R-80-277 - 1/24/1980RESOLUTION NO. 7
BE IT RESOLVED by the City Council of the City of Round Rock that the
proposal of Brent Rauhut Engineering, Inc. and Hamilton Drilling & Engineering
Testing, Inc. dated January 14, 1980 for subsurface investigations, pavement
•
thickness designs and foundation recommendations and quality control for the
1980 Capital Improvement Program with cost estimates as follows:
1. Street investigation, pavement thickness. -
design, & bridge foundation recommendations $6,715.00
2. Standpipe, ground storage tank & sewage
treatment plant investigation & foundation
recommendations 3,286.50
3. Quality control as per fee
schedule in
proposal
be, and is hereby, accepted and that the Mayor be, and is hereby, authorized
to sign a letter accepting said proposal.
RESOLVED this 24th day of January, 1980.
ATTEST:
RY L. T , Ma or
City of Round Rock, Texas