RESOLUTION NO. . i R.
WHEREAS, the City Council feels that there is a need for
a Master Water and Wastewater Plan for the City, and
WHEREAS, Haynie & Kallman, Inc. have submitted a proposal
for the preparation of such a Plan, a copy of said proposal
being attached hereto and incorporated herein for all purposes,
and
WHEREAS, the Council wishes to approve said proposal, Now
Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS, THAT
The mayor of the City of Round Rock, Texas, is hereby
authorized and directed to execute on behalf of the City, a
Water and Wastewater Plan, a copy of said proposal being attached
hereto and incorporated herein for all purposes.
RESOLVED, this ,28 day of
■
L Y L. ONN, Pryor
City of Round Rock, Texas
ia. .Ag_&
t y ,
, 1979.
Haynie & Kaltman, Inc.
CONSULTING ENGINEERS
2115 North Mays
Round Rock, Texas 78664
(512) 255 -4564, 255 -7861
Mr. Bob Bennett, City Manager
City of Round Rock
214 East Main Street
Round Rock, Texas 78664
Dear Mr. Bennett:
May 22, 1979
RE: Master Water & Wastewater Plan
Pursuant to your request, we are submitting our proposal to the City of
Round Rock for preparation of a Master Water & Wastewater Plan. We have
established the scope of items to be included in the Plan by meetings with
you and your staff. The Plan will incorporate a planning period of approxi-
mately 15 years. The Plan will include a geographical area based on anticipated
population distribution, as prepared by City Staff. The scope of work is listed
as follows:
WATER PLAN
1. Analyze existing major facilities including water supply, ground
storage, booster pump stations, elevated storage and distribution
system (8" lines and larger).
2. Sizing, recommendations and priorities for additional major facilities
to update the City of Round Rock Urban Services Plan.
3. Computer analysis of arterial water lines (8" and larger) 'to assist
in sizing and locating proposed lines.
4. An integral part of the Plan will be to include the surface water
supply of 6 MGD (average) from the North Fork Reservoir.
5. Preliminary Cost Estimates for the first five years of the planning
period.
6. Recommendations on oversize policies for arterial water lines
(larger than 8 ").
CIVIL ENGINEERING • LAND PLANNING • MUNICIPAL CONSULTANTS • SURVEYING
Timothy E. Haynie, P.E.
Steven D. Kallman, P.E.
Mr. Bennett, City Manager
May 22, 1979
Page Two
WASTEWATER
1. Analyze existing major facilities including wastewater treatment
plant, sewage lift stations and wastewater interceptors in major
drainage basins within planning area.
2. Sizing, recommendations and priorities for additional major facilities
to update the City of Round Rock "Urban Services Plan."
3. Consideration of the E.P.A. funded Wastewater Treatment Plant in the
overall planning for this study.
4. Preliminary Cost Estimates for the first five years of the planning
period.
5. Recommendations on oversize policies for,wastewater lines (larger, ;
than 8 "), sewage,lift stations and,sewage force mains. •
The Master Plan will be bound and will include pertinent text and exhibits.
We will provide one set of mylar sepias of the "exhibits" to the City after
completion of the Plan. We will provide 20 copies of the Master Plan to the
City, after your office has commented on a "draft" copy of the Plan.
We will provide the above listed services for $7,500. We will complete
these services within 90 days after the date of your authorization below,
exclusive of City review time.
Please sign this letter and the attached copy and return one copy to
our office. Please retain one copy for your files. We appreciate the
opportunity to provide these services for the City of Round Rock.
SK:kmm
Cordially,
APPROVED: CITY OF ROUN)ItiCK
HAYNIE & KALLMAN, INC.
Steve Kallman, P.E.
Haynie & Hallman, Inc.
CONSULTING ENGINEERS
2115 North Mays
Round Rock , Texas 78664
(512) 255 -4564, 255 -7861
Mr. Bob Bennett, City Manager
City of Round Rock
214 East Main Street
Round Rock, Texas 78664
Dear Mr. Bennett:
May 22, 1979
RE: Master Water & Wastewater Plan
Pursuant to your request, we are submitting our proposal to the City of
Round Rock for preparation of a Master Water & Wastewater Plan. We have
established the scope of items to be included in the Plan by meetings with
you and your staff. The Plan will incorporate a planning period of approxi-
mately 15 years. The Plan will include a geographical area based on anticipated
population distribution, as prepared by City Staff. The scope of work is listed
as follows:
WATER PLAN
1. Analyze existing major facilities including water supply, ground
storage, booster pump stations, elevated storage and distribution
system (8" lines and larger).
2. Sizing, recommendations and priorities for additional major facilities
to update the City of Round Rock Urban Services Plan.
3. Computer analysis of arterial water lines (8" and larger) to assist
in sizing and locating proposed lines.
4. An integral part of the Plan will be to include the surface water
supply of 6 MGD (average) from the North Fork Reservoir.
5. Preliminary Cost Estimates for the first five'years of the planning
period.
6. Recommendations on oversize policies for arterial water lines
(larger than 8 ").
CIVIL ENGINEERING • LAND PLANNING • MUNICIPAL CONSULTANTS • SURVEYING
Timothy E. Haynie, P.E.
Steven D. Kallman, P.E. .
Mr. Bennett, City Manager
May 22, 1979
Page Two
WASTEWATER
1. Analyze existing major facilities including wastewater treatment
plant, sewage lift stations and wastewater interceptors in major
drainage basins within planning area.
2. Sizing, recommendations and priorities for additional major facilities
to update the City of Round Rock "Urban Services Plan."
3. Consideration of the E.P.A. funded Wastewater Treatment Plant in the
overall planning for this study.
4. Preliminary Cost Estimates for the first five years of the planning
period.
5. Recommendations on oversize policies for wastewater lines (larger
than 8 "), sewage lift stations and sewage force mains.
The Master Plan will be bound and will include pertinent text and exhibits.
We will provide one set of my sepias of the "exhibits" to the City after
completion of the Plan. We will provide 20 copies of the Master Plan to the
City, after your office has commented on a "draft" copy of the Plan.
We will provide the above listed services for $7,500. We will complete
these services within 90 days after the date of your authorization below,
exclusive of City review time.
Please sign this letter and the attached copy and return one copy to
our office. Please retain one copy for your files. We appreciate the
opportunity to provide these services for the City of Round Rock.
SK:kmm
APPROVED: CITY OF ROUND ROCK
By:
Date
Cordially,
HAYNIE & KALLMAN, INC.
S �
Steve Kallman, P.E.