R-82-443 - 4/8/1982WHEREAS, the City of Round Rock wishes to begin prepara-
tion of a Master Water & Wastewater Plan - 1982 Revision, and
WHEREAS, professional engineering services are required
in connection with the preparation of said Plan, and
WHEREAS, Haynie & Kallman, Inc., has submitted a
proposed agreement to provide the required engineering
services, and
WHEREAS, the City Council desires to enter into said
agreement with Haynie & Kallman, Inc., Now Therefore,
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS
That the Mayor is hereby authorized and directed to
execute on behalf of the City of Round Rock a letter agree-
ment for engineering services with Haynie & Kallman, Inc., a
copy of said agreement being attached hereto and incorporated
herein for all purposes.
ATTEST:
RESOLVED this 8th day of Apri , 982.
J ANNE LAND, City Secretary
RESOLUTION NO. W.-7k
A
RY : N, ayor
ty of Round ock, Texas
Haynie & Kallman, Inc.
CONSULTING ENGINEERS
2115 North Mays
Round Rock, Texas 78664
(512) 255 -4564, 255 -7861
Mr. Bob Bennett, City Manager
City of Round Rock
214 E. Main Street
Round Rock, Texas 78664
Dear Mr. Bennett:
WATER PLAN
February 19, 1982
Re: Master Water & Wastewater Plan -
1982 Revision
Pursuant to your request, we are submitting our proposal to the City of
Round Rock for preparation of a Master Water & Wastewater Plan - 1982 Revi-
sion. The Plan will incorporate a planning period of approximately 10
years. The Plan will include a geographical area based on updated antici-
pated population distribution, including areas to the west of Round Rock, as
prepared by City Staff. The scope of work is listed as follows:
1. Analyze existing major facilities including water supply, ground stor-
age, booster pump stations, elevated storage and distribution system (8"
lines and larger).
2. Sizing, recommendations and priorities for additional major facilities
to assist in updating the City of Round Rock Urban Services Plan.
3. Computer analysis of arterial water lines (8" and larger) to assist in
sizing and locating proposed lines.
4. An integral part of the Plan will be to include the surface water supply
of 6 MGD (average) from the North Fork Reservoir.
5. Preliminary Cost Estimates for the first five (5) years of the planning
period.
CIVIL ENGINEERING • LAND PLANNING • MUNICIPAL CONSULTANTS • SURVEYING
Timothy E. Haynie, P.E.
Steven D. Kallman, P.E.
Page 2
Mr. Bob Bennett, City Manager
City of Round Rock
February 19, 1982
WASTEWATER
1. Analyze existing major facilities including wastewater treatment plant,
sewage lift stations and wastewater interceptors in major drainage
basins within planning area.
2. Sizing, recommendations and priorities for additional major facilities
to assist in updating the City of Round Rock Urban Services Plan.
3. Consideration of the E.P.A. funded Wastewater Treatment Plant in the
overall planning for this study.
4. Preliminary Cost Estimates for the first five (5) years of the planning
period.
The Master Plan will be bound and will include pertinent text and exhi-
bits. We will provide one (1) set of mylar sepias of the "exhibits" to the
City after completion of the Plan. We will provide 20 copies of the Master
Plan to the City, after your office has commented on a "draft" copy of the
Plan.
We will provide the above listed services based on our June, 1981 Hour-
ly Rate Schedule (attached) in an amount not to exceed $10,000. We will
complete these services within 90 days after the date of your authorization
below, exclusive of City review time.
Please sign this letter and the attached copy and return one copy to
our office. Please retain one copy for your files. We appreciate the op-
portunity to provide these services for the City of Round Rock.
SDK /cla
APPROVED: OF R0 rICK
lialIi.6.
w •n n,V ay.
Cordially,
HAYNIE & KALLMAN, INC.
Steven D. Kallman, P.E., R.P.S.
Date
HAYNIE & KALLMAN, INC.
HOURLY RATE SCHEDULE
JUNE, 1981
ITEM DESCRIPTION RATE
1. Registered Professional Engineer - Group I(E) $50.00 /hr.
2. Registered Public Surveyor - Group I(S) $40.00 /hr.
3. Field Engineer (not registered, ie. E.I.T.) -
Group II $30.00 /hr.
4. Designer & Calculator - Group III(E) $24.00 /hr.
5. Chief of Survey Parties - Group III(S) $24.00 /hr.
6. Inspector - Group IV(I) $18.00 /hr.
7. Drafting Personnel - Group IV(E) $18.00 /hr.
8. Clerical (including word processor equipment)
Group V(C) $15.00 /hr.
9. Technician - Group V(T) $15.00 /hr.
10. Three man survey crew, including truck and all
equipment except distance measurement instruments $55.00 /hr.
11. Two man survey crew, including truck and all
equipment except distance measurement instruments $45.00 /hr.
12. Reimbursement for direct non -labor expense and
sub - contract expense at invoice cost plus
twenty - percent (20 %) service charge
13. Blueline Reproductions $ 0.40 / sq.ft.
14. Mylar Drawing Reproductions $ 1.00 /sq.ft.
15. Specifications Reproductions Per Page $ 0.10 /ea.
16. Distance Measurement Instruments (2 Mile Range) $10.00 /hr.
17. Computers: Wang with Printer or Hewlett Packard $ 5.00 /hr.
9815