WHEREAS, the hourly rates provided for in the Engineer-
ing Contract for the Lake Georgetown Project are over four
years old, and
WHEREAS, Haynie & Kallman, Inc. have requested that the
Engineering Contract be amended to reflect the hourly rate
schedule currently being charged, and
WHEREAS, the Council wishes to approve the amendment to
the rate schedule, Now Therefore,
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS
That the Mayor is hereby authorized and directed to
execute on behalf of the City, an amendment to the hourly
rate schedule provided for in the Lake Georgetown Engineering
Project, a copy of said amendment being attached hereto and
incorporated herein for all purposes.
RESOLVED this AO r day of / ,I 1981.
ATTEST:
41PeGY i.
NE 'ID, ty ecretary
RESOLUTION NO. 4N R,
Mayor
City of Round Rock, Texas
Haynie & Kaltman, Inc.
CONSULTING ENGINEERS
2115 North Mays
Round Rock, Texas 78884
(512) 255 -4564, 255 -7861
The Honorable Larry L. Tonn
Mayor of Round Rock
City of Round Rock
214 E. Main Street
Round Rock, Texas 78664
Dear Mayor Tonn:
September 3, 1981
Re: Lake Georgetown Project
(Formerly North Fork Project)
Amendment No. 1 to
Engineering Contract
We would like to respectfully request approval of an amendment to
our Engineering Contract on the Lake Georgetown Project pertaining to
our hourly rate schedule. The hourly rate schedule is used to deter-
mine compensation to the engineer for special services not included in
the basic percentage charges. Such services are listed - 7 Paragraph D
of our Engineering Contract with the City of Round Rock and cover such
items as easement descriptions, construction staking, etc.
The hourly rate schedule of the 1977 C.I.P. Engineering Contract
was referenced to be used on the North Fork Project, for which our
services were retained on September 12, 1978. Due to the time schedule
in funding this project, we are using an hourly rate schedule on the
Lake Georgetown Project that is four (4) years old.
We have understandably experienced increases in our hourly rate
schedule over a period of four (4) years and are presently handling
several of the City of Round Rock projects based on our most recent
hourly rate schedule.
This request will substitute our most recent hourly rate schedule
for the 1977 hourly rate schedule to be used on the remainder of the
Lake Georgetown Project. No back charges will be made for this project
on other hourly work for which we have already been paid; only on
future billings. Of course, the total of Engineering Fees Budgeted for
the Lake Georgetown Project shall remain within the funds previously
budgeted for engineering. The "old" and "new" hourly rate schedules
are attached for your review.
If the City Council approves of this amendment, please sign in the
spaces provided below on the original and the attached copy and return
one to our office.
CIVIL ENGINEERING • LAND PLANNING • MUNICIPAL CONSULTANTS • SURVEYING
Timothy E. Haynie, P.E.
Steven D. Kaltman, P.E.
3 �
Page 2
The Honorable Larry L. Tonn
Mayor of Round Rock
City of Round Rock
September 3, 1981
EXECUTED in two counterparts (each of which is an original) on
behalf of the Engineer by its Vice - President shown below, and on behalf
of the Ow r by its Mayor (thereunto duly authorized) this the /QT'"
day of , 1981
Attest:
AP
OW. "ILL i∎ / 1
ne and, ity ecretary
Attest:
ery A s rong,
Secreta s7 to Steven D. Kall
HAYNIE & KALLMAN; INC.
Steven D. Kallman, P.E., R.P.S.
Vice - President
HAYNIE & KALLMAN, INC.
HOURLY RATE SCHEDULE 64'')
JUNE, 1981
ITEM DESCRIPTION RATE
1. Registered Professional Engineer - Group I(E) $50.00 /hr.
2. Registered Public Surveyor - Group I(S) $40.00 /hr.
3. Field Engineer (not registered, ie. E.I.T.) -
Group II $30.00 /hr.
4. Designer & Calculator - Group III(E) $24.00 /hr.
5. Chief of Survey Parties - Group III(S) $24.00 /hr.
6. Inspector - Group IV(I) $18.00 /hr.
7. Drafting Personnel - Group IV(E) $18.00/hr.
8. Clerical (including word processor equipment)
Group V(C) $15.00 /hr.
9. Technician - Group V(T) $15.00 /hr.
10. Three man survey crew, including truck and all
equipment except distance measurement instruments $55.00 /hr.
11. Two man survey crew, including truck and all
equipment except distance measurement instruments $45.00 /hr.
12. Reimbursement for direct non -labor expense and
sub - contract expense at invoice cost plus
twenty - percent (20 %) service charge
13. Blueline Reproductions
14. Mylar Drawing Reproductions
15. Specifications Reproductions Per Page
16. Distance Measurement Instruments (2 Mile Range)
17. Computers: Wang with Printer or Hewlett Packard
9815
$ 0.40 /sq.ft.
$ 1.00 /sq.ft.
$ 0.10 /ea.
$10.00 /hr.
$ 5.00 /hr.
j•
ATTACHMENT NO. 3 - RATE SCHEDULE COL-i6
ITEM DESCRIPTION RATE
1. Registered Professional Engineer 25.00/hr.
2. Field Engineer (not registered) 19.50 /hr.
3. Project Representative (Inspector)
and Calculator 15.00 /hr.
4. Drafting Personnel 11.50 /hr.
5. Three man survey crew including
truck and all equipment 40.00 /hr.
6. Two man survey crew including
truck and all equipment 29.00 /hr.
7. Reimbursement for direct non -labor expense and
sub - contract expense at invoice cost plus
15 percent service charge.
8. Blueline Reproductions 0.15 /sq.ft.
9. Sepia Drawing Reproductions 0.25 /sq.ft.
10. Mylar Drawing Reproductions 1.00 /sq.ft.
11. Specifications per page reproduced 0.10 /EA.
Distance Measurement Devices:
12. Electro Tapes (30 Mile Range) 15.00 /hr.
13. DMI (2 Mile Range) 20.00 /hr.
Computers:
14. Wang With Printer 18.50 /hr.
-17-