R-85-744 - 7/25/1985JO WHEREAS, a group of developers in Northeast Round Rock has joined together to build a sewer line to serve the drainage basin, and WHEREAS, the cost of these improvements is $916,792, and WHEREAS, the Council wishes to approve said contract, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS That the Mayor of the City of Round Rock, Texas is hereby authorized and directed to execute on behalf of the City, an Agreement with MMJ Develop- ment Joint Venture, Meadow Lake Joint Venture, Continental Deversified Investments, Inc., Northeast Round Rock Partners Limited and Margaret M. Nash, John Harvey Nash III, and the John H. Nash Testamentary Tract, a copy of said Agreement being attached hereto and incorporated herein for all purposes. RESOLVED this 25th day of July, 1985. ATTEST: NE AP v■_tAL /� LAND, City Secretary RESOLUTION NO. lv-vR MIKE ROBINSO , Mayor City of Round Rock, Texas THE STATE OF TEXAS COUNTY OF WILLIAMSON AGREEMENT REGARDING CONSTRUCTION OF THE NORTHEAST ROUND ROCK SEWER SYSTEM S s 6 WHEREAS, the existing wastewater facilities of the City of Round Rock have not been extended to meet the needs of various proposed developments and properties of the hereafter named Participants; and WHEREAS, each such Participant so hereafter named respectively desires to (i) contribute to the cost of the 'sewer system serving the basin as shown on Exhibit "A" (hereafter the sewer system shown on Exhibit "A" and referred . to as "Project ")j,,.(ii) become entitled to receive sewer taps'" for the proposed development of its property in. accordance with current City of Round Rock standards and policies; (iii) have those capacities set forth opposite its name on Exhibit "A" within the Project upon certain conditions; (iv) receive proportionately refunds for line oversize as applicable to the Participants; and (v) have guaranteed 'reserves and - capacity in future lines to be constructed by other Participants as hereafter provided, NOW, THEREFORE, KNOW ALL MEN BY THESE PRESENTS: That this CONTRACT is made and entered into by and among: (i) MMJ Development Joint Venture ( "MMJ "), developer of The ?Settlement, Stoney Brook, Oakmont Centre and the Bartz Tract, acting herein by and through Bill Milburn, its Managing Venturer; (ii) Meadow Lake Joint Venture ( "Meadow Lake "), developer of Meadow Lake, acting herein by and • through James W. Spence, its Managing Venturer; Continental Diversified Investments, Inc.,' a Texas • corporation, acting herein by and through its heretofore -1- duly authorized president, Zack E. Williams, and Northeast Round Rock Partners Limited, a Texas limited partnership acting herein by and through its General Partner, Zack E. Williams, jointly the developers of Vista Heights, and herein jointly sometimes called "Vista "; (iv) Edward D. Quick ( "Quick "); (v) Margaret M. Nash, John Harvey Nash, III, and the John H. Nash Testamentary Trust for the Benefit of William Lawrence Nash (collectively "Nash "); and (vi) City of Round Rock ( "City "), a municipal corporation; acting --by a ,— gack- Har-ske ; - W I T N E S S E T H : (1) Collectively MMJ, Meadow Lake, Vista, Quick and Nash are hereafter called "Participants" and individually each is a "Participant ". (2) Each Participant agrees to be responsible and obligated to other Participants for constructing and acting as the Managing Participant for the portion of the Project within its respective Development (as shown on Exhibit "A ") and upon execution of this Contract by all of the Partici- pants, shall in its name, but on behalf of itself and the Participants: (a) Engage the services of an Engineer to complete the plans and specifications for its respective portion of the Project; (b) Obtain approval of the City of Round Rock of such plans and specifications; (c) Acquire and dedicate all necessary easements for its portion of the Project; (d) Solicit bids for the construction of its , portion of the Project; i +.': '. ' s�; s: yt, of #, (e) Enter into a contract for the installation • and construction of its portion of the Project (performance -2- and payment bonds are furnished for all construction contracts); (f) Supervise the completion of its portion of Project for the benefit of all Participants; and (g) Administer its contract in order to complete construction of the Project in accordance with the respective plans and specifications in a good and workmanlike manner in accordance with industry standards or standards of the City, whichever standards shall be the higher. (3) Within ten (10) working days of the date of notification of bid result, each Participant will deposit with each Managing Participant the respective sums for each as shown in the notification of bid, including each Partici- pant's pro rata share of any sums attributed to City. The notification of bid result will be submitted by each Managing Participant and specified in the format of Exhibit "B" and will indicate actual construction, engineering and other costs to be shared by the Participants (other costs may include necessary legal fees, etc., as approved by the Participants under the terms of paragraph (5) below). Upon receipt of all such funds, each Managing Participant will open a separate trustee interest - bearing account and deposit such funds so received therein. From such funds and the interest thereon each Managing Participant shall pay all its respective Project costs. In the event the amount so depos- ited, plus accrued interest, exceeds the cost of the Project, the balance shall be refunded by such Managing Participant to the Participants in the same proration as each Partici- pant's initial deposit was to the total deposit of all Participants. In the event construction contracts have been executed prior to execution of this Contract, then each Participant will have fifteen (15) working days from the date of this Contract to fund those portions of the Project. -3- (4) Each Managing Participant, for its respective segment of the Project, shall be responsible for: (i) the supervision of the Project, (ii) completion in accordance with the plans and specifications therefor as approved by City, and (iii) acceptance for maintenance by City. (5) In addition to the basic costs set forth in this Contract, any other costs incurred by any Managing Participant in connection with the construction of the Project ( "Additional Costs ") shall be paid in the same proration as each Participant's initial deposit was to the total deposit of all Participants; provided, however: (i) no Participant shall have any liability to any Managing Participant or any other party for Additional Costs unless such Additional Costs are agreed to in advance in writing by a majority of all Participants (not in numbers, but in percentage of cost share as shown on Exhibit "B "); provided, however, such advance approval shall not be required for change orders equal to or less in amount than total interest accrued on the account established pursuant to paragraph (3) above, and (ii) such Additional Costs shall not exceed twenty -five percent (25 %) of the original basic bid price submitted by the Managing ' Participant for the respective Project of such Managing Partici- pant, unless unanimous approval is obtained from all affected Participants. If after approval a Participant refuses to fund its share of the Additional Cost, then it will be deemed in default of this Contract. . (6) ' The City hereby agrees: (a) to review and approve plans and specifications submitt2ed by each Managing Participant in a timely manner to determine if such plans and specifications comply with City's ordinances, rules, regulations, and policies; (b) upon completion of the respective portions of Project by each Managing Participant in accordance with the plans and specifications, accept the same for operation and maintenance; • (c) to refund to each Participant the respective Participant's amount of oversize refund due as shown on Exhibit "B" at the time of the Project's Final Acceptance by City; -4- (d) provided that the Participant requesting sewer service is not in default under this Contract, to issue to each nondefaulting Participant (upon payment of the oh µ3 customary sewer tap fee if required) such sewer taps as may be required for elopment of that Participant's acreage E ' r • j. tie Land t e'total number 'ofs as listed and specified on Exhibit "A ", for the privilege of tapping into and using the wastewater facility being constructed under this Contract, subject to payment of all utility service fees applicable at the time of connection; r' c (e) that'no additional expenditure will be _equired ■ of any party hereto for an improvement to the wa tewate. of the City in connection with utilization of the +x°± macu y any Participant for service to the respective ..i Project areas shown and specified on Exhibit "A" attached hereto; and (f) ` ,.to guarantee and rgserve capacity /to each 4 3 Y y Participant .gas } oe= sbe the service areas r shown and specified on Exhibit "A" according to the respective capacities or acreage indicated on Exhibit IIA It • in the Project. :�4y (7) In the event that any Participant fails to pay its pro rata portion of any Costs on or before the date due, such amount shall bear interest from the due date until paid at the prime rate of Texas Commerce Bank - Austin, Austin, Texas, plus one percent (1 %). (8) During construction of the Project, each respective Managing Participant and its successors and assigns, shall have the sole and absolute right to supervise and control the day to day activities of the Project. Each Managing Participant agrees to undertake and perform (subject ' the weather and availability of adequate labor, machinery and materials) all of its obligations under this Contract, and -5- complete the Project in accordance with plans and specifications approved by City. Each Managing Participant shall make monthly reports to each Participant as construction progresses and furnish each Participant with a copy of the contractor's monthly draw request and the engineer's certifi- cate of payment. All records pertaining to the Project shall be made available to each Participant by each Managing Participant if requested. (9) In the event any Managing Participant shall fail or refuse to comply with the terms and conditions of this Contract, then a majority in interest (not in numbers but in Percent Cost Share as shown on Exhibit "B ") of the Partici- pants, after written notice to such defaulting Managing Participant (specifying therein the alleged default and such Managing Participant's failure to cure within ten (10) days after receipt of such notice) may remove such Managing Participant and may appoint one Participant as such new Managing Participant. Any such new Managing Participant shall have the right to take over all contracts and trustee accounts in progress so as to finish such respective portion of the Project remaining to be completed. (10) In the event it is necessary for any Participant to employ an attorney or attorneys to enforce the terms and conditions of this Contract against any other party hereto, the nonprevailing party in such action shall pay all costs and expenses and reasonable attorney's fees incurred by the prevailing party in connection therewith; provided, however, that this liability shall not apply to City. In the event a Participant is in default by having failed to comply with the terms and conditions of this Contract, it will lose its, right to utilize those portions of the Project in which it is in default. Provided, however, any such penalty shall -6- apply only after written notice of default (which shall specify the nature and extent of default) to such Participant, and such Participant after a reasonable period of time has failed to cure such specified default. (11) This Contract, together with the exhibits attached hereto, which exhibits are incorporated herein and made a part hereof for all purposes, constitutes the entire agreement among the parties hereto, and may not be amended except by a writing signed by all parties hereto, and shall be binding upon the heirs, administrators, successors, and assigns of the parties hereto; provided, however, no assignment of this Contract shall be valid unless' approved by City prior to such assignment and written notification of such assignment is given to each Managing Participant. (12) This Contract or any portion thereof, including, without limitation, any of the reserved capacities or refunds, may be assigned by a Participant to its successor in title to the land to which the right relates, upon written notice to the City and each Participant. (13) Each person signing this Contract certifies by its signature that the entity for whom it is signing owns the land indicated as being owned by that entity in Exhibit "A ", and that it has the full authority to sign the Contract on behalf of that entity. (14) All parties hereto further agree that Exhibit "A" does not indicate any portion of the Project to be placed upon property of Nash. Under Exhibit "A ", the Project's wastewater line is to be installed only to the south boundary line of existing Chandler Road. All parties hereto agree that such wastewater line shall be extended across Chandler Road in a northerly direction to the southerly boundary line of Nash's property. Accordingly, MMJ hereby agrees to act -7- as Managing Participant for such extension of the wastewater line across Chandler Road without fee or charge to any party hereto except that in addition to costs allocated to Nash under Exhibit "B ", Nash will pay to MMJ the actual costs incurred by MMJ in the installation of such wastewater line across Chandler Road to Nash's southerly boundary line. EXECUTED this day of , 1985. MMJ DEVELOPMENT JOINT VENTURE By: Bill Milburn, Managing Venturer MEADOW LAKE JOINT VENTURE By: Managing Venturer CONTINENTAL DIVERSIFIED INVESTMENTS, INC. By: By: -8- Zack E. Williams, President NORTH EAST ROUND ROCK PARTNERS LIMITED Zack E. Williams, General Partner Edward D. Quick Margaret M. Nash 1 John Harvey Nash, III JOHN H. NASH TESTAMENTARY TRUST FOR THE BENEFIT OF WILLIAM LAWRENCE NASH By: Trustee By: Trustee By: Trustee CITY OF ROUND ROCK By: City Manager -9- EXHIBIT "B" LENGTH 1 THE lEADOW VISTA [RUCK STONEY OAKMONT BARTZ NASH ROUND LINE /SIZE 1 SETTLEMENT LAKE HEIGHT TRACT BROOK CENTRE TRACT TRACT ROCI( _ C -D 1,150 I 27'4 D-E 1,050 1 24',I 1 E-F 2,100 I 15 °- 1 F-6 1,000 1 12"/1 1 6-41 2,200 I 10 °' H-I 2, 200 _ -8' 1 J - K 3,000 I 15' 1,550 1 2' 15 1 '1= . 1,650 M N 1,350 (0" 12' • 8-0 1,350 10' 1 NORTHEAST ROUND ROCK SEWER SYSTEM - P'IMINARY COST PARTICIPATION BREAKDOWN (PRO -RATA PARTICIPATION BASIS, EXCEPT CITY) CITY & DEVELOPER SERER SERVICE (INCLUDES CONSTRUCTION RND ENGINEERING COSTS) - A-B 810 1 $6,798 $3,440 $15,389 $3,621 $8,455 $679 14,934 $5,250 10 348,567 27'- I I ' 8-C 3,''0 1 $17,406 $17,591 $78,697 $18,517 $43,237 $3,472 $25,229 $26,850 $0 $231,000 27' $0 $6,772 $30,295 17,128 $16,645 $1,337 $9,712 $10,336 - -$0 $0 $7,908 $21,983 $5,648 $21,102 30 10 $2,259 30 $58,9 10 $7,341 $8,051 111,840 $44,233 30 30 14,736 30 $76,200 $0 $0 14,194 $0 $23,040 $0 $0 $2,467 $0 30 50 $0 $0 150,313 $0 $0 15.387 $0 10 $0 10 $0 $37,887 $0 10 $8,113 $0 50 10 $43,333 $0 $0 $4,470 $32,485 128,611 10 8-1 TOTAL COST .ERRSSB3 10 19,474 ; $0 $2,368 117,210 115,158 812,090 ; __ -1 - 156,300 13.063 822,254 , 819,600 - $0 ' $0 $0 50 10 18 117,589 115,491 $7,020 1 $40,100 50 $0 10 C(4 JUNE 14, 1985 $0 $0 $0 $8,674 $18,506 17,020 1 TOTAL 582,225 829,700 $55,700 $46,000 ' 1108,900 134,200 $24,204 $43,051 $215,500 $46,754 $244,912 $15,389 1138,088 $162,763 (1 / 1 $916.792 Haynie & Kallman, Inc. " a CONSULTING ENGINEERS i l Austln,Tsxas THE ?EMU VISTA QUICK STONEY OAKMONT BARTZ NASH ROUND POINT 1 SETTLEMENT L88E HEIGHT TRACT BROOK CENTRE TRACT TRACT ROCK 1 TOTAL 8 LIE'S I 751 380 1,700 400 934 75 545 580 544 - 1 5,909 % I 12.71 6.43 28.77 6.77 15.81 1.27 9.22 9.82 9.21 1 100.00 B LUE'S I 376 380 1,700 400 934 75 545 580 544 1 5,534 % 1 6.79 6.87 30.72 7.23 16.88 1.36 9.85 10.48 9.83 -_ 1 100.00 C LIE'S 1 0 380 1,7 %.• 400 934 75 545 • 580 544 1 5,150 % 1 0 7.37 32.96 7.75 18.11 1.45 10.57 11.24 10.55 1 100.00 M N 0 NEROES93 NORTHEAST ROM ROCK SEWER SYSTEM L. U. E. BREAKDOWN (CITY & DEVELOPER SEWER SERVICE) JUNE 11, 1985 - 0 LUE'S 1 0 358 973 250 934 0 0 100 48 _ 1 -2,655 - - % I 0 13.18 36.65 9.42 35.18 0 0 3.77 181 1 100.08 E LIE'S 1 0 155 170 258 934 0 0 100 48 1 1,657 % 1 0 9.35 10.26 15.09 56.37 0 0 6.04 2.90 1 1 1 .00 F LIE'S 1 0 8 170 0 934 0 0 100 48 1 1,252 % 1 0 0 13.58 0 74.60 0 0 7.99 3.83 1 100.09 6 LLE'S 1 0 0 0 0 934 0 0 100 48 1 1,082 % 1 0 0 0 0 86.32 0 0 9.24 4.44 1 100.00 I I H LUE'S 1 0 0 0 0 467 0 0 100 48 1 615 % 1 0 0 0 0 75.93 0 0 16.26 7.80 1 100.00 I LUE' S I 0 0 0 100 48 1 148 % 1 0 0 0 0 0 0 0 67.57 32.43 i 100. J LUE'S 1 0 8 727 0 0 75 545 480 496 1 2,323 % I 0 0 31.30 0 0 3.23 23.46 20.66 21.35 1 100.80 - K LUE'S 1 0 0 300 0 0 75 545 480 496 1 % I 0 0 15.82 . 0 0 - 3.96 28.74 25.32 25.16 •„ 1 100.00 0 " _ _._ 0 100 - 0 0 75 • ., 545 '.' 480 ' 496 ". 1 1.696 0 , 0 5.90 0 0 4.42 "32.13 ' 28.30 29.25 "L1 100 "80 LIE'S I 0 9 0 0 A 8 545 480 496 - 1 1,521 % 1 0 0 0 0 A 0 35.83 31.56 32.61 1 100.89 - 2 LIE'S 1 0 0 0 0 0 225 480 496 1 1,201 % 1 0 0 0 0 0 0 18.73 39.97 41.30 1 100.00 1 I LUE'S 10 8 0 0 0 0 0 480 248 1 728 % 1 0 0 0 0 0 0 0 65.93 34.07 1 100.00 Haynie & Kallman, Inc. FITZ CONSULTING ENGINEERS -1 Austin ,Texas June 14, 1985 Bruce N. Sloan Attachments : ' Spence _ `Zack`William Don Quick .fi BISS /tcj " ' 0761J The Bill Milburn Company_ Building New Homes the Old Way 'Jim Nuse, P.E. 'Director of Public Works -,City of Round Rock . 214 East Main Round Rock, Texas 78664 RE: North East Round Rock Sewer System Dear Jim: Please find attached the final cost participation allocation, 'exhibits and draft contract for the referenced project. Included within the allocation are tabulations which show Round Rock's participation based on the city oversize policy (pages 1 & 2 item "Round Rock Oversize "), cost participation without service areas designated as "City of Round Rock" (pages 3 & 4), and cost participation based on an LUE pro rata share for all participants including the City of Round Rock (page 5). The exhibits show the line sizes and slopes both with and without City of Round Rock flow contributions. - A prompt review of these documents would be appreciated. We are currently under construction on the phases of the project which extend through the Settlement and Meadow Lake. I would like to meet with you on Wedndesday, June 19th to review and discuss any quedtions you might have concerning the City's participation. ',Sincerely, 11911 Burnet Road /P.O. Box 9802 x"682 /Austin, Texas 78766/(512) 835 -HOME ;4