R-84-621 - 6/28/1984RESOLUTION NO. _ /o ?/R
WHEREAS, engineering services are necessary in order to
amend the E.P.A. Facility Plan for the City of Round Rock, and
WHEREAS, the engineering firm of Haynie & Kallman, Inc. has
submitted a proposal to provide the needed engineering services,
and
WHEREAS, the City Council wishes to accept said proposal,
Now Therefore,
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK,
TEXAS
That the Mayor of the City of Round Rock, Texas, is hereby
authorized and directed to execute on behalf of the City, a
proposal submitted by Haynie & Kallman, Inc. to amend the E.P.A.
Facility Plan, a copy of such proposal being attached hereto and
incorporated herein for all purposes.
JUNE 0 Mi
ATTEST:
NNE LAND, City Secretary
MIKE ROBINSON, Mayor
City of Round Rock
•
111: 4
Haynie & Kallman, Inc.
CONSULTING ENGINEERS
2115 North Mays • Round Rock, Texan 78664 • (512) 255 -7861, 255.4564 J 12212 Technology Blvd., Suite H • Austin, Texas 78727 • (512) 250 -8611
June 25, 1984
Mr. Jack Harzke, P.E.
Director of Public Works
City of Round Rock
214 E. Main Street
Round Rock, Texas 78664
Dear Jack:
SDK /cla
Enclosure
AUTHORIZED BY:
Signature
• S
Re: Engineering Services to Amend the
E.P.A. Facility Plan for the City
of Round Rock, Texas
We are pleased to offer our engineering services to amend the facility
plan for the City of Round Rock, Texas. This amendment is required in order
that the City of Round Rock can be eligible for funds from the construction
grant program. This project will be based on an hourly rate schedule which
is attached. The total sum shall not exceed an amount of $7,500 for these
services. We anticipate that the assignment will be completed by the middle
of July, 1984.
Please sign both copies of this letter in the space provided, authoriz-
ing this expenditure if it meets with your approval and return one copy to
our office. Please retain a copy for your file.
Work will commence upon receipt of this signed authorization letter.
We appreciate the opportunity to be of service to you.
Cordially,
HAYNIE & KALLMAN,
INC
Steven D. Kallman, P.E., R.P.S.
Title Date
CIVIL ENGINEERING • CONSULTANTS • MUNICIPAL ENGINEERING • LAND PLANNING • SURVEYING
HAYNIE & KALLMAN, INC.
HOURLY RATE SCHEDULE
MARCH, 1984
ITEM DESCRIPTION RATE
1. Registered Professional Engineer - Group I(E) $70.00 /hr.
2. Registered Public Surveyor - Group I(S) $55.00 /hr.
3. Land Planner - Group I(LP) $50.00 /hr.
4. Field Engineer (ie. E.I.T.), Hydrologist -
Group II(E) $38.00 /hr.
5. Director of Survey Parties - Group II(S) $38.00 /hr.
6. Inspector with Vehicles & Equipment - Group II(I) $38.00 /hr.
7. Designer - Group III(E) $33.00 /hr.
8. Calculator - Group III(S) $33.00 /hr.
9. Drafting Personnel - Group IV(E) $27.00 /hr.
10. Clerical - Group V $20.00 /hr.
11. Four man survey crew, including truck and all
equipment except distance measurement instruments $85.00 /hr.
12. Three man survey crew, including truck and all
equipment except distance measurement instruments $75.00 /hr.
13. Two man survey crew, including truck and all
equipment except distance measurement instruments $65.00 /hr.
14. Reimbursement for direct non -labor expense and
sub - contract expense at invoice cost plus
twenty - percent (20 %) service charge
15. Blueline Reproductions
16. Mylar Drawing Reproductions
5 t
17. Specifications Reproductions Per Page
18. Electronic Distance Measurement Instruments
19. Computers: Hewlett Packard 85 or 86 -B
20. Wang
21. Plotter
$ 0.40 /sq.ft.
$ 1.25 /sq.ft.
$ 0.10 /ea.
$10.00 /hr.
$ 5.00 /hr.
$33.00 /hr.
$10.00 /hr.