Loading...
R-85-784 - 11/14/1985WHEREAS, the City of Round Rock wishes to revise its Master Water & Wastewater Plan; and WHEREAS, Professional engineering services are required in connection with the revision of said Plan;, and WHEREAS, Haynie & Kallman, Inc., has submitted a proposed agreement to provide the required engineering services; and WHEREAS, the City Council desires to enter into said agreement with Haynie & Kallman, Inc., Now Therefore, BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS That the Mayor is hereby authorized and directed to execute on behalf of the City of Round Rock a letter agreement for engineering services with Haynie & Kallman, Inc., a copy of said agreement being attached hereto and incorporated herein for all purposes. RESOLVED this 14th day of November, 1985. ATTEST: NNE LA D, City Secretary RESOLUTION NO. /iJ YR MIKE ROBINSON, Mayor City of Round Rock, Texas Haynie & Kaltman, Inc. CONSULTING ENGINEERS 1106 South Mays • Round Rock, Texas 78664 • (512) 255- 7861/12212 Technology Blvd., Suite H • Austin, Texas 78727 (512) 250 -8611 Mr. Jim Nuse Director of Public Works City of Round Rock 214 E. Main Street Round Rock, Texas 78664 Dear Jim: November 12, 1985 Re: Master Water & Wastewater Plan 1985 Revision Project No. 103 -1040 Pursuant to your request, we are submitting our proposal to the City of Round Rock for preparation of a Master Water and Wastewater Plan - 1985 Revision. The Plan will incorpo- rate a planning period of approximately 10 years. The Plan will include a geographical area based on updated anticipated population distribution, including areas to the west of Round Rock, as prepared by City Staff. The scope of work is listed as follows: WATER PLAN 1. Analyze existing major facilities, including water sup- ply, ground storage, booster pump stations, elevated storage and distribution system (8" lines and larger). 2. Sizing recommendations and priorities for additional major facilities to assist in updating the City of Round Rock Urban Services Plan. 3. Computer analysis of arterial water lines (8" and larger) to assist in sizing and locating proposed lines. Assistance in getting the program up on the City's com- puter as required. 4. Preliminary cost estimates for the first 5 years of the planning period. CIVIL ENGINEERING • CONSULTANTS • MUNICIPAL ENGINEERING • LAND PLANNING • SURVEYING Page 2 Mr. Jim Nuse Director of Public Works City of Round Rock November 12, 1985 WASTEWATER PLAN 1. Sizing recommendations and priorities for additional major facilities to assist in updating the City of Round Rock Urban Service Plan. 2. Consideration of the Brushy Creek WC & ID Regional Wastewater Treatment Facility in the overall planning for this study. 3. Preliminary cost estimates for the first 5 years of the planning period. The Master Plan will be bound and will include pertinent text and exhibits. We will provide one (1) set of mylar sepias of the exhibits to the City after completion of the Plan. We will provide the City with 20 copies of the "final" Master Plan, after your office has commented on a "draft" copy of the Plan. As we discussed, we will look at including color on certain exhibits to add to their affect. We will provide the above listed services based on the attached August 1, 1985 Hourly Rate Schedule, in an amount not to exceed $25,000. We will complete these services with- in 90 days after the date of your authorization below, exclu- sive of City review time. Please sign both counterpart originals of this letter and return one to our office. Please retain the other for your files. We appreciate the opportunity to provide these services for the City of Round Rock. WVL /cla Enclosure Sincerely, AUTHORIZED BY THE CITY OF ROUND ROCK HAYNIE & KALLMAN, INC. Scott Linden, P.E. Mike Robinson, Mayor Date CLASSIFICATION SOURLY RATE 1. CORPORATE OFFICER $100 2. REGISTERED PROFESSIONAL ENGINEER $ 75 3. REGISTERED PUBLIC SURVEYOR $ 60 4. PROJECT MANAGER /HYDROLOGIST $ 55 5. ENGINEER -IN- TRAINING (E.I.T.) $ 45 6. LAND PLANNER $ 50 7. SURVEY CREW COORDINATOR $ 40 8. PROJECT REPRESENTATIVE (INCLUDES VEHICLE AND EQUIPMENT) $ 40 9. DESIGN TECHNICIAN $ 35 10. DRAFTER $ 30 11. SURVEY CALCULATION TECHNICIAN $ 40 $ 30 $ 25 14. FOUR MAN SURVEY CREW (INCLUDES VEHICLE AND EQUIPMENT) $ 80 15. THREE MAN SURVEY CREW (INCLUDES VEHICLE AND EQUIPMENT) $ 75 16. TWO MAN SURVEY CREW (INCLUDES VEHICLE AND EQUIPMENT) $ 65 17. REIMBURSEMENT FOR DIRECT NON -LABOR EXPENSE AND SUB- CONTRACT EXPENSE - COST PLUS 20% 12. TECHNICAL SUPPORT PERSONNEL 13. SECRETARIAL PERSONNEL HAYNIE & RALLMAN, INC. )iOURLY RATE SCHEDULE Revised 8 -1 -85