Loading...
R-84-669 - 12/26/1984CCOUNT NO... i. ,` DESCRIPTION "cf._ GROSS:J olscouN NET .AMOUNT q Study of a Regional Treat- ment and Transmission System 14,805.00 .,THE ,10ER 0 • GOUO LIVING 4V1 TH A PROUD NERITAGL • DETACH BEFORE DEPOSITING H-,.'^',, r•'+ tTHWFACEOE *THIS'kDOCUMEN'CHA'S46C0iOREO BACK - OtN WHtTELPARE'o THE CITY OF ROUND ROCK 214 E. MAIN ST. • ROUND ROCK, TEXAS 78664 DATE CHECK NO 01/11/85 1056 r ROUND ROCK V.6 I 4 8 0 65: The Brazos River Authority I:30.9706511: ROUND ROCK UNLIT FUN 8.4 08 00 20 3 11• A No.001056 G ` C ' S ` ROUND POCK, TEKAS AMOUNT $14,805.00 , __, liBAC ICt OFTHfS.DOC,UMENWCONTAINS :AN?ARTIFICUSle WATERMARICF. -�i T XtKIRANry. ANCvLH 'FO..1.t1EW0. "p -4 'o.V P 608 099 307 RECEIPT FOR CERTIFIED MAIL NO INSURANCE COVERAGE PROVIDED NOT FOR INTERNATIONAL MAIL (See Reverse) Sent 13 Stre Nr ^v r/ 5:5-5 P Ot. Syjtr,rZ J(, Codg er/ 7i v -,J 5 J Postage I S" / Certified Fee Special Delivery Fee Restricted Delivery Fee Return Receipt Showing to whom and Date Delivered Return ec showing to w Dat a A eipt ddress of Delivery TOTAL Postage and Fees $ LL o Postmark or Date WHEREAS, the City Council wishes to authorize the Brazos River Authority (B.R.A.) to proceed with an engineering study to evaluate the feasibility of several modifications to the Engineer's recom- mended plan for the transmission, treatment and distribution of water from Stillhouse Hollow, and WHEREAS, the estimated cost of the proposed feasibility study is Thirty -Two Thousand Nine Hundred And No /100 Dollars ($32,900.00) and Round Rock's prorata share is Fourteen Thousand Eight Hundred Five and No /100 Dollars ($14,805.00), and WHEREAS, B.R.A. has submitted a Letter Agreement authorizing it to initiate and perform the studies, Now Therefore, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS That the Mayor is hereby authorized and directed to execute on behalf of the City a Letter Agreement with the B.R.A., a copy of which is attached hereto and incorporated herein for all pur- poses, and BE IT FURTHER RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS That the payment of Fourteen Thousand Eight Hundred Five And No /100 Dollars ($14,805.00) as Round Rock's prorata share of the cost of the feasibility study is hereby authorized. RESOLVED this 26th day of December, 1984. ATTEST: E LAND, City Secretary RESOLUTION NO. 6(19/ MIKE ROBINSON, Mayor City of Round Rock, Texas Honorable Mike Robinson Mayor, City of Round Rock 214 East Main Street Round Rock, Texas 78664 Dear Mayor Robinson: BRAZOS RIVER AUTHORITY 4400 COBBS DRIVE • P. 0. BOX 7555 • TELEPHONEAREA C0DE817776 -1441 WACO, TEXAS 76714 December 18, 1984 At the meeting held December 5, 1984 to review the water supply contracts and to discuss the future planning for the trans- mission, treatment and distribution of that water supply, the decision of the representatives at the meeting was to proceed with studies to evaluate the feasibility of several modifications to the Engineer's recommended plan. The requested modifications to be considered in a second phase of feasibility studies ( "Phase II Studies ") were to evaluate the incorporation of the existing City of Round Rock treatment plant and the incorporation of the proposed City of Georgetown treatment plant as the single region- al plant, and to evaluate dual regional treatment plants using the City of Round Rock's existing plant and the City of Georgetown's proposed plant. The Phase II Studies would include efforts to update the water demand and service schedules of each participant as well as perform engineering feasibility studies on the alternatives for the treatment plant site(s). The Authority has received from the engineering firm of Henningson, Durham and Richardson (HDR) a proposal and cost estimate, provided as Enclosure 1 for the Phase II engineering feasibility studies of the Regional Treatment and Transmission System (RTTS). The estimated cost of these studies is $32,900.00. This total cost will be prorated between the partic- ipants based on each participant's Total Allocation of water supply. Enclosure 2 shows the Total Allocation, the Allocation Percent and the Prorated Phase II Study Cost for each partici- pant. It is understood that each participant in the Phase II Studies will advance their prorated share of the study cost. These costs as well as the Phase I. study costs may be repaid if, and only if, bonds are issued to finance the construction of facilities to expand the basinwide water supply system of the Brazos River Authority needed for the RTTS participants. The total cost for performing the Phase II Studies will not exceed $32,900.00 without further written authorization by the RTTS participants. At the conclusion of the study, the results will be reported to the participants at a joint meeting. Honorable Mike Robinson — cont'd. Page 2 This letter will serve as a Letter Agreement between your governing body and the Brazos River Authority for the Authority to initiate and perform the Phase II Studies, as provided in the HDR proposal shown as Enclosure 1, at the prorated cost shown for each participant in Enclosure 2, provided all entities execute this Letter Agreement and advance their prorata share of the Phase II Studies Cost. In the event one or more participants fail to execute this Letter Agreement or fail to deliver payment for their prorata cost, this Letter Agreement shall be cancelled and be of no further force or effect. If this Letter Agreement is cancelled, those participants which had executed this Letter Agreement and provided advance payment will be contacted to determine if they desire, on a prorata basis, to pay the additional study cost (as revised) and complete the feasibility studies. In the event that neither of the options described above is acceptable, then the advanced payment made in accordance with the cancelled Letter Agreement will be returned. If the proposals set forth in this letter for accomplishing the Phase II Studies meet with the approval of your City council, please so indicate by signing in the appropriate space below and returning one copy of this Letter Agreement together with a certified copy of the resolution of the proper governing body authorizing its acceptance, to the Authority not later than January 11, 1985. Your payment in accordance with Enclosure 2 and made payable to the Brazos River Authority should also be included. ATTE I //.JId / ./L/1_ By n Dated this O` day of 1, ,(�7 llC 1985. Sincerely BRAZOS RIVER AUTH R By: rson H. Hoge, General Manager B y TTEST: � 7 a n Asst. Secretary Dated this 18 day of 4gC 1984. ACCEPTED: By: 7/44 Page 1 of 6 Enclosure 1. PROPOSAL FOR PHASE II OF A FEASIBILITY STUDY OF REGIONAL TREATMENT AND TRANSMISSION SYSTEM - STILLHOUSE HOLLOW FOR BRAZOS RIVER AUTHORITY TENTATIVE TASK SCHEDULE, COST ESTIMATE, AND SCHEDULE Phase I of the feasibility study of a Regional Treatment and Transmission System (RTTS), utilizing water made available in Stillhouse Hollow Reservoir to the study participants by the Brazos River Authority, concluded that the most economically feasible alternative for supplying the water to the participants was by transmitting raw water by pipeline to Lake Georgetown, constructing a regional treatment plant on Lake Georgetown and transmitting treated water to all participants. Since the Phase I report was completed, the participants have identified a number of revisions in water use projections, due to higher than anticipated growth, and some other potential water sources that may delay their need for RTTS water. The purpose of this Phase II study is to revise each participants' water demand projections and analyze the participants' proposed modifications to the Regional Treatment and Transmission System recommended in Phase I. The study participants are: City of Cedar Park; City of Georgetown; High Gabriel Water Supply Corporation; Jonah Water Supply Corporation; City of Leander; City of Round Rock; and SC3 Development Corporation. The attached task schedule describes each of major work items which will be completed in the course of the study. It is followed by an estimate of study costs and a schedule for completion of the study tasks. REGIONAL TREATMENT AND TRANSMISSION SYSTEM STILLHOUSE HOLLOW - PHASE II TENTATIVE TASK SCHEDULE Task 101: Initial Meeting with BRA and Participating Entities The initial effort of the project will be a presentation of the study outline, schedule, and costs to the participating entities by BRA and HDR. Prior to the presentation, HDR will present a synopsis of the presentation to BRA and assist in preparation of the joint presentation. The presentation will provide the participants with their percentage of study costs, based on the total allocation of water and will outline additional information required from them for Phase II. Task 200: Analysis of Modification #1 Modification #,1 requires the revision of entity water demand projections and revision of their phasing of service from RTTS because other service alternatives (short and long -term) have been identified by the entities. Task 201: Review Entity Needs and Short & Longterm Service Alternatives HDR will review the following initial study components with the RTTS participants. 1. Update population and water use projections with data provided by participating entities. 2. Review the other available short and long -term water service plans with each participating entity and their engineers. Each entity will be required to furnish a time and capacity schedule for service from the RTTS. Task 202: Analyze Short & Longterm Water Service Alternatives Based on the information provided by the participants in Task 201, HDR will analyze the short and long -term service plans for each of the participating entities. Feasible composite plans for a schedule of service from RTTS will be developed and a cost comparison will be made between the plans. Task 203: Review Service Schedule with BRA The recommended schedule of service from RTTS for both short and long -term service will be reviewed with BRA and the entities prior to analysis of other RTTS modifications. Page 2 of 5 Task 300: Analysis of Modification #2 Task 301: Data Collection Modification #2 involves the purchase by RTTS of the existing Round Rock 6 MGD water treatment plant and transmission line from Lake Georgetown and utilizing the facilities as the first stage of RTTS. Discussions will be held with the City of Round Rock and their engineers concerning the design, construction and operation of the existing 6 MGD water treatment plant, raw water transmission line and existing & proposed treated water transmission lines within the City's service area which could be utilized in the RTTS. The City of Round Rock is requested to provide at a minimum the following data: 1. Construction Plans and Specifications for the existing 6 MGD plant and proposed additions, and the raw water line from Lake Georgetown to the plant. 2. Operating records on the existing plant, including water quality, pumping and maintenance records. 3. Design data on proposed transmission lines within the service area which could be utilized in RTTS. 4. Financial data on the existing plant and raw water line, including actual construction costs, terms of the funding, and equity in the facilities. Task 302: Evaluation of Treatment Facilities Utilizing the data obtained in Task 301, HDR will evaluate the capability of the existing Round Rock water treatment plant to serve as the initial stage of RTTS and the feasibility of expanding the facility to satisfy long -term needs of RTTS. Cost estimates will be prepared for the purchase, modifications and expansions to the plant for use in RTTS. Task 303: Evaluation of Transmission Facilities Utilizing the data obtained in Task 301 and the updated water use projections from Task 201, HDR will determine the sizing and staging of transmission lines to all the participating entities from the Round Rock plant except Georgetown, which will be utilizing their own plant. Consideration will be given to the short and long -term water service plans for each participant, determined in Task 202. Cost estimates will be prepared for the transmission system. Task 400: Analysis of Modification 43 Modification 43 involves the purchase by 1TTS of the proposed Georgetown 6 MGD water treatment plant to Se located near Page 3 of 6 Task 401: Data Collection Lake Georgetown and utilizing the facilities as the first stage of RTTS. Discussions will be held with the City of Georgetown and their engineers concerning the design, construction and operation of the proposed 6 MGD water treatment plant and existing raw water transmission line. The City of Georgetown is requested to provide at a minimum the following data: 1. Construction Plans and Specifications for the existing raw water line from Lake Georgetown to the proposed plant. 2. Design plans, proposed operating procedures & cost estimates, for the construction of the proposed 6 MGD treatment plant. 3. Financial data on the following: a. The existing raw water line, including actual construction costs, terms of the funding, and equity in the facilities. b. The proposed treatment plant including estimated construction costs and terms of the funding. Task 402: Evaluation of Treatment Facilities Utilizing the data obtained in Task 401, HDR will evaluate the capability of the proposed Georgetown water treatment plant to serve as the initial stage of RTTS and the feasibility of expanding the facility to satisfy long -term needs of RTTS. Cost estimates will be prepared for the purchase, modifications and expansions to the plant for use in RTTS. Task 403: Evaluation of Transmission Facilities Utilizing the data obtained in Task 401 and the updated water use projections from Task 201, HDR will determine the sizing and staging of transmission lines to all the participating entities from the Georgetown plant. The short and long -term water service plans for each participant determined in Task 202 will be taken into consideration in the staging process. Cost estimates will be prepared for the transmission system. Task 500: Analysis of Modification 4 4 Modification 44 involves the purchase by RTTS of both the existing Round Rock and the proposed Georgetown water treatment plants and operating both plants to serve the RTTS participants. Page 4 of 6 Task 501: Evaluation of the Treatment Facilities Based on the data obtained in Tasks 301 and 401 concerning the Round Rock and Georgetown water treatment plants and the evaluations performed in Tasks 302 and 402, HDR will determine the feasibility of operating the RTTS through two separate systems, utilizing the Round Rock and Georgetown water treatment plants. Cost estimates will be prepared for the purchase, modifications and expansions required to utilize the plants in RTTS. Task 502: Evaluation of Transmission Facilities Utilizing the data obtained in Tasks 301 and 401 and the updated water use projections from Task 201, HOR will determine the sizing and staging of transmission lines to all the participating entities from the Georgetown and Round Rock plants. The short and long -term water service plans for each participant determined in Task 202 will be taken into consideration in the staging process. Cost estimates will be prepared for the transmission systems. Task 500: Task 601: Recommendation and Report Review of Modification Evaluation The results of the evaluation of all modifications will be reviewed with the Authority. The sizing, staging and costs of each of the RTTS modifications will be compared to the recommended RTTS plan determined in the Phase I study. The most economically feasible RTTS plan(s) will be defined for the participants. A verbal presentation of the results of the Phase II study will be presented to the participants when the draft addenda to the report is completed and has been reviewed with the Authority. Comments from all participants will be solicited prior to finalization of the addenda. Task 502: Addenda to RTTS Report The addenda to the RTTS report addressing all items outlined in this Phase II study will be prepared and submitted to the Authority in sufficient numbers to provide BRA with 5 copies and each participant with two copies. Page 5 of 6 REGIONAL TREATMENT AND TRAPNSMISSION SYSTEM - STILLHOUSE HOLLOW PHASE II - STUDY COST ESTIMATE AND SCHEDULE Calendar Days Task Estimated Costs ( to Complete 101 $ -0- 201 3,550 35 ( 202 3,700 10 203 1,020 5 301 1,935 35 ( 302 3,420 20 ( 303 1,930 20 ( 401 2,545 35 (2 )( 3 ) 402 4,140 20 (4) 403 1,930 20 (4) 501 2,700 20 ( 502 1,790 20 ( 601 - 1,960 15 602 2,280 10 TOTAL $32,900 95 (1) These costs were computed based on total salary costs of each employee multiplied by a factor of 2.5 and direct non -labor expenses at cost plus ten percent (1070. No subcontract services are included in the estimate. There will be no cost for financial advisory services. (2) Includes an estimated 30 days delay for sponsors' submission of requested data. (3) To be completed simultaneously. (4) To be completed simultaneously. Page 6 of 6 Enclosure 2 PRORATA DISTRIBUTION OF THE PHASE II STUDY COSTS REVISED FINAL PRORATA ALLOCATION TOTAL ALLOCATION PHASE II STUDY PARTICIPANTS PERCENT (MGD) (AF /YR) COST CEDAR PARK 19.44 6.639 7436 $6395.76 GEORGETOWN 14.24 4.864 5448 $4684.96 HIGH GABRIEL .81 .277 310 $266.49 JONAH WSC 3.24 1.106 1239 $1065.96 LEANDER 10.78 3.682 4124 $3546.62 ROUND ROCK 45.00 15.369 17214 $14805.00 SCB CORP. 6.49 2.217 2483 $2135.21 TOTALS 100.00 34.154 38254 $32900.00