R-81-408 - 9/10/1981 -����,�- I ,, «���L�9e� �vnr ����. -fes �� WHEREAS, the hourly rates provided for in the Engineer- ing Contract for the Lake Georgetown Project are over four years old, and WHEREAS, Haynie & Kallman, Inc. have requested that the Engineering Contract be amended to reflect the hourly rate schedule currently being charged, and WHEREAS, the Council wishes to approve the amendment to the rate schedule, Now Therefore, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS That the Mayor is hereby authorized and directed to execute on behalf of the City, an amendment to the hourly rate schedule provided for in the Lake Georgetown Engineering Project, a copy of said amendment being attached hereto and incorporated herein for all purposes. RESOLVED this AO r day of / ,I 1981. ATTEST: 41PeGY i. NE 'ID, ty ecretary RESOLUTION NO. 4N R, Mayor City of Round Rock, Texas Haynie & Kaltman, Inc. CONSULTING ENGINEERS 2115 North Mays Round Rock, Texas 78884 (512) 255 -4564, 255 -7861 The Honorable Larry L. Tonn Mayor of Round Rock City of Round Rock 214 E. Main Street Round Rock, Texas 78664 Dear Mayor Tonn: September 3, 1981 Re: Lake Georgetown Project (Formerly North Fork Project) Amendment No. 1 to Engineering Contract We would like to respectfully request approval of an amendment to our Engineering Contract on the Lake Georgetown Project pertaining to our hourly rate schedule. The hourly rate schedule is used to deter- mine compensation to the engineer for special services not included in the basic percentage charges. Such services are listed - 7 Paragraph D of our Engineering Contract with the City of Round Rock and cover such items as easement descriptions, construction staking, etc. The hourly rate schedule of the 1977 C.I.P. Engineering Contract was referenced to be used on the North Fork Project, for which our services were retained on September 12, 1978. Due to the time schedule in funding this project, we are using an hourly rate schedule on the Lake Georgetown Project that is four (4) years old. We have understandably experienced increases in our hourly rate schedule over a period of four (4) years and are presently handling several of the City of Round Rock projects based on our most recent hourly rate schedule. This request will substitute our most recent hourly rate schedule for the 1977 hourly rate schedule to be used on the remainder of the Lake Georgetown Project. No back charges will be made for this project on other hourly work for which we have already been paid; only on future billings. Of course, the total of Engineering Fees Budgeted for the Lake Georgetown Project shall remain within the funds previously budgeted for engineering. The "old" and "new" hourly rate schedules are attached for your review. If the City Council approves of this amendment, please sign in the spaces provided below on the original and the attached copy and return one to our office. CIVIL ENGINEERING • LAND PLANNING • MUNICIPAL CONSULTANTS • SURVEYING Timothy E. Haynie, P.E. Steven D. Kaltman, P.E. 3 � Page 2 The Honorable Larry L. Tonn Mayor of Round Rock City of Round Rock September 3, 1981 EXECUTED in two counterparts (each of which is an original) on behalf of the Engineer by its Vice - President shown below, and on behalf of the Ow r by its Mayor (thereunto duly authorized) this the /QT'" day of , 1981 Attest: AP OW. "ILL i∎ / 1 ne and, ity ecretary Attest: ery A s rong, Secreta s7 to Steven D. Kall HAYNIE & KALLMAN; INC. Steven D. Kallman, P.E., R.P.S. Vice - President HAYNIE & KALLMAN, INC. HOURLY RATE SCHEDULE 64'') JUNE, 1981 ITEM DESCRIPTION RATE 1. Registered Professional Engineer - Group I(E) $50.00 /hr. 2. Registered Public Surveyor - Group I(S) $40.00 /hr. 3. Field Engineer (not registered, ie. E.I.T.) - Group II $30.00 /hr. 4. Designer & Calculator - Group III(E) $24.00 /hr. 5. Chief of Survey Parties - Group III(S) $24.00 /hr. 6. Inspector - Group IV(I) $18.00 /hr. 7. Drafting Personnel - Group IV(E) $18.00/hr. 8. Clerical (including word processor equipment) Group V(C) $15.00 /hr. 9. Technician - Group V(T) $15.00 /hr. 10. Three man survey crew, including truck and all equipment except distance measurement instruments $55.00 /hr. 11. Two man survey crew, including truck and all equipment except distance measurement instruments $45.00 /hr. 12. Reimbursement for direct non -labor expense and sub - contract expense at invoice cost plus twenty - percent (20 %) service charge 13. Blueline Reproductions 14. Mylar Drawing Reproductions 15. Specifications Reproductions Per Page 16. Distance Measurement Instruments (2 Mile Range) 17. Computers: Wang with Printer or Hewlett Packard 9815 $ 0.40 /sq.ft. $ 1.00 /sq.ft. $ 0.10 /ea. $10.00 /hr. $ 5.00 /hr. j• ATTACHMENT NO. 3 - RATE SCHEDULE COL-i6 ITEM DESCRIPTION RATE 1. Registered Professional Engineer 25.00/hr. 2. Field Engineer (not registered) 19.50 /hr. 3. Project Representative (Inspector) and Calculator 15.00 /hr. 4. Drafting Personnel 11.50 /hr. 5. Three man survey crew including truck and all equipment 40.00 /hr. 6. Two man survey crew including truck and all equipment 29.00 /hr. 7. Reimbursement for direct non -labor expense and sub - contract expense at invoice cost plus 15 percent service charge. 8. Blueline Reproductions 0.15 /sq.ft. 9. Sepia Drawing Reproductions 0.25 /sq.ft. 10. Mylar Drawing Reproductions 1.00 /sq.ft. 11. Specifications per page reproduced 0.10 /EA. Distance Measurement Devices: 12. Electro Tapes (30 Mile Range) 15.00 /hr. 13. DMI (2 Mile Range) 20.00 /hr. Computers: 14. Wang With Printer 18.50 /hr. -17-