R-86-891 - 7/10/1986ATTEST:
ii /L//i
JOr�' E LAND, City -cretary
RESOLUTION NO. A
WHEREAS, the City of Round Rock wishes to make certain 1985 CIP
Water System Improvements; and
WHEREAS, professional engineering services are required in connection
with the said improvements; and
WHEREAS, Haynie & Kallman, Inc., submitted a proposed agreement to
provide the required engineering services; and
WHEREAS, the City Council desires to enter into said agreement with
Haynie & Kallman, Inc., Now Therefore
BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS
That the Mayor is hereby authorized and directed to execute on behalf
of the City of Round Rock an agreement for engineering services with
Haynie & Kallman, Inc., for certain 1985 CIP Water System Improvements,
a copy of said agreement being attached hereto and incorporated herein
for all purposes.
RESOLVED this 10th day of July, 1986.
MIKE ROBINSON, Mayor
City of Round Rock, Texas
4
TRANSMITTAL
TO:
City of Round
214 E. Main
Round Rock,
ATTN: Mr. Jim Nuse
'Haynie & Kaliman, Inc.
C ONSULTING ENGINEERS •
1106 SOUTH MAYS
ROUND ROCK, TEXAS 78664
lkiz .
(512) 255 -7861
DATE June 30, 1986
Rock 1985 C.I.P. Water
Street PROJECT GyG +am Tmprnvrmants
TX 78664
PROJECT NO•
WE ARE SENDING YOU THE
ATTACHED
— COPY OF LETTER
— SUBMITTAL DATA
FOLLOWING: VIA: Courier
— SPECIFICATIONS _FIELD NOTES
__ORIGINAL DRAWING — OTHER
— PRINTS
NO.
COPIES
REVISION
DATE
DESCRIPTON
2
Engineer's Cost Estimate
2
Agreement for Engineering Services
THESE ARE
For Your
TRANSMITTED
Files
and Comment
The attached
Engineering
the next
Should you
AS CHECKED BELOW:
X For Approval For Corrections
As Requested
For Review
REMARKS:
Copies to:
Approval as Noted For Distribution
— _
Approval as Submitted Other
Engineer's Cost Estimate and Agreement for
Services are forwarded for consideration at
Council meeting.
have any questions, please contact me.
From: Scott Linden. P.E.
ITEM DESCRIPTION
-------_-_-_-_-_-_-_-_-•
1. 16" ALONG IH35
(BOWMAN / HWY.620)
SUBTOTAL
5. SURVEYING
EASEMENTS
1985 C.I.F. WATER IMPROVEMENTS
TOTAL ESTIMATED PROJECT COST
ENGINEER'S COST ESTIMATE
JUNE 23.1986
UNIT
UNIT QUANTITY PRICE TOTAL COST
L.F. 5300.00 $40.00 $212,000.00
2. 16" ALONG BOWMAN
(IH35/B.S.1 L.F. M00.00 $40.00 $140,000.00
3. BORE AND ENCASEMENT L.F. 700 „ 00 $171.00 $34,200.00
TOTAL ESTIMATED CONSTRUCTION COST $=96,200.00
4. ENGINEERING FEES $34.759.00
$12
SUBTO I AL
AGREEMENT
FOR
ENGINEERING SERVICES
MADE AND ENTERED INTO by and between City of Round Rock, Texas,
hereinafter called the "Owner ", and Haynie & Kallman, Inc., Consulting
Engineers, hereinafter called the "Engineer ".
RECITALS
Owner intends to construct WATER SYSTEM IMPROVEMENTS for the 1985
C.S.P. Such improvements are hereinafter referred to as the "Project ". The
estimated cost for the Project is $440, 958.00 including construction costs,
engineering and contingencies.
CONTRACTUAL UNDERTAKINGS
SECTION I
EMPLOYMENT OF ENGINEER
The Owner agrees to employ the Engineer and the Engineer agrees to
perform professional engineering services in connection with the Project as
stated in the Sections to follow, and for having rendered such services, the
Owner agrees to pay to the Engineer compensation as stated in the Sections to
follow.
The Engineer shall render the following professional services necessary
for the development of the Project.
A. PRELIMINARY PHASE
SECTION II
CHARACTER AND EXTENT OF SERVICES
1. Attend preliminary conference with the Owner regarding the Project.
2. Perform preliminary engineering services in connection with the
Project in sufficient detail to indicate clearly the problems involved and the
alternate solutions available to the Owner, to include preliminary layouts,
sketches and cost estimates for the Project, and to set forth clearly the
Engineer's recommendations. If called for by the scope of the assignment,
prepare a preliminary engineering report.
3. When a written report is prepared, furnish the Owner with ten (i0)
copies of the preliminary report, including preliminary layouts, sketches and
cost estimates.
—1—
8. DESI(ti PHASE
1. Establish the scope and advise the Owner of any soil and foundation
investigations or any special surveys or special testing which, in the opinion
of the Engineer, may be required for the proper execution of the Project; and
arrange with the Owner for the conduct of such investigations and tests. (The
performance of these investigations and tests is not a part of the Engineer's
basic services and compensation therefor is not included in the Basic Charge;
it may be performed by the Engineer, by agreement with the Owner, in which case
compensation shall be determined by the applicable portions of Section VI D.)
2. Furnish to the Owner, where required by the circumstances of the
assignment, the engineering data necessary for applications for routine permits
by local, state and federal authorities (as distinguished from detailed
applications and supporting documents for government grants -in -aid, state loan
programs, planning advances or to meet the requirements of special programs of
the federal government).
3. Perform field surveys to collect information which, in the opinion
of the Engineer, is required in the design of the Project. Construction
staking for the Construction Improvements is not included in the Basic Charge.
4. Prepare detailed specifications and contract drawings, in pencil on
paper, for construction authorized by the Owner. These designs shall in all
respects combine the application of sound engineering principles with a high
degree of economy, and shall be submitted to the applicable state and federal
agencies for approval.
5. Prepare detailed cost estimates and proposals of authorized
construction, which shall include summaries of bid items and quantities which
will be based, wherever practical, on the unit price system of bidding. The
Engineer shall not be required to guarantee the accuracy of these estimates.
6. Furnish the Owner all necessary copies of approved plans,
specifications, notices to bidders, and proposals. All sets of plans and
specifications in excess of twenty -five (25) are to be paid for separately.
Additional sets will be paid for in accordance with Attachment No. 3 - Hourly
Rate Schedule.
7. Provide information on utilities to be relocated in connection with
the Project. The owner will provide excavation to determine location and depth
of underground water and sewer lines. Utilities to be relocated by others
shall be noted on the plans. City-owned utilities to be relocated also shall
be noted on the plans. Where feasible, relocation of City-owned utilities
shall be included in the construction contract.
8. Provide a letter for the Owner's signature to each utility operating
within the City of Round Rock advising them of the Project and describing any
known relocations to be performed by that utility and setting forth a proposed
construction schedule. This letter and a complete set of plans shall be
-2-
delivered to each utility by the Engineer. The Engineer shall provide timely
assistance and location stakes as necessary for utility relocations to assure
that utility relocations do not delay the Project.
9. Provide easement and right - of-way descriptions to the Owner in
conjunction with submission of final plans. These will be provided in the form
of field notes and drawings of the affected properties. These services will be
paid for in accordance with Attachment No. 3 - Sourly Rate Schedule.
10. Provide field note descriptions to the Owner for any site(e) that
is required for Owner to acquire that is associated with this Project. These
descriptions will be provided within thirty (30) days after authorization by
Owner, barring unforeseen and unusual difficulties associated with the
property. These services will be paid for in accordance with Attachment No. 3
- Hourly Rate Schedule.
C. CONSTRUCTION PHASE
1. Assist the Owner in the advertisement of the Project for bids.
2. Assist the Owner in the opening and tabulating of bids for
construction of the Project, and recommend to the Owner as to the proper action
on all proposals received.
3. Assist in the preparation of formal Contract Documents for the
contracts.
4. Make periodic visits to the site (as distinguished from the
continuous services of a resident Project Representative described in
Subparagraph 6 below) to observe the progress and quality of the executed work
and to determine in general if the work is proceeding in accordance with the
Contract Documents. In performing this service, the Engineer will not be
required to make exhaustive or continuous on -site inspections to check the
quality or quantity of the work or materials; he will not be responsible for
the techniques and sequences of construction or the safety precautions incident
thereto, and he will not be responsible or liable in any degree for the
contractors' failure to perform the construction work in accordance with the
Contract Documents. During visits to the construction site, and on the basis
of the Engineer's on -site observations as an experienced and qualified design
professional, he will keep the Owner informed of the extent of the progress of
the work, and advise the Owner of material and substantial defects and
deficiencies in the work of contractors which are discovered by the Engineer or
otherwise brought to the Engineer's attention in the course of construction,
and may, on behalf of the Owner, exercise whatever right the Owner may have to
disapprove work and materials as failing to conform to the Contract Documents.
5. Consult and advise with the Owner; issue all instructions to the
contractor requested by the Owner; and prepare routine change orders as
required.
-3-
6. If specifically authorized by the Owner in writing, furnish the
services of resident Project Representatives, and other field personnel for
continuous on the -site observation of construction and for the performance of
required construction layout surveys. (This service is not a part of the
Engineer's basic services and compensation therefor if not included in the
Basic Charge; if provided, compensation shall be determined under Section
VID.) The authority and duties of such Resident Project Representatives are
limited to examining the material furnished and Observing the work done, and to
reporting their findings to the Engineer. The Engineer will use the usual
degree of care and prudent judgment in the selection of competent Project
Representatives, and the Engineer will use diligence to see that the Project
Representatives are on the job to perform their required duties. It is agreed
however, that the Engineer does not underwrite, guarantee, or insure the work
done by the contractors, and since it is the contractors' responsibility to
perform the work in accordance with the Contract Documents, the Engineer is not
responsible or liable for the contractors' failure to do so, and so long as the
Engineer has exercised the usual degree of care and prudent judgment in
selecting Project Representatives and has used diligence to see that they are
on the job to perform the work, failure by any Project Representatives to
discover defects or deficiencies in the work of the contractors shall never
relieve the contractors of liability therefore or subject the Engineer to any
liability for any such defect or deficiencies.
7. Review samples, catalog data, schedules, shop drawings, laboratory,
shop and mill tests of materials and equipment and other data which the
contractor is required to submit, only for conformance with the design concept
of the Project and compliance with the information given by the Contract
Documents; and assesble written guarantees which are required by the Contract
Documents.
8. Review monthly and final estimates for payments to contractors, and
furnish to the Owner any necessary certification as to payments to contractors
and suppliers in a form acceptable to the City.
9. Conduct, in company with the Owner, a final inspection of the
Project for conformance with the design concept of the Project and compliance
with the Contract Documents, and approve in writing final payment to the
contractors.
lo. Revise contract drawings, with the assistance of the resident
Project Representatives, or the Owner's representatives, to provide record
drawings of the completed Project. Furnish one set of reproducible drawings
and one set of prints of these revised drawings to the Owner.
SECTION III
AUTHORIZATION OF SERVICES
No professional services of any nature shall be undertaken by the
Engineer under this Agreement until he has received written authorization from
the Owner.
SECTION V
PERIOD OF SERVICE
This Agreement shall be effective upon execution by the Owner and the
Engineer, and shall remain in force until termination under the provisions
hereinafter provided in Section X.
SECTION V
COORDINATION WITH THE OWNER
The Engineer shall hold periodic conferences with the Owner, or its
representatives, to the end that the Project, as perfected, shall have full
benefit of the Owner's experience and knowledge of existing needs and
facilities, and be consistent with its current policies and construction
standards. To implement this coordination, the Owner shall make available to
the Engineer, for use in planning the Project, all existing plans, maps, field
notes, statistics, computations, and other data in his possession relative to
existing facilities and to the Project.
SECTION VI
THE ENGINEER'S COMPENSATION
For and in consideration of the services to be rendered by the Engineer,
the Owner shall pay, and the Engineer shall receive the compensation
hereinafter set forth, for the Preliminary, Design, and Construction Phases of
the work and for Special Assignments and Services not included in these
phases. All remittances by Owner of such compensation shall either be mailed
or delivered to the Engineer's office in Round Rock, Texas. Where the
compensation is based on a percentage of construction cost, the charge for each
separate phase shall be based on the "construction cost" of all work authorized
by the Owner at one time, and handled by the Engineer in accordance with this
Agreement.
"Construction Cost" is defined as the total cost to the Owner for the
execution of the work authorized at one time and handled in each separate phase
of engineering services, excluding fees or other costs for engineering and
legal services, the cost of land, rights -of -way, legal and administrative
expenses, but including the direct cost to the Owner of all construction
contracts, items of construction, including labor, materials and equipment
required for the completed work (including extras) and the total value at site
of project of all labor, materials, and equipment purchased or furnished
directly by the Owner for the Project.
The aggregate of all sums paid to the Engineer for each Phase of
Construction will equal one hundred percent (100%) of the basic compensation
determined from the actual total construction cost. If the designed facilities
exceed the available funding after receiving bide or negotiating a contract
price, then the facilities which are deleted will he paid for at a later date
-5-
when they are awarded for construction. These facilities will be considered an
individual period of construction and payment will be in an amount equal to a
percentage of the ^construction cost^ of this separate Project. For example:
If the available funds will only build 90% of the designed facilities, the fee
for the awarded construction will be paid as described herein. When the
remaining 10% of the work is awarded, it will be considered a separate Project
and a percentage from the curve based on the 10% Project amount will be used to
pay the basic compensation. Considering this as an individual Project, it will
be necessary to compensate the Engineer in this manner because of the extra
work involved in the preparation of separate Contract Documents, organization
of plans, construction administration on the delayed Project, and the delay in
payment for the Engineering Services rendered.
In the event that proposals for construction of any of the work
authorized in the Design Phase are received within 90 days after submission of
completed contract drawings and specifications to the Owner by the Engineer,
the charge for the corresponding services in the Design Phase and the charge
for the corresponding services in the Preliminary Phase shall be adjusted to
the ^construction cost^ as reflected by the lowest acceptable proposal, or
lowest bona fide bid, if no contract is awarded. Where no proposal or bona
fide bids are received, the Engineer's estimate shall be the basis for final
payment for these two phases. No reduction shall be made from the Basic Charge
on account of penalties or liquidated damages or other sums withheld from
contractor's payments.
A. PRELIMINARY PHASE
Payment for services in the Preliminary Phase shall be made to the
Engineer in a sum equal to a percentage of the ^construction cost" of the work
authorized by the Owner in this phase of the Project. This percentage for the
Preliminary Phase shall be computed as ten percent (10%) of the Basic Charge,
which Basic Charge is defined by Attachment No. 1.
The classification of the construction work (Classification "A" or ^8 ^)
for the purpose of applying the alternate Basic Charge is that given in
Attachment No. 2 - Classification of Construction Work.
Final payment for services in the Preliminary Phase shall be payable
upon submission to the Owner of the required report, sketches, and estimates,
and upon his acceptance, which shall be within thirty (30) days after
submission.
if a written report is L:ot required, this payment will be due with and
in addition to payment stated in the Design Phase.
8. PESIGN PHASE
Payment for services in the Design Phase shall be made to the Engineer
in a sum equal to a percentage of the "construction cost" of the work
authorized by the Owner in this phase of the Project. This percentage for the
-6-
Design Phase shall be computed as seventy -five percent (75%)' of the Basic
Charge, which Basic Charge is defined by Attachment No. 1.
The classification of the construction work (Classification "A" or "B ")
for the purpose of applying the alternate Basic Charge is that given in
Attachment No. 2 - Classification of Construction Work.
Final payment for services authorized in the Design Phase shall be due
upon the completion of these services and upon the Owner's acceptance, which
Shall be within 30 days after submission. When the Project is funded through
the sale of municipal bonds or through grant funds, payments shall not be due
until the funds are in the Owner's possession.
C. CONSTRUCTION PHASE
Payment for services in the Construction Phase shall be made to the
Engineer in a sum equal to a percentage of the "construction cost" of the work
authorized by the Owner in this phase of the Project. This percentage for the
Construction Phase shall be computed as fifteen percent (15 %) of the Basic
Charge, which Basic Charge is defined in Attachment No. 1.
The classification of the construction work (Classification "A" or "B ")
is that given in Attachment No. 2 - Classification of Construction Work.
This sum will be paid in monthly installments in proportion to the
construction work completed, on the basis of the Engineer's estimates prepared
for monthly payments to contractors, plus the actual value of all materials and
equipment purchases or furnished directly by the Owner for the Project. Upon
completion of all work authorized in the Construction Phase the Engineer will
be paid the remainder of the charge for this Phase.
D. DIAL ASSIGNMENTS AND SERVICES NOT INCLULDED
IN ABOVE PERCENTAGE CHARGES
The charges above described in the Preliminary, Design and Construction
Phases shall provide compensation to the Engineer for all services called for
under this Agreement to be performed by him, or under his direction, except the
services set forth below. These excluded services and Special Assignments, and
the compensation to be paid by the Owner to the Engineer for their performance,
as required, are as follows:
The following services (1 through 7), if authorized by the Owner, shall
be reimbursed in accordance with Attachment No. 3 - Hourly Rate Schedule.
1. Services of a resident Project Representative, and other field
personnel as required, for on- the -site observation of construction.
2. Services for Design Surveys if not included in Basic Charge.
3. Services for Construction Layout Surveys (Construction Staking).
4. Land surveys and establishment of boundaries and monuments.
-7-
5. Preparation of property or easement descriptions.
6. Preparation of any special reports required for marketing of bonds.
7. Appearance before regulatory agencies.
8. Special investigations involving detailed consideration of
operation, maintenance and overhead expenses; preparation of rate schedules;
earnings and expense statements; special feasibility studies; appraisals;
valuations; and material audits or inventories required for certification of
force account construction performed by the Owner.
9. Additional copies of reports and specification (over 25) and
additional blue print copies (over 25).
10. Preparation of applications and supporting documents for government
grants, loans or planning advances for public works projects.
11. Assistance to the Owner as an expert witness in any litigation with
third parties, arising from the development or construction of the Project.
Basis of Compensation: $70.00 per hour in which Engineer's presence or his
representative is required by Owner. $280.00 per day minimum charge.
12. Soil and foundation investigations, including test and analyses of
test results.
Basis of Compensation: (a) Furnished by the Owner and observed by the Engineer
in accordance with Attachment No. 3 - Hourly Rate Schedule; or (b) Owner
contract separately with qualified testing firm.
13. Detailed mill, shop and/or laboratory inspection of materials or
equipment.
Basis of Compensation: (a) Furnished directly by the Owner; or (b) By Engineer
in accordance with Attachment No. 3 - Hourly Rate Schedule.
14. Extra travel required of the Engineer and authorized by the Owner
from Round Rock to points other than the State of Texas in connection with the
Project.
Basis of Compensation: Cost of travel and living expenses, plus a twenty
percent (20%) service charge. Cost of labor in accordance with Attachment No.
3 - Hourly Rate Schedule.
15. Services for location stakes associated with the Project as
necessary for utility companies operating within the City limits of Round Rock.
Payments to the Engineer for authorized services not in the basic
percentage charges will be made by the Owner, upon prccontation cf statementz
-8-
by the Engineer for such services, but not until bond or grant funds are in the
Owner's possession.
Should the Owner fail to make payment to the Engineer of the sum named
in any partial or final statement when payment is past due for more than thirty
(30) days, then the Owner shall pay to the Engineer, in addition to the sum
shown as due by such statement, interest thereon at the current prime rate of
banking institutions in Round Rock, Texas, from the date due, as provided
herein, until fully paid, which shall fully liquidate any injury to the
Engineer arising from such delay in payment, but the right is expressly
reserved by the Engineer in event payments are not promptly made as provided
herein, at any time thereafter to treat the Agreement as terminated by the
Owner and recover compensation as provided by Section X of this Agreement.
SECTION VII
pEVISION TO DRAWINGS AND SPECIFICATIONS
The Engineer will make, without expense to the Owner, such revisions of
the preliminary drawings as may be required to meet the needs of the Owner, but
after a definite plan has been approved by the Owner, if a decision is
subsequently made by the Owner which, for its proper execution, involves extra
services and expenses for changes in, or addition to the drawings,
specifications or other documents, or if the Engineer is put to labor or
expense by delays imposed on him from causes not within his control, such as by
(but not limited to) the readvertisement for bids or by the delinquency or
insolvency of contractors, the Engineer shall be compensated for such extra
services and expenses, which services and expenses shall not be considered as
covered by the percentage fee stipulated in this Agreement. Compensation for
such extra services shall be in accordance with Attachment No. 3 - Hourly Rate
Schedule. However, no extra compensation will be granted to the Engineer for
correcting errors in the plans or errors in the design of the Project or for
revising design or plans when such design and plans prove not to be feasible
for construction.
SECTION VIII
OWNERSHIP OF DOCDlE]TS
Engineer shall retain ownership of all original documents, plan designs,
and survey notes on all projects that are not completed and for which Engineer
is not compensated regardless of whether the instruments were copyrighted.
Additionally, all such documents for which Engineer is not compensated Owner
will not reuse for extensions of the original project or new projects unless
Owner shall secure the permission of the Engineer and Engineer shall be
entitled to further compensation for the use of such documents.
All original documents, plan designs, and survey notes for completed or
partially completed projects for which Engineer has been compensated shall be
the property of Owner and Engineer and reproducible copies shall be furnished
-9-
to the Owner upon request. The use by either party of such documents is
unrestricted.
SECTION IX
ARBITRATION UNDER TEIQLS GENERAL ARBITRATION ACT
A. Any controversy hereafter arising between Owner and Engineer in
connection with this Agreement and any liability or claimed liability created
hereunder or incidental hereto or pertaining to the enforcement of any
provision, condition or covenant herein shall be submitted to arbitration under
the terms of the Texas General Arbitration Act. Either party may invoke this
provision for arbitration by giving the other party notice in writing demanding
that such controversy be submitted to arbitration, which notice shall also
contain the appointment of an arbitrator by the demanding party. The party
receiving such notice of arbitration must, within five (5) days after receiving
same, mail to the demanding party a notice of appointment of a second
arbitrator. Such two arbitrators shall meet forthwith and agree in writing
upon a third arbitrator, and shall immediately give the parties written notice
of the third arbitrator's appointment.
B. If the party upon whom the demand for arbitration is served fails to
give the demanding party the required notice of the appointment of the second
arbitrator within the required five (5) days, the demanding party may apply to
the court under Article 226, Revised Statutes of 1925, to appoint the second
arbitrator. If the first two arbitrators fail to agree upon a third arbitrator
within ten (10) days from the date the second arbitrator was appointed, either
party may apply to the court, under such Article 226, for the appointment of
the third arbitrator.
C. The proceedings of the arbitrators, the award made by the
arbitrators and the endorsement of such awards shall be governed by the Texas
General Arbitration Act, Articles 224 through 238-6, inclusive, Revised
Statutes of 1925, as amended.
D. This entire Section IX providing for arbitration shall survive the
termination of this Agreement under any of its provisions, and any controversy
between Owner and Engineer existing when the Agreement terminates shall
continue to be subject to arbitration hereunder.
SECTION X
TERNINATION
Either party to this Agreement may terminate the Agreement by giving to
the other thirty (30) days notice in writing. Upon delivery of such notice by
the Owner to the Engineer, and upon expiration of the thirty -day period, the
Engineer shall discontinue all services in connection with the performance of
-10-
this Agreement and shall proceed to cancel promptly all existing orders and
contracts insofar as such orders or contracts are chargeable to this
Agreement. As soon as practicable after receipt of notice of termination, the
Engineer shall submit a statement, showing in detail the services performed
under this Agreement to the date of termination. The Owner shall then pay the
Engineer promptly that portion of the prescribed charges which the services
actually performed under this Agreement bear to the total services called for
under this Agreement, less such payments on account of the charges as have been
previously made. Copies of all completed or partially completed designs, plans
and specifications prepared under this Agreement shall be delivered to the
Owner when and if this Agreement is terminated, but subject to the
restrictions, as to their use, as set forth in Section VIII.
SECTION XI
• - *Jo «
5 <! 1.! •
All notices and communication under this Agreement to be mailed or
delivered to the Engineer shall be to the following address:
HAYNIE S KALLMAN, INC.
1106 S. Mays
Round Rock, Texas 78664
All notices and communication under this Agreement to be mailed or
delivered to the Owner shall be to the following address:
City of Round Rock
300 S. Blair
Round Rock, Texas 78664
SECTION XII
SECTION CAPTIONS
Each Section under the Contractual Undertakings has been supplied with a
caption to serve only as a guide to the contents. The caption does not control
the meaning of any Section or in any way determine its interpretation or
application.
SECTION XIII
$MULE OF COMPLETION
The Engineer will fulfill the scope of services included in the Project
in a professional and timely manner. The Owner's wishes and requirements
regarding the oroject will be conveyed through the City's Director of Public
Works, and the Engineer shall confer frequently with the Director of Public
Works throughout the Design Phase of the Project. The date for completion of
the Design Phase is 120 calendar days following the execution of this
Agreement.
The Owner and the Engineer each binds himself and his successors,
executors, administrators, and assigns to the other party of this Agreement and
to the successors, executors, administrators, and assigns of such other party,
in respect to all covenants of this Agreement. Except as above, neither the
Owner nor the Engineer shall assign, sublet or transfer his interest in this
Agreement without the written consent of the other. Nothing herein shall be
construed as creating any public body which may be a party hereto.
EXECUTED in two counterparts (each of which is an original) on behalf of
the Engineer by its Vice- President shown below, and n behalf o the Owner by
its Mayor (thereunto duly authorized) this the / C day of
19_ .
Attest:
Attest:
ne Land, City Secretary
SECTION XIV
SUCCESSORS AND ASSI0s
CITY OF ROUND RDCA
-12-
Mike Robinson, Mayor
HAYNIE S RALtI4AN, INC.
p.Gfa -4A S
Steven D. Xallman, P.E., R.P.S.
Vice- President
P
NOtES: .
(1) When Construction Cost is under $100,000, use the
"Basic Charge-Percent" Column for Curve "A" or
Curve "B" as is applicable for ;100.000 Construc-
• ' tion Cost line.
(2) Construction Cost below is the work authorized at
• one time. However, Where the work is to be accom-
pllshed in a number of separate construction con-
tracts, then each such project element should be
84
13
r
/1
a
se
•
f
•
•
•
•.00 • 1
rnmerwairvinm rncr
0 "
evaluated on an individual basis, with additional
compensation to the Engineer.
(3) Curve "A" and Curve "B" are consistent with Curve
"A" and Curve "B" in Manual 45, published by the
American Society of Civil Engineers.
(4) The "Basic Charge-Percent." Column shall be roundel
to the nearest tenth of a percent.
f
111111 1. lflnI Se w.... , • nn
10
•
100
e
R
v
�
rn
C
i
rn
H
CCP
z
,
1
1
'
11111
1111
111111
•
1111
��
■■
111111111111
■
■
111i�■
1
m
■
11.111
■ 1
INIIIIIIIIIIN
■■
1
1
i
■■■1111
■
HMI
1111111111111
■■
111111
■1111
■1111
r
■■
'
■ MUM
■■lIll
1111111111111.
,
■■
■1111
■■11
�
■■■■1111
■
■
■■
■■■1111
■
■1111
■11111
.
'
■
■■/lui
.■/1111
11111
MI
■
��
� ■il1■11111111110
��
UN
.
.
■■ ■ 11111■11111
■ ■I 1111_i�Iilli
M►
111
■.
■Ulll
1111
c %,
■■11!1
11111
1111
S
��■
�■
��■■�
��■■■
��
■
■■ ■ 1111
■■ 1111
■■� 1111�■■■■1111 �
■ ■� 1111
■
■�■lli:,
NI
■■1111
�uii
1111
■ R1111M1
∎■■■1111
i■lili
1,rIVAMI
Hill
es
�
■■■
■■■
■1111
■1111
1111
..1.•••••
■■■1111
■■
-■
•
111
■■ ■ ■1=
■■
niu
1111
1111
�■ ■■■1111
■■� 1111�■■
N
1111
1111
1
1
P
NOtES: .
(1) When Construction Cost is under $100,000, use the
"Basic Charge-Percent" Column for Curve "A" or
Curve "B" as is applicable for ;100.000 Construc-
• ' tion Cost line.
(2) Construction Cost below is the work authorized at
• one time. However, Where the work is to be accom-
pllshed in a number of separate construction con-
tracts, then each such project element should be
84
13
r
/1
a
se
•
f
•
•
•
•.00 • 1
rnmerwairvinm rncr
0 "
evaluated on an individual basis, with additional
compensation to the Engineer.
(3) Curve "A" and Curve "B" are consistent with Curve
"A" and Curve "B" in Manual 45, published by the
American Society of Civil Engineers.
(4) The "Basic Charge-Percent." Column shall be roundel
to the nearest tenth of a percent.
f
111111 1. lflnI Se w.... , • nn
10
•
100
e
R
v
�
rn
C
i
rn
H
CCP
z
Earthwork
ATIITP NO. 2
CLASSIFICATION OF CONSTRUCTION WORK
CURVE A will apply to assignments of Which the following are typical examples
(payment for design surveys included with below assignments except where shown
otherwise):
Water treatment plants
Sewage and industrial waste treatment plants
Sanitary sewage collection lines under 24" diameter
Water pumping stations
Sewage lift stations
Open- section streets, no curb and gutter, and associated drainage
improvements (NO DESIGN SURVEYS INCLUDED IN BASIC CHARGE)
Curb and gutter, streets and associated drainage improvements
Bridges, box culverts and major drainage structures
Water distribution lines 12" and larger (on Curve "A" due to profile
being required on Plans)
Water storage tank renovation, including repainting, yard piping,
or tank appurtenances
CURVE B will apply to less complicated assignments of which the following are
examples (payment for design surveys included with below assignments except
where shown otherwise):
Sanitary sewage collection lines 24" diameter and over
Water distribution lines under 12"
Water storage tanks (elevated and ground storage and standpipes)
Storm sewers 24" diameter and over
<MHRS> HAYNIE & KAI.LMAN. INC.
SOURLY RATE SCHEDULE
CLASSIFICATION RATE
1. Corporate Officer $100
2. Registered Professional Engineer $ 75
3. Registered Public Surveyor $ 60
4. Project Manager /Hydrologist $ 55
5. Engineer -in- Training (E.I.T.) $ 45
6. Land Planner $ 50
7. Survey Crew Coordinator $ 40
8. Project Representative (includes $ 40
(includes Vehicle and Equipment)
9. Design Technician $ 35
10. Drafter $ 30
11. Survey Calculation Technician $ 40
12. Technical Support Personnel $ 30
13. Secretarial Personnel $ 25
14. Four Man Survey Crew
(includes Vehicle and Equipment) $ 80
15. Three Man Survey Crew
(includes Vehicle and Equipment) $ 75
16. Two Man Survey Crew
(includes Vehicle and Equipment) $ 65
17. Reimbursement for Direct Non -Labor Expense
and Subcontract Expense - Cost Plus 20%
Revised 8 -1 -85
DATE: July 8, 1986
SUBJECT: Council Agenda, July 10, 1986
ITEM: 9D - Consider a resolution authorizing the Mayor to enter into an
agreement with Haynie & Kallman, Inc. for engineering services for
the 1985 CIP Water System Improvements.
A water improvement project which directly links the surface water
plant to the McNeil booster pump station is necessary. Funds for this
project were part of the recent bond program. The project cost is
estimated to be about $400,000.