Loading...
R-83-526 - 6/23/1983RESOLUTION NO. 5a (p e WHEREAS, an assured source of adequate water supplies is necessary for the future growth of commerce, agriculture and industry in Williamson County; and WHEREAS, meeting this need requires that additional sources of surface water be developed in the Brazos River Basin, of which Williamson County is a part; and WHEREAS, developing and making the surface water resources of the Brazos River Basin available for beneficial use is a responsibility of the Brazos River Authority; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ROUND ROCK, TEXAS That the Brazos River Authority is hereby requested to consider the City of Round Rock as a prospective contractual participant in the development and construction of a new dam and water supply reservoir in the Brazos Basin and that the City of Round Rock with this resolution, submits the attached Future Water Requirements Assessment Sheet as the future surface water needs for the City of Round Rock; and That the Brazos River Authority is hereby requested to conduct investi- gations and perform feasibility studies on behalf of the City of Round Rock and others in Williamson County and related areas of the Brazos Basin willing to share the costs thereof (the "Participants ") for the establishment and manage- ment of a centralized water treatment facility and treated water distribution system ( "System "); and That it is understood that pro -rata shares of the costs of the feasibility and preliminary engineering studies associated with the System will be allocated to the Participants, including the City of Round Rock as a Participant, but that the City of Round Rock by this resolution makes no commitment to pay any sum of money; and That it is understood that the Brazos River Authority, should it accept responsibility as System Project Coordinator, will calculate the pro -rata costs of carrying out the Project studies and submit an agreement for approval and execution by the City of Round Rock for acceptance of financial obligation for the City of Round Rock's pro -rata share of the costs of the studies be- fore the study is to proceed; and That it is understood the costs of the Project feasibility and pre- liminary engineering studies will be reimbursed to those Participants that continue with subsequent project construction, should the project prove to be feasible. RESOLVED this 23rd day of June, 1983. ATTEST: /W NNE LAND, City` Secretary Y L. TONN, Mayor City of Round Rock, Texas I. Background Information A. Entity name and address: City of Round Rock 214 E. Main Street Round Rock, Texas 78664 Brazos River Authority Future Water Regiuirements Assessment Sheet B. Representative's name /title /phone number: Robert L. Bennett, Jr. City Manager 512- 255 -3612 C. Entity's Engineer (firm, contact person, address and phone number): Haynie & Kallman, Inc. 512 - 255 -7861 Steve Kallman, P.E. 2115 N. Mays Round Rock, Texas 78664 D. Description of jurisdictional area (attach map of jurisdictional boundaries and /boundaries of other entities served) Present City Limits = Approximately 10 square miles; Service area requested for Certification with Public Utilities Commission (including dual certification with Brushy Creek MUD #2) = 70 square miles. E. Other Entities served (name and address) Brushy Creek MUD #2 (by contract) F. Other Entities considered in following projections: None II. Current Development A. Population: 16,400 B. Avg. annual water use: 1.2 billion gallons C. Peak water use: 7.38 MGD D. Well capacity: 5.4 MGD (drought conditions) E. Pump capacity: 9.28 MGD (wells) F. Storage capacity: 5,660,000 gallons G. Estimated future groundwater use is 5.4 mgd through 2030 III. Future Needs: (All water use in MGD) A. Projections Residential Industrial Total Water Year Population Connections Commercial Use Needs 1990 29,050 9,080 0.340 MGD Avg. 4.358 MGD Avq. 2000 64,900 20,280 0.759 MGD Avq. 9.735 MGD Avg. 2010 100,000 31,250 1.169 MGD Avg. 15.0 MGD Avq. 2030 175,000 54,690 2.046 MGD Avg. 26.25 MGD Avq - (If applicable, indicate the build -out Year and population: B. Surface Water Needs - To establish future surface water re- quirements the projected "groundwater use" should be substracted from the "total water use" Total Water Needs Met with Surface Water Year Needs Groundwater Needs 1990 4.358 MGD Avq. All -0- 2000 _9.13.5_11.1. n ava 5 4 4.335 2010 15.00 MGD Avg. 5.4 - 9.6 2030 26.25 MGD Avg. 5.4 20.85 RESOLUTION NO. WHEREAS, an assured source of adequate water supplies is necessary for the future growth of commerce, agriculture and industry in Williamson County; and WHEREAS, meeting this need requires that additional sources of sur- face water be developed in the Brazos River Basin, of which Williamson County is a part, and WHEREAS, developing and making the surface water resources of the Brazos River Basin available for beneficial use is a responsibility of the Brazos River Authority. NOW, THEREFORE, BE IT RESOLVED BY (Entity) THAT the Brazos River Authority is hereby requested to con- sider (Entity) as a prospective contractual participant in the development and construction of a new dam and water supply reservoir in the Brazos Basin and that (Entity) with this resolution, submits the attached Future Water Requirements Assessment Sheet as the future surface water needs for (Entity) ; and THAT the Brazos River Authority is hereby requested to conduct investigations and perform feasibility studies on behalf of (Entity) and others in Williamson County and related areas of the Brazos Basin willing to share the costs thereof (the "Participants ") for the establishment and management of a centralized water treatment facility and treated water distribution system ( "System "); and THAT it is understood that pro -rata shares of the costs of the feasibility and preliminary engineering studies associ- ated with the System will be allocated to the Participants, 'Resolution - cont'd. Page 2 ATTEST: including (Entity) as a Participant, but that (Entity) by this resolution makes no commitment to pay any sum of money; and THAT it is understood that the Brazos River Authority, should it accept responsibility as System Project Coor- dinator, will calculate the pro -rata costs of carrying out the Project studies and submit an agreement for approval and /execution by (Entity) for acceptance of financial obligation for (Entity) pro -rata share of the costs of the studies before the study is to proceed; and THAT it is understood the costs of the Project feasibility and preliminary engineering studies will be reimbursed to those Participants that continue with subsequent project construction, should the project prove to be feasible. PASSED this day of , 1983 by the , Texas. By (Mayor, etc.) Brazos River;Authority Future Water Requirements Assessment Sheet I. Background Information A. Entity name and address: B. Representative's name /title /phone number: C. Entity's Engineer (firm, contact person, address and phone number): D. Description of jurisdictional area (attach map of jurisdictional boundaries and /boundaries of other entities served) E. Other Entities served (name and address) F. Other Entities considered in following projections: II. Current Development A. Population: B. Avg. annual water use: C. Peak water use: D. Well capacity: E. Pump capacity: F. Storage capacity: G. Estimated future groundwater use is mgd through ITI." Future Needs: (All water use in.MGD)• A. Projections Year Population 1990 2000 2010 2030 Residential Industrial Total Water Connections Commercial Use Needs 1990 2000 2010 2030 (If applicable, indicate the build -out Year and population: B. Surface Water Needs - To establish future surface water re- quirements the projected "groundwater use" should be substracted from the "total water use" - Total Water Needs Met with Surface Water Year Needs Groundwater Needs