Loading...
R-85-774 - 10/10/1985t and ATTEST: AVOW) 44YAL JO•SI.NE LAND, City Secretary RESOLUTION NO. 77 //k. WHEREAS, the Round Rock Independent School District supports a competitive swimming program for the students of Round Rock High School, and WHEREAS, this program takes place at a time when the City of Round Rock pool facilities are not in active use, WHEREAS, the Round Rock Independent School District desires to have facilities for the training of its swimming team, and WHEREAS, it appears to be to the benefit for both Round Rock Independent School District and the City of Round Rock, Texas to utilize the City of Round Rock's pool facilities for this program, Now Therefore BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF ROUND ROCK, TEXAS That the Mayor be and is hereby authorized to execute any and all documents necessary to provide for the use of the City of Round Rock swimming pool by the Round Rock Independent School District. ����/�/�����111�,��� .J RESOLVED this the / day of O���kC/ , 1985. MIKE ROBINSON, Mayor City of Round Rock, Texas TOTAL ELECTRIC INSTALL COVER (COST /INSTALL) HEATER COST /INSTALL .BLDG. MODIFICATIONS $47,500.00 No charge to City for increasing capacity by TP &L $3,300.00 $33,000.00 $11,200.00 TOTAL GAS INSTALL LINE /BORE SOLAR PANELS/ HEATER COVER COST /INSTALL BLDG. MODIFICATIONS $81,780.00 $8,280.00 $59,000.00 $3,300.00 $11,200.00 TOTAL GAS INSTALL LINE /BORE COVER HEATERS BLDG. MODIFICATIONS $29,580.00 $8,280.00 $3,300.00 $6,800.00 $11,200.00 INSTALLATION COSTS ELECTRIC SYSTEM GAS SYSTEM GAS /SOLAR SYSTEM 3 MONTH(S) ELECTRIC ELECTRIC GAS CHLORINE SODA ASH TOTAL 1 (HEAT) (PUMPS) $ 258.00 - $ - -30.50 $'•2,105.1E 1 $ .700.00 $ 650.00 $ 258.00 $ 30.50 $1,638.50 6 $4,200..00 $3,900.00 $1,548.00 $ 183.00 $9,831.00 MONTH(S) *GAS ELECTRIC GAS CHLORINE SODA ASH TOTAL 1 $1,166.66 $- 650.00 $ 258.00 - $ - -30.50 $'•2,105.1E 6 $7,000.00 $3,900.00 $1,548.00 $ 183.00 $12,631.0C MONTH(S) GAS - ELECTRIC -GAS CHLORINE SODA ASH - - TOTAL 1 $ 215.83 $ 650.00 $ 258.00 $ 30.50 . $1,154.33 6 $1,295.00 $3,900.00 $1,548.00 $ 183.00 $6,926.00 ',OPERATION COST ELECTRIC SYSTEM GAS SYSTEM *Lone Star Gas reimburses 1 times gas bills of first year. ( GAS/SOLAR SYSTEM 1. 100 panels required. 0 4 2. Solar /gas auxillary heat would make it economically feasible to have pool_open year round. 3. Solar panels would pay for themselves (monthly saved on gas bills):in 3.1 years. 4. Solar would require expansion of fenced area (cost not included). 5. Panels would be placed on ground - may encourage vandalism. Panel replacement $550.00 each. • f,-