Loading...
R-86-892 - 7/10/1986ATTEST: NE LAND, City ecre ary RESOLUTION NO. Q j it/e., WHEREAS, the City of Round Rock wishes to construct a pedestrian bridge across Lake Creek; and WHEREAS, professional engineering services are required in connection with said project; and WHEREAS, HGE, submitted a contract to provide said engineering services; and WHEREAS, the City Council desires to enter into said contract with HGE, Now Therefore BE IT RESOLVED BY THE COUNCIL OF THE CITY OF ROUND ROCK, TEXAS That the Mayor is hereby authorized and directed to execute on behalf of the City of Round Rock a contract for engineering services with HGE for a pedestrian bridge across Lake Creek, a copy of said contract being attached hereto and incorporated herein for all purposes. RESOLVED this 10th day of July, 1986. MIKE ROBINSON, Mayor City of Round Rock, Texas 600 1H 1,5 Scuth Round Rock, Texs78681 512//44- i 546 • Hagood • Griffin Engineers June 24, 1986 Ms. Sharon Prete, Director City of Round Rock Department of Parks and Recreation 214 East Main Round Rock, Texas 78664 Re: Engineering Proposal Lake Creek Pedestrian Bridge Dear H.B. Prete: I an pleased to present this proposal /contract for professional engineering services for the above referenced project. This project consist of a pedestrian bridge across Lake Creek adjacent to Deepwood Drive. The bridge will be approximately 125' long. The following is a scope of services HGE is proposing to provide: STRUCTURAL ENGINEERING SERVICES: 1. Engage the services of a Geotechnical Consultant to drill two borings (one at each abutment); and provide a log of borings which will indicate depth of adequate bearing strata. 2. Investigate level of 25 year flood, to set bridge elevation. 3. Preform limited topographic survey of approach areas for the construction plans. 4. Prepare specifications for the pre — engineered pedestrian bridge. 5. Prepare construction plans for the bridge abutments and approaches. 6. Prepare Bid Documents for construction of the bridge and execute Contract for Construction between Owner and Successful Contractor. 7. Prepare Statements of Probable Construction Cost for Owner review. 8. Provide shop drawing review of bridge structure. 9. Provide three site visits to assure conformance of construction to design. Civil & Structural Engineering Page 2 Lake Creek Pedestrian Bridge Ms. Sharon Prete June 24, 1986 ITEMS SPECIFICALLY EXCLUDED: 1. Plans for hike and bike trails to and from bridge approach. 2. Construction stake out of abutments. The following services will be performed for the lump sum fee of $5,935.00. We are able to start our services upon written acceptance of this proposal. We will bill you monthly for services performed. In order to insure the orderly and continuous progress of the project, we expect payment of our bills by the 10th of the month following date of our billing. Work performed outside the scope of services defined above will be billed on an hourly basis of direct personnel expense times a multiplier of 2.65. Principal's time will be billed at $65.00 per hour. If you agree with the terms of this proposal /contract and the attached General Provisions, please sign both proposals, initial the General Provisions, and return one complete contract to me. Please retain the second contract for your files. Thank you for the opportunity to submit this proposal and your cooperation. H.G.E. looks forward to working with you and a successful project. Sincerely, Terry R. Hagood, P.E. Principal Enclosures TRH /sh Accepted: Mike Robinson, Mayor, City of Round Rock Date GENERAL PROVISIONS All documents including drawings and specifications prepared by engineer pursuant to this agreement are instruments of service in respect of the project. They are not intended or represented to be suitable for reuse by client or others on extensions of the project or on any other project. Any reuse without written verification or adaptation by engineer for the specific purposes intended will be at client's sole risk and without liability or legal exposure to engineer; and client shall indemnify and hold harmless engineer from all claims, damages, losses and expenses including attorneys' fees arising out of or resulting therefrom. Any such verification or adaptation will entitle engineer to further compen- sation at rates to be agreed upon by client and engineer. If client fails to make any payment due engineer for services and expens- es within thirty days after receipt of engineer's bill therefor, the amounts due engineer shall include a charge at the rate of 11 per month from said thirtieth day, and in addition, engineer may, after giving seven days' written notice to client, suspend services under this agree- ment until he has been paid in full all amounts due him for services and expenses. The obligation to provide further services under this agreement may be terminated by either party upon seven days' written notice in the event of substantial failure by the other party to perform in accordance with the terms hereof through no fault of the terminating party. In the event of any termination, engineer will be paid for all services rendered to the date of termination, all reimbursable expenses and termination ex- penses. Client and engineer each binds himself and his partners, successors, executors, administrators, assigns and legal representatives to the other party of this agreement and to the partners, successors, executors, administrators, assigns, and legal representatives of such other party, in respect to all covenants, agreements and obligations of this agree- ment. Neither client nor engineer shall assign, sublet or transfer any rights under or interest in this agreement without the written consent of the other. Nothing herein shall be construed to give any rights or benefits hereunder to anyone other than client and engineer. DATE: July 8, 1986 SUBJECT: Council Agenda, July 10, 1986 ITEM: 9E - Consider a resolution authorizing the Mayor to enter into an agreement with HGE for engineering services for a pedestrian bridge over Lake Creek. The pedestrian bridge is a planned CIP Project for fiscal 85 -86. The purpose of the bridge is to facilitate pedestrian school traffic and leisure time activities. Public Works has approved the construction of a pedestrian bridge over Lake Creek and has reviewed the agreement with Hagood • Griffin Engineers (HGE). Staff recommends that the Mayor be authorized to enter into this agreement. RCA) HIKE 481KE r1rnL. gyp' ■ DEE Pwoob Y W uj d v NoT To SCALE