, hereinafter called the "Agreement ", on the 26 day of September, 2002; and WHEREAS, it has become necessary to amend the Agreement to provide for additional work in the scope of services, additional compensation to the Engineer, and an extension in the contract period; NOW THEREFORE, premises considered, the City and the Engineer agree that said Agreement is amended as follows: Article 2 Sco.e of Services to be Performed b En•ineer and Attachment "B" Services to be Provided by the Engineer shall be amended as set forth in the attached Addendum To Exhibit B. Article 3, Agreement Period, shall be amended to extend the contract period May 26, 2003 to January 1, 2004. Article 4, Compensation, shall be amended by adding $39,150.00 to the lump sum amount payable under this Agreement for a total of $54,193.00. IN WITNESS WHEREOF, the City and the Engineer have executed this Supplemental Agreement No 1 in duplicate. /2-D3 -0 /O -IOA -/ Supplemental Agreement - Rev. 4/2/03 Onion branch -suppl agr.doc/dh/lk § I. II. Page 1 of 2 ESPEY CONSULTA By. Print Name: T Date CITYOF D 'O • By: dwell, Mayor 7 Date Page 2 of 2 Culvert Upgrade 0/2 Onion Branch at the Georgetown Railroad Contract Agreement EXHIBIT A "Services to be Performed by City" The scope of Services to be performed by the City is to facilitate the engineering, permitting and design of culvert improvements described in Exhibit B, by administering this contract and reviewing the work performed by the engineer. The City shall: 1. provide to the engineer, without charge, copies as needed of all available maps, plans, as -built drawings and any other information relevant to the project. 2, provide "Right of Entry" (landowner permission) if necessary for the engineer or his subconsultants to access private property in order to perform the work. 3. shall meet with the engineer on a periodic basis to review the progress of the work, to answer questions from the engineer, and for the purpose of commenting on the work. C: (Documents and Settings1C010lLocal SettingslTemporary Internet FlesIOLKI Slcontract anachments.doc April 2003 Culvert Upgrade on Onion Branch at the Georgetown Railroad Contract Agreement EXHIBIT B "Services to be Performed by the Engineer" The project site includes the immediate area on Onion Branch where the Georgetown Railroad crosses. This proposed culvert upgrade is necessary to alleviate the frequent backwater flooding on Onion Branch and the Hermitage Subdivision that is the result of existing culverts crossing under the Georgetown Railroad (Figure 1). The proposed improvements will provide conveyance of stormwater runoff for a design storm that is between a 2 -year and a 10 -year storm event based on economics and physical constraints related to the crossing. Runoff flow rates that exceed the design storm will still continue to overtop the Georgetown Railroad. Figure 1 Onion Branch Creek and Georgetown Railroad Crossing (looking downstream) The scope of this project includes the development of construction plans for the design of as many as 8 box culverts with associated channel improvements for transitioning. Espey Consultants, Inc. (EC) will solicit the support of subconsultants to provide survey and geotechnical services necessary to complete this project. 1. Coordination with USACE and Notification — EC will coordinate and submit necessary documents to the USACE for compliance with Section 404 of the Clean Water Act. At this time it is anticipated that the activity will be covered under a "nationwide" permit and will not require an "individual" permit. A nationwide permit will require approximately 45 day review / approval time from the Corps. 2. Preparation of Construction Plans — Based on design criteria from the American Railway Engineering & Maintenance of Way Assoc., cost, input from the City of Round Rock and USACE, availability of materials, etc., EC will adjust the proposed design as necessary and develop construction plans of the proposed improvements. Construction plans will include appropriate general notes to contractor, erosion / sedimentation control measures, provisions for C:IDocuments and SeitingslC010 1Locai SewngslTe porary InternetFiteslOLK151contract auachments.doc April 2003 3. Preparation of Bid Documents and Specifications - EC will prepare bid documents that will include contract documents and technical specifications using format and standard documents provided by the City of Round Rock. Culvert Upgrade on Onion Branch at the Georgetown Railroad Contract Agreement securing existing utilities (manholes, wastewater laterals, etc.), plan and profiles of the channel and box culverts, necessary cross - sections, details, etc. as required for construction by the contractor. EC will coordinate with the Georgetown railroad for "sign off" of a phasing plan and construction documents. EC will prepare one draft set construction plans and one final mylar set of construction plans with incorporated draft comments. 4. Bid Phase Services (limited) - EC will prepare a master copy of the bid documents for reproduction at the CoRR's expense. EC will provide assistance at a pre -bid conference, the bid opening, and tabulating bids, and will make a recommendation of award following review of bid results. CORR will be primarily responsible for scheduling, conducting and holding meetings. 5. Water Pollution Abatement Plan - EC will prepare a water pollution abatement plan (WPAP) for submittal and review by the TCEQ. EC will work with the TCEQ and modify the WPAP as necessary for compliance with the Edwards Aquifer rules and approval by the TCEQ. The scope of the project does not include: 1. bid phase services; 2. utility adjustments or relocations; 3. significant channel improvements other than that necessary to transition back to the existing channel; 4. construction phase services; or 5. preparation of SW3P for compliance with TPDES. C: Documents and Settings1C010lLocal SesingslTemporary Internet FilesIOLK151contract attachments.doc April 2003 Culvert Upgrade on Onion Branch at the Georgetown Railroad Contract Agreement EXHIBIT C "Work Schedule" The following schedule is the time required upon receipt of all field survey information: Survey / Geotechnical Borings / Design / WPAP / Draft Construction Plans 4 months Preparation of Final Construction Plans and Contract Documents 2 month (includes approximately 5 working day review from CORR) The "typical" time required for a nationwide permit is 45 days from the time complete documentation is submitted for review and approved by the Corps. For scheduling purposes, it is assumed that this time period would begin once the plans have been finalized. 1.5 months Total Project Duration 5 months C. and SettingslC0101Loca1 SettingslTemporary Internet FileslOLK151contract attachments.doc April 2003 Culvert Upgrade on Onion Branch at the Georgetown Railroad Contract Agreement EXHIBIT D "Fee Schedule" C. and Settings1C010lLocal SettingslTemporary Internet Files10LK151contract armchments.doc April 2003 Description Man -Hour Estimate by Labor Classification Subtotals Time Cost (hrs) (0) Principal Engineering Prom Man. Staff Technician Clerical 1 Coordination with USACE 8 16 24 $ 2,080 2 Preparation of Construction Plans 28 108 160 2 298 $ 19,000 3 Bid Documents and Specifications 10 36 16 16 78 $ 5,160 4 Bid Phase Services (limited) 8 12 8 28 $ 2,200 5 Water Pollution Abatement Plan 4 24 16 44 $ 2,960 subtotals: 0 58 196 200 18 472 $ 31,400 approximate billing rate: $ 140 $ 120 $ 70 $ 50 $ 40 subtotal by labor classification: $ - $ 6,960 $ 13,720 $ 10,000 $ 720 mileage: $ 200 courier: $ 50 reproduction: $ 500 subconsultant services (survey, geotechnical) $ 7,000 TOTAL $ 39,150 Culvert Upgrade on Onion Branch at the Georgetown Railroad Contract Agreement EXHIBIT D "Fee Schedule" C. and Settings1C010lLocal SettingslTemporary Internet Files10LK151contract armchments.doc April 2003 Mayor Nyle Maxwell City Manager Jim Nuse City Attorney Stephan L. Sheets ROUND ROCK, TEXAS PURPOSE. PASSION. PROSPERITY. July 14, 2003 Mr. Brian K. Reis, P.E. Project Manager Espey Consultants, Inc. 3809 South 2nd Street, Ste. B -300 Austin, TX 78704 Dear Mr. Reis: The Round Rock City Council approved Resolution No. R- 03- 07 -10- 10D2 at their regularly scheduled meeting on July 10, 2003. This resolution approves Supplemental Agreement No. lfor the Study of Onion Branch stormwater drainage in the vicinity of The Hermitage. Enclosed is a copy of the resolution and agreement for your files. If you have any questions, please do not hesitate to contact Tom Word at 218 -5555. Sincerely, Sherri Monroe Mayor Pro -tem Tom Nielson Assistant City Secretary Council Members Alan McGraw Carrie Pitt Enclosure Scot Knight Isabel Gallahan Gary Coe CITY OF ROUND ROCK Administrative Dept., 221 East Main Street • Round Rock, Texas 78664 Phone: 512.218.540o - Fax: 512.218.7097 - www.ci.round- rock.tx.us